Discussion on Super Splash USA. December 14, 2015

Similar documents
A Comparison for Ames, Iowa

Honey Lake Valley Recreation Authority Pool Community Workshop Presentation

CITY OF MERRIAM PARKS AND RECREATION FACILITIES MASTER PLAN

Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018

TULSA PARKS POOL FACILITY IMPROVEMENTS AND REPAIRS

Aquatic Concepts. July 23, 2018

Outdoor Pool Public Forum University of New Hampshire. July 1, 2014

Facility Assessment and Project Study. New Prague Municipal Swimming Pool New Prague, MN

KINDERSLEY AQUATICS CENTRE Town of Kindersley. Public Consultation #2 July

City of Harrisburg, PA Swimming Pool Feasibility Study Harrisburg, PA

KINDERSLEY AQUATICS CENTRE DESIGN Town of Kindersley. Public Consultation #1 May

NEEDS ASSESSMENT STUDY HIDDLESON POOL

Have your say. Aquatic AND Leisure Facility. Aquatic AND Leisure Facility ON THE NEW. Information Booklet

22'-9 1/2" 6.94 m. 48'-10" m TEACH TOT POOL. POOL AREA = ±3845 ft². 35'-1 1/2" m BEACH ENTRY MINI SPLASH PAD = ± 475 SF. 16'-0 1/2" 4.

Aquatic Facility Evaluation City of Merriam, Kansas. Kyle A. McCawley, P.E. Larkin Aquatics 4/9/2014

North Liberty, Iowa. Aquatic Master Plan

POLLOCK COMMUNITY WATER PARK REGULATIONS

DOWNLOAD : POOL REPAIR TUCSON

LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers OVERVIEW

Reston Community Center Terry L. Smith Aquatics Center. Preliminary Assessment

Moana Springs Recreational Complex Aquatic Center

Tampa: Davis Islands Recreation Area

The Future of Quarterpath Pool. October 8, 2012

Big Sky Recreation Center Big Sky Event Center

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

Aquatic Facility Feasibility Study Falmouth, MA. Presented By: James Preisig: Falmouth Aquatics Kevin Post: Counsilman-Hunsaker

CITY COUNCIL AGENDA REPORT

Q1 In your household, who would come to the Long Bridge Aquatics & Fitness Center?

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

REQUEST FOR PROPOSAL FOR WATERPROOFING STRUCTURAL ENGINEERING

VALPARAISO HIGH SCHOOL NEW NATATORIUM Valparaiso Community Schools

FINAL EXPRESS TERMS FOR PROPOSED BUILDING STANDARDS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HELATH

District 86 Swimming Pools Pool Task Force Recommendations

Aqua Pilot Suction Pool Cleaner

Superintendent s Proposed Capital Improvements Program. Fiscal Years (Revised January 14, 2019)

New Orleans Municipal Yacht Harbor

2017 Pool Manager s Report Hawthorne Memorial Pool

WAKE COUNTY POOL PERMIT PRE-SEASON AUDIT 2014

Jackson County Department of Public Health Application to Construct, Install, Remodel or Modify a Public Swimming Pool

Florida Senate SB 1694 By Senator Haridopolos

LAZY RIVER 3 3 PUMP LOCATION

Pool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service

Manatee County Parks & Natural Resources. John H. Marble Community Pool Revitalization & Marketing Plan Summer 2014

Pool Safety Assessment

Health risks posed by unregulated Water Park Installations in NSW

Albert Group Landscaping and Swimming Pools presents:

CHAPTER SIXTEEN THE MASTER PLAN. Oakland Alive

Structural Assessment. USS Yorktown CV-10

FGM ARCHITECTS Estimate of Probable Construction Cost Jun 14, 2016 PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#:

Aquatic Facility Needs Assessment Study

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE RECREATIONAL POOLS 2. DECK AND COPING MUST BE IN GOOD REPAIR AND PROPERLY DRAINED. (.

Idea Book Design ideas and tips for your swimming pool project.

BRECKSVILLE RECREATION COMMISSION January 22, 2018 Meeting Minutes. The meeting was called to order by Councilwoman Redinger at 7:30pm.

Parks & Recreation Karin Richard-Jacobi. OPERATIONAL BUDGET HIGHLIGHTS Augustus Brown Swimming Pool and Dimond Park Aquatic Center FY 11 / FY 12

Pneumatic Conveying Principles BSH&E SEMINAR

SWIM POOL MANAGEMENT City of Blue Springs, Missouri

PROPERTY EVALUATION AND RESERVE FUND STUDY ~UPDATE~

My Favorite Pool Builder, Inc.

ADA Access Standards for Swimming Pools, Wading Pools, and Spas

Point Defiance Park. Master Plan

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

Swimming Pool Plans and Specification Report

LIST OF POTENTIAL PROJECTS

Signature Spas & Pools Inc

Aquatic Center Feasibility Study

Fidalgo Pool and Fitness Center Facility Audit Anacortes, WA

Rain Barrels. Did You Know?

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

NZQA registered unit standard version 2 Page 1 of 5

FINDLAY TOWNSHIP BUILDING INSPECTION DEPT

Moderate sized male and female change rooms and disabled toilet

2012 International Swimming Pool and Spa Code Errata

Pool Birthday Party - Rental Application

HOW TO AVOID LIABILITY IN YOUR LOCAL POOL INSPECTION PROGRAM

Pleasant Valley Aquatic Center

Jennifer Hatfield FSPA Government Relations Consultant J. Hatfield & Associates, PL

Two Rivers Activity Center (TRAC) McGough Construction 630 First Avenue North, Suite 4 Fargo, ND Phone: (701) Meeting Attendance

PUBLIC POOL CHECKLIST. (This checklist is based on the Ministry of Municipal Affairs and Housing checklist)

Springville Aquat ic Act ivit y Cent er Explorat ory Commit t ee Meet ing Tuesday, February 24, :00pm

Bill Ordinance 5824

Step-by-Step Planning Guide

Swimming Pool IAQUALINK WEB CONNECT

Swimming and Water Safety Skills Chart

In this presentation we will talk about Florida Administrative Code, 64E-9 and how it regulates swimming pools and pool operator s responsibilities.

Sincerely, SUMMER CAVE STAFF

Building Great Neighbourhoods LANSDOWNE

Introduction. Check with your swimming pool contractor for more specific ways to upgrade your pool, save money and help the environment.

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE SEMI PUBLIC POOLS 1. POOL WALLS AND BOTTOM SMOOTH, LIGHT COLORED AND EASILY CLEANABLE. (.

BAINBRIDGE ISLAND AQUATICS FEASIBILITY STUDY 01/17/2019

May Re: Fiscal Year Budget and Maintenance Fees. Aloha, Owners of Kakela Makai Oceanview Community Association,

Bowie Indoor Sports Facility - Summary (Bowie, MD) Five-Year Operating Pro Forma

A Better Plan Operational Success for Aquatic Facilities Through Proper Business Planning Presented By: Scott W. Hester & Darren Bevard

Copies of your pool operator certificate as well the operating permit must be posted at the pool. The operator s certificate is your certificate that

Providing quality commercial equipment since 1998 for pool, spa, fountain and spray ground

STREAMLINE AQUATICS 2014 SASA SOMBRERO SERIES CHAMPIONSHIPS. March 28-30, 2014 Sanction Number: STA-14-23

Dare County Nourishment Project Town of Duck

GRIDLEY SWIMMING POOL Gridley, California REHABILITATION / RENOVATION FEASIBILITY REPORT. February 22, 2016

Careful planning will prevent unwanted headaches later!

NEW YEAR S INVITATIONAL SWIM MEET JANUARY ND, 2017 VANCOUVER AQUATIC CENTRE

Transcription:

Discussion on Super Splash USA December 14, 2015

Super Splash Elevated Sundeck Filter Water Slides Pebble Beach Concessions Avalanche Slide Main Pool Catalina Cove Drop Slides Filter/Admin Entry BH/ Restrooms Notes: Water Surface Area 24,000 s.f. Financially sustainable into mid. 2000 s, 75K peak attendance in 2003 with New Avalanche Slide 40k to 45K typical attendance Past 2 Yrs Operations 50 to 60% cost recovery with large repair costs 85% without factoring repair costs. Deficits of $160,000 to $180,000 30K attendance

Current Conditions Main Pool & Plunge Structurally OK Old Piping Substantial Water Loss Pool deck in poor to fair condition Parking Lot Needs crack repair and restriping Filter/Admin Some foundation movement/ cracks in walls Failing sanitary piping 1963 CONSTRUCTION (52 yrs Old)

Current Conditions Filter Building OK Condition Water Slides Just recoatedgood condition Pump is aging will need replaced Pebble Beach Structure is OK Coating is in poor condition needs full removal and replacement Piping has failed Substantial water loss Needs misc. equipment replaced Pool deck in poor to fair conditionoffsets and cracking Drop Slides Tower and Supports not in great condition 1991 CONSTRUCTION (Approx. 25 yrs Old)

Current Conditions Expanded Building For concessions Floor drain piping failing Metal roof rusting Catalina Cove Structure is OK Recent stress crack/ settlement Some water loss/ piping repair Pool deck in fair condition Connecting ramp settling and cracking Hose bibb supply on deck has failed 1993 CONSTRUCTION (Approx. 23 yrs Old)

Current Conditions Avalanche Slide (2003) Tower and stairs corroding Fiberglass in fair condition, but requires maintenance Entry Kiosk (2001) Fair Condition Dressing Rooms (2001) Fair Condition Early 2000 s CONSTRUCTION (Approx. 15 yrs Old)

Community Survey Results - Options Water s Edge Thoughts Should reuse good parts (unless new location) Including parking, dressing rooms, and Catalina Cove (with new piping) Renovation with same features = continued operating deficit All options should reduce overall water surface Preliminary Options A. 2 Pool Aquatic Center B. Phased Single Pool Aquatic Center C. Water Park Deep Water Activity D. Water Park LR + Waves E. Renovation

Option A1 Aquatic Center Demo Pebble Beach Existing Slides Wet Deck Catalina Cove Demo Main Pool New Admin/ Concessions Existing BH 2 POOL AQUATIC CENTER LEISURE POOL WET DECK WATER SLIDES WITH PLUNGE ROOM FOR EXPANSION APPROX. 6, 500S.F. WATER $1.5M TO 2M PROJECT (Approx.) REDUCED OPERATIONS EXPENSE

Option A2 Aquatic Center Demo Pebble Beach Existing Slides New Lap Pool Catalina Cove Demo Main Pool New Admin/ Concessions Existing BH 2 POOL AQUATIC CENTER LEISURE POOL LAP POOL (W/ DIVING) WATER SLIDES WITH PLUNGE ROOM FOR EXPANSION APPROX. 10,000 S.F. WATER $3M TO 3.5M PROJECT (Approx.) REDUCED OPERATIONS EXPENSE

Option B Aquatic Center Demo Slides Demo Pebble Beach New Leisure Pool Catalina Cove (with waves?) Demo Main Pool New Admin/ Concessions Existing BH PHASED SINGLE POOL AQUATIC CENTER NEW LEISURE POOL PRESERVE CATALINA POOL AND PHASE OUT (optional: convert to wave pool) APPROX. 15,000 S.F. WATER (10,000 S.F. if Catalina phased out) $5.5M to $7.0M PROJECT REDUCED OPERATIONS EXPENSE

Glenwood Concepts Example - Manhattan, KS

Option C Water Park Existing Slides Demo Pebble Beach Deep Water Pool New Wet Deck Catalina Cove (with lap swimming) Lazy River Demo Main Pool New Admin/ Concessions Existing BH WATER PARK (W/ DEEP WATER ACTIVITY) WET DECK (REPLACING PEBBLE BEACH) PRESERVE CATALINA POOL (add laps 60 ft. or expand to 75 ft.) 400 ft. LAZY RIVER WITH CONNECTED SLIDES DEEP WATER ACTIVITY POOL APPROX. 12,000 S.F. WATER (excluding wet deck area) $5M to 7M PROJECT (Approx.) REDUCED OPERATIONS EXPENSE

Glenwood Concepts Wet Deck Interactive Play

Glenwood Concepts Deep Water Activities

Glenwood Concepts Lazy River

Option C Water Park Existing Slides Demo Pebble Beach Deep Water Pool New Wet Deck Catalina Cove (with lap swimming) Lazy River Demo Main Pool New Admin/ Concessions Existing BH WATER PARK (W/ DEEP WATER ACTIVITY) WET DECK (REPLACING PEBBLE BEACH) PRESERVE CATALINA POOL (add laps 60 ft. or expand to 75 ft.) 400 ft. LAZY RIVER WITH CONNECTED SLIDES DEEP WATER ACTIVITY POOL APPROX. 12,000 S.F. WATER (excluding wet deck area) $5M to 7M PROJECT (Approx.) REDUCED OPERATIONS EXPENSE

Option D Water Park Existing Slides Demo Pebble Beach New Wet Deck Demo Main Pool Lap Pool New Admin/ Concessions Existing BH Catalina Cove (with waves and Lazy River) WATER PARK (W/ LR & WAVES) WET DECK (REPLACING PEBBLE BEACH) PRESERVE CATALINA POOL (added waves and 350 ft. lazy river) SEPARATE LAP POOL WATER SLIDES APPROX. 13,000 S.F. WATER (excluding wet deck area) $5.5M to 7M PROJECT (Approx.) REDUCED OPERATIONS EXPENSE

Option E - Renovation Elevated Sundeck Water Slides Demo Pebble Beach Filter Wet Deck Avalanche Slide Drop Slides Main Pool Filter/Admin Concessions Entry BH/ Restrooms Catalina Cove RENOVATION WET DECK (REPLACING PEBBLE BEACH) RENOVATE CATALINA COVE & MAIN POOL TEMPORARILY OPERATE AVALANCHE SLIDE AND DROP SLIDES APPROX. 19,000 S.F. WATER (excluding wet deck area) $2M to 2.5M PROJECT (Approx.)

All New Aquatic Center -Option ALL NEW ZERO DEPTH ENTRY SMALL LAP AREA DIVING WATER SLIDES APPROX. 4,500 S.F. WATER $2.5M to $3M PROJECT (Current $) Does not include demo of Super Splash