SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING

Similar documents
Specifier Note: Retain or delete material(s) below to conform to project requirements.

SECTION 2 HILLTOPPER MOUND AND HOMEPLATE CLAY BASEBALL APPLICATIONS. 1. Hilltopper Mound Clay for baseball pitching mound or homeplate areas

RoaDrain Synthetic Subsurface Drainage Layer (SSDL)

Log Balance Beam. Product: (4 ), (6 )

Notice of Intent to Close Inactive CCR Surface Impoundments

MNDOT PAVEMENT DESIGN MANUAL

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

April This report was compiled by Soil & Dust Solutions Pty Limited Tel:

EVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HVAC DUCTS AND CASINGS.

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

NO FAULT SAFETY SURFACE DETAIL SHEET "A" CONCRETE BASE ADJACENT TO SOIL

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Minnesota

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

GRAVEL ROAD MAINTENANCE PLAN FOR THE TRANSPORT OF SOLAR ENERGY EQUIPMENT FROM CAPE TOWN TO THE ALEXANDER BAY AREA

4.7 Landscape Provisions.

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Field guide for Accessible Public Rights-of-Way Edition

Contactor & Recharger Stormwater Chambers

SUPERPAVE MIX DESIGN. Superpave Mix Design 1

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Rhode Island

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

CLEANING, INSPECTION, AND TESTING OF SEWERS

Installation of Nylon Putting NP50

Building Clay Tennis Courts

Minimum Standards for Driveway Construction Village of Bear Creek

Field guide for Accessible Public Rights-of-Way Edition

Managing Density For Asphalt Pavement

Americans with Disabilities Act and Curb Ramps

JAP Additional Information Sheet

TOWNSHIP OF DOURO-DUMMER BY-LAW NO

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Standard Test Procedures Manual

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

BALL STOP INSTALLTION GUIDE

ADA Training Standard Plans

BYLAW NUMBER

Non-required Fences Update

Method of Making and Curing Concrete Specimens in the Field for Compression and Flexural Tests

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE

STRAIGHT POLE TENSIONED BATTING TUNNEL POLE LAYOUT

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

High Performance Racetracks

TRAFFIC CONTROL DEVICES

Approved Models. Important. Contents

Multi-Flow Product Catalog

APPENDIX G SIGNAGE AND STRIPING SUPPLEMENT

BOUNDARY Deer & Perimeter Fence

Inspection and Acceptance of Asphalt Mix Design Laboratories

Driveway Design Criteria

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

SECTION SHOWER AND BATH ENCLOSURES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

BALLFIELD CLAYS. Our Ballfield Clay Products have been developed precisely for baseball fields. CONDITIONERS C L A Y - B A S E D S U R F A C E S SANDS

INTERNATIONAL SLURRY SURFACING ASSOCIATION TECHNICAL BULLETIN. 800 Roosevelt Road, Building C-312, Glen Ellyn, IL 60137

Paul Vraney Bureau of Project Development 02/11/2016

Presented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E

HumeCeptor system Installation guide. Issue 2

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

County of Spartanburg South Carolina

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

SECTION TRAFFIC REGULATIONS

Chloride Stabilization of Unpaved Road Aggregate Surfacing *

SMART STEEL CRASH CUSHION

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

INSTALLATION & MAINTENANCE

European Handball Federation TM EHF Beach Handball Commission

ADA on Construction. Guidance for Section C Plan Preparers

Fibar Systems & B U Y E R P R O T E C T I O N P L A N P L A Y G R O U N D S U R F A C I N G S Y S T E M S

Soil Aggregate *Nominal Maximum Minimum Weight No. of Splits to Obtain Designation Sieve Size of Particle of Sample, Ibs Portion for Test

Geofabrics. Products to improve the playability of your course. golf courses

Accommodating Pedestrians in the Work Zone

Hot Tub Pre-Delivery Guide

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

VILLAGE OF ISLAND PARK LOCAL LAW NO. 12 OF THE YEAR A local law Private Swimming Pools

Step-by-Step Planning Guide

Bases, Ballasts, and Paving

Cat't Paths. By James L. Holmes, Mid-Western Agronomist, USGA Green Section

Standard Test Procedures Manual

SECTIONAL SNOW PUSHER NEW HOLLAND CONSTRUCTION

Density of Granular Material by Modified Sand-Cone Method for Thin Layers

ADA Operations Contact Info

Kentucky Transportation Center

TOWN OF AURORA. Pool Enclosure Permit Guide. PLANNING AND BUILDING SERVICES Building Division

Parking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way.

Chapter 3 DESIGN SPECIFICATIONS

Item 404 Driving Piling

Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA , United States.

SUPERPAVE Construction Lessons Learned. NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003

Originally Issued: 10/08/2010 Revised: 10/30/2015 Valid Through: 10/31/2016

Originally Issued: 10/08/2010 Revised: 10/27/2017 Valid Through: 10/31/2018

WYDOT CONCRETE MIX DESIGN PROCEDURE

Inspection and Approval of Asphalt Mix Design Laboratories

Best Practices for Smoothness & Density

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED

GATOR BASE Case Study

RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES

Siting and Installation Manual

Transcription:

SECTION [32 15 40] [02730] STABILIZED DECOMPOSED GRANITE SURFACING EDIT SPECIFICATION: Edit the following guide specification to comply with project requirements. This document is available in word processing format at our website. Section numbers based on MasterFormat 2004 except that numbers shown in blue are based on MasterFormat 1995. TURN ON HIDDEN TEXT FUNCTION TO SEE OR PRINT NOTES TO THE SPECIFIER. COORDINATE WITH DRAWINGS: Show location and extent of stabilized granite surfacing. Show details required at adjoining materials and special conditions. The depth of base coursed and the thickness of stabilized granite surfacing can be either shown on the drawings or described in the specifications; edit this section carefully to avoid conflicting requirements. FOR MORE INFORMATION: Contact Gail Materials at www.gailmaterials.net or call 951-279-1095. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Stabilized decomposed granite surfacing. B. Related Work: 1. Section [[32 16 13] [02770] Concrete Curbs] [ ]: Concrete curbs. 2. Section [[31 10 00] [02310] Earth Moving] [ ]: Grading. 3. Section [[32 11 00] [02720] Base Courses] [ ]: Base Course. 1.2 REFERENCES A. ASTM C136 Sieve Analysis of Fine and Coarse Aggregates. B. ASTM D2419 Sand Equivalent Value of Soils and Fine Aggregates. C. Greenbook Standard Specifications for Public Works Construction. D. [RIS Redwood Inspection Services Grades of California Redwood.] E. USP U.S. Pharmacopeial Convention (1995). 1.3 SEQUENCING GAIL MATERIALS Page 1 NATRACIL

A. Do not install work specified in this Section prior to acceptance of earth moving. B. Coordinate work specified in this Section with work specified in other Sections to minimize cutting of and operation of heavy equipment over installed stabilized decomposed granite surfacing. 1.4 SUBMITTALS A. Submit in accordance with Section [[01 33 00] [01330] Submittal Procedures] [ ]: 1. Manufacturer s product data sheet and installation instructions indicating that product complies with specifications for: a. Stabilized decomposed granite surfacing. b. [Edging] [and] [ ]. 2. Submit [quart] [ ] samples of stabilized decomposed granite material [in color[s] specified.] [in manufacturer s standard colors for selection.] 3. [Redwood Edging: Submit evidence of chain-of-custody in accordance with Forest Stewardship Council.] 1.5 MOCK-UP A. Install [20] [ ] square feet minimum of stabilized decomposed granite surfacing, including [base course and] edging, at location approved by [Architect] [Engineer]. B. Allow [Architect] [Engineer] to view mock-up before proceeding with rest of stabilized decomposed granite surfacing. C. [Approved mock-up may remain as part of completed Work.] [Remove mock-up after acceptance of work specified in this Section.] 1.6 DELIVERY, STORAGE, AND HANDLING A. Protect stabilized decomposed granite mix from contamination. Store under cover. 1.7 FIELD CONDITIONS A. Do not install stabilized decomposed granite surfacing when subbase is wet at saturated field capacity. PART 2 - PRODUCTS 2.1 STABILIZED DECOMPOSED GRANITE MATERIALS GAIL MATERIALS Page 2 NATRACIL

A. Acceptable Manufacturer: 1. Specification is based on products by Gail Materials, Corona, CA; phone 951-667-6106; fax 951-667-6102; www.gailmaterials.net. 2. Substitutions: [Not allowed.] [Products by other manufacturers that comply with specifications will be considered in accordance with Section [[00 21 13] [00200] - Instructions to Bidders.] [[01 25 00] [01630] Substitution Procedures.] [.]] B. Decomposed Granite: 1. Produce from naturally friable granite. Blends of coarse sand and rock dust are not acceptable. 2. Gradation, in accordance with ASTM C136: Sieve Size Percent Passing ½ 100 3/8 90 100 No. 4 50 100 No. 30 25 55 No. 100 10 20 No. 200 5 18 3. Sand Equivalent: 30 minimum in accordance with ASTM D2419. 4. Color: [Equal to Gail Materials [ ].] [To be selected by [Architect] [Engineer] from manufacturer s standard colors.] 5. Supplier: Gail Materials, Corona, CA; phone 951-667-6106; fax 951-667-6102; www.gailmaterials.net. C. Binder: Provide Natracil by Gail Materials and complying with following requirements: 1. Swell Volume: 35 ml/gm minimum in accordance with USP procedures. 2. 90% minimum shall pass a No. 40 mesh screen. D. Factory Blending: 1. Mix decomposed granite and Natracil with a pug mill that includes a weigh-belt feeder. 2. [Pedestrian Paths] [Horse Trails] and [ ]: Mix 12 lbs. of binder per 2000 lbs. of aggregate. 3. [Vehicular Drives] [Roadways] and [ ]: Mix 14 lbs. of binder per 2000 lbs of aggregate. 2.2 BASE COURSE MATERIAL A. Comply with Greenbook Section 200-2 Untreated Base Materials for [crushed aggregate base or crushed slag base] [crushed miscellaneous base] [processed miscellaneous base] [select subbase]. 2.3 ACCESSORIES GAIL MATERIALS Page 3 NATRACIL

A. Water: Free from contaminants that would discolor or be deleterious to stabilized decomposed granite surfacing. B. [Steel [Edging] [and] [Water Diversion Bars]]: 1. Dimensions: [3/16 ] [¼ ] [ ] thick by [4-inch] [ ] deep, with overlapping joints. 2. Stakes: 3/16 x 16 long x 1-3/4 wide at top tapering to point at bottom; located 36 o.c. maximum. 3. Finish: [Baked-on [green] [brown] [black] paint.] [Hot-dipped galvanized.] C. [Redwood [Edging] [and Water Diversion Bars]]: 1. Material: RIS Merchantable Heart Grade [from sustainability managed forests as certified by the Forest Stewardship Council.] 2. Dimensions: Nominal [1 x 4] [ ] inches. 3. Stakes: Nominal [2 x 2] [ ] inches by 16 long; located 36 o.c. maximum. D. [Recycled Plastic Lumber [Edging] [and] [Water Diversion Bars]: 1. Material: lumber made from recycled polyethylene and UV stabilizers. 2. Dimensions: Nominal [2 x 4] [ ] inches. 3. Stakes: Steel, 3/16 x 16 long x 1-3/4 wide at top tapering to point at bottom; located 36 o.c. maximum. 4. Finish: Provide in color to be selected by [Architect] [Engineer] from manufacturer s standards. E. [Geosynthetic Fabric: Comply with Greenbook Section 213-2 Geosynthetics, Type [N90] [ ].] F. [Soil Sterilant: [ ]] PART 3 - EXECUTION 3.1 EXAMINATION A. Examine grading and subsoil conditions. Do not proceed until conditions are acceptable. 3.2 PREPARATION A. Excavation: Excavate to depth required so edges of stabilized decomposed granite surfacing will match adjacent grades and have a maximum cross slope of 1 percent. [Remove excavated soil from site. [Spread excavated surface as specified in Section [31 10 00] [02310] [ ]. B. Subgrade Preparation: Comply with Greenbook Section 301-1 Subgrade Preparation. GAIL MATERIALS Page 4 NATRACIL

C. [Geosynthetic Fabric: Comply with Greenbook Section [300-10 Geotextiles for Separation ] [ ]. Do not extend beyond limits of stabilized decomposed granite surfacing.] D. Base Course Installation: Comply with Greenbook Section 301-2 Untreated Base. E. [[Edging,] [Water Diversion Bars,] [and] [Parking Stall Markings]: Install flush with stabilized decomposed granite surfacing. Provide sufficient stakes to secure in place.] 3.3 INSTALLATION A. Prior to installation, thoroughly presoak surface on which stabilized decomposed granite surfacing is to be placed. Natracil Stabilized Decomposed Granite is typically installed four (pedestrian) to six (vehicular) inches thick. B. Install in 2 maximum lift thickness and soak with sufficient water to activate Natracil through entire depth of lift. Install the additional lifts and soak with sufficient water to activate Natracil as required. C. Grade and smooth to required elevation. D. Compact: After +/- 4 hours, compact final lift with a three-five ton double or single static drum roller. E. Minimum Compacted Thickness: Install to depth shown on Drawings. F. Minimum Compacted Thickness: 1. [Pedestrian Paths] [Horse Trails] and [ ]: [4] [ ] inches. 2. [Vehicular Drives] [Roadways] and [ ]: [6] [ ] inches. G. Surface shall follow overall contours of landscape. Flat areas shall be crowned for drainage. [Slope [one] [ ] percent minimum to drain away from structures.] H. Completed surface shall be of consistent quality and free of deleterious materials such as organic materials, nails, stones, and loose material. Surface shall not have depressions or humps greater than [¼] [ ] inch in ten feet. 3.4 FIELD QUALITY CONTROL A. Material shall comply with manufactures specifications. 3.5 PROTECTION GAIL MATERIALS Page 5 NATRACIL

A. Do not allow traffic on stabilized decomposed granite surfacing for four days after placement or until compacted stabilized decomposed granite has fully cured. B. Protect stabilized decomposed granite surfacing from damage until Project completion. Repair damaged areas to match specified requirements. 3.6 MAINTENANCE & REPAIRS A. Loose aggregate will appear on the surface over time which is a natural occurrence. If excessive aggregate over ¼ inches occurs, redistribute the stabilized decomposed granite over the entire surface, water thoroughly and re-compact with a minimum one ton drum roller. This process can be repeated as needed. B. To repair, excavate damaged area leaving a minimum one inch depth of existing stabilized decomposed granite, water and scarify. Scarifying existing stabilized decomposed granite will prevent a cold joint layer between the existing stabilized decomposed granite and the newly imported pre-blended stabilized decomposed granite. C. Add water to the pre-blended stabilized decomposed granite to activate. Apply moistened pre-blended stabilized decomposed granite to excavated area at or above finished grade. D. Compact with a walk behind drum roller. Do not allow traffic on stabilized decomposed granite surfacing for one-two days after placement or until compacted stabilized decomposed granite has fully cured. E. END OF SECTION Copyright 2008 by Gail Materials. A license is given to qualified design, construction, and landscaping professionals to copy this document for the purpose of preparing project specifications for products supplied by Gail Materials. Natracil and NexPave are trademarks of Gail Materials. GAIL MATERIALS Page 6 NATRACIL