Shut-Off Valves and Valve Boxes

Similar documents
Installation and Maintenance Manual. Dual Medical Gas Outlets

Installation and Maintenance Manual. Compact Medical Gas Outlets

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

Installation & Maintenance Manual. Economy Manifold

Medical Gas Control Panel

Installation & Maintenance Manual. C2 & C3 Manifolds

Product Description 3 Cleaning and Lubricating 4 Inspection and Testing 4

453 Series Steam Heated Vaporizing Regulator

Economy Manifold Alert -2. Installation and Maintenance Manual V1.6

Tri-Safem Model I1 Regulator. INSTRUCTIONS and PARTS

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

Model: 43T. Bermad Pressure Relief Valve

623 Series Dome Load Regulators

Installation, Operation, and Maintenance Manual

Contents. Stainless Steel Side Block. 1.1 Separating the Side Block. Stainless Steel Side Block Reassembly of. Assembly from the Helmet Shell

BPB26-1 AND SSPB26-1 PATIO BASE INSTALLATION INSTRUCTIONS

Installation/Care/Use Manual

Installation, Operation, and Maintenance Manual

Instruction Manual. CG16K Barometrically Compensated Capsule Dial Gauge. CG16K Capsule Dial Gauge, 0 to 25 mbar

MEGR-1627 Instruction Manual

INSTALLATION & MAINTENANCE INSTRUCTION

SWIRLFLO Refrigerated fountains with FLEXI-GUARD

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Dual Solenoid Gas Valve Installation

Product Manual. Description. Specifications. CVS Type 1301F and CVS Type 1301G Regulator. Introduction

Instruction Manual Pressure Relief Valve and Rupture Disc Chlorine or Sulfur Dioxide, Series 869

AND OPERATION INSTRUCTIONS

MEGR-1912 Instruction Manual

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

Warning: NEVER ALTER TEST EQUIPMENT

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Your safety and the safety of others are very important.

INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

Installation Instructions for NP100 Series Nitrogen Control Panels

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Model 420-HY Pressure Regulating Hydrant Valve

INSTALLATION OPERATION MAINTENANCE

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Bermad Pressure Reducing. Model: 42T

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

WW-720. Pressure Reducing Control Valve

Type BBS-03, BBS-05, BBS-06, BBS-25

Installation and Use Manual

Installation, Operation, and Maintenance Manual

BGA158, BGA171 and BGA110 Series Shutoff Gas Valve

WW-720. Pressure Reducing Control Valve

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Types 749B and R130 Changeover Manifolds

G96 Series BASOTROL Dual Operator Valve

36H SERIES Combination Gas Valve

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

80 Litre Suction Oil Drainer

1800C and 1800C-HC Series Service Regulators

1200B2 Series Service Regulators. Instruction Manual

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

Retractable Hose Reel with 3/8" x 50' PVC Hose

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

HIGH RATE BASKET STRAINER

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

Booster Pump PB4-60 Replacement Kits

ARGUS MODEL C PIG VALVE

OPERATING AND MAINTENANCE MANUAL

Declaration of Conformity as per Directive 97/23/EC

Regulator from 1800 B series

SINGLE STAGE ULTRA-HIGH PRESSURE REDUCING REGULATOR INSTALLATION AND OPERATION INSTRUCTIONS. Certified ISO 9001

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

WHEATLEY Series 500 Swing Check Valve

/2004 US/CA

For use with select HPC Fire Pits ONLY- refer to product catalog or website. 100K BTU Maximum WARNING: FOR OUTDOOR USE ONLY

Certified ISO 9000 INSTALLATION AND OPERATION INSTRUCTIONS. Before Installing or Operating, Read and Comply with These Instructions

BGC258 Series BASOTROL Gas Valve

UNIVERSAL GAS FRYER Instruction Manual Model #8065NS

BGA158 Series CE Approved Class A Shutoff Gas Valve

INSTALLATION, CARE & USE MANUAL. EMASMB & LMASMB Surface Mount Bottle Filling Stations

VALVES & MEASUREMENT

BUTTERFLY VALVES Series 800

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

HYDRAULIC INTENSIFIER Max. Pressure: See Intensifier Data Plate Weight: 16 Lbs. (7.26 kg)

MODEL 154XST INSTALLATION AND SERVICE INSTRUCTIONS FOR MODEL 154XST STROBE LIGHT FOR USE IN HARSH ENVIRONMENTS/ HAZARDOUS LOCATIONS

3/8" Dr. Air Butterfly Impact Wrench

INSTALLATION & OPERATION MANUAL FOR Teppan-Yaki Griddles

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

DUPLEX PRESSURE REDUCING SET

Eliminating Medical Gas Shutdowns for 10 years

200 PSI COMPRESSORS - MODEL NUMBERS

LUBRICATOR ASSEMBLY AND OPERATING INSTRUCTIONS

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848

BGA158 Series CE Approved Class B Shutoff Gas Valve

Transcription:

Installation and Maintenance Manual V1.2 Shut-Off Valves and Valve Boxes Alert-1 w w w. a m i c o. c o m

Table of Contents Introduction 3 Medical Facility Responsibility 3 Precautions 3 Installation of Shutoff Valves 4 Installation of Valve Boxes 5 Maintenance 6 Repair Kit Part Numbers 7 2 Amico Pipeline

Introduction Amico Shutoff Valves are used to stop the flow of medical gas or vacuum in the medical gas distribution pipeline in cases of emergency or maintenance. Valve Boxes must be installed to enclose the shutoff valves when the valves are located in areas accessible to unauthorized personnel. The installation and maintenance should be conducted in accordance with the following standards: NFPA 99 CSA Z7396.1 Medical Facility Responsibility Amico Shutoff Valves and Valve Boxes will perform in conformity with the descriptions contained in this manual and accompanying labels and/or inserts when assembled, operated, maintained and repaired in accordance with the instructions provided. Shutoff Valves must be inspected periodically. A defective product should not be used. Parts that are broken, missing, plainly worn, distorted or contaminated should be replaced immediately. Should such repairs or replacements become necessary, please contact your local distributor. Precautions In this manual, notice the key words: WARNING: NOTE: used to denote steps which can prevent injury. used to point out helpful information. www.amico.com 3

Installation of Shutoff Valves 1. Shutoff Valves should be installed with handles pointing downstream for pressurized gases and upstream (towards the terminal or inlet side) for vacuum. 2. Before brazing, wrap wet rags around the tube extensions next to the valves to prevent overheating and possible damage to the valve seals. Connect copper tubing to the valve extensions using brazing materials and methods in accordance with NFPA 99 or CSA Z7396.1. Once valve extensions are cool, remove rags. 3. Test the systems (as per appropriate standards) to ensure that the intended gas and vacuum services are connected to the appropriate lines. WARNING: Misconnection of gases could lead to serious or fatal injury of patients. Following initial installation of shutoff valves, make certain that the intended services are correctly connected to the appropriate service lines. 4. Test the system for leaks (as per appropriate standards). NOTE: Do not install the gauges before the leak test. Excessive pressure can damage the gauge. Pressure in the system will increase or decrease with fluctuations in temperature. If no leaks are found, gauges (purchased separately) can be installed, if required. Pipe sealants should comply with requirements of NFPA 99 or CSA Z7396.1. Use care if applying pipe sealants. Pipe sealants should not enter the valve cavity and interior tube surfaces that are exposed to medical gas flow and vacuum services. Properly applied Teflon tape is an alternative to pipe sealants. Check Shutoff Valve handle operation for proper clearance from gauge (if installed). 4 Amico Pipeline

Installation of Valve Boxes The Amico Valve Box is shipped in one container holding two separate packages. One package contains the valve box, valves and gauges (if required). The other package contains the window and the frame assembly. 1. Recessed Valve Box: The rough-in of the valve box arrives with a cardboard shield covering its front. You will need to remove the cardboard shield to install the rough-in and perform the pressure test, but it should be repositioned to protect the valves while the walls are being finished. Anchor the valve box rough-in to the studs so that the front edge will be flush or slightly recessed with the finished wall. The recommended mounting is 66" (1676 mm) from the top of the valve box to the finished floor. NOTE: The Shutoff Valve handles should be installed to point downstream for pressurized gases. 2. Before brazing, remove box plugs. As they could melt during brazing, wrap wet rags around the tube extensions next to the valves to prevent overheating and possible damage to the valve seals. Connect copper tubing to the valve extensions (outside the valve box) using brazing methods and materials in accordance with NFPA 99 or CSA Z7396.1. Once valve extensions are cool, remove rags. 3. Test the system (as per appropriate standards) to ensure that the intended gas and vacuum services are connected to the appropriate lines. WARNING: Misconnection of the gases could lead to serious or fatal injury of patients. Following the initial installation of shutoff valves, make certain that the intended services are correctly connected to the appropriate service lines. 4. Test the system for leaks (as per appropriate standards). NOTE: Do not install the gauges before the leak test. Excessive pressure can damage the gauge. Pressure in the system will increase or decrease with fluctuations in temperature. If no leaks are found, install gauges (if required). Pipe sealants should comply with the requirements of NFPA 99 or CSA Z7396.1. Use care if applying pipe sealants. Pipe sealants should not enter the valve cavity and interior tube surfaces that are exposed to medical gas flow and vacuum services. Properly applied Teflon tape is an alternative to pipe sealants. Check Shutoff Valve handle operation for proper clearance from gauge (if installed). 5. Mark the areas controlled by each valve on the labels enclosed. Attach the labels to the label holders. WARNING: Make certain that the proper label coincides with the valve it describes and is positioned on the label holder so that it can be easily read. 6. Recessed Valve Boxes: After the wall is finished, remove the cardboard shield (keep screws). Remove the window by pulling the ring towards you and attach the aluminum frame to the valve box with the No. 6 metal screws provided. Then put the window back in place. www.amico.com 5

Maintenance Operate shutoff valves periodically and repair them if seals tend to stick or leak. Notify all appropriate personnel before shutting off any gas supply. WARNING: To protect the lives of patients, always notify the appropriate medical facility staff before shutting off the supply of medical gas or vacuum through a shutoff valve. Do not close shutoff valves except in cases of emergency or maintenance. Clean the exterior of the valve boxes routinely with soap and water. Strong solvents may damage the Lexan window. Authorized hospital personnel should close shutoff valves in the event of fire, explosion or damage to the pipeline systems or equipment. In Valve Boxes, the Shutoff Valve handles become accessible after the window has been removed from the valve box. To remove the window, grasp the ring and pull outwards. Turn valve handle towards you to shut off the flow of gas or vacuum. Zone Valves have a swingout design body which makes changing the internal components of the ball valve easier. All Valve bodies can be accessed by loosening all bolts and nuts and removing only one bolt. At this point the valve body can be swung out for servicing. 6 Amico Pipeline

Repair Kit Part Numbers Part Number Size Repair Kit Consists of the Following: V-X-RK-USV-05 1/2 A) O-Ring V-X-RK-USV-07 3/4 B) Teflon Seat V-X-RK-USV-10 1 V-X-RK-USV-12 1-1/4 V-X-RK-USV-15 1-1/2 V-X-RK-USV-20 2 V-X-RK-USV-25 2-1/2 V-X-RK-USV-30 3" V-X-RK-USV-40 4" A B www.amico.com 7

www.amico.com Amico Pipeline www.amico.com 85 Fulton Way, Richmond Hill Ontario, L4B 2N4, Canada 71 East Industry Court, Deer Park NY 11729, U.S.A Toll Free Tel: 1.877.462.6426 Toll Free Fax: 1.866.440.4986 Tel: 905.764.0800 Fax: 905.764.0862 Email: info@amico.com APE-IM-VLVS-BX-ALRT1 02.26.2014