Rightsizing Streets: The Seattle Experience

Similar documents
Road Diets FDOT Process

Pedestrian & Bicycle Safety Innovations & Applications

SPEED MANAGEMENT FOR VISION ZERO

Bicycle Master Plan Goals, Strategies, and Policies

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

By Dan Burden, Executive Director Walkable and Livable Communities Institute

Designing for Pedestrian Safety in Washington, DC

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Road Diets: Reconfiguring Streets for Multi-Modal Travel

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Road Diets: Improving Safety for All Road Users

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES

STANLEY STREET December 19, 2017

Road Diets A Proven Safety Countermeasure

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures.

The DC Pedestrian Master Plan

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Complete Streets 101: The Basics

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Designing for Pedestrian Safety

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Duwamish Way-finding and CTR Report

THE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA

Vision Zero Task Force June 28, 2017 COUNTERMEASURE PAIRING

Closing Plenary Session

Countermeasure Strategies for Pedestrian Safety. Road Diets. Matthew Ridgway Fehr and Peers. October 6, 2015

MEMORANDUM INTRODUCTION/PURPOSE/OVERALL FINDINGS

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Bay to Bay Boulevard Complete Streets Project

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

SAFE ROUTES TO SCHOOL (SR2S)

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

City of Birmingham Draft Multi-modal Transportation Plan

Monterey Road Complete Streets

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

Center Street (S.R. 36) Road Diet Kingsport, TN

City of Wilsonville 5 th Street to Kinsman Road Extension Project

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Hennepin County Bicycle and Pedestrian Planning

City of San Diego Vision Zero Draft Strategic Plan FY 2017

Chapter 5. Complete Streets and Walkable Communities.

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Long Island Rail Road Expansion Project Floral Park to Hicksville

Pedestrian-Bicycle Task Force, and 2017 Lawrence Budget Recommendations by Sustainability Action

Sebastopol Charter School Traffic Management Plan

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

ITE Northeastern District Meeting

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Lincoln Avenue Road Diet Trial

Major Bike Routes 102 Avenue Workshop April 21, 2015

PEDESTRIAN ACTION PLAN

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

Off-road Trails. Guidance

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

Traffic Calming Program Update

Street Design Workshop. Existing cross section Traffic volumes Examine adjacent land uses You design future improvements

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Lawrence Avenue Streetscape Concepts August 30, 2011

CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures.

Creating Complete Streets to Accommodate All Users

Engineering and Traffic Investigation Providing Justification for Lowering Default Arterial and Non-Arterial Speed Limits

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Citywide Sidewalk and Crosswalk Programs

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013

CITY OF LOMITA CITY COUNCIL REPORT

For more information, visit: rethinkingstreets.com

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Performance Criteria for 2035 Long Range Transportation Plan

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Polk Streetscape Project

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Planning Guidance in the 2012 AASHTO Bike Guide

Samish-Maple-Ellis Corridor Pedestrian & Bicycle Safety Improvements. Bellingham City Council March 26, 2018

Welcome. If you have any questions or comments on the project, please contact:

EXECUTIVE SUMMARY. Vision

SCHOOL CROSSING PROTECTION CRITERIA

Public Information Centre

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures.

ACTIVE TRANSPORTATION

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Dowling/Beaty Cycling Route

Dear Mayor Murray, Top SR-520 Design Innovations and Remaining Opportunities

Borough of Danville, PA Traffic Calming Program Guidelines

Transcription:

Rightsizing Streets: The Seattle Experience April 30, 2013 Brian Dougherty Seattle Department of Transportation

Complete Streets 16% of households do not have a car Seniors Youth Transit riders Safety for everyone Ultimately, we all need complete streets

Seattle s Complete Streets Approach Vision: Streets that are safe, convenient and accessible for everyone Plans: Bicycle, Pedestrian, Transit, Freight Funding: Bridging the Gap, state, federal grants Implementation: Complete Streets checklist Outreach: Community collaboration Opportunities: Redesigning city streets

Standard Road Diets

Seattle s Guidelines for Road Diets Daily volume under 10,000 Yes Daily volume 10,000 16,000 < 700 vehicles per hour per direction > 700 vehicles per hour per direction Yes Synchro model LOS & Critical Approaches E or better Yes Applies to 4-lane or 5-lane to 3-lane conversion

Seattle s Guidelines for Road Diets < 30% Increase in travel time Daily volume 16,000 25,000 Synchro model Corridor LOS D or better LOS E or better at critical approaches Yes Daily volume more than 25,000 No Every street is different, these are just guidelines

Complete Streets Approach

Economic Benefits

Economic Benefits

Why Road Diets? Fewer Collisions US Federal Highway Administration Proven Safety Measure to reduce all collisions by 29%

Why Road Diets? Pedestrian Safety A modest decrease in vehicle speed makes the street safer for pedestrians Top-end speeders increase the severity of pedestrian injuries

Seattle Road Diet History 14 12 10 8 6 Miles Projects 4 2 0 1972-1978 1979-1985 1986-1992 1993-1999 2000-2006 2007-2012

34 road diets have been installed in Seattle since 1972 Seattle Road Diet History 1972 2006: 21 Projects 2007 2012: 13 Projects

Complete Streets for capital projects How are Corridors Identified? Bicycle Master Plan Pedestrian Master Plan Community requests for neighborhood plan implementation S Columbian Way

What Factors are Considered? Tier 1: Traffic Operations Before After N 130 th St (2010)

What Factors are Considered? Tier 2: Safety/Collisions Before After Nickerson St (2010)

What Factors are Considered? Tier 3: Livability Before After 7 th Ave (2010)

Lane width Turning movements Design Details: Freight

Lane width Turning movements Stop consolidation Trolley lines Design Details: Transit Before After

Design Details: Parking Peak hour Utilization

Design Details: Pedestrian Crossings Refuge islands Marked crosswalks

Detection Optimize corridor Design Details: Signals

Design Details: Pavement Condition Spot repair

Outreach: Common Concerns There will be gridlock! Maintain capacity at signalized intersections Gain efficiency by removing left turns from travel lanes People will cut though the neighborhood! Monitor pre and post project implementation Implement traffic calming measures if problems occur I ll be trapped in my driveway by all the traffic! Sight distance is improved for left turns Access from side streets and driveways improved by crossing only one travel lane to the two-way left turn lane.

Outreach: Common Concerns Street Before Comments After Comments Requests to remove NE 125 th St 394 7 3 Nickerson St 66 8 0

Before & After Studies Data needs Before Study After Study (>1 year) ADT Bike and Ped Counts Injury collisions 10+ over the speed limit 85 th percentile speed Transit operations Turning vehicle counts Parking use Side street diversion Vehicle classification Resident satisfaction Business satisfaction

Case Study: Stone Way N 1.2 miles ADT 13,000 Burke-Gilman Trail Access Woodland Park Access Within 5 blocks 8 schools, 2 libraries and 5 parks

Stone Way N: Marked Crosswalks Uncontrolled, marked crosswalks at 4 intersections. Crosswalk guidelines changed in 2004. Marked crosswalks would be non-compliant with four-lane cross section.

Stone Way N: Bicycle Master Plan Adopted in 2007. Stone one of the first projects completed under the plan. Recommended climbing lane and sharrow.

Stone Way N: 85 th Percentile Speed Speed limit 30 85 th percentile was 37 mph prior to rechannelization Dropped to 36 mph northbound Dropped to 34 mph soundbound

Stone Way N: Aggressive Speeders 75% reduction in percent driver 10+ mph over the speed limit

Stone Way N: Bicycle Volume Increased 35% Represents almost 15% of the peak hour traffic volume!

Stone Way N: Motor Vehicle Volume ADT declined 6% Consistent with citywide trends Peak volume dropped 5% Off-peak volume increased south of 45 th Street

Stone Way N: Neighborhood Traffic Streets mentioned as alternatives to Stone Volume decreased Traffic did not divert

Stone Way N: Collisions Total declined 14% Injury declined 33% Angle declined 56% Pedestrian collisions declined 80%

Aggressive speeding reduced Collisions have declined Pedestrian crossings are safer Bicycle volume has increased Traffic has not diverted to neighborhood streets Stone Way N: Conclusions

Nickerson St: Before After

Nickerson Case Study

Nickerson Case Study

NE 125 th St Case Study ADT 16,200 4 lanes to 2 lanes with TWLTL and bike lanes Business district High bus usage High percent of injury collisions High speeds

NE 125 th Street Case Study Before After

NE 125 th St Case Study SPEED BEFORE AFTER CHANGE 85th Percentile 40.0 36.9-8% Driving Faster Than 30 87% 77% -11% Driving Faster Than 35 51.6% 29% -44% Driving Faster Than 40 16% 4.9% -69%

NE 125 th St Case Study COLLISION RATE Before After Change Collisions per million vehicles 5.83 5.24-10% Injury collisions per million vehicles 2.41 1.99-17% BICYCLE AND PEDESTRIAN VOLUME 5-hour Count (7-9AM; 1-2PM; 4-6PM) Before After Change High Temp 56 Precipitation 0.14 High Temp 49 Precipitation 0.03 Bicycles along NE 125 th Street 7 15 +114% Pedestrians in the crosswalks 330 676 +105%

Recent Results Street ADT Before ADT Change Injury Collisions 85 th % Aggressive Speeding (40+) Stone Way N 13,900-6% -33% -5% -75% Fauntleroy Way SW 17,599 +0.3% -72% -1% -13% S Columbian Way 12,300 +15% -19% -6% -46% Nickerson Street 18,500-1% -20% -21% -93% NE 125 th Street 13,600 +11% -8% -8% -69% N 130 th Street 13,298 +0.5% -75% -15% -87% Ellis Avenue S 9,855-39% -24% -4% -30%

Road Diet 2.0: Dexter Ave N Before After

Road Diet 2.0 : Dexter Ave N Before After

Additional Resources Nickerson Street Before and After Study http://www.seattle.gov/transportation/nickerson.htm Stone Way Before and After Study http://www.seattle.gov/transportation/docs/stonewaybeforeafterfinal.pdf FHWA: Proven Safety Countermeasures http://safety.fhwa.dot.gov/provencountermeasures/index.htm NACTO Guides http://nacto.org/ National Complete Streets Coalition http://www.completestreets.org/