Prince George s County plans, policies, and projects

Similar documents
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

NJDOT Complete Streets Checklist

Omaha s Complete Streets Policy

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

What Is a Complete Street?

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Appendix 3 Roadway and Bike/Ped Design Standards

CHAPTER IV Transportation

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN

Small Town & Rural Multimodal Networks

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Active Transportation Infrastructure Investment A Business Case

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Executive Summary Route 30 Corridor Master Plan

Living Streets Policy

City of Saline. Complete Streets Ordinance

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Planning Guidance in the 2012 AASHTO Bike Guide

5. RUNNINGWAY GUIDELINES

Table #6 VISION CHARACTERISTICS

Solana Beach Comprehensive Active Transportation Strategy (CATS)

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Arlington s Master Transportation Plan

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Preliminary Countywide Master Plan of Transportation. October Transportation Planning Section Countywide Planning Division

This page intentionally left blank.

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Proposed White Flint Separated Bike Lane Network September 2015

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Land Use Bicycle Spaces Required Type Residential

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

COMPLETE STREET DESIGN: CHALLENGES AND SOLUTIONS. John Pulliam PE and Frederik Venter PE APWA Monterey Bay Chapter November 13, 2013

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Designing Complete Streets: What you need to know

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Plant City Walk-Bike Plan

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

INDEX. Geometric Design Guide for Canadian Roads INDEX

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Transportation Planning Division

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Classification Criteria

COMPLETE STREETS PLANNER S PORTFOLIO

Chapter 5. Complete Streets and Walkable Communities.

Design Guidelines. Overview. Design Vision for Yellow Brick Road

Clackamas County Comprehensive Plan

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Active Transportation Facility Glossary

EXECUTIVE SUMMARY. Vision

4 Goals, Objectives & Actions

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

C C C

South Carolina Department of Transportation. Engineering Directive

El Centro Mobility Hub

Modest Improvements for More Bicycle-Friendly Road Projects

Complete Streets Guidance

How to Develop a Pedestrian Safety Action Plan

Road Diets: Reconfiguring Streets for Multi-Modal Travel

Physical Implications of Complete Streets Policies

Who is Toole Design Group?

Perryville TOD and Greenway Plan

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

Color your stress away

Chapter 2: Standards for Access, Non-Motorized, and Transit

Rochester Downtown Bicycle Study 2009

5 CIRCULATION AND STREET DESIGN

Off-road Trails. Guidance

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

5 Circulation & Parking

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

MONTCLAIR SAFE COMPLETE STREETS IMPLEMENTATION PLAN. Monday November 13, 2017 Michael Dannemiller, Principal Engineer NV5, Inc.

Chapter 9: Pedestrians and Bicyclists

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

CITY OF ELKO BICYCLE AND PATHWAY PLAN

Designing for Pedestrian Safety

MONTGOMERY COUNTY COUNCIL

On Road Bikeways Part 1: Bicycle Lane Design

INDOT Complete Streets Guideline & Policy

Bicycle Facilities Planning

Non-Motorized Transportation 7-1

Bikeway Elements. Study Area A: Needwood Road and Vicinity (Figures 3 and 4)

Bicycle Boulevards and Neighborhood Greenways

CTDOT Pedestrian and Bicycle Safety Initiatives

N. Frederick Street to N. Manchester Street

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Transcription:

Prince George s County plans, policies, and projects

Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail construction through the development review process Identification of Priority Sidewalk Corridors (retrofit projects) through master plans and sector plans Complete Streets Section and Policies

Trail connections to Metro Extend the Henson Creek Trail to Metro Expand the MD 4 Sidepath Complete the Folly Branch Trail Pedestrian paths as transportation connections Enhanced streetscape along US 1

Bike and Pedestrian improvements can be made as development occurs. Designated bike lanes and a sidepath along Ammendale Road Raised crosswalks in a residential environment improve pedestrian safety by slowing traffic and increasing the visibility of the crosswalk Sidewalks are crucial for walkable communities

The Countywide Master Plan of Transportation includes a comprehensive network of bicycle, pedestrian, and trail facilities. The Complete Street Policies are reflected on the plan map.

Sidewalks along both sides of new roads New road construction accommodates all travel modes All projects moving forward in County CIP are complete streets Small area plans Sidewalk retrofit opportunities Bicycle-compatible roadways Bike lanes Wide curb lanes and paved shoulders Development review: Evaluate Developed and Developing Tier projects for complete streets conformance Shoulders repaved to accommodate bicyclists Countywide Complete/Green Streets Program is in County CIP Permitting and Road Standards enforce County s Complete Streets Policies 6

POLICY 1: Provide standard sidewalks along both sides of all new road construction within the Developed and Developing Tiers. POLICY 2: All road frontage improvements and road capital improvement projects within the developed and Developing Tiers shall be designed to accommodate all modes of transportation. Continuous sidewalks and on-road bicycle facilities should be included to the extent feasible and practical.

POLICY 3: Small area plans within the Developed and Developing Tiers should identify sidewalk retrofit opportunities in order to provide safe routes to school, pedestrian access to mass transit, and more walkable communities. POLICY 4: Develop bicycle-friendly roadways in conformance with the latest standards and guidelines, including the 1999 AASHTO Guide for the Development of Bicycle Facilities.

Policy 5: Evaluate new development proposals in the Developed and Developing Tiers for conformance with the complete streets principles. Policy 6: Work with the State Highway Administration and the Prince George s County Department of Public Works and Transportation to develop a complete streets policy to better accommodate the needs of all users within the right-of-way.

AMENDMENT 7 Policy 12: Develop a safe school routes strategy as an integral part of a comprehensive Prince George's County Complete Streets Policy. Strategies: Coordinate the county Complete Streets policy with school route analysis and planning by the Prince George's County Planning Department, Prince George's County Board of Education and Prince George's County Department of Public Works and Transportation.

Some recent projects and improvements in Prince George s County

Designated bike lanes along Ruby Lockhart Boulevard, Tower Place and Evarts Street Wide sidewalks along Evarts Street, Ruby Lockhart Boulevard, Tower Place, Town Center Boulevard, and Campus Way

Wide sidewalks, landscaping, pedestrian amenities, and pedestrian scale lighting was provided along Town Center Drive.

Designated bike lanes and wide sidewalks were provided along Ruby Lockhart Boulevard (above). Medians were utilized as pedestrian refuges at major crossings (left).

Sidewalks, crosswalks, and striping provide access through some of the parking lots.

The Ammendale Road project included designated bike lanes, a sidepath along one side and a standard sidewalk along the other.

The Old Marlboro Pike bridge (MD 725) project includes sidewalks and wide outside curb lanes. The sidewalk link will provide access from a residential community to a shopping center and bus stop. The old bridge was too narrow to accommodate sidewalks.

Restriping along Walker Mill Road included over.80 miles of bike lanes The Lottsford Road project included wide outside curb lanes and sidewalk construction DPW&T recently received a Safe Routes to School grant (almost $900,000) for sidewalk construction around several inner beltway schools The City of Bowie has worked with DPW&T to sign several major bicycle routes in the Bowie area

1. Encourage medians as pedestrian refuge islands. 2. Design turning radii to slow turning vehicles. 3. Find wasted space and better utilize it 4. Time traffic signals to function for all modes. 5. Reduce crossing distances. 6. Increase crossing opportunities. 7. Encourage pedestrian-scaled land use and urban design. 8. Acknowledge that pedestrians will take the most direct route. 9. Ensure universal accessibility. 10. Pursue targeted education and enforcement efforts to reduce bicycle and motor vehicle crashes.

Currently funding is extremely constrained for implementing road retrofit or improvement projects. Building new roads to accommodate users and requiring that frontage improvements include all users can be done, but retrofitting existing streets is difficult Lack of right-of-way. Many roads in the Developed Tier (inside the Beltway) were dedicated and constructed at a time when sidewalks were not required. Sufficient R-O-W does not exist for providing sidewalks

It is difficult to retrofit existing centers and commercial areas if they were not constructed with sidewalks or bike accommodations Utility facilities serve as a significant impediment/challenge to installing sidewalks and other complete street improvements Difficulty providing connections between adjoining properties owned by different owners as development occurs. Cul-de-sacs are often provided where a full road connection may be appropriate to provide connectivity

1. Further development of the Complete Streets Policy 2. Identification of opportunities for immediate bike lane striping, placement of shared lane markings, and wayfinding signage 3. Continue the County s Safe Routes to Schools Strategy 4. Initiate the development of an implementation plan/process. This can include implementation of sidewalk retrofits, grant applications, and pedestrian safety improvements.