DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Similar documents
MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Prince George s County plans, policies, and projects

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

MARTIN LUTHER KING JR. WAY

Zebulon Multimodal Transportation Plan Update

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

PUBLIC REALM MASTER PLAN

NJDOT Complete Streets Checklist

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Bicycle Facilities Planning

2.0 Existing Conditions

Construction Specifications Manual

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

5 CIRCULATION AND STREET DESIGN

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

General Design Factors

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Chapter 3 DESIGN SPECIFICATIONS

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

TRANSPORTATION NEEDS ASSESSMENT

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Non-Motorized Transportation 7-1

Land Use Bicycle Spaces Required Type Residential

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

NEWMARKET UPHAM S CORNER

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Parks, Open Space, Trails and Recreation Master Plan

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

CURBSIDE ACTIVITY DESIGN

Appendix B - Street Sections

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Omaha s Complete Streets Policy

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Tonight is for you. Learn everything you can. Share all your ideas.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Chapter 5 Future Transportation

Bicycle Boulevards and Neighborhood Greenways

Appendix 3 Roadway and Bike/Ped Design Standards

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Safe Streets. City of Lake Forest Park. March 21, 2017

Small Town & Rural Multimodal Networks

May 4, Dear Mr. Thomas and Mr. Snyder,

Community Bicycle Planning

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Duwamish Way-finding and CTR Report

Bikeways Network and Facilities

Perryville TOD and Greenway Plan

WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Hospital Link Project Project Update September 2017

The Wiggle Route in Context

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

St. Francis Drive through the City of Santa Fe Corridor Study

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Complete Streets Funding Program Project Prioritization Plan

CONNECTING PEOPLE TO PLACES

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Plant City Walk-Bike Plan

March 2008 FINAL DRAFT. Supplemental Bikeway Design Guidelines

GENERAL. 1. Description

Active Transportation Facility Glossary

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

C C C

RZC Appendix 8A Marymoor Subarea Street Requirements

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Off-road Trails. Guidance

Classification Criteria

Montford Drive Parking & Circulation Study

Dowling/Beaty Cycling Route

Cycle Track Design Best Practices Cycle Track Sections

Sebastopol Charter School Traffic Management Plan

DRAFT FOR DISCUSSION PURPOSED ONLY, 10/26/13 MOBILITY PLAN UPDATE DESIGN TOOLBOX

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Design Guidelines. Overview. Design Vision for Yellow Brick Road

Who is Toole Design Group?

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Ocean Park Boulevard Green Street Project Community Workshop

Long Island Rail Road Expansion Project Floral Park to Hicksville

What Is a Complete Street?

Montco 2040 Implementation Grant Program Award Summary

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Construction Newsletter No. 32 October 14, 2016 On-Going

Observations and Ideas: Toomer s Corner Streetscape Improvements

Physical Implications of Complete Streets Policies

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

Executive Summary Route 30 Corridor Master Plan

Improvements Infrastructure Gap Assessment and Improvements Street Striping

What are the Qualities that make Newark a Bicycle Friendly Community? What are aspects that make Newark less Bicycle Friendly?

Tuesday, September 25 th Mount Holly Municipal Complex 400 East Central Avenue 5:30pm to 7:30pm. Activity Stations o Where do you Live?

Transcription:

5 System Components Wakefield Street Photo Simulation showing Sharrows Introduction The Master Plan identifies various system components that, together, create a comprehensive greenway system. These components include and define variations in trail design, pedestrian and bicycle improvements and facilities and amenities throughout the system. These components reflect existing conditions as well as context and ultimately influence potential use and the experience of the user. Trail Types DRAFT The master plan identifies three primary classifications of trails. These classifications reflect variations in purpose and design. These classifications are: Greenway Trails Spur Trails Urban Trails Blueways Greenway Trails Greenway Trails Greenway trails are typically 8-12 wide, asphalt paved trails with a 2 wide compacted ABC shoulder. These trail types are typically located through natural areas, within parks, and in conjunction with utility easements. Trails are to be built to withstand occasional vehicle traffic for maintenance and emergency access purposes. The stone subbase should be determined based on a geotechnical investigation of each specific corridor. In some locations a greenway trail can be natural and unpaved, partially paved or have a gravel surface. Blue Loop - Raleigh Art Museum System Components 27

Spur Trails Spur trails are normally short distance trails that provide connections from neighborhoods, adjacent land uses, public facilities, retail, and civic uses to the larger greenway trail system. These trails can be narrower than the typical 8-12 greenway trail but should not be narrower than 6. These trails should also be built to greenway trail standards and be able to withstand an occasional vehicle for either maintenance or emergency access. Spur trails typically occupy narrower corridors and can be close to established residences or other land uses and therefore may include additional amenities to screen or separate the trail from private property. These may include retaining walls to limit grading onto adjacent parcels, fencing to keep users off private property and limit access to facilities such as storm water ponds, and landscaping to minimize views and maintain privacy of adjacent land uses NC55 Streetside Trail - Cary, NC Roadside Trails A roadside trail is used along roads where higher pedestrian traffic volumes are expected and the potential for bicycle traffic is significant. These trails are typically 8-10 wide and are ideally set 5 off the back of curb. In situations where there is limited room, these trails can be constructed closer to or along the back of curb. They can be constructed of asphalt or concrete. Street Crossings In urban areas, designated street crossings will be necessary. The scale, size, speed limit, and amount of traffic on the street will determine the various approaches to street crossings and details can be used. Spur Trail - Cary, NC Low traffic volume streets can have crossings that are as simple as a crosswalk and signage. These should be located at street intersections that have stop signs or signals. Urban Trails Urban trails refer to those accommodations for bicycles and pedestrians located along or within established streets and road rights of way. Components of these trials include those amenities and features associated with greenway trails as well as street improvements for bicycles and pedestrian crossings. Sidewalks Sidewalks are pedestrian-centric and encourage safe walking conditions. The minimum sidewalk width should be 6 wide and located a minimum of 3 off the back of curb. Sidewalks typically are not placed in high pedestrian traffic areas but rather in neighborhoods. They are typically constructed of concrete. Batchelor Branch Creek Road Crossing - Cary, NC 28 System Components

Black Creek Greenway Road Crossing - Cary, NC Crossings of major roads with high traffic may require a pedestrian refuge island, pedestrian activated signals and flashing street signs in addition to signage. These can be located at intersections or in some cases mid-block. Crossings at major highways will require either an underpass or bridge. These underpasses and bridges can be expensive and should be designed to be visually attractive, durable and safe. Bridges and underpasses also provide an opportunity for public art and can also be designed to be a gateway into town. Sharrows on Lassiter Mill Road - Raleigh, NC Bike Lanes Bike lanes are dedicated travel lanes within an existing or new roadway. They are to be 4-5 wide and identified with signage and pavement markings. Sharrows Sharrows are lane markings on the road that indicate that cyclists are going to be in the same lane and have a right to ride. They are intended to make motorists aware of bicycles and that they need to share the road. American Tobacco Trail Bridge - Durham, NC Black Creek Greenway Underpass - Cary, NC System Components 29

Street Classifications The master plan identifies three levels of improvements for urban trails and other accommodations based on a tiered designation of the road and street network including classification of the road, what destinations are located along the road and the potential for future development. Tier 1 Streets Tier 1 Streets are to include bike lanes, 8 sidewalks, and signage. Streets that are classified as Tier 1 Streets are as follows: Arendell Avenue Gannon Avenue Mack-Todd Road / Business 64 Wakefield Street Tier 3 Streets Tier 3 Streets are to include 5-6 sidewalks. Tier 3 Streets are as follows: Church Street Franklin Avenue Horton Street between Wakefield Street and greenway corridor 6 Vance Street between Arendell Avenue and Wakefield Street Arendell Avenue Tier 2 Streets Tier 2 Streets are to include sharrows, 5-8 sidewalks, and signage. Streets that are classified as Tier 2 Streets are as follows: Barbee Street Horton Street between Wakefield Street and the greenway corridor 8 Judd Street Shepard School Road / Poplar Street Stratford Road Vance Street between Arendell Avenue and Poplar Street Wakefield Street S. Wakefield Street 30 System Components

Little River Blueway Corridor - Zebulon, NC Bolin Creek Trail Wayfinding Signage - Chapel Hill, NC Blueways A blueway is a river/stream that is navigable and can be used for recreational activity or movement from one destination to another. The river/stream itself may not require much improvement but will require access points for kayaks and canoes. These access points will require management. In addition to access points, some wayfinding signage may be required along the blueway. Along the western edge of the town s ETJ and connecting to Little River Park and eventually the future reservoir, the Little River offers potential for a designated blueway. Bolin Creek Trail Bicycle Stairway - Chapel Hill, NC Facilities and Amenities Facilities and amenities throughout the greenway system include trailheads, restrooms, directional signage, educational signage, bicycle stairways, exercise stations, benches, shelters and public art. Trailheads can be specific for greenway use or make use of an existing public facility like a park, library, stadium or shopping center. Bollards and / or gates at trailheads prevent vehicles from accessing the greenway trail Trailheads can typically include parking, signage, trash receptacles and restrooms. Trailhead Speight Branch Greenway - Cary, NC Along the trail, various amenities such as benches, dog waste stations, signage, both directional and educational, exercise stations, benches, shelters and public art can included. While many of these are functional amenities can also provide educational opportunities and enhance the identity of a corridor or trail. Wayfinding signage - Chapel Hill, NC System Components 31