Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Plant Isolation Lock out/tag out Procedure

Work Health and Safety Risk Management Procedures

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

HAZARD MANAGEMENT PROCEDURE

To comply with the OHS Act, the responsible manager must carry out and document the following:

Newtown Neighbourhood Centre

Boating Activity Minimum Standard. January 2015

Manual Tasks Minimum Standard. October, 2014

Health & Safety Policy & Plan. Rightway Roofing.

Hazard Management Making your workplace safer

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation

HS329 Risk Management Procedure

This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled.

Work Health Safety Record Management Guidelines. October, 2014

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

CONTRACTOR SAFETY INDUCTION HANDBOOK

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

Policy Redesign Project. Plant Safety Policy. Table of Contents

ESSENTIAL SAFETY RESOURCES

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Management of risk. Definition of terms. Managing risks. Risk

Safe work method statements

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Accident/Incident Reporting and Investigation Procedures

General Isolation Procedures

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

Hazardous substance risk management

LADDERS FIXED AND PORTABLE

Procedure: Work health and safety hazard management

Risk Management Guide

GENERAL WORK HEALTH & SAFETY CHECKLIST INTENDED USE. St Euphemia College - General Work Health and Safety Checklist

Hazard & Risk Management

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

Geotechnics, Face and Stockpile Operations

Occupational Health & Safety

Safe High Pressure Water Washing (HPWW) Requirement

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

Safety Management Manual

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Marine Education Society of Australasia HAZARD MANAGEMENT POLICY

Competency type. positions. All workers (including contractors), higher degree students and volunteers

Section 5: Hazard Identification ( version)

Faculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016

Risk Assessment. 1.3 This procedure outlines the process of undertaking a Risk Assessment in the University.

Working Alone. Latest revised date: October 26, 2011 Page 1 of 7 Prepared by: Department of Health & Safety S-014

Contractor / Exhibitor Handbook

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

Manual Handling Procedure

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Health & Safety Policy HSP 08 Control of Substances Hazardous to Health (COSHH) Version Status Date Title of Reviewer Purpose/Outcome

SOP. Working in Confined Spaces

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

COMPLETION OF PROCEDURE ASSESSMENT FORM (COSHH RELATED) GUIDANCE NOTES (Version 3)

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome

HAZARD RECOGNITION EVALUATION & CONTROL. Procedure No. HR-405-PR-2 Division Human Resources. Supersedes n/a Board Policy Ref.

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

PRO Lifting Operations

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010)

Management Procedure. Work Health and Safety Remote or isolated Work. Document number: PRO-00018

Nick Coleman. List of Legislation, Code of Practice, Australian Standards, Guidance Materials used to determine control measures

Nick Coleman. List of Legislation, Code of Practice, Australian Standards, Guidance Materials used to determine control measures

SAFE WORK METHOD STATEMENT

Safety management The Firefighter Safety Maxim Risk assessment at an incident Tactical mode Emergency evacuation and tactical withdrawal

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

Control of Vibration at Work

Hampstead Hill School Health and Safety Policy: Confined Spaces

HEALTH AND SAFETY RISK ASSESSMENT POLICY Harmer Street Gravesend Kent DA12 2AX

SAFE WORK METHOD STATEMENT CARPENTER

Accidents and accident prevention

How volunteer organisations can comply with the model Work Health and Safety Act LEGISLATIVE FACT SHEET SERIES

University Safety Policy Supplement

DRIVER FATIGUE MANAGEMENT PLAN

Corporate Standard Hazardous Substance Management HB#625157

Removal of Lead-Based Paint

LONE WORKING HEALTH AND SAFETY GUIDANCE

Work Health & Safety Event Safety Checklist Small Event

Hazard Communication Plan (HCP) 29 CFR

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

Work at height Policy

Telco Antennas SWMS Working At Height Above 2m

RISK ASSESSMENT AND HAZARD CONTROL

SH&EWMS No.: FC-QLD-017 Revision Date: July 2017 Revision Due: July 2018

Working in Confined & Enclosed Space Policy

Faculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016

THERMAL COMFORT GUIDELINES

Hazard Assessment & Control. Faculty of Veterinary Medicine

Contractor Code of Conduct

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Lifting Operation & Lifting Equipment Procedure

WORKING ALONE PROGRAM

Safe Work Method Statement Tasks

Transcription:

Project & Task Work Health and Safety Risk Management Procedure Related Policy Work Health and Safety Policy Responsible Officer Executive Director Human Resources Approved by Executive Director Human Resources Approved and commenced November, 2014 Review by November, 2017 Responsible Organisational Unit Work Health and Safety Unit CONTENTS 1 Objective... 2 2 Scope... 2 3 Procedure... 2 3.1 Exemptions... 2 3.2 Standard Provisions... 2 3.3 FieldTeq... 3 3.4 Monitoring Services... 3 4 Training and Competency Requirements... 3 4.1 Documentation Requirements... 3 4.2 Control of risk... 4 4.3 Consultation... 4 4.4 Approval... 5 4.5 Project review, Sign-off and Registration... 5 4.6 Monitoring and Review... 6 5 Responsibilities... 6 6 Definitions and Acronyms... 7 7 Supporting Documentation:... 8 8 Versioning... 8 1 Project & Task Work Health and Safety Risk Management Procedure (November, 2014)

1 Objective 2 Scope The objective of this procedure is to provide information on how risks associated with planned activities (including field activities) are assessed and how controls are selected. It addresses project/task level risks, rather than specific hazards encountered in the workplace. This procedure provides the minimum requirements for University of Tasmania (University) staff and students to follow when planning project/task activities (both on and off campus) so that work health safety risks are managed. This procedure is to be applied in conjunction with: 3 Procedure 3.1 Exemptions Risk Management Policy and Risk Matrix; and Safe Work Procedure. Completion of Project/Task activity risk assessment is not required where: the project/task is routine, has been performed before and a current Safe Work Procedure (SWP) is in place to manage the project/task; or the project/task is deemed to be a low risk, every day task, and appropriate supervision is allocated (e.g. Conferences/Meetings, inter-university travel, and visits to local public venues/attractions e.g. museum). Note: Registration requirements must still be complied with. Exemptions for any of the other requirements of this Procedure may only be approved by the Work Health Safety (WHS) Unit, following consultation with the relevant Organisational Unit (OU) head. 3.2 Standard Provisions Project risk is to be assessed when: a new project/task not previously performed is to be undertaken; reviewing/changing safe working procedures; purchasing new project plant / equipment / chemicals, etc; investigating incidents associated with a project/task; required by legislation and new information becomes available concerning a project/task, work practices, and/or project plant/equipment that may impact on the health and safety of a project participant. Where a project/task risk assessment is required, University employees are authorised to plan, coordinate, implement and/or participate in projects/tasks, provided the following minimum risk management requirements are adhered to. 2 Project & Task Work Health and Safety Risk Management Procedure (November, 2014)

3.3 FieldTeq The Fieldteq program is the preferred risk management tool for staff, students and volunteers participating in complex field activities at the University. Fieldteq incorporates a risk assessment process, project approval and review as well as meeting record keeping requirements. More information about Fieldteq is available from the WHS Website or by contacting the WHS Unit. 3.4 Monitoring Services OUs may make use of a contracted monitoring service for the purpose of monitoring personnel undertaking field activities and where required for the initiation of an emergency response. Connextions is a current provider of monitoring services to the University. Contact the WHS Unit for additional information. 4 Training and Competency Requirements All risk assessments must involve: a person who has knowledge/experience relevant to the project/task that is being undertaken; and a person competent in the form of risk assessment being undertaken with options including: involving a trained Health and Safety Representative (HSR); completion of the MyLO Officer, manager or worker on line training course; completion of an appropriate third party training course; engaging a consultant with the requisite competencies; in-house training and mentoring by a competent and experienced person. 4.1 Documentation Requirements Risk assessments are to be documented by: use of the Project/Task Risk Assessment form (available on the WHS website); or entering to the FieldTeq database (mandatory for all high-risk / complex field activities); or use of an Organisational Unit risk assessment form/system that includes the following detail: Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Description of the project / task. Detail of all project tasks / steps. Identification of all potential hazards associated with each task / step. Evaluate the possible consequence of each hazard. Evaluate the likelihood of the above consequence. Determine risk ratings of hazards (inherent risk). 3 Project & Task Work Health and Safety Risk Management Procedure (November, 2014)

Step 7 Step 8 Step 9 4.2 Control of risk Identify controls to reduce risk ratings of identified hazards (using Hierarchy of Control see 1.3 below). Evaluate the residual risk. Determine the highest remaining residual risk. Step 10 Obtain appropriate approval, review consultation, and specify if a SWP is to be developed. Step 11 If required, participants involved in the project/task are to sign on/off. Step 12 Document persons responsible for implementing controls. The exposure of any person to an identified hazard must be controlled to eliminate or minimise risks to health and safety so far as is reasonably practicable. This is to be achieved through the progressive application of the Hierarchy of Control. Most Effective Least Effective Method Elimination Substitution Isolation Engineering Administrative Personal Protective Equipment (PPE) Hazard Control Examples Eliminate, remove and/or discontinue the hazard &/or hazardous situation/process in the workplace (e.g. stop using). Replace the activity, process or substance with a less hazardous one e.g. less hazardous material or system of work. Physically isolate the hazard from the person being put at risk e.g. enclosure of noisy equipment, guarding, isolate people from the equipment or process. Measures to change the equipment or environment in which the process is undertaken; re-design or engineer out the problem e.g. mechanical handling device, modify equipment design or workplace layout. Establish appropriate systems of work (for example policies, procedures, work practices) to reduce an employee s exposure to risk e.g. safety signs, posters, training or safe work practices such as job rotation. Provide suitable and properly maintained PPE (e.g. safety boots) to cover and protect an employee from contact or inhalation. This should be the last option after considering all the other options, and employees must be trained in correct fit and use. A combination of the above methods can be implemented to reduce the level of risk to a level that is as low as reasonably practicable. The last two hierarchy of control measures should be used as support controls as they will only help reduce consequence. When identifying controls, records are to be kept of the decisions made to confirm that a higher order level of control is not practicable. 4.3 Consultation There must be adequate consultation and communication with those who may be affected by a project/task risk assessment. In particular, consultation is required when: 4 Project & Task Work Health and Safety Risk Management Procedure (November, 2014)

identifying hazards; assessing risks; developing control measures; reviewing the effectiveness of controls; and planning changes to the work environment, plant, equipment, work organisation, work systems or the chemicals in use; particularly if the proposed change has a potential for a significant detrimental effect on the health and safety of any person. The Project/task manager must give proper consideration to the outcome of any consultation undertaken, and provide feedback. 4.4 Approval Before a project/task can commence, the risk assessment and any other relevant project plans/documentation must be reviewed and approved by the Organisational Unit (OU) head. Pre-approval and sign off by a member of the University s Senior Management Team must be obtained for any project or task with an extreme residual risk rating. The OU head/ Officer may delegate their approval function to another suitably trained and competent person(s) in their OU (e.g. Senior Lecturer / Researcher or University Manager) provided it is not an extreme/high risk project. For extreme/high risk projects, it is advisable that the OU head/ Officer also participate in the risk assessment process prior to requesting approval from an SMT member. Low risk projects/tasks may be reviewed and approved by a nominated University staff member. 4.5 Project review, Sign-off and Registration Before a project/task commences: all project/tasks off-campus or inter-campus, including project/tasks deemed exempt from requiring a risk assessment, must be registered with the relevant OU administration for emergency purposes. Registration must include information on the location, date, duration, attendees and key contact details. (registration via FieldTeq meets this requirement); a copy of the Project/task risk assessment and/or safe work procedure must be available/accessible at the time of the project/task for participants to review and to ensure all required controls are implemented; and all persons involved in a project/task must acknowledge they have read and understood the risk assessment and agree to comply with all steps and control measures. This is recorded by: completing the sign-off section at the bottom of the Project/Task Risk Assessment form (Step 11) or via the use of another risk assessment format approved by the WHS Unit; or registering in the FieldTeq database as a participant for that particular project/task; or 5 Project & Task Work Health and Safety Risk Management Procedure (November, 2014)

signing onto Permit-to-Work documentation involved in the project/task, which makes reference to the risk assessment. participants are to STOP and review the work area before starting the project/task check to ensure that the assessment is still valid and that no new hazards have been introduced since the risk assessment was undertaken. 4.6 Monitoring and Review Risk assessments are to be reviewed: at least every three years; or following an incident or identified hazard; or following a change in the workplace that could impact on the health and safety of workers). Monitoring and review of risk assessments and controls for routine tasks, should also occur to ensure the continued effectiveness of controls. 5 Responsibilities Head of Organisational Unit Administration (Organisational Unit) Project/task managers Health Safety Representatives Workers Ensure risk management strategies are in place that comply with this Procedure. Provide information and training in relation to Project/Task risk assessment and control. Ensure consultation with and feedback to relevant employees including HSRs. Copies of completed Project/Task Risk Assessments are to be retained within the Organisational Unit and be made available to all workers undertaking the particular activity or task. Copies can be electronically stored. Responsibility for implementing this Procedure. Ensure persons undertaking and/or approving risk assessments are adequately trained. Review and approval of risk assessments. Provide suitable facilities and resources to ensure the effective implementation of this policy. Review and approval of risk assessments. To be proactively involved in hazard identification, provide risk assessment process. Advise and assist with raising the awareness of this Procedure. To participate in the risk assessment processes and comply with risk assessment controls and requirements. 6 Project & Task Work Health and Safety Risk Management Procedure (November, 2014)

WHS Committee WHS Unit Oversee the development and monitor the effectiveness of this Procedure. Consider and make recommendations relating to any tabled reports relating to serious non-conformances to the requirements of this Procedure. Oversee the University's compliance with this Procedure, and provide advice / guidance to Organisational Units. Investigate non-conformances and provide reports to the WHS Committee as necessary. Monitor compliance through the Continuous Self-Assessment (CSA) audit. Assist in hazard identification and risk assessment processes, and provide timely advice and information as required. Approve any exemptions to the requirements of this Procedure. 6 Definitions and Acronyms Term/Acronym Consequence Worker Hazard Hazard Identification Health Safety Representative (HSR) Inherent Risk Definition Outcome or impact of an event. Refers to any staff member, student undertaking work experience, contractor or volunteer A situation, activity or task with the potential to cause injury or damage. The process of identifying any reasonably foreseeable situation or event that may give rise to the potential of injury or illness to any person, or damage. A person formally elected under the WHS Regulations as the HSR. The risk before mitigation strategies and controls are put in place. Likelihood Officer Uses as a general description of probability or frequency. Members of Council, Pro Vice-Chancellor (Arts and Law), Principal University College, Deans of Faculties, Heads of Schools and Centres, Directors/Principals of Institutes and Heads of Divisions and Sections and Members of Boards having strategic management responsibility are considered to be Officers pursuant to Section 27 of the Work Health and Safety Act 2012. 7 Project & Task Work Health and Safety Risk Management Procedure (November, 2014)

Organisational Unit College, Faculty, School, Centre, University Institute, other University Entity, Division, Section or University Business Enterprise. Reasonably Practicable When deciding upon a way to control the risk, reasonably practicable has regard for: How severe is the risk? How much is known about the risk, and ways of minimising or removing the hazard? Are there available and suitable ways of minimising or removing the hazard? What is the cost of removing or minimising the risk? Residual Risk Risk Risk Management Workers The risk that remains after mitigation strategies and controls are put in place. A situation, activity or task with the actual likelihood of harm or damage; the chance of something happening. It is measured in terms of consequences and likelihood of a hazard occurring. A systematic method of identifying hazards, assessing the associated risks (consequence and likelihood of an event occurring) and implementing suitable risk control measures. An employee, a contractor or subcontractor, an employee of a contractor or subcontractor, an employee of a labour hire company, an outworker, an apprentice or trainee, a student gaining work experience, or a volunteer. 7 Supporting Documentation: Project/Task Risk Assessment Form & Guide Work Health and Safety Hazard Prompt Sheet Safe Work Procedure University Risk Management Policy University Risk Matrix Code of Practice: How to Manage Work Health and Safety Risks Fieldteq software program 8 Versioning Former Version(s) Version 1 Project/Task Risk Assessment & Control Procedure; approved March, 1999. Version 2 Work Health and Safety Project and Task Risk Management Procedure; approved May, 2011 Version 3 - Project and Task Risk Management Minimum Standard; reviewed and updated to comply with new WHS Act 2012; approved Executive Director Human Resources- December 2013. 8 Project & Task Work Health and Safety Risk Management Procedure (November, 2014)

Current Version Version 4 Project & Task Work Health and Safety Risk Management Procedure (current document); approved November 2014. Amended in December 2016 to incorporate Colleges. 9 Project & Task Work Health and Safety Risk Management Procedure (November, 2014)