CONSTRUCTION CONTRACTS

Similar documents
CONSTRUCTION CONTRACTS

BICYCLE STRATEGY UPDATE

ROADWORK AND INFRASTRUCTURE OVERSIGHT

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5221 FOR PUBLIC HEARING

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

ORDER NUMBER SPECIAL EVENTS REMEMBER: SERVICE IS OUR ONLY BUSINESS

City of San Francisco Pedestrian Count Report

Bicycle Strategy Capital Projects Polk Street Northbound Separated Bikeway 481, ,

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5068 FOR PUBLIC HEARING

2019 Prop K 5-Year Prioritization Program Update Prop K Project Ideas - Public Survey Results

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Compiled by the SFMTA Livable Streets Subdivision Staff

Identifying High Injury Density Corridors and Areas for Targeted Safety Improvements to Reduce Severe and Fatal Pedestrian Injuries: A Methodology

ENVIRONMENTAL EVALUATION APPLICATION

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

OBG PRESENTS: Proactive Approach to Infrastructure Renewal

Geary Corridor Bus Rapid Transit: Staff-Recommended Alternative

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Compiled by the SFMTA Livable Streets Subdivision Staff

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Geary Corridor Bus Rapid Transit

DPT Bicycle Program Report to the BAC 1/13/05

Geary Bus Rapid Transit Project

November 2011 SFMTA Livable Streets Report to the San Francisco Bicycle Advisory Committee (BAC)

Extending Parking Meter Hours SAN FRANCISCO, CALIFORNIA

Polk Streetscape Project

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Active TFCA Projects to Date - TFCA Allocations and Total Project Costs San Francisco County Transportation Authority

APPENDIX A CONTRACTOR REGISTRATION, MINOR INTERMITENT OBSTRUCTIONS, AND DOUBLE PARKING. San Francisco Blue Book, 8 th Edition, January 2012 Page 26

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5247 FOR PUBLIC HEARING

San Francisco 2008 Collisions Report December 18, 2009

FY DRAFT Capital Plan Citizens General Obligation Bond Oversight Committee

The Van Ness Campus. Weekly Construction Bulletin #238

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

I-80 Corridor Overhaul

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5883 FOR PUBLIC HEARING

ALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

1)Dir,,oht MEMORANDUM. Tabled at rnoilo TABLED DOCUMENT. Mar-16. Current Infrastructure projects/upgrades and other Council activities within the Ward

STREETSCAPE PRIORITIZATION MARCH 2015

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5194 FOR PUBLIC HEARING

San Francisco Planning Department IPIC Report 2016

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

MUNI FORWARD Proposed Changes: Stanyan

San Francisco Pedestrian Safety Capital Improvement Program: A Step Towards Vision Zero

May 20, 2016 PUBLIC HEARING RESULTS

22. Specialty Valves.

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

Vision Zero Priority Projects (March 2017)

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5756 FOR PUBLIC HEARING

Lake Waterford Community Association Meeting. November 15, 2016

Building Materials Forecasting Service. Executive Summary: Q2 2010

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA

Engineering - Bicycle and Pedestrian

SECTION PRESSURE TESTING OF PIPING

Applications for Funding

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Figure 2-1 City Of Boynton Beach, Florida Anionic Exchange Resin Facility and East Water Treatment Plant Improvements EXISTING SITE PLAN

Pedestrian and Bicycle Conditions

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN MATEO COUNTY SEA LEVEL RISE INITIATIVE

MEMORANDUM TABLED DOCUMENT. WACI lb. Tabled at tackvi-oin COMMUNITY AND LEISURE ASSETS GROUP OF ACTIVITIES 2015/16. Feb-16

THE COMPETITION KICKS OFF MAY 1, 2017

19 th Ave/M-Line project. Community Meeting, February 2016

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

WARRINGTON TOWNSHIP BOARD OF SUPERVISORS. April 14, 2015 Regular Meeting

PNWA Conference Update

District 6 & Citywide Non-Transit Project Delivery Status Report

20 th Avenue Neighborway Project August 2, Second Open House

RED COLORED TRANSIT-ONLY LANES REQUEST TO EXPERIMENT

Guidance on piling, heavy loads, excavations, tunnelling and dewatering

Highway Construction

FINDING OF NO SIGNIFICANT IMPACT

GEARY BRT SIMULATION VISSIM Calibration and Existing Conditions Results

WATERFRONT TRANSPORTATION ASSESSMENT

Attachment Pro Forma Pro Forma Regulatory Statements Revised proposed access arrangement information

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

City of San Francisco 2010 Bicycle Count Report

586, ,057 78, N/A $ 781,657 $ 586,243 $ - $ 40 N/A $ 16,307,537 $ 3,261,507 $ - $ 3,261,507

2015 Business Plan September 2014

Red Light Camera Annual Report 2014

CITIZENS ADVISORY COMMITTEE

San Francisco 2009 Collisions Report April 21, 2011

System Performance Innovation FACT Sheet Hawk Pedestrian Beacon

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Sunset Beach Annexation LOCAL AGENCY FORMATION COMMISSION MEETING OCTOBER 11, 2017

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

. Cross Connections 1

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Coastal Hazards Study

A. CALL TO ORDER, OPEN PUBLIC MEETING ACT STATEMENT, PLEDGE OF ALLEGIANCE

ST. JOHNS GOLF CLUB PHASE II FINDINGS, PHASE III RECOMMENDATION, AND POTENTIAL PARTNERSHIP OPPORTUNITY

NATIONWIDE PERMIT ACTIONS OCTOBER - DECEMBER Action Type Project Name Closure Method County State SPA NWP

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Transcription:

UPD: 2/12/18

CONSTRUCTION S OUT FOR BID WW-672 TITLE Wastewater Enterprise Elevator Maintenance, Repair and Modernization 2018-2021 BID DUE $1.5M February 15, 2018 IN DEVELOPMENT TITLE Rim Fire Assets $197K Febraury 2018 WW-654 Southeast Plant Buildings 040, 041, 044, 060, 061, 062, 925, and 960 Mechanical Improvements $4.0M February 2018 WW-639 WD-2692 WD-2775 WD-2816 WD-2614 Oceanside Water Pollution Control Plant Digester Gas Utilization Upgrade 16-Inch and 8-Inch Ductile Iron Water Main Installation, Sewer Replacement, and Pavement Renovation on Geary Boulevard from 32nd to 48th Avenues 8-Inch to 16-Inch Ductile Iron Water Main Replacement at Various Locations on 19th Avenue from Eucalyptus Drive to Lincoln Avenue and a 36-Inch Steel Pipe Installation on 19th Avenue from Sloat Boulevard to Vicente Street Watershed As-Needed Site Maintenance 8-Inch Ductile Iron Water Main Replacement On Green Street From Gough Street To Broderick Street $24.3M February 2018 $4.5M February 2018 $2.8M February 2018 $6.9M February 2018 $3.5M February 2018 1 For more information, visit: sfwater.org/contracts Updated 2/12/18

IN DEVELOPMENT WD-2719 WD-2693 WD-2823 TITLE 12-Inch Earthquake Resistant Ductile Iron Water Main and 8-Inch Ductile Iron Water Main Installation on 22nd Street from Valencia Street to Hampshire Street 8-Inch and 12-Inch Ductile Iron Pipe Main Installation on 21st, Bryant Street, Potrero Avenue, Ford Street, and Hancock Street Auxiliary Water Supply System Street Valves Improvements $2.8M February 2018 $3.4M February 2018 $3.8M February 2018 WW-627 Baker Beach Green Street $4.8M February 2018 WW-611 WW-670 WD-2797 WD-2793 WW-645 Cutler Avenue, Lower Great Highway, and Wawona Street Sewer Replacement Block 7295 Easement Sewer and Trestle Demolition San Francisco Westside Recycled Water Pump Station and Reservoir (prequalification in Water Pump Stations and Tanks required) 8-Inch and 12-inch Ductile Iron Water Main Replacement on Geary Boulevard from Van Ness Avenue to Stanyan Street Westside Pump Station Reliability Improvements $1.0M February 2018 $1.2M February 2018 $20M February 2018 $3.9M February 2018 $42.4M February 2018 WW-667 Mariposa Dry-Weather Pump Station $18.7 February2018 Upper Yosemite Creek Daylighting $4.8M February 2018 2 For more information, visit: sfwater.org/contracts Updated 2/12/18

IN DEVELOPMENT WD-2718 WD-2766 WD-2811 WD-2739 WD-2765 WD-2780 WD-2720 WD-2806 TITLE 24-Inch Ductile Iron Water Main Replacement on Prospect from Cortland Avenue to Fair Avenue and on Fair Avenue from Prospect Avenue to Valencia Street 8-Inch Ductile Iron Water Main Replacement on Taraval Street from 15th Avenue to Sunset Boulevard 16-Inch and 8-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton to Ord Streets and Various Side Streets 20-Inch, 16-Inch, and 8-Inch Ductile Iron Water Main Replacement on Castro Street from 19th to 26th Streets and on 26th Street from Castro to Guerrero Streets 8-Inch Ductile Iron Water Main Replacement on Jersey Street from Douglass to Church Streets and on Various Local Area Streets 8-Inch and 12-Inch Ductile Iron Water Main Replacement on 21st Street from Valencia to Castro Streets 24-Inch Steel and 16-Inch and 8-Inch Ductile Iron Water Main Installation and Replacement on Coso and Precita Avenues from Coleridge to Cesar Chavez Streets 36-Inch Steel and 8-Inch Ductile Iron Pipe Water Main Installation on Vicente Street from 19th to 25th Avenues $1.2M March 2018 $11.9M March 2018 $3.0M April 2018 $7.1M April 2018 $4.2M April 2018 $6.9M April 2018 $2.5M May 2018 $1.4M May 2018 3 For more information, visit: sfwater.org/contracts Updated 2/12/18

IN DEVELOPMENT WD-2812 WW-662 WD-2834 WW-624 TITLE 12-Inch and 8-Inch Ductile Iron Water Main Replacement on Pierce Street from Pacific to Post Streets and Sutter from Divisadero to Webster Streets Southeast Water Pollution Control Plant Power Feed and Primary Switchgear Upgrades 8-Inch and 12-Inch Ductile Iron Water Main Replacement on Geary Boulevard from Van Ness Avenue to Stanyan Street Casitas Avenue Easement Sewer Rehabilitation Regional Groundwater Storage and Recovery Phase II $3.9M May 2018 $29M May 2018 $2.8M July 2018 $1.2M July 2018 $7.7M August 2018 WD-2616 Baker Street/Sutter Street $2.0M September 2018 WD-2825R Alameda Creek Recapture $15.8M October 2018 WW-665 WD-2802 Force Main Rehab at Embarcadero and Jackson Street Southeast Water Pollution Control Plant Seismic Reliability and Condition Assessment Improvements 8-Inch Ductile Iron Pipe Water Main Replacement on Frederick Street from Cole to Buena Vista Avenue and on Buena Vista Avenue from Frederick to Haight Streets Beach and Sansome Street CSD Rehabilitation Richmond Transport/Storage Tunnel Rehabilitation $7M October 2018 $32.6M October 2018 $1.8M October 2018 $1M November 2018 $2.3M December 2018 4 For more information, visit: sfwater.org/contracts Updated 2/12/18

IN DEVELOPMENT WD-2717 WW-511 TITLE College Hill Reservoir Outlet Structure and Pipeline Upgrade Kansas and Marin Streets Sewer Improvements $11M March 2019 $11.2M March 2019 Cargo Way Sewer Box Odor Reduction $4.3M April 2019 WD-2804 5th, North 6th and Division Street CSD Rehab/BFP Cathodic Protection on 44-Inch Steel Main in University Mound Pressure Zone $3.0M May 2019 $0.4M August 2019 Mountain Tunnel Improvements $135M October 2019 CSD Backflow Prevention and Monitoring $10.2M March 2020 5 For more information, visit: sfwater.org/contracts Updated 2/12/18

JOB ORDER S IN DEVELOPMENT TITLE JOC-50R Job Order Contract C-20 HVAC $5M February 2018 JOC-69R Job Order Contract C-10 Electrical $5M February 2018 JOC-62R Job Order Contract B General Building $1M March 2018 JOC-70 JOC-74 Job Order Contract A General Engineering Job Order Contract A General Engineering $3M March 2018 $5M March 2018 JOC-72 Job Order Contract C-10 Electrical $5M July 2018 JOC-73 Job Order Contract C-10 Electrical $1M July 2018 6 For more information, visit: sfwater.org/contracts Updated 2/12/18

PROFESSIONAL SERVICE S OUT FOR PROPOSAL PRO.0068 PRO.0083 PRO.0082 PRO.0081 TITLE Biosolids Digester Facilities CM Staff Augmentation Services As-Needed Specialized Pipe Network Investigation and Testing Services (formerly CS-1017) As-Needed Community Benefits Professional Consulting Services and Support (formerly CS-316) As-Needed Strategic and Technical Communications and Public Outreach Services (formerly CS-291) PROPOSAL DUE $42M February 27, 2018 N/A July 10, 2018 $8M December 31, 2021 N/A December 31, 2021 IN DEVELOPMENT TITLE PRO.0041 K-12 Educational Resources $250K February 2018 PRO.0080 PRO.0079 PRO.0071 PRO.0085 San Joaquin Pipeline System Improvement Power Enterprise Engineering Planning, Assessment and Design Services Engineering Design Services Eleanor Bridge Rehabilitation EMB HCIP Region As-Needed Engineering Services $7.5M February 2018 $8M February 2018 $1.5M February 2018 $15M February 2018 7 For more information, visit: sfbid.sfwater.org Updated 2/12/18

IN DEVELOPMENT PRO.0092 PRO.0097 PRO.0095 TITLE Engineering Services for South Ocean Beach Coastal Erosion and Wastewater Infrastructure Protection HCIP As-Needed Construction Management Services As-Needed CM Services (LBE Primes Only) $3.8M February 2018 $11M February 2018 $16M February 2018 PRO.0096 Mountain Tunnel Improvements Construction Management Services $20M March 2019 PRO.0021 HHWP Technical Services for Large Pipeline Renewal and Replacement Program $8.5M 8 For more information, visit: sfbid.sfwater.org Updated 2/12/18