PROCEDURE FOR THERMAL CYCLING IN LIQUID NITROGEN

Similar documents
CALIBRATING THE GMA PRESSURE SENSORS AND THE ECU ENGINEERING UNIT

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

TEST OF GMA SPINUP ASSEMBLY PRESSURE SENSOR CALIBRATION

BLEED DOWN OF THE HIGH GMA PRESSURE

INTERNAL LEAKAGE CHECK OF THE FLIGHT GMA

DESIGN VERIFICATION AND QUALIFICATION OF NEW POPPET AND BUSHING ON GMA FLIGHT SOLENOID VALVES

CLEANLINESS TEST OF PROBE SPINUP EXHAUST LINES

Vibration/leak Test 2.5 and 6 Vatterfly Valves (3179 and 3223) spare units. GP-B Engineering Procedure P0761 Rev.-

Proton Monitor Thermal Vacuum Test Procedure GP-B P0635

GMA SLEEP PROCEDURE AT VAFB

PROBE-C CAGING VALVE INSTALLATION

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

GUARD TANK PRESSURIZATION FOR TRANSPORT

GDS OPERATING PROCEDURE

CHECK READOUT LOOP CONTINUITY IN PROBE C

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

ASSEMBLY OF GAS FLOW HARDWARE INTO SM GMA

THE UNIVERSITY OF NEWCASTLE- DISCIPLINE OF MEDICAL BIOCHEMISTRY. STANDARD OPERATING PROCEDURE PROCEDURE NO: GLP 022 MOD: 1st Issue Page: 1 of 8

Proto-qual Vibration Test Procedure 2.5 and 6 Vacuum Valves (3179 and 3223) Retest of Flight Spare Valves. GP-B P0735 Rev.-

GSE CAGING AND SPINUP BUFFER LINE INSTALLATION

SCRUB LAUNCH RECOVERY PROCEDURE FOR THE GMA

PROCEDURE TO MEASURE READOUT LOOP RESISTANCE

EHS Laboratory Guidance: Cryogenic Material

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

School of Plant Biology - Liquid Nitrogen Induction

Rev. 1. Cryogenics Thermoflasks. 2122, 2123, 2124, 2129, and 2130

GMA VENT EXTENSION SERVICE PROCEDURE

Each cryogenic liquid has its own specific properties, but most cryogenic liquids can be placed into one of three groups:

DUQUESNE UNIVERSITY. Liquid Nitrogen Safety

Cryogenic Materials Operating Procedure and Safety Requirements

OPERATION OF LIQUID PARTICLE COUNTER. GP-B P0045 Rev -

Faculty/School: Pharmacy Initial Issue Date: Oct 2016

GSE CAGING BALLAST SYSTEM INSTALLATION

PURPOSE OF THE POLICY

Cryogenics is the science of ultra low temperatures. Low temperatures are achieved by the liquefaction of gases.

Cooling Gases Phase Changes and Phase Diagrams

Schlenk Line. Standard Operating Procedure. Lab: Engineering Sciences Building 155. Department: Materials Science and Engineering. PI: Paul V.

(PTP) PROBE PRESSURE MEASUREMENT SYSTEM INSTALLATION AND LEAK CHECK PROCEDURE

STANDARD OPERATING PROCEDURES

Molecular Materials Research Center Beckman Institute California Institute of Technology

The Outer Seal is highly abrasion resistant and provides mechanical stiffness to the splice in order to better match the cable stiffness.

Compressed Gases and Cryogens

Series Environmental Chambers

17. CARGO MEASUREMENT AND CALCULATION

1. Product and company identification: 2. Hazards identification: Emergency overview Physical state: 3. Composition/information on ingredients

Laboratory Standard Operating Procedure: Cryogenic Liquids

OPERATING & HANDLING INSTRUCTIONS

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Gas Laws. Figure 1: Experimental Set-up with Leveling Bulb. GCC CHM 151LL: Gas Laws GCC, 2019 page 1 of 8

MATERIAL SAFETY DATA SHEET

Markus Hofer (Chair WHS committee) & Dianne Fisher (Safety Officer)

Working with Cryogenic Liquids

Standard Operating Procedure (SOP)

Section 2 Safety, Tools and Equipment, Shop Practices Unit 4 General Safety Practices. Unit Objectives. Pressure Vessels and Piping (1 of 2)

1.0 PURPOSE The purpose of this procedure is to describe the use of basic aseptic technique.

Hazard Communication Program. San José State University

POROUS PLUG CHARACTERIZATION TEST

THE UNIVERISTY OF NEWCASTLE - SCHOOL of BIOMEDICAL SCIENCES

GMA PREPARATION FOR E28 TESTING

MATERIAL SAFETY DATA SHEET

GUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS

Title: Contaminated Equipment

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Spacecraft Battery Magnetic Field Survey

BLEED DOWN OF THE GMA HIGH PRESSURE AT VAFB

CHE 4115 Chemical Processes Laboratory 2 Experiment 1. Batch Distillation

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Install Fill Line Burst Disk on SMD

BULK SPECIFIC GRAVITY AND UNIT WEIGHT OF COMPACTED HOT MIX ASPHALT (HMA) (Kansas Test Method KT-15)

Lecture Demonstrations Safety Manual & New Staff Induction

PARTICLE SPACING PART 1

Scarborough Fire Department. Personnel Protection Equipment

STANDARD OPERATING PROCEDURE VORTEX-GENIE 2

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS

SCIENCE Research how living things rely on carbon dioxide, study the greenhouse effect, research carbon dating

Product name: Humboldt Nutrients Grow Nitrates, and inorganic minerals in aqueous solution.

EXPERIENCE WITH CRYOGENICS SAFETY, PROBLEMS AND SOLUTIONS

KGW-ISOTHERM. Information and Operating Instructions for Dewar Vessels Type 26 to 29 B or B-E

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

Evaluation of the Mass Technology Precision Mass Measurement System on Bulk Field-Constructed Tanks (120,000 Gallon Vertical Tank Evaluation)

LPG SAFETY INFORMATION. Kwik-Gas. Safety Manual. Less talk more energy

Laboratory Personal Protective Equipment & Hazard Assessment Tool

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

B. Working with liquid nitrogen local rules when using the X-ray facility, room 5.20, Flowers building

Standard Operating Procedure Porosity Analyzer - The Micromeritics Tri-Star II (surface area) with Micrometrics VacPrep 061 (Sample Degas System)

ASSOCIATED DOCUMENTS:

Mission SuperChill Pluto Edition

Standard Operating Procedure

SAFETY DATA SHEET. Allied Food Grade AW 68 SECTION 1: PRODUCT IDENTIFICATION

MANAGEMENT OF LIQUID NITROGEN

Kinetic Model of Matter

1. Chemical Product and Company Identification

Type 131. Roller base. Information and Operating Instructions for Dewar Vessels Type 131 up to 135 boxed shaped KGW-ISOTHERM

0RGHO /6 /6/6/6 /LTXLGÃ/HYHOÃ(TXLYDOHQWV

Science Museum Group Risk Assessment Form

Compressed Gas Properties. Introduction. Compressed Gas Properties. Definition of a Compressed Gas

Variable Temperature Operation

PERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5

HAZARD COMMUNICATION STANDARD: SAFETY DATA SHEETS (SDS)

Model Description

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Transcription:

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA 94305-4085 P0063 SU/GP-B P0063 PROCEDURE FOR THERMAL CYCLING IN LIQUID NITROGEN 16 January1998 PREPARED PREPARED A. Nakashima, Systems J. Stamets, REE Caging APPROVED B. Taller, QA APPROVED J. Turneaure, Hardware Manager

TABLE OF CONTENTS 1. SCOPE...1 2. GENERAL REQUIREMENTS...1 2.1 Cleanliness... 1 2.2 Test Personnel... 1 2.3 Safety... 1 2.4. Quality Assurance... 1 2.5. Red-line Authority... 2 3. REQUIRED EQUIPMENT...3 4. OPERATIONS...4 4.1. Initial Preparation... 4 4.2. Thermal Cycling... 4 4.3. Place Unit in Storage Compartment... 4 5. DATA BASE ENTRY...5 i

1. SCOPE This procedure describes the method used for thermal cycling generic subassemblies prior to leak test. The cryogen used is liquid nitrogen LN2. 2. GENERAL REQUIREMENTS 2.1 Cleanliness Precautions must be taken to ensure cleanliness requirements of Stanford Procedure P0059 are satisfied. The test unit must be cleaned and bagged after testing. 2.2 Test Personnel 2.2.1 Test Director The Test Director has overall responsibility for the implementation of this procedure and shall sign off the completed procedure. 2.2.2 Other Personnel All engineers and technicians participating in this procedure work under the direction of the Test Director who shall determine whether the person is qualified to participate in this procedure. 2.3 Safety 2.3.1. General Special emphasis shall be placed on safety when handling cryogens. The test director shall ensure that all personnel are aware of the specific personnel and hardware safety concerns associated with this procedure. 2.3.2. Protective Garments Minimum protective garments for personnel working in the clean rooms shall be the standard Tyvek clean room apparel for clean room classes 10,000 to 1,000. When handling cryogens, safety glasses and protective gloves shall be worn. 2.4. Quality Assurance All testing shall be conducted on a formal basis to approved and released test procedures. A Quality Assurance representative shall review and document any discrepancy noted during test, and approve its disposition. Upon completion of each procedure, the QA representative will certify his/her concurrence that the effort was performed and accomplished in accordance with the prescribed instructions by signing and dating his/her approval line at the end of the procedure. QA and/or other observers shall be welcome during the procedures with Test Director approval. 1

2.5. Red-line Authority P0063 Authority to red-line (make minor changes during execution ) this procedure is given solely to the responsible integration engineer and the Test Director. Page 2

3. REQUIRED EQUIPMENT Test Unit Ground Support Equipment (GSE) Dewar flask of appropriate height and diameter for the test unit. The height of the dewar shall be tall enough so that the test article can be placed entirely in the liquid, cold vapor, or warm vapor Liquid Nitrogen Supply Bottle Nylon monofilament line - 3 ft Page 3

4. OPERATIONS 4.1. Initial Preparation 4.1.1. Align the dewar flask under a pulley (a tack on a shelf above the bench may be sufficient), so that the plumb line of a line on the pulley is in the approximate center of the flask. 4.1.2 Mark the line holding a dummy test unit such that the marks indicate when the unit is in the liquid, cold vapor (1 to 3 inches above liquid level), and warm vapor (greater than 3 incles above liquid and below 1 inch from top of flask). The marks must be visible above the top of the flask. 4.1.3 Fill the flask with liquid nitrogen from the supply bottle up to a depth of sufficient to fully submerge the test unit. WARNING: Take extreme care not to spill cryogen onto personnel. Liquid Nitrogen is capable of causing severe frostbite, particularly if it saturates clothing which is in close contact with the skin. Safety glasses and protective gloves shall be worn when handling cryogen. 4.1.4 Tie the test item securely onto the end of the guide line. If it is important to avoid water condensation on the test item, it may be enclosed in a sealed plastic bag. 4.2. Thermal Cycling 4.2.1. Lower the test unit entirely in the cold vapor, using the marker on the guide line, and hold for at least 15 minutes. Allow the part to reach a stabilized temperature, as evidenced by a steady vapor flow, prior to proceeding. 4.2.2. Lower the test unit entirely into the liquid, using the marker on the guide line. Keep submerged in liquid until boiling has subsided to its original rate (minimum 5 minutes). 4.2.3. Lift the test unit to the warm vapor, using the marker on the guide line, and hold for approximately 10 minutes. 4.2.4 Repeat steps 4.2.1 through 4.2.3 two more times, for a total of 3 thermal cycles. 4.3. Place Unit in Storage Compartment 4.3.1. Place the test unit in a clean, marked storage compartment, and allow to warm to ambient. Page 4

5. DATA BASE ENTRY The following data shall be entered into the GP-B Data Base: 1) Name, number and revision of this procedure Page 5