Site Diary Campus Drive Relocation Project. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Similar documents
RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..

La Crescent Township Zoning Ordinance

PROJECTS STREETS

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

As temporary grade control facilities along waterways until final stabilization is established.

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Existing conditions of each bridge and repair plan are presented in Table

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

Federal Project No.: STP-007-8(154)

TABLE OF CONTENTS LEGAL NOTICE

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

TABLE OF CONTENTS LEGAL NOTICE

PRELIMINARY STORM DRAINAGE REPORT

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

Figure 1. Schematic illustration of the major environments on Mustang Island.

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

Minimum Standards for Driveway Construction Village of Bear Creek

Kansas Department of Transportation. Tabulation of Bids

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

TABLE OF CONTENTS LEGAL NOTICE

Cincinnati Dayton Rd Widening

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Hospital Link Project Project Update November 2017

Shoulders. Chapter 4: chapter contents

* Appalachian Mountains -the mountain range in the Eastern U.S. which terminates in north-central Alabama

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Natural Shoreline Restoration for High Energy Shorelines. Brian Majka Restoration Ecologist 3/7/2019

Chutes Part 2: Synthetic linings

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

SMART INDUSTRIAL PARK

Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore

Dredging Engineering Short Course Texas A&M University January 2016

CHEBACCO LAKE & WATERSHED ASSOCIATION Newsletter

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828

CONSTRUCTION SPECIFICATION

FINAL EXPRESS TERMS FOR PROPOSED BUILDING STANDARDS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HELATH

D.B. Wilson Station CCR Landfill

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

COMPENSATION LAKE DESIGN CONCEPTS AND CONSTRUCTION LESSONS LEARNED

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

Track Layout Planning A Designer s Perspective ASBA 2013 TECHNICAL MEETING

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

City of Guelph. Hanlon Creek Business Park Stormwater Management Report Ponds 1, 2, 3 and 4

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

7.2.5 ACTION PLAN FOR IMPLEMENTATION COMMITMENTS MADE DURING PUBLIC HEARING

COPE PARK MASTER PLAN

Emerson Circle Entrance

State Route 28 Shared Use Path & Safety/Stormwater Enhancements Public Information Meeting

Concepts & Phenomena

JAP Additional Information Sheet

Great Lakes Stream Crossing Inventory Instructions

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Purple Line Extension Community Meeting

Fact Sheet Ordinance Regulating Erosion Threatened Structures

April This report was compiled by Soil & Dust Solutions Pty Limited Tel:

Swimming Pool Plans and Specification Report

Swimming Pool Requirements

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

Project Update #2. Cedar Springs Road Minor Reconstruction and Culvert Replacement (Britannia Road to Kilbride St)

3.9 FROM ISLANDS TO ATOLLS

RESIDENTIAL SWIMMING POOL

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

California Conference of Directors of Environmental Health Recreational Health Technical Advisory Committee September 17, 2003

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB

Swimming Pool Requirements Packet

Northside School Class I Bike Path, Cool, CA Application Attachments

Working on a Beef Cattle Station (Part 1) PRACTICAL CHECKLISTS

Heritage Palms CDD. Severn Trent Services Field Management Report Site Inspection 3/23/2016

Road Design Guidelines for Low Impact to Hydrology *

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa

Joe Rathbun Michigan DEQ Water Resources Division Nonpoint Source Unit * Thanks to The Nature Conservancy

Design Criteria. Design Criteria

Trusted Partners Delivering Value, Today and Tomorrow BUILDING STRONG

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

AMMO Field Data Collection Manual

Emergency Coastal Protection Works Practical Lessons For The Future From The Past

FGM ARCHITECTS Estimate of Probable Construction Cost Jun 14, 2016 PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#:

P r o j e c t T e a m

1.0 Introduction. Lake Tahoe Boulevard Enhancement Project Project Background

Coastal Management at XXX Beach

Transcription:

Site Diary Campus Drive Relocation Project by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University of Alabama Tuscaloosa, AL 35486

Contents Contents...i List of Figures...i 1.0 June 19, 2007 Photos...1 2.0 June 28, 2007 Photos...2 3.0 July 3, 2007 Photos...3 4.0 July 10, 2007 Photos...4 5.0 July 19, 2007 Photos...5 6.0 July 29, 2007 Photos...6 7.0 August 3, 2007 Photos...7 8.0 August 7, 2007 Photos...8 List of Figures Figure 1: June 19, 2007 Photos...1 Figure 2: June 28, 2007 Photos...2 Figure 3: July 3, 2007 Photos...3 Figure 4: July 10, 2007 Photos...4 Figure 5: July 19, 2007 Photos...5 Figure 6: July 29, 2007 Photos...6 Figure 7: August 3, 2007 Photos...7 Figure 8: August 7, 2007 Photos...8 i

1.0 June 19, 2007 Photos These photos are taken right after the class meeting on June 19. There are several stock piles causing the erosion on the road after the storm event due to the inappropriate erosion control. The site is just started grubbing and bare soils are seen on the surface. The site is protected by the silt fence and wattles are installed for the inlets. Figure 1: June 19, 2007 Photos 1

2.0 June 28, 2007 Photos These photos are taken on June 28. The first phase of the construction is almost completed and there are bear soils on the side of newly installed roads. Also, the silt fence is equipped at all the side and down slope areas in order to prevent the soil erosion from the construction site to the existing properties. After the completion of the road, inlet protections including wattles are removed from the inlet. Second layer of the asphalt will be installed in a week. Stock piles in the yard in front of the Shelby Hall are not protected and expected to cause a sediment runoff after the storm event. Figure 2: June 28, 2007 Photos 2

3.0 July 3, 2007 Photos These photos are taken on July 3 after the storm event. Due to the improper sediment control for the stock pile on the road at the construction site, large amount of sediments are runoff from the pile. Photos are describing the phase 2 improvement construction period and bear soils are seen on the surface. Inlets are protected by the silt fence and the wattle. Also, the site is surrounded by the biennial fence. Figure 3: July 3, 2007 Photos 3

4.0 July 10, 2007 Photos These photos are taken on July 10 after the storm event. Due to the storm, some fences are corrupted and it should be maintained immediately. Photos are taken during the period of the phase 2 improvement and bear soils are seen on the majorities of the surface. Inlets are protected by the silt fence and the wattle. The site is surrounded completely by the biennial fence and silt fences. Figure 4: July 10, 2007 Photos 4

5.0 July 19, 2007 Photos These photos are taken on July 19. First phase of the road construction is completed, but the parking lots for the facilities are still under construction. Photos are taken during the final period of the phase 2 improvement and bear soils are seen on the large areas of the site which has a plan to be controlled by the vegetation practice. Figure 5: July 19, 2007 Photos 5

6.0 July 29, 2007 Photos These photos are taken on July 29 after the storm event. Due to the storm, there are many water pools at the construction site. The storm even is occurred after the installation of the gutters and the most of runoff is prevented to runoff from the site. The stock pile is not protected well and there are huge amount of sediments runoff from it. Figure 6: July 29, 2007 Photos 6

7.0 August 3, 2007 Photos These photos are taken on August 3. Almost the road construction is completed including the installation of inlets and gutters. Remaining existing inlets are protected by the wattles. Permanent erosion controls such as vegetation are necessary for the bear soil surface. Most of the silt fences are removed expect the area close to the existing facilities in order to prevent the sediment runoff from the site. Figure 7: August 3, 2007 Photos 7

8.0 August 7, 2007 Photos These photos are taken on August 7. The construction is planed to complete by August 6, but it looks like the delay in a schedule. All the road construction is completed. Due to the long period of dry days, there is a dust caused by the construction vehicles. It is necessary to spray water in order to minimize the dust. All the inlet protections and silt fences are removed and the site is waiting for the completion. Figure 8: August 7, 2007 Photos 8