Status April Transportation Priority Projects in Chester County

Similar documents
Status February Transportation Priority Projects in Chester County

Executive Summary Route 30 Corridor Master Plan

Paoli Road Improvement Feasibility Study

Rail Sta ons. Transporta on Centers. Chapter 3 Design Elements PUBLIC TRANSPORTATION

VISTA 2025 Goal 1: Maintain and enhance quality of place as a key component of economic health. Goal 1 Team Meeting. April 20, 2017.

VIII. Project Prioritization & Implementation

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

TRANSPORTATION & ACCESS

CITY OF PORTSMOUTH PLANNING DEPARTMENT

KEVIN CONAHAN, PE, PTOE Senior Traffic Engineer

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

DVRPC CMP Strategies by Subcorridor

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Complete Streets in Constrained Corridors: Chicago s Central Loop BRT

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Directions to Saint-Gobain 20 Moores Road, Malvern, PA from Center City Philadelphia

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

DELAWARE COUNTY START PERIOD

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Chapter 5 Future Transportation

I-10 Bypass Project Banning to Cabazon

Request for Authorization to Open Public Comment Period

II. Identification of Opportunities and Solutions. A. Short-term action plan (Summary of Recommendations)

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

TII Projects by Municipality

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Individuals Interested in the Teacher Temp Program

West Whiteland Township Bicycle and Pedestrian Plan

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

SR 1005 SECTION PTC PAOLI TRANSPORTATION CENTER HIGHWAY IMPROVEMENTS CONCEPTUAL ALTERNATIVES ANALYSIS CHESTER COUNTY, PENNSYLVANIA TREDYFFRIN TOWNSHIP

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Philadelphia, Schuylkill Expressway

US Route 30 Master Plan Optimal Corridor Conceptual Plan

Hennepin County Transportation Department

Bus Rapid Transit Plans

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL

2012 PRIORITY TRANSPORTATION PROJECTS

M14A/D Select Bus Service

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

2017 Chester County. Transportation Improvement Inventory

2015 Data review. Capturing Ready Lane NEXUS vehicles

City of Hyattsville. Citywide Traffic Study and Transportation Plan. Sabra, Wang & Associates. February, 2010

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

TRASBURG RANSPORTATION

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

PENNSYLVANIA CONGESTION MANAGEMENT SYSTEM US I / BALTIMORE PIKE CORRIDOR. Delaware County

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

Welcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting.

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

Route 7 Corridor Study

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

State Route 160 (Blue Diamond Highway)

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

O HARA TOWNSHIP. O Hara Township Trail Feasibility and Planning Project, prepared by PBS&J TriLine, April 2005.

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Transportation Corridor Studies: Summary of Recommendations

City Avenue Projects

North Coast Corridor:

Proposed Project I 35 from Denton to Cooke County Line

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

McGrath Boulevard Project Development Public Meeting #2 May 28 th, 2015 East Somerville Community School

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Executive Summary. September 3, 2014

WHAT IFS: Over the course of

DRAFT INVESTMENT CORRIDORS

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

City of Moorhead Committee of the Whole Meeting

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

Route 29 Solutions Projects

JULY Ridge Pike. Lower Providence Township MONTGOMERY COUNTY

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Current Roadway Projects Wednesday, September 03, 2014

Fitting Light Rail through Well-established Communities

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

CITY OF PITTSBURGH. City of Pittsburgh Active Transportation Profile REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

5. RUNNINGWAY GUIDELINES

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Walking the Walk in Montgomery County, PA

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Transcription:

Transportation Priority Projects in Chester County April 2017 Highway & Trail Projects # Project Scope Current /Phase 1 US 202 over Amtrak Major bridge rehabilitation 17.567 began 03/17 2017 2 US 202 at PA 926 Additional turning lanes for EB 926/SB 202 3.288 Preliminary engineering 2021 3 US 202 Section 100 *Conceptual* widening to six lanes TBD Not on DVRPC Long Range Plan TBD 3a US 202 Section 100/ US 1 ITS Corridor Improvements 3.3+ Preliminary Engineering 2018 4 Darby Road Extension Bridge Replacement of Valley Road bridge 37.167 Preliminary engineering 2020-2022 5 US 422 River Crossing Widening to six lanes; PA 23 interchange 97.380 2016-2018 6 US 422 Pottstown Bypass Reconstruction no new capacity 259.000 Engineering/ 2016-2028 7 US 30 Bypass Widening to six lanes (east of Reeceville); 835.000 Engineering 2020-2028 Reconstruction only (west of Reeceville); Completing Airport Rd and PA 1 interchanges 8 US 1: Longwood to Schoolhouse Rd Widening to six lanes 8.863 Final Design 2019-2020 9 US 1 Bypass: MD Line to Schoolhouse Rd Reconstruction no new capacity 125.800 Preliminary Engineering 2021-2028 10 PA Turnpike: Valley Forge to PA 29 Widening to six lanes ~200.0 Final Design/ TBD 11 PA Turnpike: PA 29 to Downingtown Widening to six lanes ~200.0 Preliminary Engineering 2017-2022 12 PA Turnpike: Downingtown to Morgantown Widening to six lanes ~200.0 Preliminary Engineering 2020-2023 PA 41 (PA 926, PA 841, Chatham Gateway) Intersection safety & village gateway 9.030 Preliminary Engineering 2019-2024 14 PA 100: Font Road to Hanover St. Left-turn lane for NB PA 100 at PA 23 4.774 Final Design 2017 Police enforcement pull-offs (speeding) 15 PA 896 Safety Improvements Corridor safety improvements 4.500 Final Design 2021-2022 16 PA 10 Safety Improvements Corridor safety improvements TBD In queue of safety projects TBD 17 Schuylkill River Trail Completion of multi-use trail 8.358 Final Design/Right-of-way 2018-2019 18 Chester Valley Trail Completion of multi-use trail TBD Feasibility Study TBD 1

Notable Bridges in Chester County # Project 19 PA 926 over Brandywine Creek 22.974 2017 20 W. Bridge Street over Amtrak 5.464 Final Design 2018-2020 21 Chestnut Street over Amtrak 6.631 2017-2018 22 US 322 over Brandywine Creek 6.807 Preliminary Engineering 2020-2021 23 Boot Road over Amtrak 6.053 Preliminary Engineering 2021-2023 24 S. Creek Road over Brandywine Ck. 18.635 Preliminary Engineering 2021-2023 25 Keim Street over Schuylkill River 21.590 Preliminary Engineering 2023-2025 Public Transportation Paoli Final Concept Plan Phase A. Paoli station 1 ADA Phase 36.0 2016-2018 2 Darby Road Bridge 37.167 Preliminary engineering 2020-2022 3 Parking Garage/Intermodal 51.2 Preliminary engineering 2023-2024 B. Exton station Phase 1 High-level Platforms/Station 20.0 2016-2018 2 Bus Loop 2.5 Preliminary engineering 2020-2022 3 Parking Garage ~ 37.5 Preliminary engineering 2023-2024 Exton Phase 1 2

Phase C. Coatesville station 1 Third Ave. Streetscape 1.0 Final Design 2016-2017 2 Fleetwood Street Relocation TBD Preliminary engineering 2017-2018 3 Station and Platforms 20.0 Preliminary engineering 2019-2020 4 Parking Garage and Office Building 35.0 On hold; awaiting funding TBD Coatesville Final Concept Plan D. Downingtown station PennDOT is in process of working with a new developer towards advancing the Downingtown Station conceptual design, which is proposed to be relocated east of the existing station along US 322. The station project is estimated at $75.5 m, with the breakout by phase as follows: $8 m for Final Design; $1.5 m for Utilities; $11 m for right-of-way; and, $55 m for. PennDOT estimates completion of the project by 2022. E. Paoli-Thorndale Line extension Delaware Valley Regional Planning Commission staff is nearly complete with its ridership forecasts for the Paoli-Thorndale Extension. The ridership forecasts will give SEPTA, Chester County, and all partners an accurate estimate of operating costs for the Extension. Two scenarios will be evaluated: Scenario 1 serving Coatesville and Parkesburg stations, and, Scenario 2 serving Coatesville and Parkesburg stations as well as a new station in Atglen Borough. The narrative report is expected to be released by DVRPC in April 2017 3

F. West Chester Branch Extension SEPTA is currently progressing with final design for extending service three additional miles on the Media-Elwyn line to a new station in Wawa; this extension should be operational by 2020. Once service is extended to Wawa, there would remain approximately nine track miles (to restore) between Wawa station and West Chester. In the fall of 2015, West Chester Borough s Rail Restoration Committee delivered a volunteer-generated report that evaluated alternatives for restoring passenger service to West Chester. SEPTA Long Range Planning and the PennDOT Bureau of public Transportation at Central Office are actively working on developing a more-detailed, follow-up technical evaluation. This evaluation will assess the existing infrastructure and potential for installing an additional track, where possible, along the railroad right-of-way. A ridership assessment will also be completed to compare the existing operational conditions and passenger demand of a single track capacity to the impacts of a two track alternative and potential track upgrades. The study is expected to be complete by October 2017. 4

Transportation Priority Projects in Chester County 16 20 E Elverson 7 Coatesville C 12 D 21 6 23 22 25 17 14 Phoenixville 10 11 18 1 B West Chester F 19 2 3 & 3a A 4 5 Label Project 1 US 202 over Amtrak 2 US 202 at PA 926 3 US 202 Section 100 3a US 202 Section 100/ US 1 4 Darby Road Extension Bridge 5 US 422 River Crossing 6 US 422 Pottstown Bypass 7 US 30 Bypass 8 US 1: Longwood to Schoolhouse Rd 9 US 1 Bypass: PA 472 to PA 41 10 PA Turnpike: Valley Forge to PA 29 11 PA Turnpike: PA 29 to Downingtown 12 PA Turnpike: Downingtown to Morgantown PA 41 (PA 926, PA 841, Chatham Gateway) 14 PA 100: Front Road to Hanover St 15 PA 896 Safety Improvements 16 PA 10 Safety Improvements 17 Schuylkill River Trail 18 Chester Valley Trail 19 PA 926 over Brandywine Creek 20 W. Bridge Street over Amtrak 21 Chestnut Street over Amtrak 22 US 322 over Brandywine Creek 23 Boot Road over Amtrak 24 S. Creek Road over Brandywine Ck. 25 Keim Street over Schuylkill River A Paoli Intermodal Station B Exton Train Station C Coatesville Train Station D Downingtown Train Station E Paoli-Thorndale Line Extension F West Chester Branch Extension Kennett Square 8 24 Transportation Priority Projects Roadways and Trails Public Transportation 9 Oxford 15 04/2017