Learning Objectives. Sustainable Development: The Making of the Queen Elizabeth Olympic Park. John Charles Hopkins, ASLA, University of Pennsylvania

Similar documents
2012 Olympic and Paralympic Games: The Transport Security Challenge. London TravelWatch 6 th

LONDON 2012 Transport Strategy Don t even think of using your car

Bringing projects to life

Faster, higher, stronger greener

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd

London March Donna Taylor Head of Accommodation. 13th

WINNER S CASE STUDY. BNFL Award 2012 Olympic Delivery Authority

London Prepares. series

Olympic Planning. Derek Hardman. COMMERCIAL IN CONFIDENCE Copyright 2011 Fujitsu Services Limited

ABERDEEN: CITY OF THE FUTURE

London 2012 Olympic and Paralympic Games : Legacy

High Performance Playbook

PASTA City case study London Borough of Newham

APSE. National Sport & Leisure Seminar. The Olympic Legacy. Shaun Dawson - Chief Executive Lee Valley Regional Park Authority

Section 2 Strategic Alignment. Contents

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010

Government transport policy

Canadian Sport Tourism Alliance Congress Ottawa

Success Factors for Olympic Games in Hamburg as Beacon Project of European Urban Development

Strategic Plan Update

London Cycle Network Annual Report 2000

2012 Olympics and Paralympics Challenges and Opportunities

Olympic Games and Regeneration

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013

Central London ViewPoint

Local Sustainable Transport Fund

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

What s the issue for transport in Cardiff?

PSA Delivery Agreement 22:

LONDON FOUR YEARS ON A GLOBAL HOST FOR SPORT

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Living Streets response to the Draft London Plan

THE RIGHT TO THE CITY: BRIDGING THE URBAN DIVIDE

Round # 2 UCI Track Cycling World Cup London 5 7 December 2014

Strategic Plan Bigger Clubs, Better Coaches, Best Practice

STRATEGIC PLAN FOR PEDALS NT

Big Bike Revival Scotland - Cycling Development Officer. Job Description and Responsibilities.

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

All change. Snapshot Review. A snapshot review of sustainability and transport across the London 2012 programme. June 2010

Strategic Plan for Sevens Rugby. September 2006

Event. Where is the event taking place? The event will take place at Queen Elizabeth Olympic Park, Stratford, London, in the north of the Park.

World Rowing s Strategic Framework

The role of the university in creating a legacy strategy Mike Emmerich Chief Executive, New Economy

NETBALL TASMANIA STRATEGIC PLAN

Cycle Superhighway 4 from Tower Bridge to Greenwich

Geography B Unit 3: Making Geographical Decisions Sustainability and London s 2012 Olympic and Paralympic Games Paper 3F and 3H

Appendix N(b): Portishead Station Outline Travel Plan

STADIUM London demonstration - Olympics 2012

Olympic Route Network

DOE Climate Change Proposals

2026 Olympic and Paralympic Winter Games Bid Book Overview

Principles guiding Sport NI investment in Sporting Clubs and Sporting Winners objectives.

Executive Summary. Introduction. A sustainable social legacy

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Towards a one planet 2012

Birmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council

Interchange matters London TravelWatch 21 st June John Barry Head of Network Development - Buses Transport for London

SPORT AND RECREATION. Outcome Strategy. Outcome 10. Outcome I 10

TENNIS VICTORIA STRATEGIC PLAN TO 2020

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

PL AN. To be the premier swimming state in Australia by Photo courtesy of Delly Carr/Swimming Australia

MINISTERIAL WRITTEN STATEMENT. Tuesday 5 November 2013 SPORTING LEGACY

Westminster s Joint Health and Wellbeing Strategy

DCMS s aim is to improve the quality of life for all through cultural and sporting activities, support the pursuit of excellence, and champion the

Strategy (v4)

Lighting to rely on for safety and speed. Our stories. See how lighting created the perfect environment to help athletes perform at their peak.

Clubs: Strategic Outcomes.

The case study was drafted by Rachel Aldred on behalf of the PCT team.

Wellington Public Transport Spine Study

Ten Year Plan 2015/ /25. Approved by LLDC Board 17 March 2015

Certification, CSR & Sustainability Lessons from the Vancouver 2010 Olympic & Paralympic Winter Games

1. UK policy context

LONDON: HOME OF WORLD-CLASS SPORT

Sustrans Bike Bridge: Rotherhithe - Canary Wharf Vital for London Buildable by Feasibility Study Summary March 2016

Performance Enhancement Grants Programme Guidelines

GETTING WHERE WE WANT TO BE

Exeter Flood Defence Scheme

A journey of inspiration and opportunity

POINTS = SINGLE POINTS OF CONTACT SPORTS INTEGRITY

UK/JAPAN SEASON OF CULTURE

Department for Transport

Developing and supporting a world class sporting system. Summary of progress

Wheelchair Basketball

STRATEGIC PLAN

Strategic Plan

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Our journey towards London 2012 has begun

From Reality to Concept to Reality Territorial Approaches in Rural Development

PDMS Report 2012, NZG Consultation Process National Membership Statistics, Casual Golf Membership Research.

Strategic Plan

London s Bus Priority

Strategic Plan. Aorangi Golf Strategic Plan

Strategic Plan Basketball in Victoria:

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Hong Kong Construction Week Health and Safety as an Enabler for Success: Lessons from London 2012

PACYP 39 Ymchwiliad i weithgarwch corfforol ymhlith plant a phobl ifanc. Inquiry into physical activity of children and young people

MOVEMENT: the Bicycle

2013 BALFOUR BEATTY LONDON YOUTH GAMES

Hit The Road 2018 Frog and Toad

Transcription:

Sustainable Development: The Making of the Queen Elizabeth Olympic Park John Charles Hopkins, ASLA, University of Pennsylvania ASLA 2012 Annual Meeting and EXPO Learning Objectives 1. How London's Olympic Park was master planned, designed, and delivered 2. Understand delivery of legacy development and challenging sustainability targets 3. Be aware of the Olympic Delivery Authority's web-based Learning Legacy publications. ASLA 2012 Annual Meeting and EXPO Lower Lee Valley Opportunity Area Framework Plan 50,000 new jobs 30 40,000 new homes 44% family homes 30% affordable We have always been clear that the Olympic legacy should be to strengthen the regeneration of the Lower Lea Valley. These plans show how it is possible to improve the quality of life in the city with beautiful parks and green spaces as well as more affordable homes Yvette Cooper, Minister for the Department of Local Government and Communities Thames Gateway Parklands Vision Lower Lea Valley Opportunity Area Planning Framework 1

Socio- economic deprivakon 40% of the populakon from non- white ethnic groups compared to 30% across London and 8% nakonally More than 160 languages spoken 30% of households are workless compared to 20% in London and 18% nakonally 100K annual income Canary Wharf/ 24K around the Olympic Park Nearly 40 per cent of jobs in the Lower Lea Valley are in the industrial sector twice the proporkon for London as a whole 60% of all households are apartments without gardens 25% of all households had poor access to parkland and nature High proporkon of young people 39% under 35 years An eight stop journey east on the Jubilee line from Westminster represented a 7- year drop in life expectancy The Vision for the London 2012 Olympic and Paralympic Games To host an inspirakonal, safe and inclusive Olympic Games and Paralympic Games and leave a sustainable legacy for London and the UK Four strategic objeckves 1. To stage an inspirakonal Olympic Games and Paralympic Games for the athletes, the Olympic Family and the viewing public 2. To deliver the Olympic Park and all venues on Kme, within agreed budget and to specificakon, minimising the call on public funds and providing for a sustainable legacy 3. To maximise the economic, social, health and environmental benefits of the Games for the UK, parkcularly through regenerakon and sustainable development in east London 4. To achieve a sustained improvement in UK sport before, during and a_er the Games, in both elite performance parkcularly in Olympic and Paralympic sports and grassroots parkcipakon ODA Priority Themes Health, Safety and Security Design and Accessibility Equality and Inclusion Legacy Employment and Skills Sustainability The ODA developed and published a strategy for each of these themes, outlining strategic goals as well as specific objeckves which the ODA commided to achieve in the course of delivering its programme of construckon. In order to ensure programme- wide objeckves for the priority themes were delivered, specific targets were deployed down through individual projects (such as the Velodrome) and to Tier 1 contracts where applicable 2

The Olympic Delivery Authority s twelve sustainable development strategy themes Sustainability Strategy mission statement To minimise the carbon footprint of the Games and provide a plagorm for demonstrakng long- term solukons for energy and water resource management, infrastructure development, transport, local and seasonal food produckon and carbon impact mikgakon and adaptakon. Carbon footprint study conclusion Confirmed that the Olympic Delivery Authority responsible for delivering the transport, uklikes, building and landscape infrastructure would be responsible for 55% of all carbon emissions from the London 2012 Games Enabling works the green clean up Archaeology 40 trenches excavated Roman coins Iron Age sedlement 3,000 year old burial ground 220 exiskng buildings demolished Species and habitats translocated Cujngs and seeds collected Soil treatment 2.3 million cubic metres excavated, 800,000 cubic metres cleaned of contaminants Oil, tar, cyanides, arsenic and lead Seven soil washing machines Transport One hundred per cent of spectators by public transport 250,000 spectators/day 55,000 athletes, officials, media and other VIPS 140,000 staff and volunteers Javelin High Speed train: 7 minutes from St Pancras to the Olympic Park Stragord Regional StaKon capacity doubled to 80,000 passengers per hour at peak Stragord InternaKonal stakon with new Docklands Light Railway stop Docklands Light Railway increased capacity to three car trains Docklands Light Railway extension to Woolwich Arsenal North London Line capacity and frequency increased East London Line - new and improved stakons Kings Cross Northern Ticket Hall - capacity quadrupled to 100,000 passengers/hour at peak Walking and cycling Nine strategic routes across London The Greenway a 7 km off road pathway improved, including The Viewtube River and Canal Transport Transport infrastructure along the Thames improved Frequency and capacity improved Tower Pier improved Greenwich Pier improved Bow Back canals re- opened for commercial and leisure use for the first Kme in decades Gejng around the Park and surrounding neighbourhoods Over 20km of new roads More than 30 bridges and underpasses 12km loop road Fully connected through TransformaKon ready for Legacy Energy 50 overhead pylons removed and power lines placed in 7.5 km of underground tunnels with 200km of cables A new energy centre providing clean, green electricity, heakng and cooling for the Games and for 10,000 homes in legacy. It includes a biomass boiler using woodchip for heat and natural gas for combined heat and power delivered by barges A completely new uklikes infrastructure sewage, potable and non- potable water, Low- voltage distribukon network, telephony, etc Water Flood- risk an addikonal 5,000 properkes protected surrounding the park Improved river quality New potable supply New non- potable supply black water treatment plant 3

Olympic Park Master Plan Organising Principles 2012 Olympic Games Master Plan 2030 Legacy Master Plan Olympic Park looking south South Park 4

14/12/11 5

Temperate Asia, Japan, Himalayas C19th C20th South Africa, Australia, New Zealand C18th early C19th Temperate Americas C17th C18th Western Europe, Mediterranean post 1400 AD 14/12/11 6

The American Society of Landscape Architects is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-aia members are available on request. This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation. Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited. The American Society of Landscape Architects Learning Objectives Q & A 7