GLAST Large Area Telescope: W.B.S Electronics, Data Acquisition & Flight Software. Gamma-ray Large Area Space Telescope

GLAST Large Area Telescope:

GLAST Large Area Telescope

GLAST Large Area Telescope Monthly Mission Review

SLAC (650) DAQ & FSW

GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 09/27/05

Monthly Mission Review. TVAC at NRL? Status. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope

Monthly Mission Review. Project Status Overview. June 6, Ken Fouts SLAC Gamma-ray Large Area Space Telescope

GLAST Large Area Telescope: TEM/TPS TRR

Monthly Mission Review. Project Status Overview. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope

Integrated Space Systems

Process. Summary results. RFA Status

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Preston s Edmond Market Report

Spacecraft Simulation Tool. Debbie Clancy JHU/APL

Status update of Beam pipe. S. Tanaka KEK

2018 HR & PAYROLL Deadlines

SWISS reports stable load factors

NCC Cable System Order

Normet 1610B CT0032. This unit was not running and may need to be lifted on to transport.

Technical Review Agenda

Gamma-ray Large Area Space Telescope

MPCS: Develop and Test As You Fly for MSL

MAR DASHBOARD MAR. Compliant % Breakdown Mar % Late % On-time MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Western University Unsealed Nuclear Substance Contamination Monitoring Record

Stand-Alone Bubble Detection System

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings.

Customer Responsibilities. Important Customer Information Series Q-TOF LC/MS Systems Site Preparation Checklist

ASE SOLVENT CONTROLLER INSTALLATION INSTRUCTIONS Dionex Corporation

May08 Rev B

September 2017 MLS Statistical Report. Residential Inventory

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

Proton Monitor Thermal Vacuum Test Procedure GP-B P0635

MEDIA KIT inside sport. ahead of the game

DIY - PC - Interface for Suunto Cobra/Vyper/Mosquito

Forecasting and Visualisation. Time series in R

Applied Compression s nitrogen generator packages offer users a cost-effective alternative to costly bottled nitrogen.

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY

Deccan Charters Private Limited

State of American Trucking

JAN DASHBOARD. Positive Response Compliance JAN. Compliant Tickets : On-Time Performance Analysis. January % Late.

Hospitality Outlook Asheville, NC

Company A Company A. Company A Board Meeting Presentation 12 th May 20XX

Features. Main Voltage: Vdc. Input Control Signal: 0-5 Vdc or 4-20 madc (Sourcing) Monitor Output Voltage: 0-5 Vdc or 4-20 madc (Sourcing)

Nenescape. A Heritage Lottery Funded Landscape Partnership. 15 Partnership Projects. Phase I Project Development Jan-16 to May-17

Manufacturers Continue Capacity Expansion as Technology Orders Grow

Hospitality Outlook Asheville, NC

PROPOSED EP BOWLS CALENDAR; January 2019 Version 2 Approved 22 November 2018

PEAPOD. Pneumatically Energized Auto-throttled Pump Operated for a Developmental Upperstage. Test Readiness Review

Safety Manual VEGAVIB series 60

Wind Resource Assessment for DEADHORSE, ALASKA

GAS ANALYSER OXYBABY 6.0 for O 2. or O 2 /CO 2

Wind Resource Assessment for KING SALMON, ALASKA

NASDAQ DUBAI TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2)

Jillian C. Burgoyne Syracuse University. IAC Student Webinar March 25, 2015

490 Micro GC Site Preparation Checklist

TEL/jlRE" Introduction. Display Features and Modes. Startup Procedure. Power-Up Procedure. Adjustment Modes

Steel Market Outlook. AM/NS Calvert

Stock Market Handbook

Thermal Profiling the Reflow Process

HumiSys HF High Flow RH Generator

Estimation of polluted area in case of potential leakage of the chemical munitions

GAZIFÈRE INC. Prime Rate Forecasting Process 2015 Rate Case

Utah Ag Bankers Conference Alfalfa and Dairy Outlook

AGENDA AIRPORTS BOARD Thursday February 15, :30 p.m. Beaufort County Government Building, County Council Chambers

Auckland Transport Monthly Indicators Report 2018/19

Gravity Probe-B System Reliability Plan

IOC Overview. Overview Requirements WBS Organization Development Plan MO&DA Plan Prototyping and Trade Studies Conclusions

3. EXCEL FORMULAS & TABLES

User s Manual EJX/EJA-E Series NEPSI Certification [Option code: /NF2, /NS21, /NS24 and /NS25] IM 01C25A00-12E

DEC DASHBOARD. Positive Response Compliance DEC. Compliant Tickets : On-Time Performance Analysis. December % Late.

BEST KNOWN METHODS. Transpector XPR3 Gas Analysis System. 1 of 6 DESCRIPTION XPR3 APPLICATIONS PHYSICAL INSTALLATION

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013

May 2018 MLS Statistical Report

Alphasense 4-20 ma transmitters offer convenience and easy maintenance for toxic sensors:

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

TEC Petal Integration & Lt Pilot Centres

Nasdaq Dubai AED TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2)

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

FREEDOM OF INFORMATION REQUEST

HASTAC High stability Altimeter SysTem for Air data Computers

Cooling NI Single-Board RIO Systems Appendix: Reference Examples NI sbrio-9605/6

Manual of SF6 Comprehensive Tester

UK Integrated Behaviour Change Programmes

WIM #36 MN 36 MP 15.0 LAKE ELMO APRIL 2014 MONTHLY REPORT

MIL-STD-883G METHOD

TR Page 1 of 21 QD30revD

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

OMNISPORT 2000 SWIMMING QUICK REFERENCE

Nothing's as cool, as a freshwater pool. easychem 770 ORP and ph Controller for Pools and Spas with Timer Output for Pool Pump

MASK INTEGRITY TEST ACCESSORY (MITA) MODEL 8120

combustion efficiency monitoring General Purpose Applications Flue gas oxygen analyzers Combustion & Environmental Monitoring An Company

Calibration Gas Instrument INSTRUCTION MANUAL. Release I. Advanced Calibration Designs, Inc.

HPFM GEN3 - High Pressure Flow Meter

Drought and the Climate of the Ogallala Aquifer

WATER WELL DRILLER AND PUMP INSTALLER LICENSING REPORT ADVISORY BOARD MEETING January 5, 2018

Transcription:

Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 June Monthly Review Gunther Haller haller@slac.stanford.edu (650) 926-4257 4.1.7 DAQ & FSW V2 1

TEM/TPS Status & Schedule Status Qual unit used for FM CAL testing was sent back to SLAC (to be discussed what do with it) A & B at I&T on tower A and B #1 thru #5 delivered to I&T #6, #7: ready to be reviewed and handed to I&T #8, #9: finished TV, need final test and review #10, #11: started TV, rdy for I&T next Tuesday #12: rdy for TV #13-#19: in works TEM Module status: Last pre-coat TEM was received at SLAC, tested, sent back to GT Remaining work is Two Crystek connector problems already being repaired One Crystek connector problem to be repaired TPS Modules: Last TPS pre-coat module was received at SLAC, is being modified and will be sent back to assembler this week. 4.1.7 DAQ & FSW V2 2

PDU Status and Schedule 2 Schedule for first unit Operated in thermal chamber over temperature, worked Shipped back to assembler Removed internal EGSE harness Conformal coated boards Mounted boards in enclosure Flight harness is being assembled in enclosure Put on side box is much ahead of GASU/LCB/SIB/CPS (bottle-neck) Should get back to PDU July 9 (once GASU, LCB, SIB, LCB are shipped, plus there is 1 week shut-down at assembler for inventory) Estimated delivery to SLAC Jul 25 Estimated delivery to I&T Sept 5 2 nd unit lags by 6 weeks 4.1.7 DAQ & FSW V2 3

GASU Status and Schedule First Unit Surface-mount assembly (SMT and manual) completed Flying-probe testing completed GASU power supply and GASU DQ boards (2 each) integrated into enclosure EGSE harness being assembled into enclosure Scheduled ship date (pre-coat): June 30 Estimated Delivery of final box at SLAC: Sept 15 Estimated delivery to I&T: September 27 Schedule for 2nd unit Estimated delivery to I&T: 6 weeks after delivery of first unit 4.1.7 DAQ & FSW V2 4

SIU/EPU Status and Schedule Status Issues with voids in ccpi connector assembly joints Assembled one each (SIB, LCB, CPS) plug-in board 3 backplanes assembled Pre-coat boards are to be sent to GSFC for X-ray early next week Then boards go into functional testing and crate assembly/testing The SIB is guaranteed non-flight since it contains contaminated EEPROM s In parallel SLAC will perform some qual testing (vib/tc) of LCB/CPS, backplanes to show that >60% fill is sufficient In parallel some blank test-boards were sent to SAI to assemble connectors Results not in yet EEPROM for SIB: Have now enough approved parts for 5 boards (fly 5) Any additional ones required new parts, not schedule from Austin Schedule Oct 14 for first crate, but not flight Nov 16 first flight crate to I&T, Dec 14 for 5 th Assumes Aug 4 start date for connector assembly on flight boards 4.1.7 DAQ & FSW V2 5

Harness & heater Contol Box Harness in assembly, close to be complete Heater Control box PCB s received (passed coupon testing) Assembly contract placed Part kit sent to assembler Bottle-neck with other jobs (overall issue due to effort put in ccpi assembly tests) 4.1.7 DAQ & FSW V2 6

Thermo-testing support Estimated completion for the whole package is next Friday. The whole package includes: Completing FSW interface, LATTE interface, Power interface (DONE) Completing assembly of test stand as standalone unit (done by 6/29 AM) Completing documentation package: Interface test (done by 6/28 PM) Acceptance test procedure (done by 7/1 PM) User's manual (done by 7/6 PM) Complete signoff on documentation (done by 7/7 PM) Running acceptance test with Lockheed "witness" (scheduled for 7/8) Then, we just need to ship it to Lockheed and re-test it when it gets off the truck (7/12). 4.1.7 DAQ & FSW V2 7

VSC Six prototypes up and running in the dataflow lab In use by FSW and FSW/Test (they are executing actual test-scripts) Work on VSC has halted (since 2 weeks ago) pending GASU flight setup, LCB flight setup and TV testing Main Focus is (was) on: 1) production (cables, science interface and checkout of analog monitoring) 2) usage of GPS system (last item to provide *stable* timing, doesn't add functionality) 3) specification of new 1553 driver to support timing (done and coded by Dan as of Monday) 3) resolution of issues concerning fidelity of VSC simulation with respect to real space-craft Currently, none of these items are impacted the ability of VSC users to get on with their jobs, however, 3) is a big ticket item, as the lack of information about the spacecraft has lead to an inadequate simulation and will necessitate both a re-design and re-coding of the VSC and Proxy software. Mike H, in his spare cycles, worked out the re-design and has been communicating closely with all affected users and we are working out a migration plan. First step is an upgrade of the document, which is almost complete 4.1.7 DAQ & FSW V2 8

Tech Issues Larger TPS ripple issue resolved, potentially have small ripple at certain loads/voltage settings (could also be removed with resistor change, to be decided) AUSTIN EEPROM DPA problems Received parts for 5 boards (and parts passed DPA) No schedule yet for additional parts Qualification of ccpi press-fit connector assembly using solder process Need to work on closing open FPGA review items 4.1.7 DAQ & FSW V2 9

Level 3 Milestone Count 60 50 Plan Actual Forecast 40 M ilestones 30 20 10 0 FEB05 M AR05 APR05 M AY05 JUN05 JUL05 AU G 05 SEP05 O C T05 NOV05 4.1.7 DAQ & FSW V2 10

Level 3 Milestone List N Activity Description 4.1.7 Electronics Elex Ground Support Equipment Baseline Finish -2m -1m l Bsln Early Finish Final EGSE incl S/C Sim, FSW-Elec 04/01/05-20 -41-60 06/27/05 TEM/PS A Flight TEM Assy A: Elec to I&T 02/17/05 0 0 0 02/17/05A 2005 2006 FEMAAPMAJUJUAUSEOCNODEJAFEMAAPMAJU Flight TEM PS Assy A: Elec to I&T 02/17/05 0 0 0 02/17/05A TEM/PS B Flight TEM Assy B: Elec to I&T 03/07/05* -2-2 -2 03/09/05A Flight TEM PS Assy B: Elec to I&T 03/07/05* -2-2 -2 03/09/05A TEM/PS 1 Flight TEM Assy 1: Elec to I&T 04/22/05 0-17 -19 05/19/05A Flight TEM PS Assy 1: Elec to I&T 04/22/05 0-17 -19 05/19/05A TEM/PS 2 Flight TEM Assy 2: Elec to I&T 04/29/05 0-12 -14 05/19/05A Flight TEM PS Assy 2: Elec to I&T 04/29/05 0-12 -14 05/19/05A TEM/PS 3 Flight TEM Assy 3: Elec to I&T 05/06/05 0-12 -18 06/02/05 Flight TEM PS Assy 3: Elec to I&T 05/06/05 0-12 -18 06/02/05 TEM/PS 4 Flight TEM Assy 4: Elec to I&T 05/13/05 0-7 -15 06/06/05 Flight TEM PS Assy 4: Elec to I&T 05/13/05 0-7 -15 06/06/05 Run Date 06/23/05 16:47 Data Date 06/01/05 Primavera Systems, Inc. GLAST LAT PROJECT Level 3 Milestones Baseline iance (Organized by Subsystem) LT-DZ: Baseline iance FL-D4: AV: Level 3 Milestones Report #10 Sheet 6 4.1.7 DAQ & FSW V2 11

Level 3 Milestone List N Activity Description Baseline Finish -2m -1m l Bsln Early Finish TEM/PS 5 Flight TEM Assy 5: Elec to I&T 05/20/05 0-7 -10 06/06/05 2005 2006 FEMAAPMAJUJUAUSEOCNODEJAFEMAAPMAJU Flight TEM PS Assy 5: Elec to I&T 05/20/05 0-7 -10 06/06/05 TEM/PS 6 Flight TEM Assy 6: Elec to I&T 05/27/05 0-2 -10 06/13/05 Flight TEM PS Assy 6: Elec to I&T 05/27/05 0-2 -10 06/13/05 TEM/PS 7 Flight TEM Assy 7: Elec to I&T 06/06/05 0-2 -9 06/17/05 Flight TEM PS Assy 7: Elec to I&T 06/06/05 0-2 -9 06/17/05 TEM/PS 8 Flight TEM Assy 8: Elec to I&T 06/13/05 0 3-4 06/17/05 Flight TEM PS Assy 8: Elec to I&T 06/13/05 0 3-4 06/17/05 TEM/PS 9 Flight TEM Assy 9: Elec to I&T 06/20/05 0 3-4 06/24/05 Flight TEM PS Assy 9: Elec to I&T 06/20/05 0 3-4 06/24/05 TEM/PS 10 Flight TEM Assy 10: Elec to I&T 06/27/05 0 8 1 06/24/05 Flight TEM PS Assy 10: Elec to I&T 06/27/05 0 8 1 06/24/05 TEM/PS 11 Flight TEM Assy 11: Elec to I&T 07/05/05 0 8 1 07/01/05 Flight TEM PS Assy 11: Elec to I&T 07/05/05 0 8 1 07/01/05 Run Date 06/23/05 16:47 Data Date 06/01/05 Primavera Systems, Inc. GLAST LAT PROJECT Level 3 Milestones Baseline iance (Organized by Subsystem) LT-DZ: Baseline iance FL-D4: AV: Level 3 Milestones Report #10 Sheet 7 4.1.7 DAQ & FSW V2 12

Level 3 Milestone List N Activity Description Baseline Finish -2m -1m l Bsln Early Finish TEM/PS 12 Flight TEM Assy 12: Elec to I&T 07/12/05 0 13 6 07/01/05 2005 2006 FEMAAPMAJUJUAUSEOCNODEJAFEMAAPMAJU Flight TEM PS Assy 12: Elec to I&T 07/12/05 0 13 6 07/01/05 TEM/PS 13 Flight TEM Assy 13: Elec to I&T 07/19/05 0 13 6 07/11/05 Flight TEM PS Assy 13: Elec to I&T 07/19/05 0 13 6 07/11/05 TEM/PS 14 Flight TEM Assy 14: Elec to I&T 07/26/05 0 18 11 07/11/05 Flight TEM PS Assy 14: Elec to I&T 07/26/05 0 18 11 07/11/05 TEM/PS 15 Flight TEM Assy 15: Elec to I&T 08/02/05 0 18 11 07/18/05 Flight TEM PS Assy 15: Elec to I&T 08/02/05 0 18 11 07/18/05 TEM/PS 16 Flight TEM Assy 16: Elec to I&T 08/09/05 0 23 16 07/18/05 Flight TEM PS Assy 16: Elec to I&T 08/09/05 0 23 16 07/18/05 Elex Global Items Flight PDU Box-Elec to I&T 07/01/05-13 -36-64 10/03/05 Flight Harness-Elec to I&T 07/05/05 0 0-8 07/15/05 Flight GASU Box-Elec to I&T 07/19/05-19 -36-42 09/16/05 LCB Flight Units - Elec to Elec 07/20/05-16 -18-44 09/21/05 Flight Event Processor Units-Elec to 08/19/05-16 -11-43 10/20/05 Run Date 06/23/05 16:47 Data Date 06/01/05 Primavera Systems, Inc. GLAST LAT PROJECT Level 3 Milestones Baseline iance (Organized by Subsystem) LT-DZ: Baseline iance FL-D4: AV: Level 3 Milestones Report #10 Sheet 8 4.1.7 DAQ & FSW V2 13

Level 3 Milestone List N Activity Description Baseline Finish -2m -1m l Bsln Early Finish Elex Global Items 1st Flight EPU/SIU-Elec to I&T 08/19/05-16 -11-38 10/13/05 2nd Flight EPU/SIU-Elec to I&T 08/24/05-16 -11-40 10/20/05 3rd Flight EPU/SIU-Elec to I&T 08/26/05-15 -10-41 10/25/05 4th Flight EPU/SIU-Elec to I&T 08/30/05-16 -11-44 11/01/05 5th Flight EPU/SIU-Elec to I&T 09/02/05-14 -9-46 11/08/05 Flight Software Demo: Spacecraft Interfaces 02/14/05 0 0 0 02/14/05A Demo: Thermal Control 02/16/05 0 0 0 02/16/05A Demo: Inter-task Communications 03/11/05-25 -25-25 04/15/05A Demo: Housekeeping 03/18/05-30 -37-37 05/10/05A Demo: Event Filtering 03/23/05 9 9 9 03/10/05A Demo: Watchdog 04/15/05-5 -15-15 05/06/05A Demo: Mode Control 04/22/05-20 -29-44 06/24/05 Demo: Charge Injection Calibration 04/29/05-20 -29-44 07/01/05 Demo: Event Integrity and Delivery 05/06/05-19 -29-24 06/10/05 Demo: Diagnostics 05/06/05-19 -29-47 07/14/05 Demo: GRB Detection and Response 05/20/05-14 -48-48 07/29/05 2005 2006 FEMAAPMAJUJUAUSEOCNODEJAFEMAAPMAJU Run Date 06/23/05 16:47 Data Date 06/01/05 Primavera Systems, Inc. GLAST LAT PROJECT Level 3 Milestones Baseline iance (Organized by Subsystem) LT-DZ: Baseline iance FL-D4: AV: Level 3 Milestones Report #10 Sheet 9 4.1.7 DAQ & FSW V2 14

Cost Report Reporting Cost Incurred Estimated Cost Estimated Final Unfilled Category Cost Orders During Month Cum. to Date Detail Balance of Contractor Contract Outstanding Actual Planned Actual Planned JUN05 JUL05 Contract Estimate Value 4.1.7 ELECTRONICS 4.1.7 ELECTRONICS 0 0 353 354 0 0 1 354 354 0 4.1.7.1 ELECTRONICS MANAGEMENT 39 46 1,919 1,879 49 44 57 2,069 2,069 0 4.1.7.2 RELIABILITY & QUALITY ASSURANCE 0 0 223 220 0 0-3 220 220 0 4.1.7.3 ELECTRONICS SYSTEM DESIGN 0 0 733 733 0 0 0 733 733 0 4.1.7.4 DATAFLOW ELECTRONICS (TEMs + PROCESSOR FAR 152 338 10,043 10,263 183 170 402 10,797 10,797 342 4.1.7.5 SPACECRAFT INTERFACE UNIT 29 286 1,670 1,933 178 66 341 2,256 2,256 202 4.1.7.6 POWER CONDITIONING 68 126 2,055 2,289 82 4 234 2,375 2,375 183 4.1.7.7 ENCLOSURES 13 0 679 643 0 0-37 643 643 7 4.1.7.8 CABLE HARNESS 24 106 333 593 49 7 260 649 649 253 4.1.7.9 FLIGHT SOFTWARE 230 188 5,505 5,413 178 98 54 5,835 5,835 8 4.1.7.A EGSE & OPERATIONS 0 0 2,491 2,573 0 0 81 2,573 2,573 17 4.1.7.C INSTRUMENT INTEGRATION & TEST 44 46 144 202 49 44 155 392 392 17 CAPW[3]Totals: 597 1,137 26,148 27,094 767 434 1,546 28,894 28,894 1,029 4.1.7 DAQ & FSW V2 15

40.0 35.0 30.0 25.0 20.0 15.0 GLAST LAT Project Monthly Review, June 30, 2005 FTE Report (DOE/NASA-funded only) 10.0 5.0 PLANNED ACTUALS 0.0 FEB05 MAR05 APR05 MAY05 JUN05 JUL05 AUG05 SEP05 4.1.7 DAQ & FSW V2 16

FTE iance Explanation In general delays at flight assembler, caused mainly by unexpected large effort put into cpci assembly tests Caused delays of all modules at that assembler since resources were concentrated on connector tests Because of delays man-power to test can not be reduced at this time, since tests are still outstanding Impact in schedule and cost 4.1.7 DAQ & FSW V2 17