Environmental Assessment Registration File Ref No NAME OF UNDERTAKING: Replacement of St. Vincent s Breakwater

Similar documents
Unit 11 Lesson 2 How Does Ocean Water Move? Copyright Houghton Mifflin Harcourt Publishing Company

Eastport Pitch and Putt

ATV/ARGO Trails for Red Indian Lake Outfitting

St Vincent. Grenadines. Wise practices for coping with. and the. i b bea n Se a

Figure 1. Schematic illustration of the major environments on Mustang Island.

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today

4/20/17. #31 - Coastal Erosion. Coastal Erosion - Overview

RI Regulatory Setbacks & Buffers: Coastal Management Issues

Building Coastal Resiliency at Plymouth Long Beach

Reading Material. Inshore oceanography, Anikouchine and Sternberg The World Ocean, Prentice-Hall

Fact Sheet Ordinance Regulating Erosion Threatened Structures

North Shore of Long Island, Feasibility Study

Today: Coastal Issues and Estuaries

SHOREHAM BEACH LOCAL NATURE RESERVE

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

Bear Cove Coastline Reestablishment

Coastal Processes Day Criccieth

Vanishing Coast: Erosion

SANDBANKS COAST PROTECTION

Earth Science Chapter 16 Section 3 Review

St Kitts. Wise practices for coping with

Soft Designs for a Harsh Climate: Trends in Coastal Engineering

The Dynamic Coast. Right Place Resources. A presentation about the interaction between the dynamic coast and people

Anguilla. Wise practices for coping with. i b bea n Se a

Montserrat. Wise practices for coping with. i b bea n Se a

Estuarine Shoreline Stabilization

WHAT ARE ECOSYSTEMS? Dr. V. N. Nayak Professor of Marine Biology (Retd)

Puducherry Port Disaster. A Man-Made Made Tsunami. Coastal Erosion at Puducherry. & neighboring beaches of Tamil Nadu

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

Dauphin Island East End Beach and Barrier Island Restoration Project. Beau Buhring South Coast Engineers

Map 8: Ayrshire Coast: Ardrossan North Bay to Stevenston Pier Map Content Descriptions

Nevis. Wise practices for coping with

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

Formation and characteristics of different types of beaches

FINAL REPORT FOR 2013 ON THE CONDITION OF THE MUNICIPAL OCEANFRONT BEACHES THE BOROUGH OF AVALON, CAPE MAY COUNTY, NEW JERSEY

3.9 FROM ISLANDS TO ATOLLS

Impact of Hurricane Matthew on the Atlantic Coast of Florida

4/20/17. #32 - Coastal Erosion Case Histories - Lake Michigan

Figure 38. Locations of the 28 NJBPN profile stations in Ocean County, NJ.

Shorelines Earth - Chapter 20 Stan Hatfield Southwestern Illinois College

Franklin County Ranch Hunting, Fishing, Recreation, Cattle Hardwoods, Lakes, Ponds, Waterfowl Habitat, Pastures

Controlling Coastal erosion

Essentials of Oceanography Eleventh Edition

INTRODUCTION TO COASTAL ENGINEERING

Overview. Beach Features. Coastal Regions. Other Beach Profile Features. CHAPTER 10 The Coast: Beaches and Shoreline Processes.

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

Enos Woodward North Boat Harbour

Anatomy of Coastal Regions

HARBOR INFRASTRUCTURE INVENTORIES Fairport Harbor, OH

Protecting our Beaches

1 Shoreline Erosion and Deposition

Assateague Island National Seashore North End Restoration Project Timeline

TITLE: North Carolina s Changing Shorelines. KEYWORDS: erosion - shorelines - mapping - sustainability

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

Lecture Outlines PowerPoint. Chapter 15 Earth Science, 12e Tarbuck/Lutgens

Breakwater Wharf Encasement Hant s Harbour, Newfoundland

ATLANTIC COUNTY 2006 to 2008

Texas passes, longshore transport, hurricanes, beach erosion and sea level

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

Coastal management has lagged behind the growth in population leading to problems with pollution

Collaboration: Sea-level Marin Adaptation Response Team (C-SMART)

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

Chapter - Oceans and Coasts

Wallarah Coastal Walk

Inventory of coastal sandy areas protection of infrastructure and planned retreat

Long Beach Island Holgate Spit Little Egg Inlet Historical Evolution Introduction Longshore Transport Map, Survey and Photo Historic Sequence

GLY 5888 Coastal Hazards & Mitigation

The Long Pond Dredging Project For The Royal Newfoundland Yacht Club

Oceans Humans both depend on it and threaten it with their activities

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

OECS Regional Engineering Workshop September 29 October 3, 2014

23- Year Sand Volume Changes at Site 132, 15th Street, Brigantine

COASTAL MANAGEMENT AND PROTECTION METHODS! 1

consulting engineers and scientists

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION AND FUNCTIONAL DESIGN OF COASTAL STRUCTURES

4/20/17. #30 - Coastlines - General Principles Coastlines - Overview

Ballast. Stability Lab Experiment. Have you ever been in a boat at sea in large waves? The boat moves up and down as the waves pass under the boat.

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

Australian Coastal Councils Conference

TITLE: COASTAL EROSION AND LANDFORMS.

An Update of Coastal Erosion in Puerto Rico

Mines Inspectorate Safety bulletin no. 102 (Version 1) 30 November 2010

Coastal Change and Conflict

Sea-Level Rise and Coastal Habitats in Southeastern Louisiana An Application of the SLAMM Model

Dominica. Wise practices for coping with. i b bea n Se a

PLAQUEMINES PARISH BARRIER ISLAND RESTORATION & SUSTAINABILITY. MVD/Gulf Coast Regional Dredging Meeting November 5, 2013

HARBOR INFRASTRUCTURE INVENTORIES Oak Orchard Harbor, New York

Imagine that you can see a side view of a wave as it approaches a beach. Describe how the wave changes as the wave approaches the beach.

BEACH PROCESSES AND COASTAL ENVIRONMENTS

HARBOR INFRASTRUCTURE INVENTORIES West Harbor, OH

Does DFO Need to Review My Project?

Grenada. Carriacou. Wise practices for coping with. Petit Martinique

Nome Harbor Page 2 of 12

Marine Ecosystems. Aquatic Ecosystems Section 2

FINAL REPORT FOR 2013 ON THE CONDITION OF THE MUNICIPAL BEACHES IN THE TOWNSHIP OF UPPER, CAPE MAY COUNTY, NEW JERSEY

MARSH DEGRADATION AT THE MOUTH OF MOORE CREEK

DUNE STABILIZATION AND BEACH EROSION

Coastal Hazards and Management in North Carolina. Braxton Davis April 14, 2015

Transcription:

Town of St. Vincent s-st. Stephen s-peter s River P.O. Box 39 St. Vincent s, NL A0B 3C0 Phone: 709-525-2540 Fax: 709-525-2110 Email: svstpr@nf.aibn.com Environmental Assessment Registration File Ref No. 200 20 2489 NAME OF UNDERTAKING: Replacement of St. Vincent s Breakwater PROPONENT: (i) Name of Corporate Body: Town of St. Vincent s-st. Stephen s-peter s River (ii) Address: P.O. Box 39, St. Vincent s, NL A0B 3C0 Chief Executive Officer: Name: Daniel St. Croix Official Title: Mayor Address: P.O. Box 39, St. Vincent s, NL A0B 3C0 Telephone No: 709-525-2540 Principal Contact Person for purposes of environmental assessment: Name: Marilyn Gibbons Official Title: Town Clerk Address: P.O. Box 39, St. Vincent s, NL A0B 3C0 Telephone No: 709-525-2540

THE UNDERTAKING: (i) (ii) Name of Undertaking: Replacement of St. Vincent s Breakwater Purpose/Rationale/Need for the undertaking: The existing breakwater has been there for 40+ years and is in disrepair (Figure 13). It is constructed of spruce timber. When we have strong winds, high waves and storm surge, the ocean water washes over and between the breakwater, threating the fourteen homes that are in the direct path of the potential flooding. There is also a boatshed owned by the Fishermen s Committee and two local roads owned by the Town that can and have been damaged by high seas. When there is a storm surge and high seas with the waves reaching and going through the breakwater there has been flooding of our local roads, Beach Road and Boat Shed Road,(Figure 6) and destruction of parts of the breakwater with a lot of the actual sticks being broken down and washed away. (Figure 13) DESCRIPTION OF THE UNDERTAKING: Geographical Location: St. Vincent s is located on the Southern Avalon Peninsula (Figure 1). The breakwater is located on the St. Vincent s beach to the West of the existing breakwater owned and maintained by the Department of Transportation and Works. St. Vincent s beach is part of a 5km beach system that runs from St. Vincent s to Peter s River (Figure 2). The Transportation and Works breakwater serves to protect Route 90 and the Town of St. Vincent s while the Town breakwater provides some protection to local roads and 14 homes and structures in the local area known as The Flats (Figure 5). There is a barrier that connects St. Vincent s to the rest of the southern shore (Figure 3). This barrier also separates the ocean from Holyrood Pond. When the water level in Holyrood Pond rises, Transportation & Works open the Gut (Figure 3) to allow the water to run out. This protects route 90 and our residents from flooding. After a period of time and wave action (Figure 8), the Gut fills in again. (Figure 4). Large Scale Map/Photos: Figure 1. Map of the location of St. Vincent s on the Avalon Peninsula. Figure 2. Aerial Photo of the entire beach system from St. Vincent s to Peter s River. Figure 3. Barrier system from the open Gut to The Flats. (2009) Figure 4. Barrier system from the closed Gut to the Flats. (2008)

Figure 5. Map of St. Vincent s beach indicating the Town s and the Dept. of Transportation s breakwaters. Figure 6. Aerial photo of opening between the Town s breakwater and the Dept. of Transportation s breakwater. Figure 7. Photo of the Town s breakwater and the Dept. of Transportation s Breakwater. Figure 8. Photo of high waves/storm surge on the entire beach. Please note the wave action on the Gut. Figure 9. Photo of high waves/storm surge on the Town s breakwater. Figure 10. Photo of high waves/storm surge on the Dept. of Transportation s Breakwater and the Gut. Figure 11. Photo of high waves going over the Dept. of Transportation s Breakwater in March, 2014. Figure 12. Photo of high waves going over the breakwater and damaging Route 90 in March 2014. Figure 13. Photo of present condition of the Town s breakwater. Figure 14. Drawing of the proposed new breakwater. (i) Physical Features: The major physical feature of the undertaking is that it is a wooden breakwater constructed with spruce timber. Access to the site is from Route 90 onto our local gravel road known as Boat Shed Road (Figure 6). There are no residents on this road. There is another breakwater on the St. Vincent s Beach that is the responsibility of the Department of Transportation and Works. It is also constructed from timber and runs from our breakwater to the bridge which is the end of Route 90 and the beginning of Route 10. There is an opening of 86ft between the Town s breakwater and the Department of Transportation s breakwater (Figure 6). When there are high seas the water sometimes comes in through this opening (Figure 11).

The size of the area to be affected by the undertaking: The size of the breakwater with the cribbing will be approximately 6ft wide by 1000ft long. The area on the landward side of the proposed breakwater will be where most of the construction will take place. Once the new breakwater is in place the cribbing will be constructed and filled with rocks. The seaward side should have very little disruption only to remove the old timber and prepare the ground for the new breakwater. The physical and biological environments within the area: The area consists of sand and some old armour stone that has been uncovered over the years. There is some vegetation on the beach but the type is unknown. Berms do build by the high water mark in the summer and erode to a flat beach in the fall and winter. In early summer, June and early July, the whales visit the St. Vincent s Beach. Due to a sudden drop off the ocean floor, the whales come very close to shore and visitors and locals get to enjoy a close up view of these majestic whales for free. There is an opening between the Town s breakwater and the Dept. of Transportation breakwater that allows people to access the beach from Route 90 via Boat Shed Road. St. Vincent s Beach is also visited by seals, caplin, gulls, other sea birds and shorebirds. (ii) Construction The approximate total construction period: Three months (August to October) this year and three months (August to October) 2017. If possible full construction may be completed from August to October 2016. The proposed date of the first physical construction: August 1, 2016. Potential sources of pollutants: Chain saws and other carpentry tools will be used along with heavy equipment to dig the old breakwater out and prepare the ground for the new breakwater. There is a potential of pollutants from oil, gas, lubricants or diesel fuel but every precaution against pollution will be taken. The contractor will have a spill kit on site at all times. All employees will be made aware that there will be no littering and that all material will be removed from the site every day. The contractor will be instructed to make sure there are no leaks in his equipment. There should not be any resource conflicts. Our beach is used in the early summer for whale watching and for people just enjoying a walk on the beach. Signs will be posted prior to the beginning of construction so that people will be aware when construction will begin. Operation:

Period of operation: This is a permanent facility. The breakwater will provide protection for our residents and our Town s infrastructure from the destruction of high waves and storm surge. The Town will monitor the breakwater to correct any breaches that may occur in the structure. Special attention will be focused on the build up of sediment in front of the breakwater as this allows waves to run up and over the breakwater (Figure 11). (iii) Occupations: Number of employees required for the construction and operation: 10 employees for 10 weeks construction and 0 for operation. Enumeration and occupations: The employees will be provided under a program sponsored by the Department of Education Skills and Development and there will be 1 carpenter foreperson NOC 7271 and 9 labourers NOC 7611. The contractor will provide 1 heavy equipment operator NOC 7521, 1 truck driver NOC 7511 and 1 labourer NOC 7302. Work to be carried out: The construction of the breakwater will be constructed by the 1 foreperson and 9 labourers hired and a contractor will be hired to remove the old breakwater and prepare the ground for the new breakwater. The contractor has experience in the construction of breakwaters. They have constructed several in the past years. Employment equity: Applications will be requested with no restrictions to age or gender and hiring will be for applicants that qualify under the job creation project with the Department of Education Skills and Development. Project Related Documents: We have contacted Dr. Norm Catto, Head of the Department of Geography, Memorial University of Newfoundland, asking for any information he may have on erosion occurring on the St. Vincent s beach. Dr. Catto informed us that with the ongoing sea level rise of about 3 mm/y, and assuming storm activity stays at the same rate as for the past decade and that winter ice cover remains minimal, erosion of ~20-30 cm/y, punctuated by larger amounts from individual hurricanes, seems to be a reasonable initial estimate. We also contacted Natural Resources for any reports they may have. Melanie Irvine M.Sc, Project Geologist with Geochemistry, Geophysics and Terrain Sciences Section sent us a copy of the report from 2014 which shows the results of their studies on the barrier and cliffs near St. Vincent s. The beach in front of the community is remaining pretty stable, however erosion of the cliff is substantial.

APPROVAL OF THE UNDERTAKING Authorization required for the undertaking: Department of Municipal Affairs, Crown Lands Division approval is required. Contacted Water Resources to see if a permit was required. We do not require a permit. Mineral/Lands, Mines Division was contacted and we were told that we do not need a permit because the contractor will have their permit to supply the rock needed, but to check their website for further information for the construction of a breakwater. We also checked with Wildlife Division and we do not require a permit from them. SCHEDULE: The earliest date the project could start is the first of August, 2016. This is the date applied for under the Job Creation Program. The latest date would be September 1 2016 due to being finished before the winter season. FUNDING: This project depends partially on a project under the Government of Newfoundland and Labrador, Department of Education Skills and Development, Job Creation Partnership. P.O. Box 8700, St. John s, NL, A1B 4J6. We also have permission under the Gas Tax Funding to use $37,535.57 for this project.

Drawing of the new breakwater (Figure 14) There will be a rock base in the bottom of the trench. The 14ft. 6x6 breakwater posts will be 6ft. underground and 8ft. above ground. 4x4x6 cribbing will be placed in the trench every 8ft to stabilize the breakwater. The cribbing will be 2ft. above ground and 4ft. below ground. Not sure if we will be using 6x6x14 (salt water treated lumber) or black spruce 8 x 14 Capital Cost Estimate: 2016 Construction 800 6x6x14 (Salt water treated) @59.95 = $47,960.00 125 tons of rock @ 71.00/ton = $8,875.00 Total = $56,835.00 2017 Construction 800 6x6x4 (Salt water treated) @59.95 = $47,960.00 125 tons of rock @71.00/ton = $8,875.00 Total = $56,835.00 Grand Total 2016/2017 = $113,670.00 Capital Cost if we use Black Spruce 2016 Construction 1700 8 x14 spruce sticks @20.00 = $34,000.00 125 tons of rock @71.00/ton = = $8,875.00 Total = $42,875.00 ------------------ ------------------------------------------------ Date Signature of Chief Executive Officer/ Mayor