CHAPTER 9 PAVEMENT MARKERS

Similar documents
CHAPTER 1 STANDARD PRACTICES

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

2009 Manual on Uniform Traffic Control Devices

Pavement Markings (1 of 3)

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

Appendix Work Zone Traffic Control

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Traffic Signs and Markings. Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

APPENDIX G SIGNAGE AND STRIPING SUPPLEMENT

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS

(This page left intentionally blank)

MUTCD Part 6: Temporary Traffic Control

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

November 2012: The following Traffic and Safety Notes were revised:

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

CHAPTER 6E. FLAGGER CONTROL Section 6E.01 Qualifications for Flaggers. Section 6E.02 High-Visibility Safety Apparel. Standard: Standard:

SCOPE Application, Design, Operations,

0 CITY OF SANTA ANA 0

PUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

TRAFFIC CONTROL DEVICES

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

SECTION 12 ROAD MARKINGS AND DELINEATION

California Manual on Uniform Traffic Control Devices

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

Minnesota Manual on Uniform Traffic Control Devices

General References Definitions. (1) Design Guidance. (2) Supporting Information

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016

Australian Standard. Manual of uniform traffic control devices. Part 3: Traffic control for works on roads AS AS 1742.

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Evaluation of Construction-Zone Pavement Marking Materials

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

Appendix C. Bicycle Route Signage

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

RE: 2007 NPA Text (Clean Version)

National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

Temporary Traffic Control for Highway Work Zones

EVALUATION OF RAISED PAVEMENT MARKERS (RPMS) (PROJECT NO )

TRAFFIC LINE MANUAL Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION

TRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION

ADA on Construction. Guidance for Section C Plan Preparers

Accommodating Pedestrians in the Work Zone

Appendix A-6. Signing and Marking Guidelines. Number Name Pages. 2B.06 Signing at T Intersections 1. 2B.12 Pedestrians in Crosswalk 1

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team

New Trends In Temporary Traffic Control (TTC) Spring Occupational Safety & Health Committee Conference Philadelphia, PA

AS/NZS :2017. Retroreflective materials and devices for road traffic control purposes AS/NZS :2017. Part 1: Retroreflective sheeting

Attachment No. 13. National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

WORK ZONE TRAFFIC CONTROL PROCEDURES

PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS

Sign Designs and Markings Manual (TEM 295-2) Page 8-3

TRAFFIC CONTROLS FOR BICYCLE FACILITIES

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

Work Zone Traffic Safety

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

SafetyRail. Product & Compliance Guide. ADA-Compliant Pedestrian Barricade

Retroreflective Sheeting Identification Guide

Sign Design Manual (TEM 295-2)

MINNESOTA COMMITTEE ON UNIFORM TRAFFIC CONTROL DEVICES SEPT 20, 2017 MEETING MINUTES WATERS EDGE ROOM 403. Old Business

6. TITLE: Amendments to the Larimer County Land Use Code and the Larimer County Road Manual

Edison Electric Institute. Work Zone Safety October 4-7, 2009

Germanna Highway Route 3

Fundamentals of Traffic Control Devices

CHAPTER 6D. PEDESTRIAN AND WORKER SAFETY Section 6D.01 Pedestrian Considerations

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

WORK ZONE TRAFFIC CONTROL & SAFETY

the square steel tube posts, municipalities can use either the U-channel or square steel tube post signs on locally owned roads.

(This page left intentionally blank)

CHAPTER 6H. TYPICAL APPLICATIONS

PERMANENT PAVEMENT MARKING PLAN

ADDENDUM NUMBER ONE (1) For

CTRE Center for Transportation Research and Education

An Overview of the 2009 MUTCD

Part-time Shoulder Use Guide

Annual Progress Report from VDOT on the Effect of the Aging Population on State Agencies

Work Area Traffic Control Policies and Procedures

SOUTH MAIN STREET ROUTE 28

Guidelines. Motorcycle and Bicycle Work Zone Safety

Pavement Markings to Reduce Lane Departure Crashes. Paul Carlson, PhD, PE Road Infrastructure Inc.

Chapter 9 Maintenance

Section 9A.07 Meaning of Standard, Guidance, Option, and Support

PART 7. TRAFFIC CONTROLS FOR SCHOOL AREAS CHAPTER 7A. GENERAL

Traffic Control Devices

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

WHITE WOLF. X-ray View MID POWER MODEL ROCKET KIT BUILDING INSTRUCTIONS KIT SPECIFICATIONS:

SECTION 12 ROAD MARKINGS AND DELINEATION

Temporary Traffic Control Manual. First Edition

Part 8. TRAFFIC CONTROL FOR RAILROAD AND LIGHT RAIL TRANSIT GRADE CROSSINGS

Attachment No. 4 Approved by National Committee Council

SMART STEEL CRASH CUSHION

1/19/2016. Oregon Department of Transportation. 1of 38. 2of 38. 3of 38. January 2016

Tract or Parcel Project Name PCN Checked By Date

INTERIM ADVICE NOTE 188/16

Transcription:

CHAPTER 9 PAVEMENT MARKERS OBJECTIVES 1) Pavement Markers 2) Types of Pavement Markers PAVEMENT MARKERS Pavement markers are pre-manufactured, reflectorized devices that provide positive in-roadway delineation at night, especially during inclement weather and in areas where roadway alignment variations dictate guidance that cannot be achieved by pavement markings and roadside delineation alone. The Manual on Uniform Traffic Control Devices (MUTCD) allows the use of pavement markers as a supplement to traditional longitudinal markings. Pavement markers cannot be used as a replacement for standard linestriping. TYPES OF PAVEMENT MARKERS Pavement markers are composed of a base material that is designed to resist impacts from traffic and to provide an adherent surface securing the marker to the roadway. Some agencies use a series of hard, non-reflectorized raised markers to form a line where overhead lighting is available. Other agencies require that all pavement markers be reflectorized. The retroreflective surface can either be reflective sheeting or a prismatic reflector. The outer cover of the prismatic area can be either plastic or glass. The most common types of pavement markers are raised temporary, recessed snow plowable, and raised snow plowable. Raised Temporary Markers Raised temporary markers are normally used with construction zone markings. They are commonly referred to as temporary markers or RPMs. Specifications often require the use of temporary pavement markers in transition areas of work zones that will encroach upon the traveled roadway for a period of more than two days, and in other areas as required by the engineer. These markers are glued to the roadway with a bitumen or epoxy adhesive. Most markers of this type consist of a plastic body with a reflective surface. These pavement markers shall be replaced when they become damaged or have been removed by traffic. These markers will be inspected on a routine basis and replaced as necessary. Another general type of temporary raised marker is the peel and stick type. These markers generally have a paper backing that is removed to expose a butyl/adhesive pad. The marker is then applied to the roadway and firmly pressed in place. Figure 9.1 shows a variety of raised temporary markers. 9-1

Figure 9.1 Raised temporary markers Recessed, Snow Plowable Marker System This marker system consists of a tapered slot that is cut into the roadway. A marker similar to the raised marker is affixed in the slot using epoxy. This design allows the snowplow blade to slide over the slot and not contact the marker because it is just below the roadway surface. These markers can only be used effectively where there is sufficient traffic speed (35+ mph) to whip out any water and/or dirt that may collect on or in front of the marker lenses. This type of marker has a plastic body with a reflective surface. Figure 9.2 shows several recessed, snow plowable pavement markers. Figure 9.2 Recessed snow plowable markers 9-2

Raised, Snow Plowable Marker System This marker system generally consists of a reflective marker glued in a protective steel or cast-iron casting. This casting is applied with epoxy into a groove that is cut in the pavement surface. The system is designed so that a snowplow blade will ride up and over the reflective marker, leaving it undamaged. The reflective marker can be replaced in the casting. Figures 9.3a and 9.3b show a raised snow plowable marker system. Figure 9.3a Raised, snow plowable marker system Figure 9.3b Raised, snow plowable marker system shown in-place 9-3

VIRGINIA DOT REFERENCES See Appendix A for the following: VIRGINIA DOT ROAD & BRIDGE SPECIFICATION BOOK SECTION 235.01 THRU 235.02 (F) RETROREFLECTORS (MATERIALS) Section 512.03 (k) (k) Temporary Pavement Markers Section 704.03 2. (c) 1. and 2. (c) Pavement Markers 1. Snow-plowable Raised Pavement Markers 2. Raised Pavement Markers See Appendix B for the following: MANUAL OF INSTRUCTIONS Section 204.30 (a) (1) and (2) (1) Sampling, Testing, and Approval (2) Acceptance (Requires Cert. II) Approved List # 22 Also, follow Manufacturers installation instructions. 9-4

Chapter 9 Pavement Markers Review Questions 1. Pavement markers may be used in lieu of pavement markings. a) True b) False 2. The most common types of pavement markers are: a) raised, temporary. b) raised, snow plowable. c) recessed, snow plowable d) all of the above 3. Raised temporary pavement markers are glued to the roadway with a bitumen or epoxy adhesive. a) True b) False 4. Raised temporary pavement markers are normally used with: a) permanent markings. b) construction zone markings. c) a & b d) none of the above 5. Raised snow plowable markers are installed using bitumen adhesive. a) True b) False 9-5