Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Similar documents
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

CTH M Reconstruction

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Application of a Complete Street

CSAH 101 Preliminary Design

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Tonight is for you. Learn everything you can. Share all your ideas.

Preliminary Engineering Study

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

6.4 RECOMMENDED IMPROVEMENTS

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods LANSDOWNE

DISTRICT BICYCLE PROGRAM

Board of Supervisors February 27, 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Engineering - Bicycle and Pedestrian

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Building Great Neighbourhoods BONNIE DOON

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Route 47 (North Main Street) Reconstruction

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Item No. 14 Town of Atherton

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

WELCOME. City of Eden Prairie West 70 th Street

Pre-Construction Meeting

5 CIRCULATION AND STREET DESIGN

Columbia Pike Implementation Team (CPIT) Meeting

Intersection Design. Leah Ness, Craig Hardy and Eric Sorensen

Road Diets FDOT Process

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Derby Street. Project Updates. Salem, Massachusetts

C C C

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

APPENDIX L: COST ESTIMATING TOOLS

RZC Appendix 8A Marymoor Subarea Street Requirements

NORTH DOWNTOWN N EAST WEST

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

East Burke Transportation, Safety and Capacity Improvements

5. RUNNINGWAY GUIDELINES

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Mark Malone, P.E. SD DOT

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

STANLEY STREET December 19, 2017

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Monroe Street Reconstruction

What Is a Complete Street?

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Fleur Drive Reconstruction

Chapter 2: Standards for Access, Non-Motorized, and Transit

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Washington St. Corridor Study

TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, :00 PM City Commission Room, City Hall, 6 E.

83 AVENUE PRE-CONSTRUCTION MEETING

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Southcote Road Improvements Class Environmental Assessment Study

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

TRANSPORTATION STANDARDS

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Final Sidewalk Feasibility Study

F L E T C H E R A V E N U E

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

INDEX. Geometric Design Guide for Canadian Roads INDEX

Transcription:

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House Atwood Avenue Fair Oaks to Cottage Grove Road

Outline Project Introduction Project Team Project location and limits Project scope and goals Design Alternatives Roadway Typical Sections Intersection Alternatives Bike and Pedestrian Accommodations Pedestrian Bridge Alternatives Project Schedule Questions

Project Team City of Madison Rob Phillips, P.E. City Engineer Chris Petykowski, P.E. Principal Engineer City of Monona Dan Stephany Brad Bruun MSA Professional Services, Inc. Jaime Kurten, P.E. Ben Wilkinson, P.E.

Project Location & Limits City of Madison 2021 Construction Fair Oaks Avenue to Cottage Grove Road Olbrich Garden Olbrich Park Lake Monona Cottage Grove Road

Section 4(f) Resources City of Madison Lowell School (Section 4(f) Resource) Olbrich Garden (Section 4(f) Resource) Olbrich Park (Section 4(f) Resource) Lake Monona (Section 4(f) Resource) Section 4(f) Resources Cottage Grove Road

Project Goals Improve safety and traffic operations while enhancing multimodal connectivity and safety. The proposed project includes: New pavement, curb and gutter, sidewalk 10-foot wide multi-use path along Atwood Avenue in OlbrichPark including a pedestrian bridge crossing of Starkweather Creek. 8-foot wide multi-use path along the south side of Atwood Avenue in Monona. Utilities: storm sewer, sanitary sewer, water main Street Lighting

Project Overview Layout

Roadway Typical Section

Roadway Typical Section

Roadway Typical Section

Roadway Typical Section

Other Alternatives Considered Consideration was given to both a reduction down to a 2-lane roadway and a 3-lane roadway. Why is a 3-lane roadway being recommended?

Other Alternatives Considered Inclusion of on-street bike facilities (4-ft bike lane + 2-ft gutter, 5-ft bike lane with integral curb, 4-ft bike lane+1-ft gutter) Conclusion Not Recommended Each alternative had considerable real estate impacts to both landscaping and buildings between Fair Oaks Avenue and Oakridge Avenue and also near the intersection of Cottage Grove Road. Reduction in lane width from 11-ft desirable to 10- ft minimum. Conclusion Incorporated where feasible Lane reductions are utilized where feasible and necessary to minimize impacts. Alternate bike route connection to Fair Oaks Avenue parallel to Atwood Avenue. Conclusion Not Recommended Property impacts and parkland impacts make this alternative less desirable.

Sight Distance Considerations Intersection at Oakridge Avenue with Fair Oaks Sight distance considerations at driveways along bike path in the Monona segment.

Intersection Control Evaluation Evaluate Intersection Alternatives Signal Roundabout

Intersection Control Evaluation Evaluation Factors Safety Operational Analysis Construction Cost Right-of-way Access Operation & Maintenance Cost Environment Large Vehicles Pedestrians & Bicycles

Intersection Alternatives-Signal

Intersection Alternatives-Roundabout

Intersection Alternatives Traffic Signal Provides signal control for pedestrian crossings Less right-of-way is needed Roundabout Slower speeds Safety Better operations, especially for Walter Street during off peak times Less severe crashes

Intersection Alternatives-Signal Right of Way Impacts Total R/W Impact = Approximately.58 Acre

Intersection Alternatives-Roundabout Right of Way Impacts Total R/W Impact = Approximately.70 Acre

Pedestrian and Bike Accommodations Sidewalks 10-foot wide multi-use path along Olbrich Park 8-foot wide multi-use path along south side of Atwood Avenue in Monona to Cottage Grove Road. Colored Crosswalks

Pedestrian and Bike Accommodations Bike Connectivity Overview

Pedestrian and Bike Conflicts

Pedestrian/Bike Enhancements

Pedestrian/Bike Bridge Aesthetics

Other Project Amenities Street Lighting Path Lighting Trees Planted or colored concrete medians

Real Estate Additional right of way and/or easements will be required for this project. The city of Madison will be assessing property owners in accordance with city policy.

Project Schedule, Funding, and Staging Schedule Fair Oaks Avenue to Cottage Grove Road Construction Anticipated for 2021 Funding Applied for Federal Funds for construction 60% Federal Funds/40% Local Funds Staging Construction includes construction of the preferred intersection alternative at Walter Street. Construction will be staged under traffic maintaining a single lane in each direction.

Feedback Sign In Review Exhibits Ask Questions Provide feedback & comments