PROCEDURE TO MEASURE READOUT LOOP RESISTANCE

Similar documents
GSE CAGING AND SPINUP BUFFER LINE INSTALLATION

CHECK READOUT LOOP CONTINUITY IN PROBE C

GSE CAGING BALLAST SYSTEM INSTALLATION

Proton Monitor Thermal Vacuum Test Procedure GP-B P0635

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

POROUS PLUG CHARACTERIZATION TEST

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

BLEED DOWN OF THE HIGH GMA PRESSURE

TEST OF GMA SPINUP ASSEMBLY PRESSURE SENSOR CALIBRATION

(PTP) PROBE PRESSURE MEASUREMENT SYSTEM INSTALLATION AND LEAK CHECK PROCEDURE

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

CALIBRATING THE GMA PRESSURE SENSORS AND THE ECU ENGINEERING UNIT

Proto-qual Vibration Test Procedure 2.5 and 6 Vacuum Valves (3179 and 3223) Retest of Flight Spare Valves. GP-B P0735 Rev.-

INTERNAL LEAKAGE CHECK OF THE FLIGHT GMA

GMA SLEEP PROCEDURE AT VAFB

PROBE-C CAGING VALVE INSTALLATION

Vibration/leak Test 2.5 and 6 Vatterfly Valves (3179 and 3223) spare units. GP-B Engineering Procedure P0761 Rev.-

DESIGN VERIFICATION AND QUALIFICATION OF NEW POPPET AND BUSHING ON GMA FLIGHT SOLENOID VALVES

(PTP) REMOVE PROBE SPINUP GAS/VAC. LINES (HORIZ.)

GDS OPERATING PROCEDURE

SCRUB LAUNCH RECOVERY PROCEDURE FOR THE GMA

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

ASSEMBLY OF GAS FLOW HARDWARE INTO SM GMA

CLEANLINESS TEST OF PROBE SPINUP EXHAUST LINES

GMA VENT EXTENSION SERVICE PROCEDURE

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

PROCEDURE FOR THERMAL CYCLING IN LIQUID NITROGEN

BLEED DOWN OF THE GMA HIGH PRESSURE AT VAFB

GUARD TANK PRESSURIZATION FOR TRANSPORT

GMA TO SPACE VEHICLE PLUMBING HOOKUP

OPERATION OF LIQUID PARTICLE COUNTER. GP-B P0045 Rev -

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Spacecraft Battery Magnetic Field Survey

GMA PREPARATION FOR E28 TESTING

Preparation and Installation of the Sanitary BDI-FLX Sensor and Connection to the BDI-FLX Interface Cable

PREPARE FOR CRYO OPS FOLLOWING TRANSPORT TO B1610 To be performed at Vandenberg Air Force Base building 1610

Coda cx1 Thermal Cycle Test Procedure

Teledyne Oil & Gas North Williamson Blvd. Daytona Beach, FL USA (phone) (fax)

BGA244 Binary Gas Analyzer

Significant Change to Dairy Heat Treatment Equipment and Systems

HST-3000 VDSL QUICK CARD

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Install Fill Line Burst Disk on SMD

DigiTRON Electrical Flying Leads, Jumpers and Harness Assemblies Site Received Test Manual

SFHGEN77 - SQA Code HD48 04 Perform first line calibration on clinical equipment to ensure it is fit for use

DTG - LCD Digital Temperature Gauge USER MANUAL

32374 R. Jazowski 4/4/ D. W. Mudge G. Sivik 1 of 8 ODN TITLE: Installation & Operation Manual for Nautilus G2 Connectors

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Prepare Payload for Mass/CG Measurements and Condition Payload During Spin Balance Test

DeFelsko PosiTector Dew Point Meter DPM & DPMD Probes

Rigel 601 CHECKBOX. Instruction Manual. 348A551 Issue 2.0. April Seaward Electronic Ltd. Issue 2.0

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Install Fill Line Relief Assembly on SMD

INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES

Constant Pressure Inlet (CCN) Operator Manual

Polatrak ROV II - Tip Contact Probe Operation Manual

Dust & Water Test Report SMA SMA-J-C-XX-ST-SB1/SMA-P-C-XX-ST-CA1

_ pressure transducers. User Manual

ES18 Security Theory/Regulations Answer Schedule

Differential Probes TDP1500 and TDP3500 Datasheet

PREPARED BY: Marshall K. Cheung, Ph.D., Laboratory Director. REVISED BY: Marshall K. Cheung, Ph.D., Laboratory Director

BekkTech s Procedures For Performing In Plane Membrane Conductivity Testing

PRODUCT SPECIFICATION. SFP+ Cage and Cage Assembly 1 of 8 A

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR REGULATE GUARD TANK PRESSURE

QUARTZ HOUSING COATING PROCEDURE

Operator s Manual 701 Test Kit for Static Control Surfaces (Megohmmeter)

MASSACHUSETTS STATE POLICE CRIME LABORATORY. Certificate of Calibration Procedure for the Alcotest 9510

2000 lb manual winch

ALTERNATIVE INSTALLATION PROCEDURES FOR 90 AND 45 KTKK MOULDED PART AND ADAPTOR ASSEMBLIES

HLM-2000-TX Gas Transmitter User Manual

Pressurize Well to One Atmosphere with Probe Installed

SCIENTIFIC DATA SYSTEMS, INC. Depth Tension Line Speed Panel. DTLS Manual

T EK-SUB 4800C 19 mm Submersible Level Transmitter

INSTALLATION PROCEDURES FOR COATED RAYATEN MOULDED PARTS ONTO D-SUBMINIATURE CONNECTORS

ESAIL D3.1.1 Requirement specifications of the tether test reels

Calibration Procedure

INSTRUCTION MANUAL. 840 Transmitter. Loop Powered Dissolved Oxygen Transmitter

Model SM/PL Series. Calibration Guide. Precision Loads. Anritsu Company 490 Jarvis Drive Morgan Hill, CA USA

OC Panel High Limit Aquastat Kit, Manual Reset p/n

Paper Session II-C - Verification of International Space Station Component Leak Rates by Helium Accumulation Method

Reduce Liquid Level in Main Tank- Liquid at NBP To be performed at Vandenberg Air Force Base building 1610

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS

PECIMEN IMM6. Minor Electrical Installation Works Certificates. Amd 3: In accordance with BS 7671

HYDROSTATIC LEAK TEST PROCEDURE

WBEA Standard Operating Procedure

VARIABLE TEMPERATURE HOT AIR GUN VALIDATION

High-performance submersible pressure transmitter For level measurement Model LH-10

Victoreen B. Operators Manual. Image Intensifier Ion Chamber

CONFINED SPACE AWARENESS

CERTIFICATION OF THE TEMPERATURE MONITOR AND ALARM

Size Selection & Installation of QSZH-125

Features. Description

INSTRUCTION MANUAL MP4AR Remote Convection Gauge Range: 1 x 10-3 Torr to 1 x 10+3 Torr

Climatic Independent Level Sensor LAR

OEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE

GEMS SENSORS & CONTROLS

Improve Process Reliability

Owners Manual Release Date: Thursday, December 29, 2011

Status Date Prepared Reviewed Endorsed Approved

Spectrum AquaLight (SAL ) Color Underwater Light Owner s Manual

Thermo Probe, Inc. TP-5 TP-7 TP-8. Instruction Manual English. Switch. Display. Carry Strap. Probe. Ground Clip. Switch. Display.

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR STOP PUMPING ON SMD VACUUM SHELL / DISCONNECT VACUUM MODULE

SUMMARY STEPS TO CERTIFY ACOUSTIC DUCT SILENCER PERFORMANCE UNDER AMCA INTERNATIONAL S CERTIFIED RATINGS PROGRAM

Transcription:

Stanford University Gravity Probe B Program October 19, 1998 GRAVITY PROBE B PROCEDURE FOR GYROSCOPE COMMISIONING P0426 REV. - PROCEDURE TO MEASURE READOUT LOOP RESISTANCE Prepared by: Robert W. Brumley Approvals: 19 October, 1998 Program Responsibility Signature Date Robert Brumley Acting RE Gyroscope Verification Barry Muhlfelder SQUID RE P. Bayer Gyroscope Integration B. Taller GP-B Quality Assurance Sasha Buchman GP-B Hardware Manager NOTES: Level of QA required during performance of this procedure: Stanford QA Representative Government QA Representative

Page 2 of 9 Revision Record: Rev Rev Date ECO # Summary Description Acronyms and Abbreviations: Acronym / Abbreviation Meaning

Page 3 of 9 Table of Contents A. SCOPE... 4 B. REQUIREMENTS VERIFICATION... 4 C. CONFIGURATION REQUIREMENTS... 4 D. HARDWARE REQUIRED... 4 E. SOFTWARE REQUIRED... 5 F. PROCEDURES REQUIRED... 5 G. PERSONNEL REQUIREMENTS... 5 H. SAFETY REQUIREMENTS... 5 I. GENERAL INSTRUCTIONS... 6 J. REFERENCES AND APPLICABLE DOCUMENTS... 6 K. EQUIPMENT PRETEST REQUIREMENTS... 7 L. OPERATIONS... 7 M. TEST DATA RECORDS:...ERROR! BOOKMARK NOT DEFINED. N. ANOMALOUS TEST DATA...ERROR! BOOKMARK NOT DEFINED.

Page 4 of 9 A. SCOPE This procedure describes a test to determine that the connection of the readout cable to the gyroscope thin film loop is unaltered when the gyroscope is cleaned. Basically, it consists of making a careful measurement of the resistance of the cable-loop combination before and after gyroscope cleaning. B. REQUIREMENTS VERIFICATION B.1. Requirements Cross Reference: None B.2. Expected Data for verification per requirement: Verification that readout loop resistance does not change during gyroscope cleaning and assembly, coupled with direct experimental evidence that the readout loop was DC coupled prior to the cleaning, may constitute verification that the readout loop remains DC coupled after the cleaning procedure. C. CONFIGURATION REQUIREMENTS C.1. The gyroscope shall be fully assembled. C.2. The measurement be done on a Class 10 clean bench; all standard cleanliness and handling precautions used in gyroscope cleaning apply here. D. HARDWARE REQUIRED D.1. Commercial test equipment Manufacturer Model Serial Number Calibr. Exp. Date Keithley DMM with 4-wire resistance measurement 196 467891 7/99 D.2. Mechanical/Electrical Special test equipment Description Part No. Rev. no. Serial No. Certification Date Interface Cable Set none - 001 Measurement Fixture none - 001

Page 5 of 9 Note: The measurement fixture was originally assembled to be the interface between the GTU-2 gyroscopes readout cables and the old low-temperature acceptance probe. It contains a strain relief for the cable while making a reliable and reproducible connection. D.3. Tools None required. D.4. Expendables None required E. SOFTWARE REQUIRED No software is required for this procedure. F. PROCEDURES REQUIRED Procedure Name Procedure No. G. PERSONNEL REQUIREMENTS This test to be conducted only by certified GSS personnel. Two persons from the following list must be present during the execution of the test: Paul Bayer Barry Muhlfelder Bruce Clarke David Hipkins Chris Gray Robert Brumley H. SAFETY REQUIREMENTS NOTE This test is to be performed on a science-mission gyroscope. Great care

Page 6 of 9 should be taken in handling so as to not damage or alter the state of the equipment. I. GENERAL INSTRUCTIONS I.1. I.2. I.3. Redlines can be initiated by a qualified person as noted in Section H, QA approval is required. Any nonconformance or test anomaly should be reported by a Discrepancy Report. Refer to the Quality Plan, P0108, for guidance. Do not alter or break test configuration if a test failure occurs; notify quality assurance. Qualified test personnel have the authority to exit/terminate this test or perform a retest. J. REFERENCES AND APPLICABLE DOCUMENTS (none specified)

Page 7 of 9 K. EQUIPMENT PRETEST REQUIREMENTS The following procedure is required to set up and calibrate the support equipment for this test. K.1. DMM setup K.1.1. Make sure DMM has been turned on for at least 30 minutes. K.1.2. Press the Ω button in the FUNCTION area of the DDM. K.1.3. Put the Ohmmeter on the 30 kω scale by pressing the down key until the decimal place is two places from the left. The meter should read OV.ERFLOkΩ. K.2. Cable Setup K.2.1. Connect the Test Leads to the Readout Loop Measurement Fixture -- DO NOT CONNECT THE TEST LEADS TO THE DMM! L. OPERATIONS NOTE 1: This resistance measurement is very dependent on temperature. Specifically, the current used by the DMM to measure the resistance and heat coupled from the operator s hands will both cause the pickup loop to heat up and alter the resistance. Therefore it is important to (1) minimize the length of the measurement, and (2) perform the before and after gyroscope cleaning measurements under conditions as similar as possible. NOTE 2: This procedure may be used to verify that the readout cable resistance has not changed during the cleaning procedure. Therefore there has been space left in the data table for two separate measurements of the cable resistance. L.1. Note current temperature in the clean room and record in Table 1. L.2. L.3. L.4. Being careful to not overly torque the cable or stress the gyroscope readout cable connection, place the end of the readout cable into the readout loop measurement fixture. Clamp down the measurement fixture cable strain relief Insert ends of readout cable under lead spring clips (these are the same spring clip design used to connect the readout cable for the science mission). L.5. Insert the free ends of the test lead cables into the DMM per Figure 1.

Page 8 of 9 L.6. L.7. L.8. L.9. Quickly record measured resistance in Table 1. Include at least 0.1 ohms of accuracy. The readout loop may heat up during the measurement, changing its resistance. The initial reading on the DMM is the correct one. Disconnect DMM from measurement cables Remove the ends of the readout cable from underneath the spring clips Unclamp the strain relief cover from the measurement fixture L.10. Remove the readout cable from the measurement fixture L.11. Procedure complete.

Page 9 of 9 M. DATA TABLE Table 1 Meas. # Date Time Temperature Resistance (Record to better than 1 Ohm) Comments 1 2 Figure 1 00.00000 Ω Ohms Sens HI Volts Ohm Test Lead SQUID Lead LO Test Lead SQUID Lead