Bicycle & Pedestrian Advisory Committee

Similar documents
City of Springfield BPAC 2017 WORK PLAN OVERVIEW MEMBERS STAFF

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Omaha s Complete Streets Policy

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Major Bike Routes 102 Avenue Workshop April 21, 2015

Tonight is for you. Learn everything you can. Share all your ideas.

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Lawrence Avenue Streetscape Concepts August 30, 2011

Broad Street Bicycle Boulevard Design Guidelines

City of Seattle Edward B. Murray, Mayor

Safe Routes to School Action Plan Aberdeen, Idaho

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Item No. 14 Town of Atherton

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Ocean Park Boulevard Green Street Project Community Workshop

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Wilsonville 5 th Street to Kinsman Road Extension Project

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

North Avenue Corridor Study

COMPLETE STREETS PLANNER S PORTFOLIO

Henderson Ave. Complete Streets Project

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Community Task Force November 15, 2017

Lynchburg District Update

North Avenue Corridor Study

San Jose Transportation Policy

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

5 CIRCULATION AND STREET DESIGN

Technical Working Group November 15, 2017

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014.

Pennsylvania Avenue (CR 484) Design Alternatives Study

Executive Summary Route 30 Corridor Master Plan

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

Complete Streets Funding Program Project Prioritization Plan

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Bicycle Facilities Planning

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Charlottesville Bicycle and Pedestrian Master Plan Update

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Zlatko Krstulich, P.Eng. City of O9awa

6.4 RECOMMENDED IMPROVEMENTS

Governance and Priorities Committee Report For the July 2, 2015 Meeting

including shade trees; Recommend minimum 13 ft total sidewalk

TRANSPORTATION COMMISSION. -Meeting Minutes. August 9, :00PM

Water Street Promenade Engineering and Design Services

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Granger Ave from State to Packard Pilot On Street Parking and Pavement Marking Discussion Summary and Feedback Reponses

Bellevue Downtown Association Downtown Bike Series

MONTCLAIR SAFE COMPLETE STREETS IMPLEMENTATION PLAN. Monday November 13, 2017 Michael Dannemiller, Principal Engineer NV5, Inc.

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Chapter 3: Multi-Modal Circulation and Streetscapes

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Non-Motorized Transportation 7-1

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

The Wiggle Route in Context

Introduction. North 12 th Complete Street Project Overview

LANCASTER CITY BICYCLE NETWORK

Lincoln Neighborhood Corridor Plan The LiNC

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

122 Avenue: 107 Street to Fort Road

Duwamish Way-finding and CTR Report

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

City of Birmingham Draft Multi-modal Transportation Plan

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Safety on the Fessenden / St Louis Corridor. This presentation put together by Donna Cohen

Active Transportation Facility Glossary

MARTIN LUTHER KING JR. WAY

STREETSCAPE CONCEPTS

Design Guidelines. Overview. Design Vision for Yellow Brick Road

MEDIAN DESIGN example median A

Charlottesville Bicycle and Pedestrian Advisory Committee

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Transportation Planning Division

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

Transcription:

Bicycle & Pedestrian Advisory Committee Meeting Minutes June 14, 2016 6:00 to 7:30 pm Springfield City Hall Jesse Maine Room, 225 5 th Street, Springfield Attendance Staff: BPAC members: Public: Emma Newman, Michael Liebler, Jolynn Barker Kevin Schaper, Holle Schaper, Allison Camp, Claudia Denton, Darla Robbins, Robin Clevenger, Jerry Hooton, Jeffery Sakacsi, Andrew Landen, Sheri Moore, Joel Krestik, Simon Daws Andrew Martin, Matthew Fisher CALL TO ORDER. Meeting was called to order at 6:00 p.m. Welcome/Introductions Agenda Review Nothing was added to the agenda. Committee Business Public Comment No public comment. Approve Meeting Minutes No minutes to approve. Subcommittee Reports Claudia Denton gave an update on the Programming subcommittee. On Wednesday July 20 th they will be doing tabling/outreach at Willamalane s South Hills String Band event from 6:30-8:00 at Douglas Gardens Park. 1 B PAC Minutes

Darla Robbins said that volunteering at Eugene s Sunday Streets might be a good idea to see how the event is run, if they want to bring it to Springfield. Downtown Sunday Streets will be on July 31 st and the University area event will be on September 25 th. Jerry Hooton handed out Eugene Sunday Streets flyers. Allison Camp asked what they will be doing at the Douglas Gardens Park event. Claudia replied that they event is introducing the BPAC, educating about crosswalk laws, and sharing information about the bikeway project. Kevin Schaper added that he talked to LTD and Emma Newman said that there might be a chance to do a joint lights order in the fall. Allison gave an update on the Planning subcommittee. They planned a site visit to the D St. Path, the two-way cycle track in the Gateway area, and revisiting the Virginia-Daisy Bikeway project. They are also continuing to work on their pin map. Jerry gave a briefing on the Eugene s BPAC meeting. They voted on changing their name to ATAC (Active Transportation Advisory Committee). They also discussed the pilot phase on Willamette from 24 th to 29 th streets. There is also a new bike share program that will be launching soon. Claudia mentioned that Springfield could consider changing their name also, if there is interest. ATAC is a more encompassing name, but BPAC has the name recognition. Claudia asked Joel to find out if they could get a bike share station in downtown Springfield. Virginia-Daisy Bikeway Project Update Emma Newman gave a history of the Virginia-Daisy Bikeway and what is currently going on. They are suggesting shared lane markings, trees within the curb-to-curb space, mini-roundabouts, and raised crosswalks and speed cushions for the residential, lower traffic areas. They are also proposing using a single lane roundabout at 42 nd and Daisy St and a pedestrian refuge island crossing at 32 nd and Virginia Ave. Robin Clevenger asked if the proposed sidewalk would have to be put in the street near 51 st. Emma replied that they may be removing the planter strip for the sidewalk and there will be enough width for travel lanes. Emma said that they are entertaining the idea of different colored asphalt for the parking lanes. Jerry Hooton asked how the color will hold up. Michael Liebler said that it will fade with time. It will need to be researched further. 2 B PAC Minutes

Emma offered two options for the eastern most portion of the corridor from 54 th to a block west of Bob Straub Parkway: buffered bike lanes or a planter strip. For the 32 nd intersection, they are looking at refuge islands with rapid flash beacons. Jerry asked if they are planning on an intersection closer to Main St. Michael replied that 32 nd is the closest. Robin asked if there will be one near the school. Emma replied that there will be, but they are still discussing it and it is not funded. Michael added that the plans for it are out there, just not in this committee s discussion. Kevin Schaper asked if they could label speed limits in the crosswalk. Michael replied that signage could be difficult and that spreading public information would be more effective. Emma said that they might be able to have temporary signs just after construction. On 42 nd, Emma walked through the design options including a roundabout, full signal with bike boxes, pedestrian hybrid beacon, or moving bikes to the center with a signal. Emma spoke about meeting with the Planning Commission and they prefer a roundabout on 42 nd. They also thought that the bike lanes and sharrows were used properly. There was a discussion about the consistency of way-finding signs. Emma also shared about the City Council meeting. They liked the proposal for 32 nd and preferred the roundabouts for 42 nd. They thought that some treatments might be overkill. The Council wants to have more data collected for parking utilization during the evenings on the weekends. Councilor Sheri Moore added that City Council was concerned about vegetation in the center of roundabouts, but incorporating stormwater runoff makes sense. The trees can have a calming effect and give the sense that you are in a residential area. Citizens should also know that the funding for this is specifically for bicycle and transportation safety from ODOT. Andrew Landen asked how effective stormwater can be. Michael replied that, depending on several factors, they can handle quite a bit of stormwater. Councilor Moore added that it better than having it treated at the plant and the Planned Parenthood on Franklin has a great example of storm water treatment in front of their building. Claudia Denton said that she liked the trees and plants because it does not seem like a dangerous area. Simon Daws mentioned that trees need more room to grow and there are maintenance issues. 3 B PAC Minutes

Robin Clevenger noted that there are speeders that come off of Bob Straub and a buffered bike lane would be nice. Claudia agreed that there should be a buffered bike lane up to Bob Straub. Darla Robbins asked how the light was in that area. Emma Newman answered that it is not great. Allison Camp asked about the homeowners in the area. Emma replied that she has not heard a whole lot from them. Other residents in the project area liked the buffered lanes to slow down traffic. The committee voted to propose a buffered bike lane. Joel Krestik suggested planters in the buffer. Robin said that it would look nice and there isn t space to turn there, anyway. Emma said that maintenance would be a concern though, so she will take it to the team to see if they have a low-maintenance solution. Robin said that she believes a few areas in South Eugene are maintained by the neighborhood. Claudia proposed a roundabout for 42 nd St. Jerry Hooton asked what a mixing zone was. Emma replied that it is a shared space for bikes and pedestrians. Andrew Landen said that roundabouts will create consistency throughout town. Robin asked what the study said about entering the roundabout for a cyclist. She was concerned about the volume and safety. Andrew Landen said that a one lane roundabout could really slow traffic down. The committee voted in favor of the roundabout treatment for 42 nd. Emma asked committee members to provide additional comments before they go into design in the fall. Main-McVay Transit Study Overview Emma Newman said that the safety on Main St. is very important so improvements are needed. Andrew Landen added that he has seen a huge improvement on Main St. since they painted lines. 4 B PAC Minutes

Emma said there are a few studies going on about the lighting, median treatments, and land use. The purpose of Main-McVay study is to identify the most appropriate treatments along the corridor. Robin Clevenger asked how much wider the proposed bike lane would be. Emma said existing is 5 5.5 and the proposed design concept is to widen to 9 total bike space, including the buffer or separation treatment. Andrew Landen asked about the future of a lightrail in Springfield. Emma said that during phase 1 at the stakeholder advisory committee it was discussed and it does not look like there will be one in the next 20-30 years due to ridership and population and the high capital cost. Emma laid out the timeline for the study and any potential projects from it. Robin asked about the railroad yards on Main St. Michael Liebler replied that they will be working with ODOT s rail division to accommodate any decisions. Membership Update & Vice-Chair Nomination Claudia Denton was nominated and voted unanimously into the position of Vice Chair. Updates Allison Camp told the committee that they have a chance to host a Wheels by the Willamette event on Sept 23, from 4-6. More information will follow. Info Share Simon Daws informed the committee that the Mill Race Path is now under construction. Jerry Hooton said that the petition to have the speed limit reduced on Main St. was denied. Jeffery Sakacsi shared that Willamalane Park Foundation is having a safety clinic at Day Island Park on July 31 st. Allison mentioned an article she read about the quantity of trees and level of relaxation. Next Meeting: August 9, 2016; 6-7:30 5 B PAC Minutes