S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Similar documents
SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

SR 2108-A12/SR 2308-A02 Forbes Avenue Betterment and SR 2108-A13 Forbes Avenue Corridor Improvements. July 17, 2017

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

MIAMI & ERIE CANAL SHARED USE TRAIL

APPENDIX L: COST ESTIMATING TOOLS

City Avenue Projects

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Request for Authorization to Open Public Comment Period

Bluffdale/ UDOT South High-T Intersection Project Type Operations

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Readington Road (C.R. 637) Construction

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

122 Avenue: 107 Street to Fort Road

ADA PRESENTATION (CURB RAMPS)

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Derby Street. Project Updates. Salem, Massachusetts

Chapter 4: Funding and Implementation

Welcome to the Quebec Alternatives Analysis Public Meeting

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

South Carolina Department of Transportation. Engineering Directive

Water Street Promenade Engineering and Design Services

IMPLEMENTATION WORKBOOK

City Avenue Projects

CITY OF SPOKANE VALLEY Request for Council Action

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Military Road Safety Improvements

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Legislative Update Williamsburg Residency

Henderson Ave. Complete Streets Project

Route 47 (North Main Street) Reconstruction

Complete Streets Funding Program Project Prioritization Plan

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Long Island Rail Road Expansion Project Floral Park to Hicksville

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Route 7 Corridor Study

Downtown Signals Traffic Analysis

February 11, 2016 TPO Board Presentation

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Board of Supervisors February 27, 2017

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Geometric Design Tables

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

F L E T C H E R A V E N U E

Road Diets FDOT Process

Lynchburg District Update

Multi-Modal Traffic Analysis. Parisi and Associates

SECTION 14: LANDSCAPING AND BEAUTIFICATION

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Building Great Neighbourhoods QUEEN ALEXANDRA

CTDOT Pedestrian and Bicycle Safety Initiatives

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

NJDOT Complete Streets Checklist

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Cincinnati Dayton Rd Widening

Eastern PA Trail Summit October 1, 2018

PISMO BEACH COUNCIL AGENDA REPORT

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Driveway Design Criteria

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Citywide Sidewalk and Crosswalk Programs

This page intentionally left blank.

El Paso County 2040 Major Transportation Corridors Plan

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Transportation and General Civil Engineering Projects

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Non-Motorized Transportation 7-1

Chapter 5: Crossing the Street

APPENDIX D COST SUMMARY TABLES

Route 117 Review of Ownership Transfer October 2014

Final Sidewalk Feasibility Study

Transcription:

Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library Avenue January 18, 2018

Purpose of Meeting Project Need Here tonight to discuss: Location Public Outreach Funding :HSIP/Safety Improvement Project Overview/History & Characteristics Safety Enhancements / Improvements Construction Phasing / Traffic Control Business / Residential Access and Parking Impacts During Construction Plan overview Anticipated Design / Construction Schedule Estimated Construction Cost

Project Team PennDOT Richard Yakupkovic, P.E., Acting ADE Design Division Cherie DiDomenico, Project Manager Design John Myler, P.E., Assistant Construction Engineer Tyler Mercer, P.E., Assistant Environmental Project Manager Titus D. Brookins, Real Estate Specialist, Right Of Way Consultant Team Freeport Road Alan Bailey, P.E., Project Manager, SPK Engineering Inc. David Piccolomini, Vice President Highway Admin., SPK Engineering Inc. Highland Park Bridge Domenic Piccolomini, P.L.S., CEO SPK Engineering Inc.

Purpose of Meeting - Project Needs S.R. 3009, Section A20 Project (South Park Road) Intersection Improvement: Congestion relief - Traffic analysis of the existing intersection warrants left turn lanes at each leg of the intersection Safety - Reportable rear end and angle accidents occur at the intersection. Logan Road South Park Road

Project Location Satellite Overview Proposed Work Widening to add a 10 turn lane from South Park Rd to Logan Road and 2 (12 ) lanes. Updating Signalized Intersection.

Public Outreach Public Meeting Notice Letters were sent to 6 Public Officials on December 15, 2017 Public Meeting Notice posted in the Post Gazette Newspaper on Sunday January 11, 2018 Public Meeting Notice letters were mailed to residents and businesses within the Project on December 20, 2017 PennDOT Press Release issued for the Public Meeting on January 11, 2018 Public Meeting Information is posted on the Municipality of Bethel Park Website January 4, 2018 Comment Forms (located on sign-in table) may be filled out this evening, mailed in at later date or email at cdidomenic@pa.gov Please sign at the table before you leave

Overview And History The S.R. 3009 (South Park Road) corridor has been in service within Allegheny County dating back to 1886. SR 3009 a main corridor for Bethel Park which has many businesses and nearly 32,000 residents. In 1925, Reinforced Cement Concrete Pavement 9 in thickness was constructed with unknown subbase material 18 foot width From 1960 to present various layers of overlay with bituminous and maintenance milling and paving in 1969 the roadway was widened to 22 using bituminous material. Anticipated 2019 Intersection Improvement with widening.

Project Characteristics S.R. 3009 (South Park Road) is an Urban Community Arterial Highway Proposed work: Project is located within the Municipality of Bethel Park, at a signalized intersection Variable 21.5 to 34 wide curbed roadway section throughout Shoulder width 2.4 to 5.1 Project length is 487 feet (0.092 Miles) Average Daily Traffic (ADT) of 22,627 vehicles in 2019 (Year of proposed work) Design Year ADT is 23,038 (2039) Percent trucks is 8% (1,810 trucks/day) The Posted Speed Limit is primarily 35 MPH.

Proposed Improvements Replace Existing Traffic Signal - New Foundations will include Subsurface Utility Engineering. Left Turn Lanes from South Park Rd (S.R. 3009) onto Logan Road (S.R. 3010) Drainage improvements Bicycle safe grates for inlets & Cross Pipe Cleaning Signing and Pavement Marking Updated ADA Curb Ramp Installations Milling and Resurfacing with widening

Safety Enhancements Traffic Signal Replacement: Higher visibility thermoplastic 24 Piano Keys crosswalk markings Reflective signal back plates New LED vehicular and pedestrian signal heads ADA Curb Ramp Installations/Alterations Install updated Pedestrian ADA Curb Ramp & Push Button Supports Pavement Marking Upgrades Durable thermoplastic pavement markings

Safety Enhancements (cont.) ADA Curb Ramps - Example of new ADA curb ramp installation on corner of intersection

Proposed Traffic Control Proposed Traffic Control Restrictions: No Detours during Construction Using short term lane restrictions, with 3 phases of lane restrictions. Phase 1: Construct NB Lanes Phase 2: Construct SB Lanes Phase 3: Construct center Lane. This project will take 1 construction season

Impacts During Construction Business/Residential Access During Construction South Park Road (S.R. 3009) and Logan Rd (S.R. 3010) traffic will be maintained at all times within the project Pedestrian access will be maintained during construction for residences Utility Relocation of electric poles For ADA Curb Ramp Construction No sidewalk work is proposed, except for the ADA curb ramps

Construction Typical Sections

Preliminary Line and Grade Plans

Preliminary Line and Grade Plans

Anticipated Schedule and Costs Anticipated Project Schedule: Prior Utility Work, by Duquesne Light to move poles: Summer/Fall 2018 Project Bid Opening Date: Winter 2018/2019 Construction Start Work Timeframe: Spring 2019 Project Completion Date: Fall 2019 Construction Cost: Approximately $2 Million

Project Input/Feedback Opportunity to address any questions you may have? Plans are located on tables for viewing Comment Forms (located on sign-in table) may be filled out this evening, mailed in at later date or email cdidomenic@pa.gov

S.R. 3009-A20 Project Comment Form Name: Address: Phone Number: Please provide any comments or questions you may have related to the S.R. 3009, Section A20 Project? Please fill out comment form this evening or it may be mailed in at later date to the following address: Cherie DiDomenico PA Department of Transportation Engineering District 11-0 45 Thoms Run Road Bridgeville, PA 15017 412-429-4868 cdidoomenic@pa.gov