Similar documents




OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17


*REVISED-AWARDED CALL ORDER /09/13



OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000


OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15

OKLAHOMA DEPARTMENT OF TRANSPORTATION

OKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018

LINE ITEM REPORT 9/18/2009

Bowhunter Observation Survey

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019

Apparent Bids for Letting of January 20, 2017

Bowhunter Observation Survey

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

Estimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1

Asphalt Concrete Plants With Expired or Nearly Expired Scale Certifications (Scales must be recertified every six months)

HIR on Oklahoma Turnpikes

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

Club County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa

General Notes. Project No /15/2018 Page 1 of 1

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Edge Wedge 150 lb/ft 3

ACTIVE PROJECTS DIRECTORY

DAVID JAMESON 2014 BIG-GAME REPORT. By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician OUTDOOR OKLAHOMA

2017 DIVISIONS 1ST GRADE

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

General Notes. Project No /15/2018 Page 1 of 1

"Emul Asph (SS-1HP) Tack".

TO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2018

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

Along the Arkansas with Oklahoma s First Scientist

2012 Payne County Economic Outlook

FDOT Treasure Coast Traffic Report

City Council Work Session

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

Page 1 of KA

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

STAGE #3 TRANSITION 1 at Camp Keystone

2011 VISITING SIDELINE SPIRIT GUIDE TABLE OF CONTENTS

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

FOR SALE OR LEASE COMMERCIAL / INDUSTRIAL BUILDING

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as

Important Lane Closures for Jan , 2012

Tour de Wyoming 2015 Route Overview:

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

Sapulpa has always been nice size manufacturing center. On Dewey Street we next encountered a tribute to their transportation and rail development

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Report

Flood Insurance Study

Commence - Athletes Transport Mall. Left at traffic lights onto Parklands Drive. Right at traffic lights onto Smith St

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, SEPTEMBER 16, 2014 FOR LETTING OF SEPTEMBER 26, 2014

Mileage One-Way (Remember, river left is the left side of the river headed downstream.)

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium

do you know what you are missing?

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

Proposed Project I 35 from Denton to Cooke County Line

Buckeye Mountaineer Conference Directions

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

APPENDIX D COST SUMMARY TABLES

Decreasing Distribution and Current Status of the Arkansas River Shiner, Notropis girardi, in the Rivers of Oklahoma and Kansas

2015 Summer Kickoff June 12-14, 2015

Legislative Update Williamsburg Residency

MISSOURI DEPARTMENT OF TRANSPORTATION NOTICE OF BID OPENING FOR PROPOSED STATE ROAD WORK BIDS TO BE RECEIVED -- January 19, 2018

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

RECEIVED. Colorado Secretary of State. t iu. Initiative #22 ORIGINAL TEXT. Be it Enacted by the People of the State of Colorado:

FDOT Treasure Coast Traffic Impact Report

Girls on the Run Spring 5K Parent Guide

6 BOYS. 1) Garfield County Tigers 2) Okarche 3) Guymon Sharpshooters

FDOT Treasure Coast Traffic Impact Report

FOR LOOP RAMPS-TAPERED DECELERATION LANE

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Current Roadway Projects Wednesday, September 03, 2014

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Flood Insurance Study

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

American Legion Legacy Run Route Plan

Highway Construction

OKLAHOMA SECONDARY SCHOOL ACTIVITIES ASSOCIATION P.O. Box 14590, Oklahoma City, Oklahoma

Tack Coat Effect on Field Performance. February 3rd, 2015 NCAUPG/ICT Joint Meeting

Update January 4, 2016

Plan Holders Listing October 19, 2018 Letting (1) CN McKinley County

Driving Directions from Jacksonville, TX to Jacksonville, TX

I-10 AT SCENIC LOOP RD. Open House

INCOG Board of Directors

Transcription:

AWARDED: CALL ORDER: 080 PROJECT NO.: SAP-111D(41) J.P. NUMBER: 1879104 BAMS NO: 010065 CALENDAR DAYS ALLOTTED: 30 COUNTY: CHEROKEE HIGHWAY NO.: PARK ROAD LENGTH: 0.000000 MILES LOCATION : SEQUOYAH STATE PARK-WESTERN HILLS LODGE PARKING LOT CONTRACT AMOUNT : $ 60,025.00 CONTRACTOR : TIGER INDUSTRIAL TRANS. SYS., INC. FT. GIBSON OK AWARDED: CALL ORDER: 090 PROJECT NO.: IMY-35-2(242)118 J.P. NUMBER: 1793704 BAMS NO: 010039 CALENDAR DAYS ALLOTTED: 580 COUNTY: CLEVELAND HIGHWAY NO.: I-35 LENGTH: 1.055000 MILES DESCRIPTION : BRIDGE REDECKING & REHABILITATION LOCATION : I-35 OVER 5TH STREET AND MAIN STREET IN MOORE. CONTRACT AMOUNT : $ 8,251,978.20 CONTRACTOR : HASKELL LEMON CONST. CO. OKLAHOMA CITY OK AWARDED: CALL ORDER: 120 PROJECT NO.: BRFY-NBIP(209) J.P. NUMBER: 1876404 BAMS NO: 010041 CALENDAR DAYS ALLOTTED: 60 COUNTY: COAL HIGHWAY NO.: SH-43 LENGTH: 0.000000 MILES DESCRIPTION : BRIDGE PAINTING LOCATION : AT MUDDY BOGGY CREEK AND OVERFLOW, 1.44 MILE EAST OF COALGATE ON SH-43 CONTRACT AMOUNT : $ 130,800.00 CONTRACTOR : M.B.E., INC. TARPON SPRINGS FL HOLIDAY FL

AWARDED: CALL ORDER: 130 PROJECT NO.: STPY-16C(280) J.P. NUMBER: 1016704 BAMS NO: 010042 CALENDAR DAYS ALLOTTED: 360 COUNTY: COMANCHE HIGHWAY NO.: SH-49 LENGTH: 5.256000 KILOMETERS DESCRIPTION : GRADE, DRAIN AND BRIDGE LOCATION : FROM THE JCT. OF SH-58/SH-49 JUST EAST OF MEDICINE PARK EAST TO I-44 CONTRACT AMOUNT : $ 3,400,717.81 CONTRACTOR : BEMIS CONSTRUCTION, INC. WHEATLAND OK AWARDED: CALL ORDER: 140 PROJECT NO.: BHIY-NBIP-0(111)(205)000 J.P. NUMBER: 1792204M BAMS NO: 010043 CALENDAR DAYS ALLOTTED: 60 COUNTY: GARVIN HIGHWAY NO.: I-35 LENGTH: 0.000000 MILES DESCRIPTION : BRIDGE PAINTING LOCATION : SH-145 OVER I-35, 6.7 MILES NORTH OF SH-19 ON I-35 AND COUNTY ROAD OVER I-35 1.0 MILE SOUTH OF SH-19 ON I-35 CONTRACT AMOUNT : $ 63,940.00 CONTRACTOR : KERRVILLE PAINTING CO., INC. KERRVILLE TX AWARDED: CALL ORDER: 150 PROJECT NO.: BHIY-35-2(241)079/BHIY-35-2(24 J.P. NUMBER: 1792205M BAMS NO: 010044 CALENDAR DAYS ALLOTTED: 90 COUNTY: GARVIN HIGHWAY NO.: I-35 LENGTH: 0.000000 MILES DESCRIPTION : JOINT REPAIR/SEAL LOCATION : SH-145 OVER I-35 APPROX. 2.0 MILE WEST OF PAOLI; COUNTY ROAD OVER I-35 APPROX. 1.0 MILE SOUTH OF JCT. OF I-35/SH-19. CONTRACT AMOUNT : $ 93,795.97 CONTRACTOR : PBX CORPORATION SAPULPA OK

AWARDED: CALL ORDER: 160 PROJECT NO.: HDPY-9269(002)HP J.P. NUMBER: 1286504 BAMS NO: 000103 CALENDAR DAYS ALLOTTED: 150 COUNTY: GRANT HIGHWAY NO.: US-60 LENGTH: 3.370000 MILES DESCRIPTION : GRADE, DRAIN & SURFACE(ASPHALT) LOCATION : ON US-60 BEGINNING APPROXIMATELY 1.0 MILE SOUTH AND 3.2 MILE WEST OF LAMONT AND EXTENDING WEST. CONTRACT AMOUNT : $ 979,424.75 CONTRACTOR : K & R BUILDERS, INC. WHEATLAND OK AWARDED: CALL ORDER: 170 PROJECT NO.: CB-133D(16) J.P. NUMBER: 1683604 BAMS NO: 010067 CALENDAR DAYS ALLOTTED: 120 COUNTY: JACKSON HIGHWAY NO.: COUNTY ROAD LENGTH: 0.220000 KILOMETERS DESCRIPTION : BRIDGE AND APPROACHES LOCATION : CO. BR. OVER UNNAMED CREEK, 2 MILES EAST AND 3.2 MILES SOUTH OF INTERSECTION OF SH-34 AND US-62 CONTRACT AMOUNT : $ 86,620.20 CONTRACTOR : SEWELL BROTHERS, INC. CORDELL OK AWARDED: CALL ORDER: 290 PROJECT NO.: IMY-NBIP-0(114)000IR J.P. NUMBER: 1792604 BAMS NO: 010054 CALENDAR DAYS ALLOTTED: 60 COUNTY: OKMULGEE HIGHWAY NO.: I-40 LENGTH: 0.000000 MILES DESCRIPTION : BRIDGE PAINTING LOCATION : OVER RAILROAD, 5.5 MILES EAST OF OKFUSKEE COUNTY LINE ON I-40 CONTRACT AMOUNT : $ 62,750.00 CONTRACTOR : KERRVILLE PAINTING CO., INC. KERRVILLE TX

AWARDED: CALL ORDER: 300 PROJECT NO.: IMY-40-6(277)239IR J.P. NUMBER: 1792605 BAMS NO: 010055 CALENDAR DAYS ALLOTTED: 30 COUNTY: OKMULGEE HIGHWAY NO.: I-40 LENGTH: 0.000000 MILES DESCRIPTION : JOINT SEAL/REPAIR LOCATION : I-40 OVER THE BURLINGTON NORTHERN-SANTA FE RAILROAD APPROX. 1.0 MILE WEST OF THE JUNCTION OF I-40/INDIAN NATION TURNPIKE CONTRACT AMOUNT : $ 32,188.00 CONTRACTOR : KEYSTONE SERVICES, INC. BIXBY OK AWARDED: CALL ORDER: 340 PROJECT NO.: BRO-165D(15)CO J.P. NUMBER: 1790504 BAMS NO: 010058 CALENDAR DAYS ALLOTTED: 120 COUNTY: ROGER MILLS HIGHWAY NO.: COUNTY ROAD LENGTH: 0.169000 MILES DESCRIPTION : BRIDGE AND APPROACHES LOCATION : COUNTY BRIDGE OVER WILD HORSE CREEK APPROX. 3.5 MILES NORTH AND 1.8 MILES WEST OF STRONG CITY CONTRACT AMOUNT : $ 145,499.92 CONTRACTOR : K & R BUILDERS, INC. WHEATLAND OK AWARDED: CALL ORDER: 343 PROJECT NO.: ACBRFY-168A(35)GB/ACBRFY-168A( J.P. NUMBER: 1746904C BAMS NO: 010174 CALENDAR DAYS ALLOTTED: 720 COUNTY: SEQUOYAH HIGHWAY NO.: US-59 LENGTH: 2.746000 MILES DESCRIPTION : GRADE, DRAIN, BRIDGE & SURFACE(ASPHALT) LOCATION : ON US-59 BEGINNING APPROXIMATELY 4.7 MILE NORTH OF THE JUNCTION OF US-59/SH-9 AND EXTENDING NORTH. CONTRACT AMOUNT : $ 28,446,012.54 CONTRACTOR : JENSEN CONST. CO. TULSA OK

AWARDED: CALL ORDER: 380 PROJECT NO.: SAP-176D(43) J.P. NUMBER: 1879004 BAMS NO: 010074 CALENDAR DAYS ALLOTTED: COUNTY: WOODS HIGHWAY NO.: PARK ROAD LENGTH: 0.000000 MILES LOCATION : LITTLE SAHARA STATE PARK-ENTRANCE TO EXIT AREA OF MAIN PARK AND ENTRANCE TO EXIT OF DUMP STATION CONTRACT AMOUNT : $ 108,572.75 CONTRACTOR : BROCE CONSTRUCTION CO., INC. NORMAN OK AWARDED: CALL ORDER: 540 PROJECT NO.: MC-110C(72) J.P. NUMBER: 1874804 BAMS NO: 010090 CALENDAR DAYS ALLOTTED: COUNTY: CARTER HIGHWAY NO.: SH-76 LENGTH: 3.710000 MILES LOCATION : BEGIN 3.71 MILES SOUTH OF JCT. SH-76/SH-53W,EXTEND NORTH TO JCT. SH-76/SH-53W CONTRACT AMOUNT : $ 156,785.20 CONTRACTOR : OVERLAND CORPORATION ARDMORE OK AWARDED: CALL ORDER: 550 PROJECT NO.: IMC-143N(23) J.P. NUMBER: 1875204 BAMS NO: 010091 CALENDAR DAYS ALLOTTED: 30 COUNTY: LOVE HIGHWAY NO.: I-35 LENGTH: 3.800000 MILES LOCATION : BEGIN AT THE NORTH END OF RAILROAD OVERPASS (MILE POST 8), EXTEND NORTH ON I-35 (OUTSIDE SOUTHBOUND LANES ONLY) CONTRACT AMOUNT : $ 137,598.72 CONTRACTOR : BROCE CONSTRUCTION CO., INC. NORMAN OK

AWARDED: CALL ORDER: 680 PROJECT NO.: MC-124C(28)PT1&2/MC-127B(36)PT J.P. NUMBER: 1873704SC BAMS NO: 010104 CALENDAR DAYS ALLOTTED: COUNTY: GARFIELD HIGHWAY NO.: SH132/SH11/SH51/SH15 LENGTH: 39.700000 MILES DESCRIPTION : RESURFACE(ARMOR COAT) LOCATION : ARMOR COAT ALONG SH-132, SH-11, SH-51 AND SH-15 IN GARFIELD GRANT, KINGFISHER AND NOBLE COUNTIES IN DIVISION 4. CONTRACT AMOUNT : $ 643,235.70 CONTRACTOR : VANTAGE PAVING, INC. OKLAHOMA CITY OK AWARDED: CALL ORDER: 790 PROJECT NO.: MC-142A(58) J.P. NUMBER: 1874004 BAMS NO: 010115 CALENDAR DAYS ALLOTTED: COUNTY: LOGAN HIGHWAY NO.: US-77 LENGTH: 4.670000 MILES DESCRIPTION : MICROSURFACE LOCATION : FROM JCT.I-35/US-77 EXTEND NORTH TO INDUSTRIAL ROAD ON US-77 CONTRACT AMOUNT : $ 227,306.50 CONTRACTOR : VANCE BROTHERS, INC. KANSAS CITY MO AWARDED: CALL ORDER: 890 PROJECT NO.: MC-176B(42) PT.1.PT.2 J.P. NUMBER: 1872304C BAMS NO: 010125 CALENDAR DAYS ALLOTTED: COUNTY: WOODS HIGHWAY NO.: US-281/US-64 LENGTH: 2.894000 MILES LOCATION : EXTEND SOUTH AND WEST OF JCT. US-281/US-64 IN ALVA CONTRACT AMOUNT : $ 411,714.00 CONTRACTOR : THE CUMMINS CONST. CO., INC. ENID OK

LETTING DATE = 02/22/01 REJECTED: CALL ORDER: 341 PROJECT NO.: ACBRFY-168A(35)GB J.P. NUMBER: 1746904 BAMS NO: 010172 CALENDAR DAYS ALLOTTED: COUNTY: SEQUOYAH HIGHWAY NO.: US-59 LENGTH: 2.390000 MILES DESCRIPTION : GRADE, DRAIN & SURFACE(ASPHALT) LOCATION : ON US-59 BEGINNING APPROXIMATELY 4.7 MILE NORTH OF THE JUNCTION OF US-59/SH-9 AND EXTENDING NORTH. CONTRACT AMOUNT : CONTRACTOR : REJECTED: CALL ORDER: 342 PROJECT NO.: ACBRFY-168A(70)GB J.P. NUMBER: 1746907 BAMS NO: 010173 CALENDAR DAYS ALLOTTED: COUNTY: SEQUOYAH HIGHWAY NO.: US-59 LENGTH: 0.356000 MILES DESCRIPTION : BRIDGE & APPROACHES LOCATION : ON US-59 OVER THE ARKANSAS RIVER AT THE SEQUOYAH/LEFLORE COUNTY LINE. CONTRACT AMOUNT : CONTRACTOR : REJECTED: CALL ORDER: 560 PROJECT NO.: MC-110C(72)/IMC-143N(23) J.P. NUMBER: 1874804C BAMS NO: 010092 CALENDAR DAYS ALLOTTED: COUNTY: CARTER HIGHWAY NO.: SH-76/I-35 LENGTH: 7.510000 MILES LOCATION : BEGIN 3.71 MILES SOUTH OF JCT SH-76/SH-53W EXT. NORTH ON SH-76 AND EXT NORTH FROM MILE POST 8 ON I-35 CONTRACT AMOUNT : CONTRACTOR :

LETTING DATE = 02/22/01 THE TOTAL AMOUNT OF AWARDED CONTRACTS: $ 43,438,965.26 ================ THE TOTAL AMOUNT OF REJECTED CONTRACTS: $ 29,433,903.55 ================