MOBILE DESCOMPRESOR GAS SUPPLY UNITS AND EXTERNAL GAS NETWORK FOR TOWNS, VILLAGES AND SMALL CITIES SERVINAV LTDA

Similar documents
Paul Ladage 26 September 2017 MOVING THINGS AROUND - LATEST TRENDS IN HONEYWELL FLAGSHIP REGULATORS

SYSTEM FOR HYPERBARIC OXYGEN THERAPY MONOPLACE HYPERBARIC CHAMBER FOR MEDICAL TREATMENTS MODEL OXICAB MO-13-H TECHNICAL OFFER

Air Amplifiers & SYSTEMS

Valve test benches. Systems overview

SULLAIR SX Filtration Series ,000 scfm

Products for Cryogenic Applications

Best Practices Pneumatics Machine & Design. Written by Richard F. Bullers, CFPPS as published in Fluid Power Journal, July/August 2016

1800C and 1800C-HC Service Regulators

Flow Sensors & Hydrometers Specification Sheet

Premium Solutions for Gas and Biogas Handling

Natural Gas Conditioning Skids & Equipments

ABRASIVE REGULATOR II

RMG 5020 Gas Pressure Regulator Enabling Dependable Gas Operations

Pneumatic proportional controller Types M Types FM Function tested for use of the float in Ex-zone 0

Desiccant Air Breathers DBE. Section 3: TNK SCHROEDER INDUSTRIES ACCESSORIES 21

PRO-50 Instrument Supply Regulator

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

CHECK-VALVES Automatically Position Themselves by the Natural Forces of the Conveying Air. A PNEUMATIC CONVEYING SYSTEM PATENT #: 5,160,222

Ball valve HKSF-W100. Ball valve HKSF-W100. RMA Kehl GmbH & Co. KG Oststrasse 17 D Kehl / Germany

Booster Regulator/Air Tank

E 094 E 103 E 143 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 135 l/min / 35.7 gpm

Compressed Airline Breathing Apparatus

INSTRUCTION MANUAL & PARTS

Type 4708 Supply Pressure Regulator

Potter Nitrogen Generators

Continental Industries TRANSITION FITTINGS or FAX Visit

GAS DISTRIBUTION PRODUCTS TRANSITION FITTINGS

HORIZONTAL BLADDER TANK

Breathable Compressed Air

HON C210 Series Control Valves. High Pressure Control valves

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE

ABRASIVE REGULATOR II

Deltaflux Control Valve

TECHNICAL DATA. Q = C v P S

Memo. Shelley Cohen. From: Bill Dickson CC: Date: February 5, 2015 Re: Editorial Oil & Gas News

ACTUATORS AND INSTRUMENTS

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Locator Locator-D-Lux Air-Saver G1 Air-Saver G2

AIR DRIVEN. Gas Boosters & SYSTEMS. Accepting VISA, MasterCard and American Express

94270 Vapor Guard Tank Blanketing Valve Vapor Guard Tank Blanketing Valve What is Tank Blanketing? Features How does it work?

TECHNICAL DATA. Q = C v P S

Natural Gas Vehicle Refuelling

VERTICAL BLADDER TANK

SABRE AIRLINE BREATHING APPARATUS

TECHNICAL DATA. Page 1 of 12

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

SILENTAIRE TECHNOLOGY

Pipe-Away Pressure Vacuum Vent /Conservation Vent

A new concept in the storage of liquefied chemical and petrochemical gases Zero leakage Zero fugitive emissions

SyncroFlo Municipal University and Hydraulic Institute, Pump Systems Optimization

APG001. Application Guide for Gas. T: F: E:

COMPARING PLUG & SEAT REGULATORS & CONTROL VALVES. Lamar Jones. Equipment Controls Company 4555 South Berkeley Lake Road Norcross, GA 30071

Horizontal Bladder Tanks

SF SERIES CNG COMPRESSOR MODEL HF-4MH. 4 Nm3/Hour Displacement OPERATION MANUAL

Mounting and Operating Instructions EB EN. Type Supply Pressure Regulator. with increased air capacity

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009

HON R100 Series High Pressure Regulator Ensuring Reliable Gas Operations

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

FAS-W. Features. Applications. Automatic condensation hygrometer

CHE Well Testing Package/Service:

AIR SAVING PRODUCTS ADDING VALUE AIR-SAVER LOCATOR LOCATOR-EV

Water Solenoids Safety Valves Air. Meters. Butterfly Ball Gate Globe Strainers Pressure Gauges Thermometers

MOBILAIR M 235. Portable Compressor With the world-renowned SIGMA PROFILE Flow rate 18.1 to 23.3 m³/min ( cfm)

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

1200 Series Pressure Regulators

Pneumatic switch module 3/2-way valve (On/Off) Types P Types FP Function tested for use of the float in Ex-zone 0

E 441 E 451 E 461 E 641 E 700 Tank mounting Nominal flow rate up to 800 l/min

GENO -Flushing Compressor Product Data Sheet F 02

TECHNICAL DATA OBSOLETE

Breathing Air Purifiers. Comply with European Pharmacopoeia and International Breathing Air Standards

Full Range Pressure Compensating Variable Flow Control

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL

OWNER S TECHNICAL MANUAL

Pressure on Demand. Air Pressure Amplifiers

Flex-Kleen CT Series Pulse-Jet Dust Collectors For high pressure/high vacuum applications

MOBILAIR M 210 / M 235. Portable Compressor With the world-renowned SIGMA PROFILE Flow rate 18.0 to 23.3 m³/min ( cfm) COMPRESSORS

Plant, components and devices for very high and high pressures (7000 bar and over)

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times

Type Pressure Regulator. for increased air capacity. Fig. 1: Type Pressure Regulator. Mounting and Operating Instructions EB EN

TECHNICAL DATA. Q = C v P S

1800CPB2 Service Regulators

Test pumps. Pressure sources. Good reasons for proper and reliable calibration

FIK In-Tank Filters FIK. Max Flow: 170 gpm (643 lpm) Working Pressures to: Rated Static Burst to: Flow Range to:

E 328 E 498 Tank top mounting Connection up to G1½ / -24 SAE and SAE 2 Nominal flow rate up to 600 l/min / gpm

Model MTB-ASME Horizontal Bladder Tanks

IX1 Spirax-Monnier International Compressed Air Filter Installation and Maintenance Instructions

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT Abrasive Regulator II and 800# Pot Manual

I Connected Industrial. HON 5020 Gas Pressure. Enabling Dependable Gas Operations

Applied Compression s nitrogen generator packages offer users a cost-effective alternative to costly bottled nitrogen.

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

instruction manual highpressure handpump manual

Pressure Reducing Valve DMV 755

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

COMPRESSED AIR SAVING PRODUCTS INDEX. Useful information AIR-SAVER G1 AIR-SAVER G2 LOCATOR. Condensate Management Specialist

NGN Series nitrogen generator

1800CPB2 Service Regulators Maximum Inlet Pressure 125 PSIG

Transcription:

MOBILE DESCOMPRESOR GAS SUPPLY UNITS AND EXTERNAL GAS NETWORK FOR TOWNS, VILLAGES AND SMALL CITIES SERVINAV LTDA GAS SUPPLY SPECIALIST CERTIFICATED BY BUREAU VERITAS

INTRODUCTION Today s world is demanding better condition in their way of life, and the demand of better services such as GAS, that s why our enterprise is interested in offering a new way to deliver Gas service to an entire community or town between 500 to more than 2000 subscriber among households, commercial and industries as well. Our proposal is safe, economic and ensures complete satisfaction to the end user TECHNICAL DESCRIPTION OF THE MOBILE GAS DES-COMPRESSING GAS UNIT The mobile virtual Gas Station is an Assembly of pipes, valves and equipment in order to receive 3,500 PSI pressure of gas storage tanks and adjust them to deliver the volume in M3/h and pressure that the client requests. Mobile virtual Gas Station design varies according to the technical requirements of customer. Modular design framed in steel and dimensions bars allowed on any type of trailer to safely send it to a working destination It supports all types of climatic conditions and can operate outdoors The volumes of gas according to the design range from 50 M3/h up to 2000 m3/h, the pressure (PSI or bar) is required by the client and under the API and ASME international safety standards. 1 Terms and scope Mobile virtual Gas Station meets the following technical - operational requirements RANGE Implementation of the basic engineering design and installation Criteria for selection of computers for GPRS Data transmission Pressures and working temperatures maximum and minimum for each of the components of the station. Configuration and control of heating equipment Configuration of the security scheme The station delivered design Security system in case of high pressure Compliance with normative references Operating and training Shipment of all elements for external and internal installation Engineering supervision during the entire project Test and trials to ensure quality of the project CUMPLY

2. Operation Conditions 2.1 ENTRY The des-compressor station unit is designed to receive the coming CNG modules storage under the following conditions: Income Max pressure of 3.500 PSI Minimum working pressure 125 PSI Maximum temperature: 49 C Low temperature: 2 C The connections shall be flanged and sealed with gaskets espiro metal allowing a seal in the totality of the structure of the virtual station 2.2 OUTPUT Temperature output minimum: Maximum output temperature: Minimum of volume output Maximum volume output Pressure Out Put 7.3 C 40 C 50 M3/h 2000 M3/h 30 to 60 PSI The station is designed to decompress the gas coming from the storage modules CNG at a pressure of between 4.1 bar and 5.5 bar and to provide maximum flow minimum inlet pressure conditions. Maximum flow rate: Des-compressor station is able to supply the following values of flow rate at standard conditions up to 2000 m3/h. Installed equipment are equipped with feedback, allowing self-adjustment, delivering a flow and constant pressure, according to the requirements requested by the client 3. Processes included in the offer 3.1 FILTRATION The des-compressor station is equip with a filter system for the retention of moisture and solid particles, the filter designed has relief valves system that allows through eviction of moisture maintenance without having to disassemble the filter unit. The filters have efficiency for coalescence of 99.5% with a greater than 99% particle retention design. Two manometers of pressure on each end of the filter system shall be installed to determine differences in pressure and detect blockages by contamination on the filters. Changing the filter is quick and does not require the dismantling of any of the parts of the station, requires only the removal of the top cover and remove the used filter.

3.2 HEATING In order to prevent freezing of regulators due to compression of the gas, included the installation of a heater that will function heating the CNG in the stage of regulation of 4 C to 40 C and the CNG flow through the entire station entrance Offered heater uses the same gas as fuel, which ensures a greater margin of safety of work, autonomy and independence of installations providing greater security in operation. 3.3 REGULATION OF HIGH FIRST STAGE The first stage of pressure will be handled by High des-compressor units attached to the station, that will aloud the Station with the amount of working gas to meet the demand required. At all times the CNG is subject to heater that will allow a working temperature of 40 C to 32 C preventing freezing by decompression. 3.4 REGULATION OF HALF SECOND STAGE Axial controller has locking system by high pressure and low pressure with the following characteristics Type of connection: flanged ANSI 150 Includes: Locking mechanism and pressure switch for high pressure, with pressures according to spring It applies under the following conditions: Normal conditions: Normal income: 150 PSI Mínimum income: 80 PSI Exit pressure: 25 to 60 PSI P's shot blocking high: 250 PSI Maximum flow conditions: 2,000 m3/h 3.5 SECURITY SYSTEMS The station will feature the following safety systems Relief valves pneumatic performance of flow control ANSI 300 in the high-pressure phase 3.6 MEASUREMENT SYSTEMS Rotary meter model FMR G100 brand FMG, ANSI 150, 3 "in diameter, with low frequency pulse output 3.7 INSTRUMENTATION The station has local direct-reading instruments 1. Gauges: To operate outdoors under the fulfillment of the ASME B40.1. 2. Ground Connector 4. PAINT AND PROTECTION PREPARATION AND APPLICATION The mobile Virtual Gas station has three coats of paint polyurethane for the sealing of steel with external elements

Polyurethane has two components that need to mix well and leave between fifteen to thirty minutes, before its application. After using the component B (catalyst), it needs to close well container to prevent the entry of air and moisture. The first layer with two-component anticorrosive paints After the first application, is expected 24 hours, never more than 36, to apply the second. Proceed in the same way on successive applications. This allows good adhesion between hands. MODELS MOBILE DESCOMPRESSOR UNIT FROM 500 TO 2000 M3/H GAS STORAGE UNITS

All stations are compact, built on a steel frame for your protection, handling with elevator or crane and safe transport in a truck trailer. It can be installed in any room and outdoors. It supports all types of weather conditions EXTERNAL GAS NETWORK Pipes and accessories for conduction of gaseous fuels are obtained from medium density (MDPE) grade PE2406 or PE80 and high density (HDPE) polyethylene grade PE4710 or PE100 for up to 145 PSI working pressure. Polyethylene accessories required for the connection of pipes such as: unions, tees, caps, reductions, saddles, transitions among others are manufactured from the same resins and the design confers greater resistance to the internal pressure, these products possess equal or superior characteristics for external use MOBILE GAS DESCOMPRESOR UNIT TECHNICAL CHARACTERISTICS Product name: Mobile Gas des-compressor unit Product description: The Mobile Gas des-compressor unit is designed to supply gas to the community of a City municipality and/or the industry, according to the requested pressure and flow requirements, is built into a steel frame that provides security and versatility for transport, according to the requirement of the client has the ability to deliver a volume of gas from 50 M 3/h up to 2000 M3/h, in a range of output from 25 PSI to 60 PSI pressure. The Mobile Gas des-compressor fits in a 24 feet cargo container Place of production: The station is designed and built entirely in Colombia STORAGE GAS UNITS Our containers modules are lightweight V3 - Full fiber Cylinder design capable of resisting up to 3.500 PSI of pressure and a capacity of 4.000 QM (M3) for GNC storage PROJECT COST FOR COUNTRY OF GUINEA ANY CITY OF A TWO THOUSAND (2.000) LESS OR MORE SUBSCRIBERS (HOUSEHOLDS ) ITEM DESCRIPTION 1000 VALUE PER SUBSCRIBERS SUBSCRIBER TOTAL COST 1 Gas descompressor unit USD$85 USD$85.000 2 Storage Gas unit 4.000 3M Cap USD$90 USD$90.000 3 External Gas net work material USD$80 USD$80.000 4 Messuring Gas device USD$30 USD$30.000 5 Internal Regulator USD$10 USD$10.000 6 Internal Installation USD$10 USD$10.000 7 Enginering supervision and exp 4 months in the country USD$25 USD$25.000 Total Project Cost USD$330 USD$330.000 Price will increase proportion of quantity of house hods on ITEMS 2, 3, 4, 5 and 6 IMPORTANT; Country must define type of Gas ( GLP or GNC) in order to provide accurate proposal

These prices includes all certified material placed CIF of destination country Obligations of host country; The municipality will provide the following: 1. Chart or map of the town showing roads to be use as guiding for diging the drenches 2. Equipment such as power concrete cutters, slash hamers, shovels and picks to cut and open the drenches for pipe lay out 3. The municipality will provide the terrains to install the Gas descompressor unit and the gas storage Units 4. The municipality will provide all permits to implement the gas network 5. Local Man power to execute the tasks of opening the drenches 6. Disposal of all the dirt material out come of the diging using truks or any other mean 7. Provide concrete and sand to fill in certain areas and construction of site (Security wall, Gate and concrete base. 8. Provide the man power and equipment for all the duration of the project and in the quantities proportional to the number of Households 9. The project is planned to be completed in less than (4) four months from the moment the all material in placed on location site of the project. 10. The project will benefits those housholds in a radio max 5 Km from the gographical center of the town 11. The local gas company will provide all the logistic materials such as compressor, truks to transport the gas to the storage tank 12. The local company will manage and provide the necessary equipment to bill the gas customers (the local company will deliver the invoice to each customer according to lecture of every counter) Sincerily ENRIQUE GRAU FUENTES SERVINAV Ltda CEO