Sand Court Facilities. Pictures and Specifications

Similar documents
European Handball Federation TM EHF Beach Handball Commission

Specifier Note: Retain or delete material(s) below to conform to project requirements.

YOUR ISTRC SYSTEM REPORT CITY FREDERICKSBURG Mr. Bill Hanna

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING

ASBA MULTI-FIELD FACILITY AWARDS APPLICATION. Please complete the following or refer to site plan.

Pressure Compensating (PC) Spray Stakes

Beach Volleyball Skills Recommended Baseline

Method of Test for Sieve Analysis

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

League Name Age Division/Grade Division Gender. TVAVA Neptune League Grades 4th through 6th Coed

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

BASICS OF ASPHALT PAVING: SCREEDS. Kevin Jeske Great Lakes Regional Manager

Appendix A Test Pit Logs

1.3 Pedestrian Environments

FACILITY NAME: ASBA SINGLE FIELD FACILITY AWARDS APPLICATION. New Construction Upgrade of Existing Facility. Date of completed project:

Chapter 5. General Site and Building Elements

2017 NCAA College Beach Volleyball

How to Become A Beach Volleyball Official

Design Guide. Table of Contents

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

2018/2019 CAROLINA REGION JUNIOR TOURNAMENT DIRECTOR INFORMATIONAL WEBINAR. December 12, 2018

Kintrol Instructions for Use Product Number: VS4

Summary of Findings and Historical Commentary

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

April This report was compiled by Soil & Dust Solutions Pty Limited Tel:

AGGREGATE INFORMATION

FIELD EVENTS DIAGRAMS

Kinterra Instructions for Use Product Number: ROM-00-XXXXX-XX

ProGreen International PG Augusta Putting Green Installation Instructions

Expanding Your Tennis Court Knowledge

Magnetic Tape Installation Straight guide tape, embedded magnetic bar, curve segments HG A

CHRVA Outdoor Club Directors Primer

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

Clayton Hubbs, Stabilizer Solutions, Inc. Barney Lopas, L.A. Angels of Anaheim Grant Trenbeath, Arizona Diamondbacks

TECHLINE HCVXR AND CV DESIGN GUIDE DRIPLINE FOR SUBSURFACE AND ON-SURFACE

RENOVATION MASTER PLAN

2 / 1 DAYS BVB / 52. COURT INSPECTION CHECKLIST (to be completed by the relevant Referees) EVENT: DATE: / / TIME: H / M COURT NUMBER: REFEREE:

The Organisers may keep the first party TV rights (national rights), subject to FIBA Europe s prior approval.

Venue Name / Location Complex Esportiu - Futbal Salou Report Number R A1. Primary Sport(s) Football

Sponsored by Mrs. Gina Gregory and Mr. Reggie Copeland.

18 HOLE RISK ASSESSMENT COMPLETED BY: MARK HAINES POSITION HELD: COURSE MANAGER DATE:

Jackson County Department of Public Health Application to Construct, Install, Remodel or Modify a Public Swimming Pool

The best alternative to nature

The Past. The Present. The Future. Objective of turf manager High quality appearance of turf Complementing the surrounding environment.

Montmorency Park Facility Audit

Diablo VBC Beach Volleyball

Nursery: facilities and culture of post-larvae

TABLE OF CONTENTS LEGAL NOTICE

TPD GUN RANGE DESIGN BUILD

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

Contactor & Recharger Stormwater Chambers

TABLE OF CONTENTS LEGAL NOTICE

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

Chesapeake Region Volleyball Beach High Performance Program

HydroCourt Owner-Users Manual

EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016

RULES FOR VOLLEYBALL Introduction

BALLFIELD CLAYS. Our Ballfield Clay Products have been developed precisely for baseball fields. CONDITIONERS C L A Y - B A S E D S U R F A C E S SANDS

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

SAND IS ONE of the most common

1 Shoreline Erosion and Deposition

Appendix B Harris County Standard Operating Procedure for Determining In Situ Hydraulic Performance of High Flow Rate Bioretention Media

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005

;0iii] C*Iq'FgRHI{CE --::-- ;: -.. !: t,' li l:j. :t. ti?-. tlr. . *,, :;. :slill I iii-: .ir,::ri:}.:f :aei*l$ljai:!r. ; i:r ;: i:- ; i I!

OUTDOOR EVENTS Season

MARLWOOD GOLF & COUNTRY CLUB WASAGA BEACH, ONTARIO

Marketing Guidelines at 2016 IIHF World Junior Championship and 2016 IIHF Ice Hockey Women's World Championship

COPE PARK MASTER PLAN

BRAND STYLE GUIDE

FACILITY NAME: ASBA TRACK AND FIELD FACILITY AWARDS APPLICATION TRACK PORTION

Melancthon Pits Extension Noise Study Part of West Half of Lots 12 and 14, Concession 3 O.S. Township of Melancthon, County of Dufferin

RoaDrain Synthetic Subsurface Drainage Layer (SSDL)

ATT-26/13, SIEVE ANALYSIS, Fm Minus

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

Construction Dewatering

Telfer Reserve Facility Audit

AGE GROUP WORLD CHAMPIONSHIPS 2016 ORGANIZING TERMS & CONDITIONS

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Nordberg GP series cone crushers. Wear parts application guide

BEAM CLAY INFIELD CONDITIONER / TOP-DRESSING

CLEANING, INSPECTION, AND TESTING OF SEWERS

National Horseshoe Pitchers Association

Installation of Nylon Putting NP50

White Paper. Draft Variable Depth Root Zones for Golf Putting Greens. James Crum and Trey Rogers. Michigan State University.

AGE GROUP WORLD CHAMPIONSHIPS ORGANIZING TERMS & CONDITIONS

STATIONARY SPRINKLER IRRIGATION SYSTEM

INSTANT REPLAY SYSTEM

NWP Page 1 Enclosure 1

SPM B-Net Assembly Instructions. Installation Recommendations

Swimming Pool Requirements

Raleigh Park Open House #2 Summary (5/23/17)

ST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS

Single and Triple Rain Barrel Setup

Three Springs Design Guidelines Fencing and Wall Standards

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

USER MANUAL. Beach volleyball posts BEACH CHAMP ID:

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT

Transcription:

Sand Court Facilities Pictures and Specifications

Jacksonville University, four Court facility Spring 2011 Cost: $80,000

U. Of Louisiana Monroe 2 courts < $30,000 No costs for land or site preparation

U. of Utah Existing Campus Courts

U. of Florida Existing Campus courts

Rollins College Existing Campus courts

Nebraska Indoor Court 2007 Approximate Cost: $30,000

Florida State, Feb. 2012 Coach: Danalee Corso, dcorso@admin.fsu.edu Approx Cost: $375,000

U. of Alabama- Birmingham March 3, 2012 AD: Brian Mackin bmackin@uab.edu Cost: $280,000

U of Virginia Courts Spring 2011 Jane Miller, SWA 434.982.5100 jm2y@virginia.edu Cost: $275,000

Semi Covered Sand Courts St. Louis, MO

. of S. Carolina pring 2014 udy Van Horn, SWA anhornj@sc.edu

(School Sampling and Experience) If possible, a school should visit a sand volleyball court constructed with the candidate sand. Sand Composition and Drainage Recommendations Collegiate Volleyball Sand Courts Sand Guideline Submittal to The AVCA 2/18/11, U.S. Silica, George Dodson Grain Shape Round Sands Sub-Round Sands Sub-Angular Sands Range Range Range Gradation Criteria Definition Coarsest Finest Coarsest Finest Coarsest Finest Coarsest Finest Coarsest Finest Coarsest Finest U.S. Mesh U.S. Mesh mm mm U.S. Mesh U.S. Mesh mm mm U.S. Mesh U.S. Mesh mm mm Top Size: D100-100% Passing All Sand Grains Finer Than 16 25 1.190 0.710 18 30 1.000 0.589 20 35 0.840 0.500 Coarse Cut: D97-97% Passing, Min. Max. 3% Retained on 20 40 0.840 0.420 25 40 0.710 0.420 25 45 0.710 0.351 Middle: D50-50% Passing, Min. Max. 50% Retained on 30 65 0.589 0.230 30 65 0.589 0.230 35 65 0.500 0.230 Fine Cut: D3-3% Passing, Max. Min. 97% Retained on 70 140 0.210 0.104 70 140 0.210 0.104 70 140 0.210 0.104 Additional Criteria Description Silica Sand Mineral: Quartz, Minimum 99% SiO 2 Source Must be a clean naturally occurring silica sand, washed and screened, not produced from crushed aggregate plant, round to sub-angular sands only. Condition The clean silica sand must be free of rocks, shells, and/or other debris. Infiltration, inches/hour Must drain adequately for site e.g., 15-20 inches/hour. Color White as possible to reduce potential heat gain. Penetrometer (Firmness), kg/cm 2 Guideline Pending. Sand Depth Minimum sand depth: 18" in center, 15" at side/end lines, 12" at perimeter of sand surface. Overall Playing Quality It is strongly suggested that the school obtain a sample of candidate sand for evaluation and/or purchase a ton for player experience and comments. (School Sampling and Experience) If possible, a school should visit a sand volleyball court constructed with candidate sand. Geotextile: Separation and Drainage Overlays drainage pipes/gravel, placed over entire base of court complex and stapled to perimeter strip of facility. Provides placement surface for court sand. Subsurface Drainage At least one 6" pipe per court length embedded in 12" washed gravel, sloped away from court either to open or pipe evacuation system. Overall Playing Quality It is strongly suggested that the school obtain a sample of candidate sand for evaluation and/or purchase a ton for player experience and comments.

USAV Sand Specifications USAV ProCourt Sand Chart USAV Recommendations for SAND Specifications Grade Gravel V. Course Course Medium Fine V.Fine Material Sizes (% retained) Millimeter 2.0mm 1.0mm.5mm.25mm.15mm.05mm Pan (Clay+Silt) Screen #10 #18 #35 #60 #100 #270 <0.05 Benchmark 0 5.1 46 41.8 3.9 2.4 0.7 USAV Standards USAV CI* 50% 50% 10% 10% 15% 30% 25% Acc Var** 0 2.6-7.7 41.4-50.6 37.6-45.9 3.3-4.5 1.7-3.1 0.5-0.9 %Recommended <2% <15% Combined 78% to 100% <5% <3% Penetrometer Value (kg/cm2) Crusting Crusting Color (dry) Infiltration Rate (In/Hr) Sphericity/Angularity Acceptable: 1.8 to 2.4; Superior > 24 Light to None Personal Preference >20 inches/hour Angular to Subangular *USAV Confidence Interval **Acceptable Variance

Court Layout Outdoor courts are built North/South Minimizes the interference of sun on players and broadcasting Net line runs East/West TV camera shoots facing East Avoids facing sun during primetime broadcasting Reduces shadows

Court Layout USAV Lighting Specs Televised and Non-Televised Light Towers A minimum of 40 feet in height and a maximum of 60 feet in height Setup at approximately 45 degree angle to court Towers are to be placed evenly around the court to maintain a consistent illumination of the area

Court Layout Slope Outdoor park land and parking lots are built to drain (most parking lots are up to 7%) Court should run parallel to slope to minimize cost (Figure B) Figure A Figure B

USAV Court Dimensions

USAV Court Dimensions