Roundabouts Near At-Grade Railroad Crossings

Similar documents
Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

THE INSTALLATION OF PRE-SIGNALS AT RAILROAD GRADE CROSSINGS

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Shockoe Bottom Preliminary Traffic and Parking Analysis

Operational Comparison of Transit Signal Priority Strategies

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

Traffic Signal Redesign 50% Design Report

US-6 Spanish Fork Fact Finding Study. December 2017

RETROFITTING CLOSELY SPACED INTERSECTIONS USING THE PEANUT- TURBO ROUNDABOUT CONCEPT

TRAFFIC IMPACT ANALYSIS

Harrah s Station Square Casino

Roundabouts in a System of Intersections

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Updated Roundabout Analysis Methodology

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

DUNBOW ROAD FUNCTIONAL PLANNING

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Intersection Control Evaluation Report. This report conforms to the Caltrans Traffic Operations Policy Directive

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

Highway 111 Corridor Study

Agenda. Introduction to Roundabouts. Introduction to Roundabouts. Introduction to Roundabouts 6/6/2018

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

Update to DOTD Roundabout Design Policy

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

SELECTED ROADWAY CAPACITY ANALYSIS

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Gene Dillon Elementary School Traffic Study Division Street Site

Operational Performance Comparison between Three Unconventional Intersection Designs: Left-turn Bypass, Diverging Flow and Displaced Left-turn

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

Durrance Elementary School

Roundabouts In Colorado

Chapter 4 Traffic Analysis

Glenn Avenue Corridor Traffic Operational Evaluation

Traffic Impact Study Flathead County Rail Park Kalispell, Montana DRAFT. Prepared for Flathead County Economic Development Association

A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY

#!! "$% ##! &! # '#! % $ #!

TAKOMA METRO STATION

TRAFFIC IMPACT STUDY CRITERIA

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018

Memorandum Pershing Road Suite 400 Kansas City, MO Tel Fax

Traffic Analysis Report No-Build Conditions (2040)

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Washington St. Corridor Study

Low Level Road Improvements Traffic Analysis. Report

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Appendix D: Concept Screening

Lake Whitney Elementary School

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

1 st and 2 nd Street Couplet FAQ s

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

ACCOMMODATING COMMERCIAL AND OVER- DIMENSIONAL VEHICLES AT ROUNDABOUTS

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

3.0 PROJECT DESCRIPTION

TECHNICAL MEMORANDUM

I-95/Temple Avenue Interchange

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Capital Region Council of Governments

Clay Street Realignment Project Traffic Study

Design Traffic Technical Memorandum

Roundabout Prequalification Training. March 11, 2015

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

A-1 Arcadia with Signal

Intersection Control Evaluation Report Project: Alternative: Location: Evaluator:

Cricket Valley Energy Project Dover, NY Updated Traffic Impact Study

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

Roundabout Design 101: Roundabout Capacity Issues

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

THIS PAGE LEFT BLANK INTENTIONALLY

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

3.9 Recreational Trails and Natural Areas

Donahue Drive Corridor Traffic Operational Evaluation

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Transcription:

Roundabouts Near At-Grade Railroad Crossings May 12, 2008 1,592 Words Alex J. Ariniello LSC Transportation Consultants, Inc., 1889 York Street Denver, CO 80206 Phone: 303-333-1105 FAX: 303-333-1107 email: aja@lscdenver.com National Roundabout Conference 2008 1 Transportation Research Board

Alex J. Ariniello Page 2 ABSTRACT Roundabouts near at-grade railroad crossings present safety issues that are similar to other intersections. There are two major problems: vehicles queued at an approach to a roundabout may get caught on the railroad tracks; and vehicles queued at the railroad track may back up into the roundabout and interfere with the roundabout operations. Approaches to these problems will be explored through a case study of a roundabout network near a railroad with freight train operations. Roadway links in the transportation network could be blocked by trains for up to 4 minutes. Through analysis with simulation software, queues were analyzed and traffic control techniques evaluated to provide safe operations at nearby roundabouts. These techniques include providing additional capacity within the nearby roundabouts and approaches and signalizing nearby roundabout approaches. Conclusions from this case study can be applied to other similar at-grade railroad crossing/roundabout configurations. National Roundabout Conference 2008 2 Transportation Research Board

Alex J. Ariniello Page 3 INTRODUCTION The Town of Eagle is located about 20 miles west of Vail along the I-70 corridor in western Colorado. As shown in Figure 1, US 6 parallels I-70 in the Eagle area and provides access to the Town of Eagle, a community of about 5,000 residents. The Union Pacific railroad is located between US 6 and I-70 and only one roadway, Eby Creek Road, connects I-70 with US 6. Eby Creek Road has a grade-separated crossing of the Union Pacific railroad. The Town of Eagle s Comprehensive Plan calls for expansion of the existing commercial area to the east, in an area bounded by I-70 to the north and US 6 to the south. As part of this planning, the Town desired to establish another connection between I-70 and US 6. A new interchange is planned on I-70, to be located about 1.8 miles to the east of the I-70/Eby Creek Road interchange, along with a connector road linking the new interchange with US 6. The Town and the Colorado Department of Transportation (CDOT) both indicated a desire to have a roundabout at the intersection of US 6 and the new connector road. Since US 6 and the Union Pacific railroad are less than 100 feet apart in this area, concern was expressed about the effect of the railroad on operations of the roundabout. In addition, the Union Pacific railroad expressed concern about the proximity of the roundabout to the railroad. Another concern was raised by CDOT about the possibility of queues developing at the railroad crossing backing up into the new I-70 interchange. Roundabouts near railroad crossings are relatively rare in the United States. France, however, had just completed a study Sécurité aux passages á niveau, Cas de la proximaté d un carrefour giratoire (1), which provided useful information and guidance. In addition, the publication Preemption of Traffic Signals Near Railroad Crossings (2) was consulted for the principles on traffic signals near railroad crossings for application to roundabouts near railroad crossings. THE FRENCH EXPERIENCE The French report Sécurité aux passages á niveau, Cas de la proximaté d un carrefour giratoire identified two major cases regarding roundabouts near railroad crossings. The first, illustrated in Figure 2, involves a queue developing on a roundabout approach backing up onto the railroad crossing, presenting a danger that vehicles may be caught on the crossing. Counter measures identified for this situation include: Signing to warn drivers not to stop on the tracks; Providing an area for vehicles to move into if they get caught on the tracks; Signalization of the roundabout approaches to hold vehicles while the queued approach clears. The second case, illustrated in Figure 3, involves queues forming at a railroad crossing backing up into a nearby roundabout. Counter measures identified include: National Roundabout Conference 2008 3 Transportation Research Board

Alex J. Ariniello Page 4 Signing; Signalization of adjacent roundabout approaches to allow for operation of some of the roundabout movements. These counter measures were evaluated in the Eagle, Colorado, case study. THE EAGLE VISSIM MODEL In order to predict vehicle queues emanating from the proposed connector road crossing of the railroad, a VISSIM model was developed, with vehicular traffic projections taken from the I-70/East Eagle interchange Study. In order to forecast train blockage times, information provided by Union Pacific indicated that the longest train would be 5,000 feet long and would travel at a minimum speed of 25 mph. This translated into a maximum blockage time of 4 minutes and VISSIM was programmed so that a train would travel across the crossing for 4 minutes. 2025 PM peak hour volumes were input into the VISSIM model and the reporting capabilities of the model used to output maximum queues on various roundabout approaches. An iterative approach was used to test various lane configurations at the roundabouts (i.e., single-lane or multi-lane circulatory or approach operation). It became apparent through these simulations that during a blockage of the railroad crossing the US 6/connector road roundabout would lock up unless additional traffic control measures were implemented. Under normal operations, a single-lane circulatory roadway with single-lane approaches provided sufficient capacity to accommodate projected peak-hour traffic. With a crossing blockage, however, the roundabout quickly locked up, since eastbound traffic desiring to turn left onto the connector road backed up into the roundabout, effectively blocking both eastbound and westbound through traffic on US 6. To address this problem, the roundabout was reconfigured for modified twolane operation, with a two-lane eastbound approach. To simulate this operation, VISSIM was programmed with a traffic signal on the eastbound approach so that the inner lane was stopped during blockage events, with the outer through lane allowed to operate normally. With this configuration, VISSIM showed normal free flowing operations for through traffic on US 6. Moreover, the calculation of queues on the eastbound approach to the roundabout aided the design of the length of the two-lane approach for various blockage times. Figure 4 illustrates a VISSIM run with maximum queues. Based on the VISSIM simulations, the design of the roundabout was modified for twolane operation as shown in Figure 5. The design raised some issues for traffic control: Could the approach operate acceptably with normal Yield control? Would drivers see the train blockage and not venture into the roundabout and block through traffic? Would a traffic signal coordinated with the rail crossing signals and gates provide adequate control? What kind of operation should this signal have? A green/red indicator would be confusing. The green indicator would conflict with the Yield control on the approach. Would a dark/red indicator provide better indication? National Roundabout Conference 2008 4 Transportation Research Board

Alex J. Ariniello Page 5 Should the approach have gates of its own? Would a raised island be needed between the 2 lanes? Would drivers encountering a long queue try to bypass the queue and then sneak in to make a left-turn at the roundabout? These issues need further research and evaluation. The project team is leaning toward a signalized eastbound approach with dark/red control. Figure 5 also shows three other modifications based on the French experience and the VISSIM simulations. The southbound approach was modified to provide enough stacking distance between the Yield line at the roundabout and the railroad tracks to store a WB-67 vehicle, the largest vehicle expected to use the roundabout. In addition, this approach was enlarged to provide an area wide enough to allow a passenger vehicle to move around a truck stopped at the Yield line. The westbound approach was widened to provide for stacking of westbound rightturning vehicles during a crossing blockage. This would allow westbound through vehicles to pass these waiting vehicles and use the roundabouts during a blockage event. SIGNING AND STRIPING Figure 6 illustrates the initial signing and striping plan. This plan follows the recommendations found in Chapter 8 of the 2003 Manual of Uniform Traffic Control Devices (MUTCD) (3) with the railroad/intersection warning sign modified with the roundabout symbol. Note that, as prescribed in the MUTCD, railroad pavement marking symbols are not used on the northbound approach to the rail crossing since the crossing is too close to the intersection. A Do Not Stop on Crossing sign is used to prevent vehicles queue at the roundabout from getting caught on the crossing when a train might be coming. CONCLUSIONS Roundabouts near railroad crossings present similar issues as conventional intersections near railroad crossings. Signing and striping need only slight modifications from standard practice found in Chapter 8 of the MUTCD. Like conventional T intersections, roundabouts need to insure that adequate storage is available between the Yield line and the railroad crossing to store the design vehicle. A subject for further research is the method of controlling traffic to minimize roundabout disruptions during a train blockage event. Controlling certain multi-lane approaches with traffic signals or gates synchronized with the railroad crossing signals and gates is an issue that needs further exploration. National Roundabout Conference 2008 5 Transportation Research Board

Alex J. Ariniello Page 6 References: 1. Sécurité aux passages á niveau, Cas de la proximite d un carrefour giratoire, République Française ministére des Transports de l Équipement du Tourisme et de la Mer, September 2006. 2. Preemption of Traffic Signals Near Railroad Crossings, An ITE Recommended Practice, Institute of Transportation Engineers, January 2006. 3. Manual on Uniform Traffic Control Devices 2003 Edition, Federal Highway Administration. National Roundabout Conference 2008 6 Transportation Research Board

Figures 1 Eagle Vicinity Map 2 Roundabout Queue Backing Into Railroad Crossing 3 Railroad Crossing Queue Backing Into Roundabout 4 Queues from VISSIM 5 US 6/Connector Road Roundabout 6 US 6/Connector Road Signing and Striping Plan National Roundabout Conference 2008 7 Transportation Research Board

National Roundabout Conference 2008 8 Transportation Research Board

Figure 2 Roundabout Queue Backing Into Railroad Crossing Figure 3 Railroad Crossing Queue Backing Into Roundabout Source: Sécurité aux passages á niveau National Roundabout Conference 2008 9 Transportation Research Board

Figure 4 Queues From VISSIM National Roundabout Conference 2008 10 Transportation Research Board

National Roundabout Conference 2008 11 Transportation Research Board

National Roundabout Conference 2008 12 Transportation Research Board