S T A T I O N A R E A P L A N

Similar documents
Streetscape: Core Shopping District

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Observations and Ideas: Toomer s Corner Streetscape Improvements

Elm Street Business District: Streetscape and Signage Plan

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

PUBLIC REALM MASTER PLAN

STONY PLAIN ROAD STREETSCAPE

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

5 Circulation & Parking

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Chapter 3: Multi-Modal Circulation and Streetscapes

Tonight is for you. Learn everything you can. Share all your ideas.

UDC Street Cross Sections

TRANSPORTATION STANDARDS

MARTIN LUTHER KING JR. WAY

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Draft Recommended List of Potential Projects

Miami Health District

Circulation Improvement Strategy. Chapter 5: Improvement Strategy. Cross Street Neighborhood Improvement Plan

Welcome. If you have any questions or comments on the project, please contact:

GENERAL. 1. Description

NJDOT Complete Streets Checklist

Transportation Improvement Plan SECTION2

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

El Centro Mobility Hub

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

Omaha s Complete Streets Policy

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Guthriesville Village Manual of Written & Graphic Design Guidelines

Fulton Market Streetscape

integrated action plan

Why invest in the 1 Street S.W. Corridor?

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

CURBSIDE ACTIVITY DESIGN

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

5. Automobile Circulation, Wayfinding and Signage

Executive Summary Route 30 Corridor Master Plan

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

COMPLETE STREETS PLANNER S PORTFOLIO

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

5. RUNNINGWAY GUIDELINES

STREETSCAPE CONCEPT PLAN

Lincoln Neighborhood Corridor Plan The LiNC

Table #6 VISION CHARACTERISTICS

5 CIRCULATION AND STREET DESIGN

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

WELCOME. City of Eden Prairie West 70 th Street

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Design Guidelines. Overview. Design Vision for Yellow Brick Road

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Public Workshop #2. September 14, 2016

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

211 th Street Park Forest Station Area Pedestrian Access Improvement Plan May 2015

summary of issues and opportunities

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Chapter 3 BUS IMPROVEMENT CONCEPTS

1.3 Pedestrian Environments

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Town of Ashland. Downtown Planning Initiative 2 nd Community Workshop. March 29, Presented by:

C C C

Central Harlem Avenue Corridor Study

Complete Streets for Niagara A working method to visualize the creation of a complete street June 20th, 2013

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

Lawrence Avenue Streetscape Concepts August 30, 2011

Complete Streets. Designing Streets for Everyone. Sarnia

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

4 GENERIC COST ESTIMATING TOOL

City of Darlington Beautification Report

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Appendix A-2: Screen 1 Alternatives Report

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Walkability Audit Cities of Olympia, Tumwater and Lacey, Washington. Next Steps Memorandum September FINAL

A Guide to Great Streets: The Basics. September 25, 2009

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Morristown, NJ Complete Streets Policy

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Thesis Presentation. Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core. Brad Garcia Advisors: Jason Kost & Dominic Fischer

Chapter 2: Standards for Access, Non-Motorized, and Transit

ALTERNATIVES TO BE CONSIDERED

Bridges and Arizona Crossings

Chapter 4: Funding and Implementation

CHAPTER 7.0 IMPLEMENTATION

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Transcription:

The Circulation and Access Plan describes vehicle, pedestrian, and transit improvements recommended within the Concept Plan. In order to create and sustain a vibrant business district that provides pedestrian-friendly connections to and from the Elmwood Park Station, the majority of improvements relate to Grand Avenue and to Conti Parkway. Proposed improvements are depicted in Figure 9: Circulation and Access Plan and briefly described below. Vehicle Circulation, Access, and Parking Grand Avenue s street paving width is 56-feet wide from curb to curb, but the street s travel lane configuration varies due to intermittent on-street parking, turning medians, and intersection turning lanes. This inconsistent configuration creates a disorienting environment, particularly for those who are unfamiliar with the corridor. The condition also limits on-street parking, which is desired as a pedestrian-friendly buffer between moving traffic and sidewalks. The Plan suggests Grand Avenue should be re-designed to consistently accommodate four 11-foot travel lanes and two 7-foot parking lanes from Harlem to 76th Avenues. An exception would be to allow for leftturn lanes at signalized intersections, and the low concrete medians near the at-grade crossing of Grand Avenue and Metra s Milwaukee District West (MD-W) Line cannot be removed. The majority of properties fronting Grand Avenue currently depend on mid-block curb cuts to access off-street parking lots. This access configuration necessitates a center median turning lane along Grand Avenue. In order to re-design Grand Avenue with consistent on-street parking, curb cuts and single-use off-street parking lots need to be reduced. Potential solutions to this parking access dilemma are to provide shared municipal parking lots and to require side or rear yard access to parking lots. As part of the Preferred Concept Plan, redevelopment projects depend on structured parking to eliminate the need for off-street surface parking and maximize site development potential. In order to provide safe access to proposed parking structures, new traffic signals are recommended on Grand Avenue at 72nd Court and at 74th Avenue. Prior to actual site redevelopment, these new traffic signals could provide new consolidated access points in order to reduce curb cuts, and remove the median turning lane on Grand Avenue. The proposed traffic signals would need to be discussed with IDOT, ICC, and Metra due to the nearby traffic signals that would need to be interconnected. Page 7-

Diversey Avenue City of Chicago FIGURE 9 Circulation & Access Plan Sunset Drive Schubert Avenue July 2006 Metra Milwaukee District West Line Westwood Drive Conti Parkway Grand Avenue Wrightwood Avenue E. Brook Road W. Brook Road Altgeld Street Village of River Grove Altgeld Street 79th Avenue 78th Court 78th Avenue 77th Court Fullerton Avenue Belden Avenue 77th Avenue 76th Court 76th Avenue k 75th Court Grand Avenue 75th Avenue 74th Court 74th Avenue 73rd Court 73rd Avenue 72nd Court Harlem Avenue Elmwood Park Metra Station Study Area Boundary Village Boundary Grand Avenue Re-Design New Traffic Signal Recommended Pedestrian Streetscape Enhancements Palmer Street Crosswalk Enhancements Commuter Parking (139 Spaces, Including 5 Accessible) Proposed Future Commuter Parking (90 Surface Spaces) Proposed Shared-Use Parking Garage Locations 0 800 1600

Since Grand Avenue is under the jurisdiction of the Illinois Department of Transportation (IDOT), the recommended street configuration, signalization, and access patterns will require a detailed engineering study to analyze potential impacts. The Village should discuss potential funding with IDOT for a preliminary engineering study for the Grand Avenue re-design recommendations. Federal funding is available for transportation projects that improve pedestrian access to train stations. It is important to note that the at-grade railroad crossing with Grand Avenue is currently being studied for a possible grade separation. The current study will not be complete until late 2006. If a grade separation is deemed feasible and warranted, the implementation could take up to 10 years based on funding availability. Although the study s outcome may affect local roadway configuration, the Village should not delay in making Grand Avenue a more pedestrian-friendly street that connects with the Elmwood Park Station. Pedestrian Circulation and Access The current streetscape environment along Grand Avenue contains virtually no pedestrian amenities, and few street-level shopping opportunities. The Plan seeks to improve pedestrian amenities to complement and enhance the proposed mixed uses and residential uses along Grand Avenue. More importantly, the Plan recommends the creation of a unified business district--including Grand Avenue from Harlem and 76th Avenues, Conti Parkway, and the Elmwood Park Station--through a streetscape improvement program with the following pedestrian enhancements. Streetlights Pedestrian-scaled lighting is typically about 16-feet tall and focuses light on the sidewalk, which improves the pedestrian s safety and comfort. Recommended spacing is typically 60 feet on center. High-mounted streetlights illuminate the road and are meant for vehicle safety. Nevertheless, the style and pattern of the high-mounted streetlights could match the pedestrian-scaled lighting to create a harmonious and orderly impression when driving or walking along Grand Avenue and Conti Parkway. The Village has recently installed new pedestrian lights onto the high-mounted streetlights from the 76th to Harlem Avenues. Nevertheless, this project does not preclude the possibility for new decorative streetlights in the future. Page 7-

Streetlight Banners Colorful banners are typically used to welcome visitors to a district and provide business or community information. In order to unify the business district along Grand Avenue from Harlem to 76th Avenues and along Conti Parkway, streetlight banners should be installed to brand this geographic area as Downtown Elmwood Park. The Village currently has plans to install banners on every other streetlight pole in this area. Sidewalks Sidewalks should generally portray an image of a well-maintained and quality business district. New sidewalks could consist of plain concrete with a brick paver edge treatment, plain concrete with a scored pattern, or exposed-aggregate concrete that provides texture and color variations. Crosswalks Well-maintained striped crosswalks indicate to pedestrians and vehicles that the pedestrian has the right-of-way within the crosswalk area. Crosswalks are recommended at every signalized intersection along Grand Avenues, as well as along all cross streets. Due to expanse of paving at the Grand Avenue and Conti Parkway intersection, a special scored concrete pattern is recommended to unify Grand Avenue, Conti Parkway, and the Elmwood Park Station. (Note: Any crosswalk treatments that require sub-surface treatments and pass over a bus stop should be designed with a reinforced pavement according to Pace standards.) Street Trees Street trees provide shade to pedestrians in the warmer months, and soften an urban environment dominated by concrete and asphalt. Since Grand Avenue does not contain overhead utility lines, a street tree that provides a canopy over Grand Avenue could be used. Street trees are typically planted at 30 feet on center, and pruned to avoid blocking retail signage. In addition, it is important that trees do not interfere with Pace bus zones, which encompass an 85-foot length at corners. Street trees should not have any branches below 11.5 feet due to the height of Pace buses. Page 7-4

Street Furniture Street furniture such as tables and benches help create an outdoor room environment and implicitly signal to pedestrians that they should linger in the public realm. Benches and trash receptacles are especially important at train and bus stops for commuter comfort, as well as within small parks and plazas along Grand Avenue and Conti Parkway. In order to maintain a clean sidewalk environment, trash receptacles should generally be placed within each block of the business district, and convenient to bus stops and outdoor seating areas. Wayfinding Signage Wayfinding signage is important for both pedestrians and vehicles to travel to areas of interest within the business district. When a passenger departs from a train, they should be able to orient themselves towards Grand Avenue and Conti Parkway. In addition, signage should be used to clearly direct departing train passengers to nearby bus stops for transfer purposes. Similarly, vehicles along Grand Avenue should be able to easily locate the Elmwood Park Station and commuter parking areas. Due to the perception that there is a lack of business parking, consistent wayfinding signage could be used to direct vehicles to shared parking facilities and side street parking areas. A more detailed streetscape study should be undertaken to determine the specific types and locations for all of these pedestrian amenities. Due to the cost of streetscape improvements, the Village may wish to pursue a phased approach that allows the Village to provide public improvements when a development is approved for a particular block area. However, if the Village is able to obtain funding to re-design Grand Avenue and construct pedestrian enhancements at the same time, the Village should consider an integrated improvement approach to ensure costefficient implementation. Tax increment finance (TIF) funding could be used for engineering and construction of a streetscape improvement program, and is described further under Plan Implementation. Transit Access and Circulation Current access and circulation patterns to and from the Elmwood Park Station could be improved for pedestrians, vehicles, and buses. As highlighted in the Preferred Concept Plan, the station Page 7-5

side redevelopment concept contains a transit plaza, a gateway park, a bus drop-off, a kiss-n-ride location, and pedestrian enhancements. The Village should discuss these concepts with IDOT, Metra, and Pace to determine engineering feasibility. Pace is willing to work with the Village to develop a bus stop shelter plan to conform to the overall design of the streetscape improvement program. Due to the proposed transit plaza and gateway park, pedestrians would have greater northbound access to and from the station between Grand Avenue and Conti Parkway. Pedestrian access is currently mixed with vehicle access due to existing land uses and curb cuts. Additionally, there are recommendations to improve pedestrian access along Marwood Avenue west to Grand Avenue by completing the sidewalk from 77th Avenue to 77th Court and installing wheel-stops along the commuter parking area, which would prevent vehicles from encroaching upon the sidewalk area. The two proposed public open spaces would also improve transit and vehicle circulation. The gateway park would contain open space, sidewalks, and curbs. East of 76th Avenue, five on-street parking spaces would be assigned as a kiss-n-ride location with 15-minute parking restrictions. At Grand Avenue and 75th Court, a bus pull-out would be located at the northern perimeter of the transit plaza with clear views of the train station. (Note: On-street parking cannot interfere with Pace bus operations which require an 85-foot zone for corner stops and a 125-foot zone for mid-block stops). Finally, Metra has expressed a need for future commuter parking, particularly on the north side of the train station. To maximize existing parking resources, the Village could establish a free permit system for commuter parking along Marwood Avenue during peak hour use. For future parking infrastructure, Metra and the Village should explore the potential for a commuter parking lot on the north side of Grand Avenue at 75th Court. The single-story and auto-oriented land uses in this location are not transit-supportive. A commuter surface parking lot in this location would not only serve future parking needs, but could also be incorporated into a future mixed-use development project. Alternatively, future commuter parking demand could be accommodated in a parking structure as part of a mixed-use development along Grand Avenue between 74th and 75th Avenues. If the Village pursues the proposed kiss-n-ride, bus pull-out, or parking structure or surface lot for various uses, including future commuter parking needs, a public/private partnership could be formed between multiple parties, such as the Village, IDOT, Metra, and developers. Page 7-6