MSC Guidelines for Review of Stability for Towing Vessels (M)

Similar documents
MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T)

MSC Guidelines for Review of Cargo and Miscellaneous Vessel Stability (Subchapter I)

MSC Guidelines for Review of Passenger Vessel Stability (Subchapters K & H)

MSC Guidelines for Review of Inland Tank Barge Stability Procedure Number: C1-13 Revision Date: May 13, 2016

T. O. PHILLIPS, CDR, Tank Vessel and Offshore Division

MSC Guidelines for the Review of Oil Spill Response Vessels (OSRV), Lightship and Stability

MSC Guidelines for the Review of OSV Stability

MSC Guidelines for the Submission of Stability Test (Deadweight Survey or Inclining Experiment) Results

MSC Guidelines for Commercial Fishing Vessel Stability Procedure Number: H2-20 Revision Date: 06/17/2013

Marine Safety Center Technical Note

U.S. COAST GUARD MARINE SAFETY CENTER PLAN REVIEW GUIDELINE

MSC Guidelines for Review of Gas Carrier Stability (Intact, Damaged, Lightship, and Special Loading Authorization)

MSC Guidelines for Review of General Arrangements (Subchapters H, I, K, R, & U)

MSC Guidelines for Review of General Arrangement Plans for Small Passenger Vessels (T)

MSC Guidelines for the Review of Mobile Offshore Drilling Unit (MODU) General Arrangement Plans Procedure Number: C2-36 Revision Date: 10/18/2016

MSC Guidelines for Tank Barge General Arrangements Procedure Number: C1-16 Revision Date: June 1, 2017

MSC Guidelines for Review of Emergency Evacuation Plans (Subchapter K)

MSC Guidelines for Compressed Air Systems

Marine Safety Center Technical Note

MSC Guidelines for Sanitary & Sewage Systems

MSC Guidelines for Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: 01/08/2018

MSC Guidelines Potable Water Systems

MSC Guidelines for Pressure Vessels

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

MSC Guidelines for Review of Rigging Systems for Sailing Vessels

MSC Guidelines for Gas Carrier Barge Cargo Authority Procedure Number: C1-41 Revision Date: January 27, 2012

Rules for Classification and Construction Additional Rules and Guidelines

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

MSC Guidelines for Review of Emergency Evacuation Plans (NVIC 8-93)

MSC Guidelines for Vents, Fills and Sounds

MSC Guidelines for the Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: March 30, 2012

G.L.M. : the on-board stability calculator... DEMONSTRATION OPERATOR S MANUAL

MSC Guidelines for Liquefied Gas Barge General Arrangements

MSC Guidelines for Engine Cooling Systems

Guidelines for Clean Agent Fire Suppression Systems

MSC Guidelines for Carbon Dioxide Fire Suppression Systems

Fishing Vessel Stability

January 30, 2018 (DRAFT) 46 CFR PART 28 SUBPART E STABILITY Page 1 of 3 Recommendations

MSC Guidelines for Independent Fuel Tanks

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 15 Stability. Edition October 2015 DNV GL AS

MSC Guidelines for Bilge and Ballast Systems

Subj: REQUIREMENTS FOR OUT OF WATER SURVIVAL CRAFT AND REPLACEMENT OF LIFE FLOATS AND RIGID BUOYANT APPARATUS

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS SCOPE

STABILITY AND WATERTIGHT INTEGRITY

RULES FOR CLASSIFICATION. Ships. Part 3 Hull Chapter 15 Stability. Edition July 2016 Amended January 2017 DNV GL AS

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 *

MSC Guidelines for Review of Gas Carrier/Barge Structures

RULES FOR THE CLASSIFICATION AND CONSTRUCTION OF SEA-GOING SHIPS

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

RULES PUBLICATION NO. 94/P SUBDIVISION AND DAMAGE STABILITY OF NEW OIL TANKERS, CHEMICAL TANKERS AND GAS CARRIERS January

Guidelines for the Presentation of Stability Information for Operating Personnel

RULES PUBLICATION NO. 86/P EXPLANATORY NOTES TO SOLAS CONVENTION AND DIRECTIVE 2003/25/EC STABILITY AND SUBDIVISION REQUIREMENTS

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

Trim and Stability Report for M.V. Storm Warning

RULES FOR THE CLASSIFICATION AND CONSTRUCTION OF SMALL SEA-GOING SHIPS

10 December 2010 GUIDANCE FOR WATERTIGHT DOORS ON PASSENGER SHIPS WHICH MAY BE OPENED DURING NAVIGATION

Part 7 Fleet in service Chapter 2 Inclining test and light weight check

Definitions 13 FREE SURFACE EFFECT

RESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6)

ANNEX 5 IMO MARINE CASULATY AND INCIDENT REPORT DAMAGE CARDS* AND INTACT STABILITY CASUALTY RECORDS

Stability Information Booklet. Priority Pontoon

ocr o12011

Marine Safety Center Technical Note

RESOLUTION MSC.415(97) (adopted on 25 November 2016) AMENDMENTS TO PART B OF THE INTERNATIONAL CODE ON INTACT STABILITY, 2008 (2008 IS CODE)

Higher National Unit Specification. General information for centres. Unit title: Ship Stability 2. Unit code: D78J 35

Ship Stability: Theory and Practical Application (SCQF level 8)

DNVGL-OS-C301 Edition January 2017

COMPREHENSIVE STABILITY TRAINING ACCREDITATION PROGRAMME AND BALLAST CONTROL OPERATOR CERTIFICATION PROGRAMME

This lesson will be confined to the special case of ships at rest in still water. Questions of motions resulting from waves are not considered at

SOFTWARE. Sesam user course. 12 May 2016 HydroD Hydrostatics & Stability. Ungraded SAFER, SMARTER, GREENER DNV GL 2016

BMA INFORMATION BULLETIN No. 96

MSC Guidelines for Refrigeration Machinery

Investigation of the Intact Stability Accident of the Multipurpose Vessel MS ROSEBURG

STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

RESOLUTION MEPC.64(36) adopted on 4 November 1994 GUIDELINES FOR APPROVAL OF ALTERNATIVE STRUCTURAL OR OPERATIONAL ARRANGEMENTS AS CALLED FOR IN

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE

Hockema & Whalen Associates

MARINE CIRCULAR MC-25/2012/1

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

Guideline for Scope of Damage Stability Verification on new oil tankers, chemical tankers and gas carriers *)

Doors in watertight bulkheads of cargo ships and passenger ships

Enhanced Discussion of Requirements for Commercial Fishing Vessels

STABILITY & TRIM (MT4241)

IMO DEVELOPMENT OF EXPLANATORY NOTES FOR HARMONIZED SOLAS CHAPTER II-1

Part 3 Pressure hull and structures Chapter 7 Stability and buoyancy

STABILITY DOCUMENTATION FOR APPROVAL

All IMO Members Contracting Governments to the International Convention for the Safety of Life at Sea, 1974

Guideline for Scope of Damage Stability Verification on new oil tankers, chemical tankers and gas carriers

RESOLUTION MSC.141(76) (adopted on 5 December 2002) REVISED MODEL TEST METHOD UNDER RESOLUTION 14 OF THE 1995 SOLAS CONFERENCE

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance

OVERALL SURVEY: A survey intended to report on the overall condition of the hull structure and determine the extent of additional close-up surveys.

STABILITY AND WATERTIGHT INTEGRITY, CLOSING APPLIANCES

ST. VINCENT AND THE GRENADINES

SHIP STABILITY IN PRACTICE

National Maritime Center

CLASS 1E 8 SMOOTH WATERS OPERATIONS 8

ANNEX 3 DRAFT GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS GUIDELINES FOR VERIFICATION OF STABILITY ON TANKERS PART 1

RAPID RESPONSE DAMAGE ASSESSMENT MOBILE OFFSHORE DRILLING UNITS

GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

Transcription:

S. E. HEMANN, CDR, Chief, Hull Division References Contact Information a. 46 CFR Subchapter M, Part 144 b. 46 CFR Subchapter S, Parts 170, 173 c. Navigation and Vessel Circular No. 17-91, CH 1, Guidelines for Conducting Stability Tests, dated November 4, 1991 d. ASTM F1321-92, Standard Guide for Conducting a Stability Test (Lightweight Survey and Inclining Experiment) to Determine the Light Ship Displacement and Centers of Gravity of a Vessel e. USCG MSC Plan Review Guide H2-06, MSC Guidelines for Preparation of Trim & Stability (T&S) Booklets f. COMDTINST M16000.9, Marine Safety Manual, Vol. IV g. MTN 01-01, CH-1, Towline Pull Criteria for Vessels Equipped with Azimuth Thrusters (Z-Drives), dated February 22, 2011 h. MTN 1-17, Guidance on Design Verification for Subchapter M Towing Vessels, dated December 4, 2017 i. Navigation and Vessel Circular No. 3-89, CH 1, Guidelines for the Presentation of Stability Information for Operating Personnel, dated September 7, 1989 If you have any questions or comments concerning this document, please contact the Marine Safety Center by e-mail or phone, referring to Procedure Number: H1-04. E-mail: msc@uscg.mil Phone: 202-795-6729 Website: http://www.dco.uscg.mil/msc Applicability This Plan Review Guideline is applicable to stability calculations reviewed by MSC for towing vessels with a keel laid on or after July 20, 2017; or underwent a major conversion on or after July 20, 2017. Stability review for a towing vessel under Subchapter M does not need to be completed by MSC. The owner of the vessel has the following options: 1. A registered professional engineer (P.E.) licensed by one of the states of the United States or the District of Columbia 2. An authorized classification society that has been delegated the authority to issue the SOLAS Cargo Ship Safety Construction Certificate under 46 CFR 8.320 3. The Coast Guard 1

Submittal Checklist Check that the following items are included in the submittal package: Letter of intent identifying what is included in the submittal and requested actions to be taken by the Marine Safety Center; Copy of Application for Inspection submitted to the Officer in Charge, Marine Inspection (OCMI); Description of vessel operating envelope including route designation and classification, number of persons carried, and any operating limits and/or restrictions (such as maximum draft, trim, wave height, speed or geographical boundaries); Vessel loading conditions; Lines plan of the hull to at least the bulkhead deck; Computerized hull model (recommended, but not required); Hydrostatics or Curves of Form and Righting Arm Curves (tabulated data may be accepted); Tank capacity data including liquid volume or weight, center of gravity location, and free surface factor for relevant tank filling levels; General Arrangement and relevant plans showing: 1. Outboard Profile; 2. Compartmentation (at least plan and profile views); 3. Location and extent of bulkhead deck; 4. Watertight and weathertight doors, hatches, scuttles and similar closures; 5. Weather deck freeing port and/or scupper sizes and locations (as applicable); 6. Downflooding points and other openings into the hull such as vents or windows; 7. Locations and reference points of any draft of loading marks; Fixed Ballast Plan or Listing (if applicable): Ensure that fixed ballast shown on ballast plan or listing matches the fixed ballast used in lightship calculation; Foam flotation material information (if applicable); Approved lightship values or stability test lightship calculations; Intact Stability Calculations; Proposed Stability Instructions (if applicable); Trim and Stability (T&S) booklet (if applicable). Lightship Verification Ensure that lightship characteristics were (or are to be) determined using one of the following methods: Acceptance as a sister to a vessel with known characteristics (46 CFR 144.155); 2

Deadweight survey combined with a conservatively assumed vertical center of gravity (VCG) height (references (c) or (d)); Inclining (full stability test) (references (c) or (d)). In accordance with 46 CFR 170.085, a written stability test procedure must be sent to the Coast Guard Marine Safety Center at least two weeks before the stability test. Reference (d) provides guidance on the required elements for the stability test procedure. The procedure shall be approved by the MSC prior conducting the test or survey. In accordance with 46 CFR 170.175(b), arrangements shall be made with the OCMI for an acceptable Coast Guard representative to witness the stability test. Hull Model MSC will generate a hull model in GHS from the lines, offsets or provided computer model information to verify the stability of the vessel. Passenger/Crew Weight Guidance The assumed average weight per person (AAWP) must not be less than 185 pounds in accordance with 46 CFR 170.090 (d)(1). Loading Conditions Realistic loading conditions must be developed that allow for clear, simple tank loading instructions for placement in the stability instructions. 1. Load conditions shall include conditions for all consumable tanks full and all consumable tanks empty. Partially filled tanks cannot be utilized in any load condition. Ensure that the vessel s loading conditions cover the entire range of operation. This includes, but is not limited to the following conditions: a. Full load with 100% consumables; b. Mid Voyage with 50% consumables; c. Arrival (Burned Out) with 10% consumables. 2. Additional load conditions should be added to account for the realistic extents of both list and trim. 3. If the loading conditions are too varied for inclusion in the stability instructions for the Master, a Trim and Stability (T&S) booklet shall be submitted. See reference (e) for guidance on the preparation of T&S booklets. 4. If the developed loading conditions do not pass applicable stability criteria, you may contact MSC to discuss alternate load conditions. 3

Ensure that loading conditions incorporate liquid free surface in accordance with 46 CFR 170.285 for intact stability. 1. For each type of consumable liquid, the maximum free surface effect of at least one transverse pair of wing tanks or a single centerline tank. 2. The maximum free surface effect of each partially filled tank containing non-consumable liquids. 3. For the purpose part (1) above, the tank or combination of tanks selected must be those having the greatest free surface effect. Intact Stability Vessels shall demonstrate compliance with the criteria below, regardless of route, if applicable to the vessel: Towline Pull Criteria, 46 CFR 173.095 (for each towing condition): 1. Applicable if the vessel engages in towing operations. 2. For the purpose of this section, downflooding angle means the static angle from the intersection of the vessel s centerline in calm water to the first opening that does not close watertight automatically. 3. Reference (f), Section 6.E.2 is to be used in the evaluation of Voith-Schneider type propulsion units. 4. Reference (g) is to be used in the evaluation of Azimuth thruster (Z-drive) type propulsion units. Lifting Criteria, 46 CFR Part 173, Subpart B: 1. Determine applicability in accordance with 46 CFR 173.005: If the vessel is equipped to lift cargo or other objects, submit calculations comparing maximum heeling moment due to hook load to (0.67)(W)(GM)(F/B). In accordance with 46 CFR 173.007, the hook load must be considered to be located at the head of the crane. 2. If the crane heeling moment is greater than (0.67)(W)(GM)(F/B), submit additional calculations for lifting: 46 CFR 173.020, and.025. Vessels shall demonstrate compliance for each condition of loading based on the applicable route the vessel is seeking operations for: Protected Waters 46CFR170.173(e)(2) Partially Protected Waters 46CFR170.170 46CFR170.173(e)(1) Exposed waters or that is assigned a load line 46CFR170.170 46CFR174.145 4

Weather Criteria, 46 CFR 170.170: 1. Ensure correct use of weather criterion variables for intended route. 2. Ensure available GM meets or exceeds the minimum acceptable value. Righting Energy Criteria, 46 CFR 170.173: 1. Ensure stability characteristics meet the minimum requirements for intended route and that all criteria are addressed: a. Partially Protected Route: 46 CFR 170.173(e)(1) b. Protected Route: 46 CFR 170.173(e)(2) 2. Ensure these calculations correctly reflect submergence of any potential downflooding points. Special Rules Pertaining to Tugboats and Towboats, Righting Energy Criteria, 46 CFR 174.145: 1. This regulation applies to inspected subchapter I tug, but is utilized for vessels that require a Load Line. 2. Ensure these calculations correctly reflect submergence of any potential down flooding points. Ensure compliance with the watertight integrity requirements of 46 CFR 144.320 and 144.330. Stability Instructions As discussed in reference (h), vessel owners, or managing operators of towing vessels NOT requesting a Loadline assignment must propose to the MSC a set of stability instructions outlining the operating restrictions necessary to maintain the safe operation of their vessels. The format of the stability instructions is left to the discretion of the owner. The MSC will verify that the format and content are appropriate for the vessel and suitable for use by the vessel's operators. If the loading conditions are too varied for inclusion in the stability instructions for the Master, a Trim and Stability (T&S) booklet shall be submitted. At a minimum the general instructions listed in paragraphs 3 and 4 in enclosure (1) of reference (i), if applicable, must be addressed in the proposed stability instructions: Good marine practices: 1. Bilges pumped to minimum content. 2. Maintain freeing ports operable and unobstructed. 3. Secure cargo to prevent shifting. 4. Keep weather doors and hatches closed. 5. Keep the number of slack tanks to a minimum. 6. Keep cross-connections between tanks closed. 7. Determine the cause of list prior to taking actions to correct it. 5

8. State the standard of subdivision and the location of watertight (WT) bulkheads. 9. Keep doors in watertight bulkheads closed. 10. Minimize trim. 11. State that it is the responsibility of operating personnel to ensure a satisfactory stability condition at all times. Operating limitations: 1. Route restrictions. 2. Maximum draft(s) (and any trim limitations). 3. Maximum weight of deck cargo and its VCG and or height. 4. Location of internal watertight doors and other fittings to be kept closed. 5. Limitations on slack tanks for each type of liquid. 6. Restrictions on the use of liquid ballast. 7. Fixed/required ballast and foam flotation descriptions and locations. 8. Number of passengers allowed. 9. Restrictions on the number of passengers allowed on upper decks. Stability instructions should be simple to use, appropriate for any operator of the vessel, and free from unnecessary or confusing information. Generally, the stability instructions becomes more complex as the vessel size increases, due to the owner's desire to provide maximum flexibility in the vessel's use. In most cases, such complexity is accommodated by improved understanding of stability by the operating personnel. Lightship Changes In accordance with 46 CFR 144.315, changes in weight to a vessel with approved Lightweight Characteristics must be documented and new Lightweight Characteristics calculated following each weight change. The aggregate weight change (absolute total of all additions, removals, and relocations) since the last stability test must be maintained. Submissions to document changes in a vessel s Lightship Characteristic should be made to the authorized entity who verified the lightship values and stability instructions. Determination with regard to when a new Stability Test will be required will be in accordance with Table 144.315. 6

Disclaimer This guidance is not a substitute for applicable legal requirements, nor is it itself a rule. It is not intended to nor does it impose legally-binding requirements on any party. It represents the Coast Guard s current thinking on this topic and may assist industry, mariners, the general public, and the Coast Guard, as well as other federal and state regulators, in applying statutory and regulatory requirements. You can use an alternative approach for complying with these requirements if the approach satisfies the requirements of the applicable statutes and regulations. If you want to discuss an alternative, you may contact the Marine Safety Center, the unit responsible for implementing this guidance. 7