Dredging Engineering Short Course Texas A&M University January 2016

Similar documents
Table 1. Sequence of bubble and dredging tests with prevailing tide stage and number of bucket cycles recorded for each test.

Module 15 : Grit Chamber. Lecture 20 : Grit Chamber

Notice of Intent to Close Inactive CCR Surface Impoundments

APPENDIX G DREDGING STUDIES. G.1: Fish Related Dredgi g I pacts a d Mitigatio

Dredging Keeping Our Underwater Highways Open

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

Smooth Vent Valve. Series XVD XL XL Q D- XVD XGT CYV

Impact of Dredging the Lower Narrow River on Circulation and Flushing

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

Cordova Harbor Page 2 of 9

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

BASICS OF ASPHALT PAVING: SCREEDS. Kevin Jeske Great Lakes Regional Manager

EFFECTS ON CUTTER SUCTION DREDGE PRODUCTION WHILE DREDGING SIMULATED DEBRIS IN THE LABORATORY

Design a grit chamber for population with water consumption of 135 LPCD.

Sontek RiverSurveyor Test Plan Prepared by David S. Mueller, OSW February 20, 2004

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

TOP:001.3 U.S. Fish and Wildlife Service TECHNICAL OPERATING PROCEDURE

Smooth Vent Valve XVD. Series

Appendix B Harris County Standard Operating Procedure for Determining In Situ Hydraulic Performance of High Flow Rate Bioretention Media

γ water = 62.4 lb/ft 3 = 9800 N/m 3

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Smooth Vent Valve. XVD Series

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

2.4 Gutter and Downspout Sizing and Location Calculations

Nome Harbor Page 2 of 12

Tools of Oceanography Ocean Currents. Drift Bottles and Dyes: measures speed and direction of ocean currents.

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

River Bridge - Test Shaft-1 Clarke County, MS, 4/2/2012

Thermo Scientific Chromatography Well Plates

Thermo Scientific Chromatography Well Plates

VACUUM REGULATORS CONTENTS

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

Synchronised Swimming. Skill Level 1

Department. «Ships and on-board Equipment» lfremer. (Head : Marc Nokin)

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Minnesota

3.9 FROM ISLANDS TO ATOLLS

DF1 and DF2 Diffusers

Reinstatement in hot-lay bituminous materials

Agilent 1290 Infinity Pump Head Maintenance

Tiling And Filling The Pool Student Materials Page 1 of 12

Sucker Rod Pumping Workshop Technology in a Mature Industry. September 2017 John C. Patterson Consultant Retired from ConocoPhillips (2015)

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

AUTOMATIC DREDGING PROFILE AND CONTOUR CONTROL

GRAVEL ROAD MAINTENANCE PLAN FOR THE TRANSPORT OF SOLAR ENERGY EQUIPMENT FROM CAPE TOWN TO THE ALEXANDER BAY AREA

PRO-III & IV (916) (800) Parts: 80000, 80020, & G Trade Center Drive Rancho Cordova, CA 95742

Installation of Nylon Putting NP50

Components of a Barrage

Sculpture Conservation Report

SEA LIFE Brighton: Access Statement May 2015

What happens to the mass and what happens to the weight of the liquid in the cup? decreases stays the same decreases stays the same

R. Randall Center for Dredging Studies Texas A&M University

OPERATION. Estimated kerf width compensation. HPR260 Manual Gas Instruction Manual 4-9

Yasuyuki Hirose 1. Abstract

For Establishing and Maintaining Your Spa using PROtech Spa Chemicals

Aluminum Sheeting Guide (ASG)

6. EXPERIMENTAL METHOD. A primary result of the current research effort is the design of an experimental

The playing field shall be rectangular yards max in length and yards in width. The center of the field shall be marked by

from ocean to cloud PARAMETRIC SUB-BOTTOM PROFILER, A NEW APPROACH FOR AN OLD PROBLEM

Figure 8: Buoyancy Force and Weight Acting on an Object

Info Counting chamber (haemacytometer)

PHYS 101 Previous Exam Problems

Site Diary Campus Drive Relocation Project. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Mass Spec will not Autotune

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Grading Plan - Drawing No. C-2 - Project Revision 1 dated January 30, 2018.

Wind Flow Validation Summary

Operation and Maintenance Manual. First Defense and First Defense High Capacity. Vortex Separator for Stormwater Treatment

FIX ROAD & FIX STRAP cargo securing systems Operating Instruction Manual

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.

The field of play must be rectangular and marked with lines. These lines belong to the areas of which they are boundaries.

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

Outlet Structures T-12

Juneau Douglas Harbor

Engineering Surveying - II CE313. Hydrographic Survey Lecture 06 Muhammad Noman

Geocells. Sundeep Inti Vivek Tandon

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

RocketSat V: AirCore. 4/18/09 Symposium Jessica (JB) Brown Mackenzie Miller Emily Logan Steven Ramm. Colorado Space Grant Consortium RocketSat V 1

Resident s Toolkit Traffic Control Device Local Area Traffic Management

T e l N o : F a x N o : E m a i l : a i s h c m c - m e. c o m w w w. c m c - m e.

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

Less bars, more light Maxilite Aluminium Roof Lanterns

Ninilchik Harbor Page 2 of 11

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

Method of Making and Curing Concrete Specimens in the Field for Compression and Flexural Tests

Behavior of the Simple Pendulum

Synchronised Swimming Skill Level 3

Pressure Dump Valve Service Kit for Series 2300 Units

ARM & CHEST FEATURES BAUER REACTOR 9000 THE HOME OF HOCKEY. Price 699,95 NEW! Item Type Size Color

Reinstatement in Hot-lay Bituminous Materials

The Ideal Gas Constant

Description of Underwater Noise Attenuation System Design Unit 2. New NY Bridge Project

Reinstatement of sub-base and base (roadbase) in non-bituminous materials

NOTE ON PERFORMANCE TESTING

Grader Note: It is recommended that you read the Supporting Information page before you read this factsheet.

FireHalt TM Flexible Cavity Fire Barrier Systems

Transcription:

Dredging Engineering Short Course Texas A&M University January 2016

Full video: http://komonews.com/archive/property-owners-funding-lake-union-clean-up-project

Solids Removed: 2,260 yd3

Turbidity is one of the largest factors in environmental dredging. Techniques for dredging sediments polluted by heavy metals and dioxins must create little pollution diffusion. They should remove only a polluted layer to limit the final disposal amount. Furthermore, they should produce high solid concentrations by taking little water to reduce the need for surplus water treatment at the disposal site. -Penta Ocean

When choosing a bucket for environmental applications, pay close attention to its specifications. Each feature should aid in the overall reduction of windrowing, the row of material that is pushed out of the bucket during closing. Windrowing is the main cause of residual found in high turbidity ratings. Windrowing effects can be reduced significantly with a proper bucket design! Watch full video: http://www.cablearm.com/buckets/enviro.html Or Download: http://www.cablearm.com/downloads/videos/envirovideolow.zip

Over-Square Footprint CLAMVISION Sloping Profile Width greater than opened length minimizes outward flow of material during bucket closure. (up to 100 m2) Precise XYZ dredge positioning software. Allows for angled, lateral movement along an inclined bottom. Previously, over dredging in steps were required. These steps are then often filled in with capping material. Venting System with Open Center Decreases downward pressure during bucket descent and seals in material during bucket ascension. Lightweight Eliminates the processing of hard, uncontaminated sediment. Overlapping Side Plates Minimize outward flow (windrowing) of material during bucket closure and seals in material during bucket ascension. 150 Cutting Edge Allows the bucket to scoop material which lowers the materials center of mass within the containment area. Material Location Level-Cut Center of Mass of material is located below the center of the bucket s containment area minimizing material washout during bucket closing and ascension. Produces a flat surface opposed to the pothole effect which can create a pool of contamination. info@cablearm.com

16 15

17 22 30 21 A surface area of: 3 5 7 f t 2 will excavate: 13.2 yard 3 per foot of depth when using a 50 yard 3 bucket 50 yard 3 footprint size / depth of cut 30 A=462 ft 2 17.1 yard 3 Per foot of depth A=900 ft 2 33.3 yard 3 Per foot of depth 48 35 18 Depth of Cut at 50 yard 3

Watch full video: http://www.cablearm.com/buckets/enviro.html Or Download: http://www.cablearm.com/downloads/videos/envirovideolow.zip

Watch full video: http://www.cablearm.com/buckets/enviro.html Or Download: http://www.cablearm.com/downloads/videos/envirovideolow.zip

Venting System decreases downward pressure during bucket descent and seals in material during bucket ascension. Over-square Footprint (width greater than opened length) minimizes outward flow of material during bucket closure. Sloping Profile allows for angled, lateral movement along an inclined bottom. Previously, over dredging in steps were required. These steps are then often filled in with capping material. Center of Mass of material is located below the center of the bucket s containment area minimizing material washout during bucket closing and ascension. 150 Cutting Edge allows the bucket to scoop material which lowers the materials center of mass within the containment area. Level-Cut produces a flat surface opposed to the pothole effect which can create a pool of contamination. Overlapping Side Plates minimize outward flow (windrowing) of material during bucket closure and seals in material during bucket ascension.

CORRECT DESIGN FEATURES REDUCE WINDROWING WRONG DESIGN FEATURES CAUSE HIGH RISK DREDGING center of mass center of containment area

Cutterhead dredging typically produces 4 to 14 times more water than environmental clamshell dredging.

WASH TANK Removes loose adhering material on the bucket DREDGE CELL Portable cell with inclined silt curtain helps contain material that becomes suspended CLAMVISION Precise XYZ wireless positioning software

Contaminated Sediment Disposal Process Solidified material can be transported to disposal site

Imagery from a multi beam echo sounder Displays smooth, level-cut, over-square footprints Obtainable with a properly designed clamshell bucket

MADE FOR SEDIMENT DREDGING