IMPLEMENTATION GUIDELINE NO. 13

Similar documents
PROPOSED RESIDENTIAL SUBDIVISION

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15

Street Paving and Sidewalk Policy

Minta Farm Berwick S96A Transport Impact Assessment

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

Proposed Residential & Retail Development at Geelong Rd Portarlington

CITY MANUALS AND STANDARDS REVIEW

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.

Appendix 12 Parking on footways and verges

DRAFT OPERATIONAL RESPONSIBILITY FOR PUBLIC ROADS IN WESTERN AUSTRALIA DRAFT VERSION 2

QLDC Council 29 October Report for Agenda Item: 3

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

10 SHERFORD Town Code

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

2. TRANSPORTATION ELEMENT.

TRANSPORT AND MOVEMENT

Delivering the. Strategy 7.0

PLAN 20 PUBLIC TRANSPORT NETWORK

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

WALKING PLAN. Analysis of pedestrian-related provisions in the Melbourne Planning Scheme. Purpose. Pedestrian issues

A5.1 Permitted activities

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Traffic Control Signals - Cosburn Avenue and Cedarvale Avenue

Appendix 5 Traffic Assessment

Inspector MUST Sign and Date Each Inspection

Wicklow County Council Chomairle Chontae Chill Mhantáin. Traffic Calming Policy

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

Pedestrian Crosswalk Audit

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

(HIGHWAY GEOMETRIC DESIGN -1)

Exhibit B: Proposed amendments to the Transportation Element of the Oakland Comprehensive Plan

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Liveable Neighbourhoods Design Code and Policy

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

SECTION 1 - TRAFFIC PLANNING

T A B L E OF C O N T E N T S

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

TOWN OF PAYSON TRAFFIC CALMING MANUAL

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Traffic Calming Policy

Non-Motorized Transportation 7-1

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY

Section 14B Purpose of the Suburban Residential Zone and the Large Lot Residential Zone

ALL SPFL CLUBS SCOTTISH HIGHLAND FOOTBALL LEAGUE CLUBS SCOTTISH LOWLAND FOOTBALL LEAGUE CLUBS

Safety barriers to a swimming pool and spa pool at 130 Wharf Road, Pigeon Bay

TGSI Tactile Ground Surface Indicators

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

ARLINGTON COUNTY, VIRGINIA

TRAFFIC STUDY GUIDELINES Clarksville Street Department

A2:1 The Facility Standards are focused on ensuring appropriate standards for the benefit of the Game including:

DRAFT for a State Policy for Healthy Spaces and Places

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

MILTON ROAD LLF PROJECT UPDATE

THE CORPORATION OF THE CITY OF KENORA BY-LAW NUMBER

BLYTHEWOOD PARK, BROMLEY

Metro Nashville Sidewalk Requirements. Section (Provision of sidewalks) Effective July 1, 2017

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP)

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

Case Study: Transportation Plan Environmental Impact Statement. National Park Service U.S. Department of the Interior

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

SECTION 8.0 HIGHWAY SETBACK LINES & ROADSIDE REGULATIONS

City of Margate, Florida. Neighborhood Traffic Management Manual

STANDARD PROCEDURE FOR MANAGING SPEED ON RESIDENTIAL STREETS

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

VEHICLE CROSSING AND PEDESTRIAN CUTDOWN SET OUT

COMMITTEE RECOMMENDATIONS. That Council approve:

CAR PARKING [15] General provision

Australian Standard. Manual of uniform traffic control devices. Part 3: Traffic control for works on roads AS AS 1742.

Citizens Handbook for Requesting Traffic Calming Devices

OSHTEMO TOWNSHIP COMPLETE STREETS POLICY

Confirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance

Transit boulevard: A new road type for Sydney s Growth Centres

WELCOME TO OPEN HOUSE # 1 June 14, 2017

The Value of Technical Peer Reviews

CIRCLE DRIVE TRAFFIC AND ACCESS MANAGEMENT POLICY GUIDE. Management Principles and Implementation Concepts

CITY OF TORONTO. BY-LAW No

NRA MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS. Introduction to the NRA Manual of Contract Documents for Road Works. Volume 0 Section 0 Part 1

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

QLDC Council 24 July Report for Agenda Item: Fergburger Proposed Shotover Street Footpath Upgrade

PennDOT Access Management Model Ordinances Training

NRA MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS

LIVESTOCK MOVEMENT BYLAW 2008

REPORT DP Development Approval & Planning Policy Department

ORDINANCE NO

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

Town of Siler City - Unified Development Ordinance ARTICLE XIV - Streets and Sidewalks

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Traffic Control Signals Review 4325 McCowan Road

Urban Street Design and Development

Transcription:

IMPLEMENTATION GUIDELINE NO. 13 Provision of Electricity, Driveways and Crossovers, Footpaths, Kerb and Channel Date of Council Resolution These guidelines were adopted by Council on 13 October 2009, and take effect on 20 October 2009, in accordance with Section 2.3 (2) of the Planning Scheme. Purpose of the Guidelines This document is intended to assist with the implementation of the Planning Scheme by providing guidelines for variations to development standards for:- 1. Provision of Electricity; 2. Driveway Inverts and Crossovers; and 3. Footpaths, Kerb and Channel. Council s Implementation Guidelines are intended to apply a standard approach to the interpretation and implementation of relevant aspects of the Planning Scheme. They offer a degree of certainty and formality to applicants, Council and the community. Where an applicant is proposing a variation to the guidelines the onus is on the applicant to demonstrate the facts and circumstances to support the variation. Guidelines 1. Provision of Electricity (1) Council s standard requirement for the provision of electricity to new development involves underground reticulation. (2) Overhead electricity reticulation may be acceptable in situations where:- (a) the subject land is already serviced by an overhead reticulation network; and (b) the development involves:- (i) a reconfiguration of land where there is no new road opening; or (ii) a single tenancy or dual occupancy use on an existing lot. (3) Underground electricity reticulation will normally be required for:- (a) hatchet lots; (b) reconfigurations which involve the opening of a new road; or (c) multiple dwelling units, or multiple tenancy retail/commercial/industrial sites (e.g. a shopping centre or multi tenancy factory complex). 2. Driveways and Crossovers (1) Driveway inverts (where required, i.e. in areas which do not have mountable kerbs) and footpath crossovers are to be installed prior to the commencement of the proposed use of the land. (2) Driveway inverts and footpath crossovers are required to be provided for all new lots created through the reconfiguration of land. NOTE 1 Approval to construct driveway inverts and footpath crossovers is also required to be obtained under Local Law No. 4 (Permits). (3) The relevant development approval is to be conditioned to ensure that future purchasers of the reconfigured lot(s) are notified about any outstanding requirements for construction, upgrade or maintenance of driveway inverts and footpath crossovers as a condition of sale. (4) A notation is also to be placed on Council s property system to highlight the requirement as per clause (3) above, for the purposes of inclusion on Planning and Development Certificates relating to the subject land if such work is outstanding at the time of signing and dating the plan of survey. (5) Existing access arrangements to existing dwellings will normally be considered to be adequate unless there is a demonstrated need for a new driveway invert or footpath crossover based on:- (a) an existing, rough footpath surface condition; or (b) evidence of scouring or other damage across the footpath or road surface. 3. Footpaths, Kerb and Channel (1) Where a development site frontage abuts, or is in close proximity (e.g. generally within 20m) to a site with an existing paved footpath, or kerb and channel, the developer shall be required to extend (construct) the paved footpath, or kerb and channel from the existing paved footpath, or kerb and channel for the full frontage of the subject land. (2) The developer shall also undertake any road widening or infill pavement works necessitated by the extension of the kerb and channel. NOTE 2 (1) This provision is intended to achieve the extension of contiguous lengths of paved footpath, or kerb and channel along the street frontage of a development site. (2) It is not intended to create isolated sections of paved footpath, or kerb and channel which do not immediately adjoin or cannot readily connect to an existing paved footpath, or kerb and channel. August 2013 1

(3) If the construction of the paved footpath, or kerb and channel is on a Council Works Program, the developer is to make a contribution of an amount to be conditioned in accordance with the proportionate cost (i.e. based on the length of site frontage) for the works as outlined in the Works Program. (4) Where Clauses 3(1) and (3) do not apply, and if the site is reasonably expected to be included in the kerb and channel network within ten (10) years, a contribution equal to the cost of the frontage works for the site, based on the amount specified in Council s Register of Fees and Charges (i.e. based on the length of site frontage), should be included as a condition of any development approval. (5) Where a development site is isolated from an existing kerb and channel network and is not reasonably expected to be included within the network within ten (10) years, no kerb and channel construction or contributions are required. Figure 3.1: Flow Chart Summarising Kerb & Channel Construction & Contribution Requirements Figure 3.2: Flow Chart Summarising Footpath Construction & Contribution Requirements (6) Where Clauses 3(1) and (3) do not apply, the developer is to make a contribution towards the cost of additional paved footpath works in the vicinity of the site, based on the amount specified in Council s Register of Fees and Charges (i.e. based on the length of site frontage). (7) The footpath contributions received under clause (6) above are to be used on the footpath network within the Roadworks Contribution Sector in which the site is situated, or within an adjoining or other Roadworks Contribution Sector where the footpath network also serves the site. (8) Where there is an existing sealed driveway footpath crossover which is suitable for use as part of a pedestrian footpath, or where a sealed driveway footpath crossover is required as a condition of approval, any footpath contribution amount is to be reduced accordingly to subtract the width of the driveway crossover from the contribution calculations. (9) Despite Clauses (6) to (8) above, Council may determine not to impose footpath contributions in situations where:- (a) it is unlikely that the site will be connected to a footpath network within ten (10) years; and (b) the development comprises an acreage subdivision (ie lots generally 4000m 2 or greater in area) within a designated or zoned large lot housing area; and (c) the overall development is small scale (eg 1 into 2 lot subdivision); and 2 October 2009

(d) the site does not constitute a major pedestrian thoroughfare providing a key link to a transit node (eg railway station) or community facilities hub (eg a school, shopping centre, or a township business centre). Figure 4.2 - Partial Reconfiguration NOTE 3 The payment of a contribution towards the construction of a paved footpath shall be utilised for the extension of the paved footpath network within the local area. 4. Examples for Footpath, Kerb and Channel - Construction & Contribution Requirements and Variations (1) Paved footpath, or kerb and channel construction and contribution requirements may vary depending on the location and form of development. Construction Examples (2) In accordance with Section 3 above, Figures 4.1 to 4.2 provide examples where the construction of the paved footpath, or kerb and channel may vary. Figure 4.1 - Standard 1 into 2 Lot Reconfiguration i. Site is immediately adjacent to the existing footpath, or kerb and channel network. The developer shall construct the paved footpath and kerb and channel for the full frontage of both lots. i. Construction shall extend a typical lot width into the balance lot, e.g. 20m for urban residential areas and 40m for large lot residential areas. NOTE 4 (1) A typical lot entitlement shall only be applied where the balance lot has the capacity to create more than two (2) additional lots, based on the typical lot frontage. (2) Where a typical lot entitlement (part payment) has been granted, the typical lot entitlement (part payment) is to be recorded on the balance lot. (3) The typical lot entitlement (part payment) is to be based on the typical lot width pattern in the street, e.g. 20m for urban residential areas and 40m for large lot residential areas. (4) A typical lot entitlement is not to result in a dwelling being located within the balance area (i.e. outside the typical lot entitlement). (5) Where the proposed lot incorporating the typical lot entitlement is vacant, a building envelope (BLE) shall be provided for the proposed lot within the typical lot entitlement area. Contribution Examples (3) In accordance with Section 3 above, Figures 4.3 to 4.6 provide examples where the contribution for the provision of paved footpath, or kerb and channel may vary. October 2009 3

Figure 4.3 - Standard 1 into 2 Lot Reconfiguration Figure 4.5 - Partial Reconfiguration With Options to Either Pay Contribution or Construct i. Site located within an area contained within a works program or is reasonably expected to be included in the kerb and channel network within ten (10) years and is not in close proximity to an existing paved footpath, or kerb and channel network. The developer shall make a contribution equal to the cost of the full frontage works of both lots for paved footpath and kerb and channel. Figure 4.4 - Partial Reconfiguration i. Where the existing paved footpath, or kerb and channel network is nearby but does not meet the close proximity test (e.g. 20m) the developer shall be given the option to:- (a) construct the paved footpath or kerb and channel for the full frontage to connect to the existing paved footpath or kerb and channel network; or (b) pay the contribution amount. Partial construction that does not connect into the existing network is to be avoided. Figure 4.6 - Corner Lot Partial Reconfiguration With Options to Either Pay Contribution or Construct i. Similar to Figure 4.3, except the site has capacity to create additional lots from the balance (larger) lot. Site located within an area contained within a works program or is reasonably expected to be included in the kerb and channel network within ten (10) years and is not in close proximity to an existing paved footpath, or kerb and channel network. i The contribution amount may be reduced from the standard full frontage to incorporate a typical lot entitlement (part payment) over the balance lot for paved footpath and kerb and channel. i. Where the existing paved footpath, or kerb and channel network is nearby but does not meet the close proximity test (e.g. 20m) the developer shall be given the option to:- (a) construct the paved footpath or kerb and channel for the full frontage to connect to the existing paved footpath or kerb and channel network; or (b) pay the contribution amount. Partial construction that does not connect into the existing network is to be avoided. 4 October 2009

Two (2) Street Frontage Example (4) Where a site has two (2) street frontages, the examples provided above would normally apply independently for each street frontage (see Figure 4.7). (5) Development should be designed to address both street frontages where practical. Figure 4.7 - Two Street Frontage 1 into 2 Lot Reconfiguration (6) However, where the secondary street frontage is:- (a) (b) (c) (d) unformed; inaccessible to the lot; not contained within a works program; and not reasonably expected to be included in the road network within ten (10) years; Council may waive the paved footpath, or kerb and channel contribution requirements to the secondary frontage. (7) The construction of a paved footpath, or kerb and channel within a laneway, or the payment of a contribution is not normally required where the laneway is provided for vehicular access and services only. (8) Where clause (6) or (7) above are considered applicable, the paved footpath, or kerb and channel contribution requirements will apply to the principal frontage only. Special Circumstances Notwithstanding the actual provisions contained in this Guideline, care should be exercised in its application in order to consider:- the specific impacts on individual cases, including adjoining lands; and whether non-compliance, by a marginal amount, with a specific numerical standard would affect the overall intent of the Guideline. i. Site is immediately adjacent to the existing footpath, or kerb and channel network. The developer shall construct the paved footpath and kerb and channel for the full frontage of both lots along both road frontages. October 2009 5