Ketchikan Harbors Thomas Basin and Bar Point Harbor

Similar documents
1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Juneau Aurora Harbor

Juneau Douglas Harbor

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

Cordova Harbor Page 2 of 9

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

Nome Harbor Page 2 of 12

Ninilchik Harbor Page 2 of 11

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

Grays Harbor O&M and Deepening Dredging

Mouth of the Columbia River Jetties Three-Phase Construction Plan

HARBOR INFRASTRUCTURE INVENTORIES West Harbor, OH

Grays Harbor Federal Project

APPENDIX D REAL ESTATE PLAN

Redondo Beach Boat Launch Ramp Facility

HARBOR INFRASTRUCTURE INVENTORIES Oak Orchard Harbor, New York

Dive Operations Plan for Personal Submersibles. Revision

UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION

Information for File # SEW

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

PNWA Conference Update

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

New Orleans Municipal Yacht Harbor

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

Project Incorporation of Sea Level Rise City of Newport Beach Approach for Balboa Islands, City of Newport Beach, California

ROOK COMPANY PANAMA CANAL BANCROFT LIBRARY

HARBOR INFRASTRUCTURE INVENTORIES Port Sanilac Harbor, Michigan

2016 Annual Inspection Report

2018 Beach Preservation Project Information

UMass Boston Waterfront at a glance

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Upper/Lower Owl Creek Reservoir

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

FINDING OF NO SIGNIFICANT IMPACT

Cline s Point Marina Ship Wave Analysis

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

Southeast Sustainable Salmon Fund Project Statement of Work

Recreational Boating Feasibility and Capacity Study

Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA Eelgrass (Zostera marina) Survey

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

A Single-Point Mooring System for Direct Pumpout of Hopper Dredges

REVISED SILT CURTAIN DEPLOYMENT PLAN

Port Sections Guide Section 01

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

Description of Underwater Noise Attenuation System Design Unit 2. New NY Bridge Project

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400

Multi-Purpose Workboats and Vessels. Marine Engineering and Construction. Salvage and Wreck Removal. Marine Consultancy Services

THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY

Coastal Engineering Technical Note

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

Burrard Bridge Civic Marina. Class B Marina (No Liveaboard Facilities) A Prime Location in the Heart of Downtown Vancouver

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia

ATLANTIC COUNTY 2006 to 2008

HARBOR INFRASTRUCTURE INVENTORIES Lorain Harbor, Ohio

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

Fall Protection Guidelines. Individual Unit Function: Safety Procedure No.: SOP-0111 Page: 1 of 13. Preparer: Owner: Approver: Safety Safety Safety

(a) Calculate the speed of the sphere as it passes through the lowest point of its path.

2018 Annual Inspection Report

Estimated on-the-ground start and end dates: 1 June October 2018

BookletChart. Chesapeake Bay Severn and Magothy Rivers NOAA Chart A reduced-scale NOAA nautical chart for small boaters

6/19/2006 The Reef Ball Foundation 1

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Chapter I: Marine Resources

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

Chapter 269: MOORING REGULATIONS

Region: USA Language: EN Number : TB0031 Revision : B. Total Page: 3 Page n : 1 First Issue: 10/2014 Rev. Date: 10/08/2014

DQM Annual Hopper QA Checks

Wave Transmission Testing of the Martin Ecosystems BioHaven Floating Breakwater

Shoalwater Bay Shorline Erosion Dredging

ADL Attachment 1

HARBOR INFRASTRUCTURE INVENTORIES Fairport Harbor, OH

ADC PROGRAM - MARITIME EMPLOYER S LIABILITY APPLICATION FORM (FEBRUARY 2007)

US Navy Wave Energy Test Site. Kaneohe, HI

Maltester Channel Dredging. Shoreline Marina Committee. November 18, 2008

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc.

Why Update. OSHA updated Walking Working Standard. Who & What it Covers. Housekeeping (a) 6/25/ nd Leading cause of Workplace fatalities

Inflatable Pontoons Listing ID:

4/20/17. #32 - Coastal Erosion Case Histories - Lake Michigan

FINDLAY TOWNSHIP BUILDING INSPECTION DEPT

UPPER BEACH REPLENISHMENT PROJECT RELATED

BoatWasher Swede, , MS Float

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

Transcription:

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Condition of Improvements 30 December 2014 Thomas Basin & Bar Point Harbors Ketchikan, Alaska (CWIS No. 000631 & 087071) Authorization (1) Rivers and Harbors Act, 3 July 1930 (House Doc. 113, 70th Congress, 1st Session) as adopted, provides for construction of a stone breakwater with concrete cap, 940 feet in length, to protect the harbor in the vicinity of Ketchikan Creek, and dredging the protected area (11.35 acres) to a depth of -10 feet MLLW; (2) Rivers and Harbors Act, 2 September 1954 (House Doc. 501, 82nd Congress, 2nd Session) provides for the dredging of an additional small boat basin at Bar Point, 17.91 acres in area, to depths of -10 and -15 feet MLLW, and construction of three rock breakwaters 700, 1,100 and 450 feet in length, topped by concrete gravity walls. (3) Under Section 107 of the River and Harbor Act, 14 July 1960, as approved on 29 June 1978, Bar Point Harbor expansion is authorized for the construction and placement of 2 concrete floating breakwaters of 963 and 120 feet to enclose a basin of about 25 acres. Table 1 Existing Project Length ft. Width ft. Depth ft. Thomas Basin Harbor Basin 11.35 acres -10 Breakwater 940 Bar Point Harbor Basin 17.91 acres -10, -15 Southeast Breakwater 700 West Breakwater 1100 Floating Breakwater 963 Floating Breakwater 120 Project Usage Thomas Basin and Bar Point Harbors are used as a base of operations for commercial fishing and are capable of accommodating 300 and 520 vessels respectively. In addition, the harbors are used by more than 100 transient fishing boats as a seasonal base of operations. Thomas Basin & Bar Point Harbors Page 3 of 9

Progress of Work Thomas Basin Harbor 1933 The small boat basin at Ketchikan Creek, Thomas Basin, is completed. 1950 Maintenance dredging in Thomas Basin is begun in June and finished in FY 1951. 1960 Thomas Basin is dredged by contract over the summer. 1964 Maintenance dredging in Thomas Basin begins in July and is completed in August with the removal of 24,316 cubic yards. A controlling depth of -14 feet MLLW is reported. 1974 A contract for maintenance dredging in Thomas Basin is awarded in June and completed in October with 2,530 cubic yards of material removed. 1976 Repair of the rock breakwater at Thomas Basin begins in October and is completed in November. 1994 A condition survey of the harbor is performed in January and February. Sampling and testing is carried out for Thomas Basin. 1996 Maintenance dredging is completed at Thomas Basin in February with the removal of 8,678 cubic yards. 2001 A condition survey of the harbor is conducted with multi-beam techniques in April. 2004 A condition survey of the harbor is conducted in July. 2005 Aerial photography is taken of the harbor in April. 2007 A condition survey of the harbor is conducted in May. 2012 A condition survey of the harbor is conducted in July. 2013 Comprehensive Evaluation of Project Datums Compliance report completed and recorded in February. Bar Point Harbor 1957 Construction of Bar Point Basin begins in November with work on the Southeast Breakwater. The concrete gravity walls have been deleted during design and compensated for by increased breakwater elevation. 1958 Bar Point Basin is successfully completed in November. 1979 Work begins on the Bar Point Harbor expansion in April. The 450 foot breakwater is subsequently de-authorized in November. 1980 After repair of wind damage, the floating breakwaters are completed in place in April. 1994 A condition survey of the harbor is performed in January and February. The U.S. Navy is hired under contract to inspect the floating breakwaters at Bar Point Harbor. 1996 The Navy is contracted to rehabilitate the floating breakwaters at Bar Point. 2001 A condition survey of the harbor is conducted with multi-beam techniques in April. Thomas Basin & Bar Point Harbors Page 4 of 9

Progress of Work Bar Point Harbor 2003 Anchor blocks for the floating breakwaters at Bar Point Harbor are located by survey. 2004 A condition survey of the harbor is conducted in July. 2005 Aerial photography is taken of the harbor in April. 2008 The floating breakwaters at Bar Point Harbor were inspected by the U.S. Army dive team. 2009 Repair to the floating breakwater by the Army dive team includes realignment/replacing the wire tension ropes, replaced missing and badly corroded anchor chains, repositioned anchor blocks, adjusted slack in anchor chains, replaced wooden fender system, and repaired concrete damage. 2012 The large floating breakwater located at Bar Point Basin was damaged following a storm in early March. Corps personnel and the 544th Army Dive Team found that several of the wire tension cables failed. The Army Dive Team replaced the tension cables, interconnecting hardware, and neoprene bumpers for all modules on the large floating breakwater in July and August. The Dive Team also removed marine growth from both floating breakwaters and conducted an inspection of the anchor chains. The inspection revealed that two anchor chains were broken while 18 additional chains were in need of replacement. A Condition survey of the harbor was conducted in July. 2013 For the Bar Point Harbor, a Value Engineering Study was conducted in February to evaluate alternatives for replacing the floating breakwaters. The 544th Army Dive Team conducted an inspection of the anchor chains and prepared new connection points for the anchor blocks in August and September, The Dive Team also inspected the tension cables and interconnecting hardware for all modules on the large floating breakwater. Several of the cables were retensioned during the inspection. Comprehensive Evaluation of Project Datums Compliance report completed and recorded in February. 2014 The 7th Army Dive Team conducted an inspection and repairs of the floating breakwaters beginning in mid-august. A total of 24 anchor chains were replaced, 2 on the small breakwater and 22 on the large breakwater. The Dive Team also finished repairs of the anchor chain connection points to the anchor blocks. A contract was awarded to Pool Engineering to provide a crane for lift support and barge for staging dive equipment and construction materials. Repairs were completed in early November when the Dive Team inspected the tension cables and interconnecting hardware for all modules on the large floating breakwater. Thomas Basin & Bar Point Harbors Page 5 of 9

Table 2 Cost to Date Project Description Cost $ 000631 CG Appropriation 640,967 (Thomas Basin) CG Costs 640,967 O&M Appropriation 967,982 O&M Costs 967,982 087071 CG Appropriation 2,829,865 (Bar Point) CG Costs 2,829,865 CG Contributed Appropriation 1,318,421 CG Contributed Costs 1,318,421 O&M Appropriation 2,338,754 O&M Costs 1,616,565 Table 3 Range of Tides in feet Tide Station Mean Range Diurnal Range Extreme Range 945 0460 Ketchikan AK 12.97 15.45 26.57 Controlling Depth Thomas Basin (July 2012): A depth of +6.7 feet MLLW controls near the boat grid in the southeast corner of the basin. A depth of -5.6 feet MLLW controls near the transient float in the northern area near Ketchikan Creek. The shoal at the mouth of Ketchikan Creek continues to build compared to the 2007 condition survey, otherwise project depth is effectively available throughout the basin. Bar Point Harbor (July 2012): A depth of -7.0 feet MLLW controls near the toe of the west breakwater in the 15 foot basin. A depth of -1.0 feet MLLW controls near the boat grid and launch ramp for the 10 foot basin. Some minor areas above project depth are present in both portions of the basin, primarily along the side slopes. The condition of the project has not significantly changed compared to the 2007 condition survey. Thomas Basin & Bar Point Harbors Page 6 of 9

Ketchikan Harbors, Ketchikan, Alaska Oblique of Bar Point Harbor, 2013. Bar Point Harbor, 2013. Ketchikan Harbors Page 7 of 9

Ketchikan Harbors, Ketchikan, Alaska Oblique of Thomas Harbor, 2013. Thomas Harbor, 2013. Ketchikan Harbors Page 8 of 9

Ketchikan Harbors, Ketchikan, Alaska Equipment is mobilized to repair anchor chains for the floating breakwaters, August 2014. The Dive Team begins work to repair the floating breakwaters, August 2014. Ketchikan Harbors Page 9 of 9