en de fr nl SAFETY INSPECTION DISASSEMBLING prescriptions SAFETY INSPECTION Personnel Installing and operating personnel must possess the appropriate knowledge and training. Follow the instructions Installation, operation, maintenance and disassembly must be carried out as stated and showed in the different instruction manuals making integral part of the delivery and in accordance with best practice. If anything is unclear, please contact IMI Hydronic Engineering customer service. Tests for commissioning and periodic inspections Test required for commissioning and periodic inspections must be performed according to the regulations in the country where the device is installed and operated. There are no unified international regulations for the acceptance test prior to commissioning and periodic inspections. It is usually the vessels that determine how the installation is classified. These are CE type-tested in accordance with guideline PED/DEP/97/3/EC for pressurised equipments. For periodic inspections, openings are provided for flange-type or endoscope inspections. In Switzerland, Compresso does not require autorisation from the SVTI if the installation is protected in such a way that psch is not exceeded. Vessels with psv x V up to 3000 bar*litres do not require inspection by the SVTI. Following combinations with TecBox are recommended: Primary vessel () TecBox safety valve (SV) C 10 C15 1000 litres 3 bar on request 800 litres 3.75 bar on request 700 litres 4. bar on request 600 litres 5 bar on request 500 litres 6 bar 6 bar 300 litres 10 bar For Transfero as many extension vessels as required can be connected to the primary vessel. The CE-approved bar safety valve protects the vessels from inadmissible pressures. In Switzerland, SVTI inspection is not required for these types of vessels. Place of installation The access to the place of installation must be restricted to trained and specialised personnel. The floor statics must be able to support the maximum operating and installation conditions. Connections for electricity, communication, main water and waste water must correspond to the requirements of the device. The room must be thouroughly ventilated. Water quality IMI Hydronic Engineering devices are designed to maintain pressure, to degass or to make-up and/or treat water in closed heating, solar and cooling systems with water that contains no aggressive or toxic agents.the entire system must be dimensioned and operated in such a way as to minimise the amount of oxygen admitted through the make-up water or through permeable components. Water treatment systems are to be dimensioned, installed and operated according to the current state of the art. Electrical connection The electrical and the communication wiring and connections should be carried out by a qualified electrician, in accordance with current local regulations. The devices and the potential free outputs must be disconnected from the electrical supply before working on electrical components. Protection on the supply to be done by the contractor: Compresso C10.1; C15; CX: 10 A Compresso C10.; C15.: 16 A Transfero range 4;6;8;10 = 1 x 30 V: 16 A Transfero TPV...P = 3 x 400 V: 10 A Vento range,3,4,6,8,10 = 1 x 30V: 16 A Vento range 13,19 = 3 x 400 V: 10 A Pleno PI9.1; PI6.1: 10 A PI6.: 16 A Residual current device (RCD) following local regulation. If installed in residential building we recommend a commercially available line filter to the junction box. WCMOIN0004 05.016 Compresso Connect F INSTALL Compresso Transfero Vento PlenoI www.imi-hydronic.com
The texts, graphics and diagrams in this document may be subject to alteration without prior notice or reason being given. www.imi-hydronic.com TecBox Compresso CU Compresso CG x3 x5 AVV DLV CDVV CDVV LT LT
DLV 600 mm 0% OK 0% Hygro 80% 100% +5 C - +40 C 0% - 80% 1x30V Cl : < 60 mg/m²/4h 150 mm 3
Compresso CU Compresso CG 3 ACV 4 ACV 3 CDVV CDVV 1 1 4
DNe SVS DNe DNe DNe IMI Hydronic Engineering DNe 30 m DNe 0 5 3 EN 188 Q kw 1000 1700 3000 SWKI 93-1 * Q kw 300 600 900 ts max 50 C Q kw 1600 700 5000 *) CH 5
TecBox SA1 SVV SF1 V1 PT 1 x3 CLICK! 6
3 x5 4 7
x CU / CG CUE / CGE 8
30V/50/60 Hz 10A / 3 x 1,0 mm #1-5 1 L 1! PE N 3 4 L PE N 5 6 BrainCube Connect! www.imi-hydronic.com 9
30V/50/60 Hz Sicherung/ fusible/ fuse 10 A / 50V / 5x0 F00 Klemmen Ausführung C.1 Version des bornes C.1 Terminal execution C.1 30 V 50/60 Hz LINE P/C1 V1 V3 V4 WM V P/C OD1OD OD3 OD4 L N PE L N PE L N PE L N PE 13 14 13 14 13 14 Achtung: Fremdspannung BN BU GNYE BN BU GNYE BN BU GNYE BN BU GNYE Attention: tension externe Attention: external voltage G erätestecker Fiche Main plug 16 A M 1 ~ C NO C NO C NO *A *A max. A Leitungsabsicherung bauseits Protection de la ligne max. A par l `installateur max. A line protection by c ontractor Netzversorgung P1 V1 Alimentation K ompressor Ü berströmv entil electrique Compresseur Network supply C ompressor V anne de 30V/50/60 Hz decharge 10A / 3 x 1,0 mm² Spill valve WM Nachspeisev entil V anne d`appoint d`eau Water make up valve Meldungen Gebäudeleittechnik Programmierbar, Zuordnung nach Menü Parameter Report de messagevers la GTC, affection siuvant menu-parametres B uilding control reports, allocation acc. to menu-parameter 4V Klemmen Ausführung C.1/C. Version des bornes C.1/C. Terminal execution C.1/C. SELV IA5 IA4 IA3 IA IA1 ID4 ID3 ID ID1 OA OA1 IDA IDA1 GND IN + GND IN + GND IN GND IN SHIELD WH PE BN GN BN 1 1 OUT + PE OUT + 1 1 p P P S ensor Gefässinhalt LT C apteur de n iveau LT Level sensor LT S ensor Anlagendruck PT C apteur de pression PT Pressure s ensor PT TAZ+ PAZ- Grenzwertschalter C ontacteur de seuil Limit switch Jumper (RS485) off = Offen / stationne / open on = Gesteckt / branche / connect ID6 ID5 IDA3 RS 485 IN OUT A B S A B S SHIELD SHIELD GND IN GND IN GND IN + LAN / Ethernet A B S A B S RS458 USB 10
11
We reserve the right to introduce technical alterations without previous notice. www.imi-hydronic.com