***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

Similar documents
Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Gerald P. Oliveto, P.E. George Franz NJDOT

Tabulation of Bids. Counties: Project(s):

SECTION VII ROADWAY AND SITE IMPROVEMENTS

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E

Tabulation of Bids. Counties:

Duke Street (Route 236) Over I Bridge Plan & Elevation

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

HIR on Oklahoma Turnpikes

A Basic Approach to the Installation of Small Movement Expansion Joints. Peter Weykamp, P.E.

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

APPENDIX E Activity Defect Assignment

Hospital Link Project Project Update November 2017

Existing conditions of each bridge and repair plan are presented in Table

General Notes. Project No /15/2018 Page 1 of 1

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Taylor Road Resurfacing Project

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

List of Figures. List of Tables

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

PROPOSAL. PROPOSAL OF, a corporation a

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

Riverside County Transportation Department Summary of Bids

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

General Notes. Project No /15/2018 Page 1 of 1

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

PAL Material Listing by Company. Material for Joints 1057

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

Non-Motorized Overpass at SR 5/US1

Name Roads Station Distance Miles

Perched Box Caisson Overview. January 2014

Appendix B Existing ADOT Data Parameters

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

"Emul Asph (SS-1HP) Tack".

FairwayRailing.com

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK

District Construction Projects

Page 1 of 5 11/18/2013 9:17 AM

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Traffic Management Guidelines for Structure Rehabilitation Projects

ABC D BC ecision Ma ion trix

Hospital Link Project Project Update September 2017

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program

MNDOT PAVEMENT DESIGN MANUAL

The first lift, mainline, shall be placed using a spray paver.

Kansas Department of Transportation. Tabulation of Bids

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Panel Discussion: Tack Coat - Storage and Handling - Sampling and Testing

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

2017 Temporary traffic control guidelines for pedestrians. v.2

YAVAPAI COUNTY PUBLIC WORKS

Manual Of Standard Traffic Signs And Pavement Markings Alberta

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

XTS-Impact. XTS-Terminal (hold)

Session 1. Pushover Analysis of a Torsionally Eccentric Cellular Abutment. Date 11/03/ PM 4 PM Eastern Time

Estimating Highway Maintenance Work 2008

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M

Legislative Update Williamsburg Residency

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

FY 2005 TRANSPORTATION CAPITAL PROGRAM

2 Months of road works in Port of Antwerp Severe traffic disruption expected

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Keeping good roads good

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

PED (OLD TWNS RD) over OTTER TAIL RIVER

Bases, Ballasts, and Paving

Log Balance Beam. Product: (4 ), (6 )

Transcription:

General Info Number: PROJECT NO. 43-16-03 Description: Deadline: BRIDGE DECK REPLACEMENT AND REHABILITATION, CLIFTON-GUNN ROAD OVER OHIO TURNPIKE M.P. 21.4, RUEGER-SHETLER ROAD OVER OHIO TURNPIKE M.P. 23.9, FULTON-WILLIAMS ROAD OVER OHIO TURNPIKE M.P. 24.4, SPIES-HANDY CORNERS ROAD OVER OHIO TURNPIKE M.P. 27.3, WILLIAMS AND FULTON COUNTIES, OHIO DECEMBER 8, 2015 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,500,000) Bids Business Bid Total E.S. Wagner Company $ 3,189,955.40 Mosser Construction $ 3,232,573.30 Miller Bros. Const., Inc. $ 3,434,825.55 ***PROJECT NO. 43-16-03 AWARDED TO E.S. WAGNER VIA RESOLUTION NO. 4-2016 ON JANUARY 19, 2016***

E.S. WAGNER COMPANY GENERAL (Ref. Nos. 1-5) PREMIUM FOR CONTRACT PERFORMANCE BOND AND PAYMENT IB.ART.6 1 BOND 1.00 LUMP $ 20,000.00 $ 20,000.00 2 SP 614 MAINTAINING TRAFFIC 1.00 LUMP $ 197,200.00 $ 197,200.00 3 SP 619 FIELD OFFICE 1.00 LUMP $ 25,000.00 $ 25,000.00 4 SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $ 10,000.00 $ 10,000.00 5 624 MOBILIZATION 1.00 LUMP $ 100,000.00 $ 100,000.00 Total: $ 352,200.00 ROADWAY (Ref. Nos. 6-18) 6 202 GUARDRAIL REMOVED 792.00 FOOT $ 2.00 $ 1,584.00 7 202 CURB REMOVED 40.00 FOOT $ 5.00 $ 200.00 8 254 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH 470.00 SQ. YD. $ 25.00 $ 11,750.00 9 407 TACK COAT FOR SURFACE COURSE 37.00 GAL. $ 3.00 $ 111.00 10 407 TACK COAT FOR INTERMEDIATE COURSE 20.00 GAL. $ 3.00 $ 60.00 11 448 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 22.00 CU. YD. $ 650.00 $ 14,300.00 12 448 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64-22 10.00 CU. YD. $ 650.00 $ 6,500.00 13 604 CATCH BASIN RECONSTRUCTED TO GRADE 8.00 EACH $ 600.00 $ 4,800.00 14 606 GUARDRAIL, TYPE MGS 400.00 FOOT $ 17.60 $ 7,040.00 15 606 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 16.00 EACH $ 2,385.00 $ 38,160.00 16 609 CURB, TYPE 6 40.00 FOOT $ 35.00 $ 1,400.00 17 642 EDGE LINE, 4", TYPE 1 0.40 MILE $ 7,975.00 $ 3,190.00 18 642 CENTER LINE, TYPE 1 0.20 MILE $ 8,120.00 $ 1,624.00 Total: $ 90,719.00

STRUCTURES (Ref. Nos. 19-36) 19 SP 202 PORTIONS OF STRUCTURE REMOVED 1.00 LUMP $ 400,000.00 $ 400,000.00 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFORCING 509 20 STEEL 400.00 LBS. $ 3.00 $ 1,200.00 21 SP 509 EPOXY COATED REINFORCING STEEL, GRADE 60 261,781.00 LBS. $ 0.90 $ 235,602.90 22 SP 511B CLASS HP4 CONCRETE, SUPERSTRUCTURE DECK SLAB 700.00 CU. YD. $ 1,225.00 $ 857,500.00 CLASS S CONCRETE, BARRIERS AND PARAPETS, USING TYPE 1 SP 511B 23 CEMENT 276.00 CU. YD. $ 1,000.00 $ 276,000.00 24 SP 511B CLASS HP4 CONCRETE, ABUTMENT SLABS 91.00 CU. YD. $ 1,450.00 $ 131,950.00 25 SP 511B CLASS HP4 CONCRETE, FOR PREPLACEMENT TESTING 12.00 CU. YD. $ 500.00 $ 6,000.00 26 513 WELDED STUD SHEAR CONNECTORS 6,738.00 EACH $ 4.00 $ 26,952.00 27 SP 516B SEALING OF CONSTRUCTION JOINTS 2,672.00 FOOT $ 3.00 $ 8,016.00 28 SP 516G REPLACE EXPANSION BEARING DEVICE 66.00 EACH $ 2,400.00 $ 158,400.00 29 SP 516J REPLACE FIXED BEARING DEVICE 28.00 EACH $ 2,000.00 $ 56,000.00 FALSEWORK, TEMPORARY BRACING AND PROTECTIVE SP 527 30 STRUCTURES 1.00 LUMP $ 200,000.00 $ 200,000.00 31 SP 533 3" CONTINUOUS STRIP SEAL IN STRUCTURAL STEEL JOINT 222.00 FOOT $ 425.00 $ 94,350.00 1 1/2" ELASTOMERIC COMPRESSION SEAL IN STRUCTURAL STEEL SP 533A 32 JOINT 156.00 FOOT $ 425.00 $ 66,300.00 CONCRETE WEATHERPROOFING, DECK, ABUTMENT SLABS, AND SP 536 33 APPROACH SLABS 2,593.00 SQ. YD. $ 8.00 $ 20,744.00 34 SP 536 CONCRETE WEATHERPROOFING, BARRIERS AND PARAPETS 2,562.00 SQ. YD. $ 8.00 $ 20,496.00 35 SP 536 CONCRETE WEATHERPROOFING, SUBSTRUCTURE 1,387.00 SQ. YD. $ 10.00 $ 13,870.00 36 SP 607 TYPE II FENCE, ALL ALUMINUM (6'-0" CHAIN LINK WITH SPECIALS) 1,763.00 FOOT $ 98.50 $ 173,655.50 Total: $ 2,747,036.40 TOTAL BID AMOUNT --------------- $ 3,189,955.40

MOSSER CONSTRUCTION CO. GENERAL (Ref. Nos. 1-5) PREMIUM FOR CONTRACT PERFORMANCE BOND AND PAYMENT 1 IB.ART.6 BOND 1.00 LUMP $ 25,000.00 $ 25,000.00 2 SP 614 MAINTAINING TRAFFIC 1.00 LUMP $ 225,000.00 $ 225,000.00 3 SP 619 FIELD OFFICE 1.00 LUMP $ 35,000.00 $ 35,000.00 4 SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $ 20,000.00 $ 20,000.00 5 624 MOBILIZATION 1.00 LUMP $ 100,000.00 $ 100,000.00 Total: $ 405,000.00 ROADWAY (Ref. Nos. 6-18) 6 202 GUARDRAIL REMOVED 792.00 FOOT $ 2.00 $ 1,584.00 7 202 CURB REMOVED 40.00 FOOT $ 15.00 $ 600.00 8 254 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH 470.00 SQ. YD. $ 28.00 $ 13,160.00 9 407 TACK COAT FOR SURFACE COURSE 37.00 GAL. $ 2.00 $ 74.00 10 407 TACK COAT FOR INTERMEDIATE COURSE 20.00 GAL. $ 2.00 $ 40.00 11 448 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 22.00 CU. YD. $ 715.00 $ 15,730.00 12 448 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64-22 10.00 CU. YD. $ 700.00 $ 7,000.00 13 604 CATCH BASIN RECONSTRUCTED TO GRADE 8.00 EACH $ 850.00 $ 6,800.00 14 606 GUARDRAIL, TYPE MGS 400.00 FOOT $ 17.60 $ 7,040.00 15 606 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 16.00 EACH $ 2,385.00 $ 38,160.00 16 609 CURB, TYPE 6 40.00 FOOT $ 50.00 $ 2,000.00 17 642 EDGE LINE, 4", TYPE 1 0.40 MILE $ 3,500.00 $ 1,400.00 18 642 CENTER LINE, TYPE 1 0.20 MILE $ 3,500.00 $ 700.00 Total: $ 94,288.00

STRUCTURES (Ref. Nos. 19-36) 19 SP 202 PORTIONS OF STRUCTURE REMOVED 1.00 LUMP $ 335,000.00 $ 335,000.00 20 509 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFORCING STEEL 400.00 LBS. $ 6.00 $ 2,400.00 21 SP 509 EPOXY COATED REINFORCING STEEL, GRADE 60 261,781.00 LBS. $ 1.20 $ 314,137.20 22 SP 511B CLASS HP4 CONCRETE, SUPERSTRUCTURE DECK SLAB 700.00 CU. YD. $ 1,220.00 $ 854,000.00 CLASS S CONCRETE, BARRIERS AND PARAPETS, USING TYPE 1 23 SP 511B CEMENT 276.00 CU. YD. $ 850.00 $ 234,600.00 24 SP 511B CLASS HP4 CONCRETE, ABUTMENT SLABS 91.00 CU. YD. $ 800.00 $ 72,800.00 25 SP 511B CLASS HP4 CONCRETE, FOR PREPLACEMENT TESTING 12.00 CU. YD. $ 1,200.00 $ 14,400.00 26 513 WELDED STUD SHEAR CONNECTORS 6,738.00 EACH $ 2.70 $ 18,192.60 27 SP 516B SEALING OF CONSTRUCTION JOINTS 2,672.00 FOOT $ 6.00 $ 16,032.00 28 SP 516G REPLACE EXPANSION BEARING DEVICE 66.00 EACH $ 2,600.00 $ 171,600.00 29 SP 516J REPLACE FIXED BEARING DEVICE 28.00 EACH $ 2,500.00 $ 70,000.00 30 SP 527 FALSEWORK, TEMPORARY BRACING AND PROTECTIVE STRUCTURES 1.00 LUMP $ 200,000.00 $ 200,000.00 31 SP 533 3" CONTINUOUS STRIP SEAL IN STRUCTURAL STEEL JOINT 222.00 FOOT $ 550.00 $ 122,100.00 32 SP 533A 1 1/2" ELASTOMERIC COMPRESSION SEAL IN STRUCTURAL STEEL JOINT 156.00 FOOT $ 550.00 $ 85,800.00 33 SP 536 CONCRETE WEATHERPROOFING, DECK, ABUTMENT SLABS, AND APPROACH SLABS 2,593.00 SQ. YD. $ 7.00 $ 18,151.00 34 SP 536 CONCRETE WEATHERPROOFING, BARRIERS AND PARAPETS 2,562.00 SQ. YD. $ 7.00 $ 17,934.00 35 SP 536 CONCRETE WEATHERPROOFING, SUBSTRUCTURE 1,387.00 SQ. YD. $ 9.00 $ 12,483.00 36 SP 607 TYPE II FENCE, ALL ALUMINUM (6'-0" CHAIN LINK WITH SPECIALS) 1,763.00 FOOT $ 98.50 $ 173,655.50 Total: $ 2,733,285.30 TOTAL BID AMOUNT --------------- $ 3,232,573.30

MILLER BROS. CONST., INC. GENERAL (Ref. Nos. 1-5) PREMIUM FOR CONTRACT PERFORMANCE BOND AND PAYMENT 1 IB.ART.6 BOND 1.00 LUMP $ 25,000.00 $ 25,000.00 2 SP 614 MAINTAINING TRAFFIC 1.00 LUMP $ 250,000.00 $ 250,000.00 3 SP 619 FIELD OFFICE 1.00 LUMP $ 30,000.00 $ 30,000.00 4 SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $ 10,000.00 $ 10,000.00 5 624 MOBILIZATION 1.00 LUMP $ 100,000.00 $ 100,000.00 Total: $ 415,000.00 ROADWAY (Ref. Nos. 6-18) 6 202 GUARDRAIL REMOVED 792.00 FOOT $ 2.00 $ 1,584.00 7 202 CURB REMOVED 40.00 FOOT $ 15.00 $ 600.00 8 254 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH 470.00 SQ. YD. $ 20.00 $ 9,400.00 9 407 TACK COAT FOR SURFACE COURSE 37.00 GAL. $ 1.85 $ 68.45 10 407 TACK COAT FOR INTERMEDIATE COURSE 20.00 GAL. $ 1.85 $ 37.00 11 448 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 22.00 CU. YD. $ 850.00 $ 18,700.00 12 448 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64-22 10.00 CU. YD. $ 1,200.00 $ 12,000.00 13 604 CATCH BASIN RECONSTRUCTED TO GRADE 8.00 EACH $ 900.00 $ 7,200.00 14 606 GUARDRAIL, TYPE MGS 400.00 FOOT $ 17.60 $ 7,040.00 15 606 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 16.00 EACH $ 2,385.00 $ 38,160.00 16 609 CURB, TYPE 6 40.00 FOOT $ 50.00 $ 2,000.00 17 642 EDGE LINE, 4", TYPE 1 0.40 MILE $ 4,250.00 $ 1,700.00 18 642 CENTER LINE, TYPE 1 0.20 MILE $ 8,500.00 $ 1,700.00 Total: $ 100,189.45

STRUCTURES (Ref. Nos. 19-36) 19 SP 202 PORTIONS OF STRUCTURE REMOVED 1.00 LUMP $ 350,000.00 $ 350,000.00 20 509 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFORCING STEEL 400.00 LBS. $ 1.50 $ 600.00 21 SP 509 EPOXY COATED REINFORCING STEEL, GRADE 60 261,781.00 LBS. $ 1.10 $ 287,959.10 22 SP 511B CLASS HP4 CONCRETE, SUPERSTRUCTURE DECK SLAB 700.00 CU. YD. $ 1,315.00 $ 920,500.00 CLASS S CONCRETE, BARRIERS AND PARAPETS, USING TYPE 1 23 SP 511B CEMENT 276.00 CU. YD. $ 1,200.00 $ 331,200.00 24 SP 511B CLASS HP4 CONCRETE, ABUTMENT SLABS 91.00 CU. YD. $ 965.00 $ 87,815.00 25 SP 511B CLASS HP4 CONCRETE, FOR PREPLACEMENT TESTING 12.00 CU. YD. $ 400.00 $ 4,800.00 26 513 WELDED STUD SHEAR CONNECTORS 6,738.00 EACH $ 3.25 $ 21,898.50 27 SP 516B SEALING OF CONSTRUCTION JOINTS 2,672.00 FOOT $ 4.00 $ 10,688.00 28 SP 516G REPLACE EXPANSION BEARING DEVICE 66.00 EACH $ 2,400.00 $ 158,400.00 29 SP 516J REPLACE FIXED BEARING DEVICE 28.00 EACH $ 2,100.00 $ 58,800.00 30 SP 527 FALSEWORK, TEMPORARY BRACING AND PROTECTIVE STRUCTURES 1.00 LUMP $ 240,000.00 $ 240,000.00 31 SP 533 3" CONTINUOUS STRIP SEAL IN STRUCTURAL STEEL JOINT 222.00 FOOT $ 550.00 $ 122,100.00 32 SP 533A 1 1/2" ELASTOMERIC COMPRESSION SEAL IN STRUCTURAL STEEL JOINT 156.00 FOOT $ 550.00 $ 85,800.00 33 SP 536 CONCRETE WEATHERPROOFING, DECK, ABUTMENT SLABS, AND APPROACH SLABS 2,593.00 SQ. YD. $ 10.00 $ 25,930.00 34 SP 536 CONCRETE WEATHERPROOFING, BARRIERS AND PARAPETS 2,562.00 SQ. YD. $ 10.00 $ 25,620.00 35 SP 536 CONCRETE WEATHERPROOFING, SUBSTRUCTURE 1,387.00 SQ. YD. $ 10.00 $ 13,870.00 36 SP 607 TYPE II FENCE, ALL ALUMINUM (6'-0" CHAIN LINK WITH SPECIALS) 1,763.00 FOOT $ 98.50 $ 173,655.50 Total: $ 2,919,636.10 TOTAL BID AMOUNT --------------- $ 3,434,825.55