Pedestrian & Bicycle Connectivity Framework Plan

Similar documents
CONNECTING PEOPLE TO PLACES

ACTIVE TRANSPORTATION

Hennepin County Bicycle and Pedestrian Planning

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Perryville TOD and Greenway Plan

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Living Streets Policy

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

City of Novi Non-Motorized Master Plan 2011 Executive Summary

RZC Appendix 8A Marymoor Subarea Street Requirements

Chapter 5 Future Transportation

Chapter 5. Complete Streets and Walkable Communities.

Non-Motorized Transportation 7-1

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

East Burke Transportation, Safety and Capacity Improvements

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

5 CIRCULATION AND STREET DESIGN

Parks, Open Space, Trails and Recreation Master Plan

2.0 Existing Conditions

Chapter 2: Standards for Access, Non-Motorized, and Transit

See Figure 38, Existing Nonmotorized Connections.

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

3.9 Recreational Trails and Natural Areas

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Executive Summary Route 30 Corridor Master Plan

Physical Implications of Complete Streets Policies

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Active Transportation Facility Glossary

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Item No. 14 Town of Atherton

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

CITY OF ELKO BICYCLE AND PATHWAY PLAN

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Montco 2040 Implementation Grant Program Award Summary

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

INDOT Complete Streets Guideline & Policy

MASTER BICYCLE AND PEDESTRIAN PLAN

COMPLETE STREETS PLANNER S PORTFOLIO

Section 5: Bike and Pedestrian

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Complete Streets Successes, Opportunities, and Challenges

Omaha s Complete Streets Policy

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

1.0 EXECUTIVE SUMMARY

Duwamish Way-finding and CTR Report

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

TRANSPORTATION & MOBILITY

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

CHAPTER 1 INTRODUCTION

Transportation Improvement Plan SECTION2

Montgomery County Life Sciences Center Loop Trail

4. Mobility and Transportation Element. Page Bikes and Pedestrians

NON-MOTORIZED TRANSPORTATION

This chapter describes the proposed circulation system and transportation alternatives associated with

Table #6 VISION CHARACTERISTICS

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Bicycle Master Plan Goals, Strategies, and Policies

Ann Arbor Downtown Street Plan

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Appendix B - Street Sections

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

MONTCLAIR SAFE COMPLETE STREETS IMPLEMENTATION PLAN. Monday November 13, 2017 Michael Dannemiller, Principal Engineer NV5, Inc.

Complete Streets. Designing Streets for Everyone. Sarnia

TRANSPORTATION COMMISSION Agenda Staff Report

4 TRANSPORTATION AND CIRCULATION

GPATS Long-Range Transportation Plan. Complete Streets

City of Charlottesville Bicycle and Pedestrian Master Plan Update

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Complete Streets Funding Program Project Prioritization Plan

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Chapter 9: Pedestrians and Bicyclists

City of McHenry Bicycle and Pathway System Plan

4 Goals, Objectives & Actions

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

Bicycle-Pedestrian Master Plan Update

CHAPTER 6: TRANSPORTATION TABLE OF CONTENTS

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Land Use Bicycle Spaces Required Type Residential

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Arlington s Master Transportation Plan

Proposed Amendment to the City-Wide Trails Plan

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Transcription:

Pedestrian & Bicycle Connectivity Framework Plan October 28, 2013 Township of 1,000 P.O. Box 250 Whippany, NJ 07981

Table of Contents Introduction --------------------------------------------------------------- 2 Purpose of this plan -------------------------------------------------------------------2 Relationship to Circulation Plan Element --------------------------------------2 Relationship to Open Space & Recreation Plan -------------------------------3 Open Space Trust ----------------------------------------------------------------------3 Patriots Path ----------------------------------------------------------------------------5 Key Attractors --------------------------------------------------------------------------5 Framework Plan ---------------------------------------------------------- 6 Complete Streets ---------------------------------------------------------------------7 Trail Users -------------------------------------------------------------------------------8 Trail Alignment ------------------------------------------------------------------------8 ing & Staging Areas -------------------------------------------------------------9 Trailheads -------------------------------------------------------------------------------9 Trail Typologies ---------------------------------------------------------------------- 10 Trail Description ---------------------------------------------------------12 North / South Spine ---------------------------------------------------------------- 12 East / West Spine ------------------------------------------------------------------- 14 Residential Neighborhoods ------------------------------------------------------- 16 Phasing -------------------------------------------------------------------------------- 18 Acknowledgements Township Committee: Ronald Francioli Robert Brueno, Jr. Kenneth C. Schleifer George F. Coppola John L. Ferramosca Connectivity Committee Arthur Linfante, Economic Development Advisory Committee Jim Coiley, Recreation Commission Darren O Conner, Open Space Committee Gene Pinadella, Planning Board Ed Schultz, Environmental Commission Blais Brancheau, Township Planner Gerardo Maceira, Township Engineer Prepared By: Planning & Design Consultant Arterial, LLC 105 Grove Street, Suite 7 Montclair, NJ 07042 1

Introduction Purpose of this plan This Pedestrian and Bicycle Connectivity Framework Plan (the Plan ) establishes a town-wide network of on-road and off-road bicycle trails that link key attractors including population centers, common destinations, school, municipal complex and public parks and open space. In doing so, this plan bridges many of the goals and policies set forth in the Circulation Plan Element with the goals and action items established in the Open Space and Recreation Plan Update 2011. The goal of this plan is to advance the Township s Trail, Greenways and Connectivity goals by: Interconnecting the Township s greenways, parks and open spaces Building upon the easements, maintenance and existing improvements associated with Patriots Path Promoting economic growth by capitalizing on s outdoor amenities Encouraging walking and bicycling as a viable mode of transportation for all residents and visitors Reducing vehicular congestion on roads during peak hours with a particular focus on large corporate campus tenants Promoting as A Healthy Relationship to Circulation Plan Element The Pedestrian and Bicycle Connectivity Framework Plan is supplemental to the Circulation Plan Element of the Township of Master Plan. The Circulation Plan Element establishes a series of goals and policies for the development and improvement of the Township s transportation network and to coordinate transportation, land use and development policies. This Plan supports the goals set forth in the Circulation Plan Element and directly achieves the following goals and policies: 2 TOWNSHIP OF HANOVER

Introduction Goal: Encourage the development and use of alternative circulation modes and networks (e.g., pedestrian, bicycle transit) for convenience of the public and in order to reduce motor vehicle traffic on Township streets. (Circulation Plan Element, Pg 1 C) Policy: Provide and interconnect pedestrian and bicycle pathways throughout the township, with particular emphasis on interconnections between recreational uses and schools. (Circulation Plan Element, Pg 2 Policy #1) Policy: Improve pedestrian accessibility in areas of the township where pedestrian traffic is encouraged (i.e., business areas, community recreation areas, municipal campus). (Circulation Plan Element, Pg 2 Policy #2) Relationship to Open Space and Recreation Plan The Open Space and Recreation Plan Update 2011 (the Open Space Plan ) was prepared by the Township of in collaboration with The Land Conservancy of New Jersey to provide a guide for the Township s open space program. The Trails and Greenways section of the Open Space Plan underscores that trails connecting local neighborhoods, community centers, natural areas and protected parklands are a priority for the Township. This plan promotes two of the Township s open space program goals and objectives: To expand and enrich Township s diverse park and trail system To create greenways connecting the neighborhoods, park and trails The Open Space Plan also includes an Action Program that identifies a series of Short-term, Mid-term and Long-term action items. The following are several of these action items: Create a bicycle/pedestrian committee to spearhead working toward solutions to improve access for nonmotorized transportation alternatives Meet with County transportation officials to request incorporation of bicycle lanes along County roads.. Work with Morris County Commission..to develop interpretive signage along Patriots Path Begin establishing a trail along lands leased by the municipality within the Rt. 24 / Rt 178 ROW Create a well-signed walking and trail system, linking the Township s neighborhoods, parks and schools Develop a comprehensive Trail Plan that includes Bike Paths and Pedestrian trails that will provide alternative transportation routes between population centers, common destinations, and public parks. Open Space Trust Fund In early 2000, the Township of established the Open Space and Land and Facilities Preservation Trust Fund (also referred to as Open Space Trust Fund) to expand and improve the town s existing parks and protect its unique natural areas. As of 2011, the Township has utilized this fund to preserve seven (7) properties totaling 238 acres (ref. Open Space and Recreation Plan Update 2011, Township of ). Whenever possible, this plan capitalizes on these properties by creating bicycle and pedestrian connections to or along these properties. PEDESTRIAN & BICYCLE CONNECTIVITY FRAMEWORK PLAN 3

Introduction Map 1 - Existing Conditions East Patriots Path Troy Hills Rd Griffith Drive Black Brook Red Bulls Parsippany Pkwy Reynolds Avenue Sunrise Condos Halo Pharma. Reynolds Ave Parsippany Rd Veterans Municipal Campus Tiffany s Grande at Condos Mondelez Memorial Junior South Jefferson Rd Whippany Village Oak Ridge Condos River Suburban Propane Bayer Eden Lane Eden Lane Condos Patriots Path South Campus Black Meadows Preserve Whippany High E. Fairchild Pl. Whippany Road Salem Drive Valley Forge Ford Hill Rd Meadows Longview Dr Central Crossings Route 24 Boulevard Rd. Ave Sterling Parcapes Cedar Knolls Rd Cedar Knolls Mews Cross Rd Malapardis Rd Malapardis Mountview Road Green Hills Condos Vierra Condos Ridgedale Ave Saddle Brook Court Apts. Morris County Library Gardens Patriots Path Frelinghuysen Arboretum Legend Existing Patriots Path routing s & Open Space Morris Plains Waterview Condos Forest Way Greenway (Rt. 24 R.O.W.) East Ave Scale Public Institutions & s Key Attractors Morristown 0 1/4 mile 1/2 mile 1 mile 4 TOWNSHIP OF HANOVER

Introduction Patriots Path Patriots Path is a network of on and off-road hiking, biking and equestrian trails extending for 55-miles throughout Morris County. The network is gradually developing with trail conditions ranging from asphalt paved paths to narrow dirt trails. The trail system is operated by the Morris County s Commission. It is supported by Adopt-A-Trail participants that help maintain segments of the trail. An important spur of Patriots Path crosses from north to south through Township (refer to Map 1 - Existing Conditions). The trail alignment is complete except for one small segment along the utility corridor from Parsippany Road to. The trail condition varies widely ranging from a small paved segment in Central to areas that appear to be less visible and somewhat difficult to identify such as the segment from Whippany Road to Veterans. Given this varied condition, the trail gets limited use and is only conducive to avid hikers that set out to explore Patriots Path. It is not conducive to bicycling or casual day-to-day walkers. In addition, almost half of the trail is on-road, meaning that the trail runs along existing roads rather than through wooded areas or other off-road routes. In these locations, no pedestrian amenities, bicycle lanes, safety signage or other amenities that encourage bicycle or pedestrian use. This Plan recommends working with the Morris County Commission to upgrade segments of Patriots Path to make them suitable for bicyclists and pedestrians; and utilizing this as a primary north-south bicycle and pedestrian spine. Key Attractors This Bicycle and Pedestrian Framework Plan furthers the goals of the Township by establishing safe, convenient bicycle and pedestrian connections between populated areas and key attractors including corporate parks, commercial areas, parks / open space and schools. In addition to existing attractors, this plan considers the impact of Key Development Sites. Key Development Sites are sites that are currently under construction or in the planning phase that will include a mix of uses or additional public space that make it a destination; and/or a generate a high volume of visitors/employees daily. PEDESTRIAN & BICYCLE CONNECTIVITY FRAMEWORK PLAN 5

Framework Plan Map 2 - Framework Plan To Parsippany & the Troy Meadows Wetlands East Griffith Drive Black Brook Parsippany Reynolds Avenue Troy Hills Rd Black Meadows Preserve Pkwy Reynolds Ave Memorial Junior Valley Forge Meadows Parsippany Rd Eden Lane Whippany High E. Fairchild Pl. Veterans Municipal Campus South Jefferson Rd Whippany Road Salem Drive Ford Hill Rd Longview Dr Central Route 24 Ave Boulevard Rd. Cedar Knolls Rd To Rt. 202 & the Morris Plains Train Station Cross Rd Malapardis Rd Morris Plains Malapardis Mountview Road Green To Morris Plains Train Station Route 24 R.O.W Ridgedale Ave Gardens East Ave Morris County Library Scale 0 To Morristown Frelinghuysen Arboretum Primary Path On-Road Shared Use Path Along-Road Shared Use Path Off-Road Shared Use Path Secondary Path On-Road Shared Use Path Along-Road Shared Use Path Off-Road Shared Use Path Bike Staging Trailhead Morristown 1/4 mile 1/2 mile 1 mile 6 TOWNSHIP OF HANOVER

Framework Plan This Framework Plan (refer to Map 2 - Framework Plan) outlines a general trail alignment based on current conditions and to link Key Attractors as described in the Introduction. However, this alignment is intended to communicate the intent of the trail system and should be flexible. The exact location or routing of this trail may need to be adjusted based on field conditions but the overriding goals should be maintained. In order to maximize efficiencies and usage, whenever possible the trail was aligned to utilize easements or paths previously established for Patriots Path. Complete Streets Streets that encourage biking and walking are essential to the livability and sustainability of New Jersey s communities. The Township of, like many of New Jersey s suburbs and exurbs has, over time, been planned and designed to accommodate cars as the dominant form of transportation. While cars are an important mode of transportation, this focus has left many of the residential neighborhoods and commercial areas inaccessible by any means other than the car. Complete Streets are streets that are designed to safely accommodate all users, including cars, pedestrians, bicyclists, and transit. Bicycle and pedestrian amenities can be retrofit into existing roadways, incorporated as a complete roadway reconstruction, or included in the construction of new roads. Complete Streets often include interventions such as: Sufficient sidewalk widths for comfortable pedestrian passage Safe, visible, and ADA compliant street crossings Streets trees, benches, and sidewalk cafes ing for many types of vehicles, including cars and bicycles Well-marked, safe public transit stops, often including shelters Currently, very few state and local government agencies in New Jersey require that streets balance the needs of all users. For this reason, many counties and municipalities across the state are adopting Complete Streets Policies. According to the National Complete Streets Coalition, Complete streets policies formalize a community s intent to plan, design, and maintain streets so they are safe for all users of all ages and abilities. Policies direct transportation planners and engineers to consistently design and construct the right-of-way to accommodate all anticipated users, including pedestrians, bicyclists, public transportation users, motorists, and freight vehicles. As of June 2013, 63 Complete Streets Policies had been adopted in NJ (NJ Bicycle and Pedestrian Resource Center). This Plan identifies a series of roads throughout the Township that should be PEDESTRIAN & BICYCLE CONNECTIVITY FRAMEWORK PLAN 7

Framework Plan improved as part of the larger trail network. In addition, the Township of should consider adopting a Complete Streets Policy that will guide the future development of the Township s roads. Trail Users This trail network has been planned to accommodate bicyclists and pedestrians of all levels and abilities. There were two types of primary users anticipated: Recreational Users: A primary focus of this study was to plan a trail that could be used recreationally by families, visitors and employees of the various corporate parks for leisure and for exercise. For this reason, the primary spines have been planned as off-road or along road multi-use paths physically separated from vehicular traffic. Alternate Transportation Users: The trail system was also designed to encourage residents and commuters to bicycle or walk to the various destinations throughout town (i.e. the library, municipal complex, schools etc) as a viable alternative to driving. However, since this is a shared-use trail that will accomodate pedestrians and bicyclists, bicycle speed limits should be enforced along the shared-use segments. 8 TOWNSHIP OF HANOVER

Framework Plan ing and Staging Areas It is anticipated that this trail will be used by recreational users, including tourists coming from surrounding towns. For this reason, this plan identifies several potential areas for parking or bicycle staging. A parking analysis should be conducted to determine if these areas have capacity to accommodate the trail users. These locations are as follows: Malapardis / Upper Malapardis Gardens Central Black Brook Veterans Whippany High Municipal Campus Trail Heads A number of potential trail head locations have been identified on the plan. These locations are generally key transitions from on-road to off-road trail segments and are in areas that are anticipated to receive a high volume of users entering the trail system. Existing trail head at Central PEDESTRIAN & BICYCLE CONNECTIVITY FRAMEWORK PLAN 9

Framework Plan Trail Typologies The trail typology will change throughout its length based on the existing conditions and anticipated usage. Whenever possible, the trail should be a Shared-Use Path that is separated from vehicular traffic. In lower traffic areas or where an off-road path is not feasible, the trail may be incorporated on-road. This Plan envisions three primary trail typologies in as follows: On-Road Path: Pedestrians and bicyclists will be separated and integrated into the existing roadway. Pedestrians will use the sidewalk areas while bicyclists will be encouraged to use the roadway. Appropriate facilities should be provided for bicyclists and pedestrians including bicycle lanes or sharrows (shared road pavement markings), safety signs for motorists, ample sidewalks and improved pedestrian crossings. On-Road Path Along Road Shared-Use Path: An 8-10 wide path constructed of either concrete or asphalt that runs parallel to a roadway. This typology is generally constructed within the road ROW. County coordination will be required for paths located within County ROW. Along-Road Shared Use Path Off-Road Shared Use Path: An 8-10 wide path constructed of either asphalt or decomposed granite that runs through wooded areas or open lawns. This typology requires that: the land is owned by the Towship; the land is owned by the County and an agreement is made allowing it to be used by the Township for this purpose; or there is an easement that the trail can be constructed within. Off-Road Shared Use Path 10 TOWNSHIP OF HANOVER

Framework Plan Washington Street NEWARK,NJ On-Road Path (Bike lane with sidewalk) Seaview Ave WILDWOOD,NJ Bayshore Bikeway CORONADO,CA Along-Road Shared Use Path Bayshore Bikeway CORONADO, CA Patriot s Path HANOVER,NJ Off-Road Shared Use Path Hudson River Greenway Trail NYACK, NY PEDESTRIAN & BICYCLE CONNECTIVITY FRAMEWORK PLAN 11

Trail Description Map 3 - East/West Spine East Griffith Drive Troy Hills Rd Parsippany Reynolds Avenue Black Meadows Preserve Pkwy Reynolds Ave Memorial Junior Valley Forge Meadows Parsippany Rd Eden Lane Whippany High E. Fairchild Pl. Veterans Municipal Campus South Jefferson Rd Whippany Road Salem Drive Ford Hill Rd Longview Dr Central Route 24 Ave Boulevard Rd. Cedar Knolls Rd Cross Rd Malapardis Mountview Road Ridgedale Ave Morris County Library Gardens Frelinghuysen Arboretum Malapardis Rd Morris Plains Green Route 24 R.O.W East Ave Scale Primary Path On-Road Shared Use Path Along-Road Shared Use Path Off-Road Shared Use Path Morristown 0 1/4 mile 1/2 mile 1 mile 12 TOWNSHIP OF HANOVER

Trail Description East/West Spine This spine (as depicted on Map 3 - East/West Spine), in its entirety connects the train station in Morris Plains down Malapardis Road to the end of Eden Lane at the southern end of the Township of. The trail begins on-road at the border of the Township of on Malapardis Road and continues south past Malapardis where is crosses Ridgedale Ave to Boulevard Road. The trail continues on-road south along Eden Lane, crossing South Jefferson Road and turning to the right where it transitions onto the South Jefferson Road along-road path. It continues along South Jefferson Road to the trail-head at Central. The trail follows the existing off-road path through Central and then continues on Eden Lane via an along-road path. At the intersection of Eden Lane and Whippany road the trail uses existing crosswalks to cross Eden Lane, then Whippany Road and continue on-road to the end of Eden Lane. At this point it transitions off-road and connects to secondary paths through Meadows and Black Meadows Preserve. This East/West spine connects the following: a) Morris Plains b) Morris Plains Train Station c) in Morris Plains d) Mountview Road e) Malapardis f) Central g) Black Meadows Preserve Malapardis PEDESTRIAN & BICYCLE CONNECTIVITY FRAMEWORK PLAN 13

Trail Description Map 4 - North/South Spine East Griffith Drive Troy Hills Rd Parsippany Reynolds Avenue Black Meadows Preserve Pkwy Reynolds Ave Memorial Junior Valley Forge Meadows Parsippany Rd Eden Lane Whippany High E. Fairchild Pl. Veterans Municipal Campus South Jefferson Rd Whippany Road Salem Drive Ford Hill Rd Longview Dr Central Route 24 Ave Boulevard Rd. Cedar Knolls Rd Cross Rd Malapardis Mountview Road Ridgedale Ave Morris County Library Gardens Frelinghuysen Arboretum Malapardis Rd Morris Plains Green Route 24 R.O.W East Ave Scale Primary Path On-Road Shared Use Path Along-Road Shared Use Path Off-Road Shared Use Path Morristown 0 1/4 mile 1/2 mile 1 mile 14 TOWNSHIP OF HANOVER

Trail Description North/South Spine This spine (as depicted on Map 4 - North/South Spine) follows the route that has already been established by the Morris County Commission for Patriots Path. This leg of the trail begins in front of the Morris County Public Library where it connects to the Morristown leg of Patriots Path (through the Frelinghuysen Arboretum). The trail travels west on-road along East Ave to an entry drive located at the Morristown Wastewater Treatment Plant. The trail extends down this driveway to the Gardens and a large open space area owned by Morris County Commission. At this point the trail transitions to an off-road trail over an open field of grass and then winding through the woods along the Whippany River. An existing pedestrian bridge brings the trail across the Whippany River, along an existing ambulatory easement through private property and towards Rt. 287 and the Whippany River. The trail meanders along a scenic segment of the Whippany River until it comes to the bridge at Cedar Knolls Road. The trail then transitions on-road over the Cedar Knolls Road Bridge to the traffic light at the intersection of South Jefferson Road. The trail crosses over Cedar Knolls Road and converts to an along-road path on the east side of South Jefferson Road to the Central Trail Head. The trail follows the existing off-road path through Central and then continues on Eden Lane via an along-road path. At the intersection of Eden Lane and Whippany road the trail uses existing crosswalks to cross Eden Lane, then Whippany Road. The trail continues along Whippany Road. At the intersection of Parsippany Road, the trail stays on-road along Parsippany Road and then turns onto Mt. Pleasant Avenue. At the end of Mt. Pleasant Ave., the trail crosses over an existing pedestrian bridge and across the Pine Plaza entrance to the Rt 10 traffic signal. Once across Rt. 10, the trail meanders through the woods adjacent to The Grande at residential development. The path continues across an open field and through Veterans to South Jefferson Road. The trail continues along South Jefferson Road for a short distance then turns off-road beneath the existing power lines. The trail follows this utility corridor off-road to Bee Meadow. The trail traverses the parking lot to Reynolds Avenue. From Reynolds Ave, the trail cuts through a wooded area to Hillary Court where it transitions back on-road to way. The trail follows way as an on-road path to Troy Road. At this point the trail connects with the East segment of Patriots Path through Troy Meadows. Note: As an alternative to following the utility corridor and off-road path between Parsippany Road and Reynolds Avenue, the path may also have an on-road spur that travels up Parsippany Road to way as shown on Map 4. This North/South spine connects the following: a) Morristown b) Frelinghuysen Arboretum c) Morris County Library d) Gardens e) Central g) Veterans h) Municipal Campus i) j) k) Troy Meadows l) East PEDESTRIAN & BICYCLE CONNECTIVITY FRAMEWORK PLAN 15

Trail Description Map 5 - Neighborhood Connectors To Parsippany & the Troy Meadows Wetlands East Griffith Drive Troy Hills Rd Parsippany Reynolds Avenue Black Meadows Preserve Pkwy Reynolds Ave Memorial Junior Valley Forge Meadows Parsippany Rd Eden Lane Whippany High E. Fairchild Pl. Veterans Municipal Campus South Jefferson Rd Whippany Road Salem Drive Ford Hill Rd Longview Dr Central Route 24 Ave Boulevard Rd. Cedar Knolls Rd To Rt. 202 & the Morris Plains Train Station Cross Rd Malapardis Rd Morris Plains Malapardis Mountview Road Green To Morris Plains Train Station Route 24 R.O.W Ridgedale Ave Gardens East Ave Morris County Library Scale 0 To Morristown Frelinghuysen Arboretum Primary Path On-Road Shared Use Path Along-Road Shared Use Path Off-Road Shared Use Path Secondary Path On-Road Shared Use Path Along-Road Shared Use Path Off-Road Shared Use Path Morristown 1/4 mile 1/2 mile 1 mile 16 TOWNSHIP OF HANOVER

Trail Description Residential Neighborhoods The purpose of secondary routes is to interconnect the towns various neighborhoods, parks, schools and businesses with the primary trail spines. These paths also create the opportunity for recreational loops and alternative transportation options. The secondary paths consist of on and off-road paths and have been broken down by neighborhood (refer to Map 5 - Neighborhood Connectors): Western Residential Neighborhood The Secondary Paths in this portion of town consist of on and off-road paths that connect Mountainview, Malapardis, Green and the Route 24 ROW open space to both the East/West and North/South Spines. This sysem also allows a potential connection to the Morris Plains Train Station via the Route 24 ROW open space. The roads identified as being part of the secondary routes include: a) Cross Road b) Boulevard Road c) Ridgedale Ave d) Cedar Knolls Road Eastern Residential Neighborhood e) Mangar Road f) Cyprus Drive g) Sycamore Terrace h) Spruce Street The Secondary Paths in this portion of town consist mainly of on and off-road paths that connect,, Reynolds Avenue, Memorial Junior High and Black Brook to the East/West Spine. The roads identified as being part of the secondary routes include: a) way b) Parsippany Road c) Reynolds Ave d) Troy Hills Road e) Griffith Drive Southern Residential Neighborhood f) Manchester Drive g) Highland Ave h) Grove Place i) South Beaumont Place j) Algonquin way The Secondary Paths in this portion of town consist of on and off-road paths that connect Salem Drive, Whippany High, Valley Forge, Meadows and the Black Meadows Preserve to both the East/West and North/South Spines. The roads identified as being part of the secondary routes include: a) Whippany Road b) Ave c) East Fairchild Place d) Longview Drive e) Ford Hill Road PEDESTRIAN & BICYCLE CONNECTIVITY FRAMEWORK PLAN 17

Framework Plan Map 6 - Phasing East Griffith Drive Troy Hills Rd Parsippany Reynolds Avenue Black Meadows Preserve Pkwy Reynolds Ave Memorial Junior Valley Forge Meadows Parsippany Rd Eden Lane Whippany High E. Fairchild Pl. Veterans Municipal Campus South Jefferson Rd Whippany Road Salem Drive Ford Hill Rd Longview Dr Central Route 24 Ave Boulevard Rd. Cedar Knolls Rd Cross Rd Malapardis Mountview Road Ridgedale Ave Morris County Library Gardens Frelinghuysen Arboretum Malapardis Rd Green Phasing Phase One Phase Two Morris Plains Route 24 R.O.W East Ave Scale Phase Three Future Phases Morristown 0 1/4 mile 1/2 mile 1 mile 18 TOWNSHIP OF HANOVER

Framework Plan Phasing The phasing of the Bicycle & Pedestrian Connectivity Framework Plan (refer to Map 6 - Phasing) is predicated upon the hierarchy of the trail system and the facilities already existing as part of Patriots Path. The Patriots Path trail exists today and there are maintenance and operational agreements in place. In addition, it connects several key destinations and key development sites within the town and outside of the town to downtown Morristown. For this reason, this portion of the path from the Morris County Library to the intersection of Whippany Road and Parsippany Road should be planned and implemented first. The second phase completes the north/south spine and connects with the Town of Parsippany. By implementing these first two phases, one major spine through the entire town is completed, offering residents and businesses the greatest amount of access to the trail. The third phase should be the East/West spine. And the final phase will be the interconnection of the surrounding neighborhoods. It should be noted that Phases do not have to be completed sequentially. Portions of various phases may be implemented simultaneously if the timing, funding or other factors deem this appropriate. way PEDESTRIAN & BICYCLE CONNECTIVITY FRAMEWORK PLAN 19