Giving Cyclists the Green Light: Prioritising Cycles at Traffic Signals

Similar documents
Design and Installation of Low Level Cycle Signals

Junction Design with Traffic Signals

Perne Rd / Radegund Rd Roundabout Cambridge

MILTON ROAD LLF PROJECT UPDATE

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

Side Roads and Other Non-Signalised Junctions

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

Section Outline Signalised Intersection Layout

Chicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction

Low Level Cycle Signals used as repeaters of the main traffic signals Appendices

Cycle Traffic and The Strategic Road Network. John Parkin and Phil Jones Presenting on behalf of Highways England

DOE Climate Change Proposals

TRAFFIC SIGNALS AND SIGNALISED ROUNDABOUTS

Nottingham Cycle City Frequently Asked Questions

Space for Cycling. A guide for decision makers

Bristol City Council has produced a draft Bristol Transport Strategy document.

Appendix A Type of Traffic Calming Measures Engineering Solutions

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

Issues at T junctions:

WEST YORKSHIRE LTP CYCLE PROSPECTUS

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

London Cycle Network Annual Report 2000

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

RESPONSIVE ROUNDABOUTS MYTH OR REALITY

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

ENFIELD TOWN THE REVISED DESIGN

Marcus Jones, TRL. Presented by Name Here Job Title - Date

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Safe Routes to School

The One Path Initiative

Design Manual for Road and Bridges (DMRB) Design Standards TD 50/04. Competency 4. Apply DfT and other technical advice and guidance.

Cycle Superhighway 4 from Tower Bridge to Greenwich

Active Travel Strategy Dumfries and Galloway

Easton Safer Streets - Final Project Report BRISTOL

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Traffic Management and Emissions

Report from Embassy Visit to Copenhagen May David Arditti

Maynooth Cycling Submission on North South Corridor

How do we design for pedestrians? Case study: transforming the Walworth Road

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

Part 3: Active travel and public transport planning in new housing developments

Chelmsford City Growth Package

Traffic Signals. Part I

Space for Cycling. Delivering healthy streets. Roger Geffen Policy Director, Cycling UK

GEOMETRIC DESIGN OF ROUNDABOUTS AND TRAFFIC S IGNAL SIGNAL CONTROLLED

Have your say on the transformation of Oxford Street West

Cycle Route Networks Sustrans creates popular cycle routes through public involvement By Tony Russell, Sustrans, England

MARKHOUSE ROAD IMPROVEMENTS

GD 0043/18 ACTIVE TRAVEL STRATEGY

West Midlands Cycle Design Guidance Cycling and the Midland Metro

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

Cyclists at road narrowings

DERIVATION OF A SIGNAL TIMING SCHEME FOR AN EXTERNALLY SIGNALIZED ROUNDABOUT

Sevenways Roundabout, and the need for a Road Safety Scheme:

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London

Advanced Stop Lines. Advanced Stop Lines are a low-cost but highly-effective way of helping cyclists at junctions,

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways

Accommodating Cyclists at Signalised Intersections

2. Context. Existing framework. The context. The challenge. Transport Strategy

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

15/06/2015. The new TSRGD: Signals and cycling. Sally Gibbons Senior Engineer Traffic Division 18 May The story so far

Milton Road Bus Stop and Crossings Workshop WSP. 19th September 2017

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways

REF. PE01595: MORATORIUM ON SHARED SPACE SCHEMES

National Cycle Network Route 81 Wolverhampton Cross City Route August 2005

9. Parking Supporting Statement

I write in response to the current consultation. I am copying this to Derrick Ashley and I will be posting this online.

TRAFFIC ADVISORY LEAFLET

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

RIGHT-OF-WAY INTERSECTIONS

Appendix 12 Parking on footways and verges

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

TRAFFIC ADVISORY LEAFLET

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Low traffic neighbourhoods

M6 Junction 10 Public Consultation

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Department for Transport

Chapter 4 - Links Within the Highway. Suitability of Routes

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

Roads and public rights of way

Road Safety Factsheet

Cycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design

Report to Cabinet. 18 May 2016

4. Guided Bus Explained

DRAFT INTERIM ADVICE NOTE 150/17

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

Manual for Streets 2: Digested Read

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Transcription:

Giving Cyclists the Green Light: Prioritising Cycles at Traffic Signals Tony Russell CEng MICE MIHT, Transport Engineering Manager, Sustrans 1. Introduction In recent years cycling has moved up the political agenda in recognition of its potential to contribute to a range of non-transport as well as transport objectives, notably health and climate change. In recognition of this, national policy is moving towards a more pro-active encouragement and enabling of more people to cycle rather than simply accommodating existing levels of cycling. Comparison with other European countries and examination of travel statistics indicates a substantial potential to increase cycle use in the UK. However, very often traffic signals schemes focus on the needs of motor vehicles and pedestrians with little attention being paid to cyclists. This paper summarises a range of good practice examples that illustrate the role signal engineers can have in creating an environment that encourages more people to cycle through the provision of safe and convenient routes, both on and off carriageway, and considers how this might develop further in the future. The presentation will include photographs illustrating many of these schemes. 2. Context Potential for Cycling There is considerable potential to increase levels of cycling in the UK, as illustrated by the following statistics: 60% of car trips are under 5 miles Nearly half of all trips are under two miles long Some 2% of trips in the UK are by cycle, compared with 5% in France and Italy and between 8% and 10% in Belgium, Switzerland, Austria and Germany. There is good evidence to indicate that cycling gets safer the more people do it. Recent work by CTC, the National Cyclists Organisation, brings together evidence for this safety in numbers effect in the UK and elsewhere in Europe. Benefits of Cycling Cycling England s report in 2007 on Valuing the Benefits of Cycling concluded that increasing cycling levels by 50% would benefit the economy by 1.3bn, through valuing the outcomes from: Health and Fitness Pollution reduction Congestion DfT s 2009 WebTAG Guidance on the Appraisal of Walking and Cycling Schemes includes three case studies that illustrate that very large benefit to cost ratios of between 18 and 38. This guidance takes account of: the impact on accidents journey ambience health benefits 1 of 7

absenteeism benefits environmental benefits Encouraging more cycling Experience in other European countries and more recently in the Cycling Demonstration Towns demonstrates that substantial increases in cycling require a serious level of investment backed by leadership at a senior level to deliver an integrated package of many different, complementary, interventions including: Safe and convenient cycle routes that give advantage to cyclists Programmes to promote cycle use working with local partners Supportive land use planning and restrictions on car use Cycle users vary in experience, with the more confident commuters using the most direct, if busy, routes, whilst the less experienced cyclist will prefer quieter roads or traffic-free cycle tracks even if they are less direct. Nevertheless, most cycling is on the highway, and even those who avoid main roads will make regular use of traffic signals at least to cross busier roads. Opportunities Current opportunities that support increased levels of cycling include: Building Britain s Future: National Cycle Plan and Active Transport Strategy Cycling City and Towns programme (Cycling England) Healthy Towns programme Sustainable Travel Towns programme Cycling Super Highways (TfL) Sustrans Connect2 Projects 3. What we do now 3.1 Scope As part of my role within Sustrans, and as coordinator of Cycling England s professional support service with a particular involvement in the Cycling City and Towns programme, I am keen to collect and disseminate examples of traffic signal schemes have been well designed to meet the needs of cyclists, particularly where this involves innovation and imagination within or beyond current design standards. Often good cycle provision is simple to provide if incorporated at an early stage in the scheme design, and engaging early in the process with your cycling officer and through them with local cycling stakeholders can assist greatly in identifying opportunities. Of course there is no substitute for riding existing and potential cycle routes yourself to ensure you understand their deficiencies and opportunities. This section briefly describes a variety of UK schemes that assist cyclists at traffic signals that could be seen as good or innovative practice. The list is not exhaustive but should give a feel for the range of initiatives. I would be pleased to receive details of any further examples you consider to be best practice, for possible inclusion in the Scheme of the Month slot on the Cycling England website. 3.2 Cycle Crossings Minimising delay for cyclists at stand alone Toucans Toucans that have a long delay time before giving a green to cyclists once a demand has been registered cause frustration and lead to frequent attempts to cross before the green light appears. 2 of 7

In Exeter, if a Toucan (or Pelican) crossing has not registered a recent demand to cross, it will react immediately to a cyclist or pedestrian demand regardless of traffic flow. This is due to operating these crossings on a pre-timed maximum rather than vehicular activated mode, such that the controller starts to count down from its maximum value as soon as the traffic phase gains right of way. Wide single stage Toucans The latest DfT guidance (LTN 2/08 Cycle Infrastructure Design) states that staggered or split crossings are not generally recommended for cyclists, because they can cause delay to people crossing and give rise to potential conflict between cyclists and pedestrians. LTN 2/95 recommends that if a road width is greater than 11m a staggered layout should be considered, and if it exceeds 15m a staggered crossing layout should be provided. There are an increasing number of examples of single stage Toucan crossings over dual carriageways and other wide roads which operate satisfactorily, where the local authority is serious about giving advantage to cyclists. Cycling England s advice is that where a Toucan crossing is required on a wide road, a single-stage crossing should generally be provided for widths below 15m. For widths over 15m, the option of a single-stage crossing should be fully considered in the light of existing examples. Where a two-stage Toucan operates under SCOOT, delays for cyclists may be increased. However, it is possible to improve its performance for cyclists by considering it as a multinode, in effect treating both halves as a single crossing. Providing good access to / from Toucans for all movements In addition to providing a safe and convenient crossing for cyclists on traffic free routes, a Toucan crossing should also take account of the demand for cyclists wishing to join or leave the carriageway at the crossing. Whilst joining the carriageway can generally be done direct from the crossing manoeuvre, cyclists leaving the carriageway to access the Toucan need a separate slip off the carriageway in advance of the crossing if conflict with pedestrians or cyclists waiting to cross is to be avoided. Cycle detection at Toucans In addition to the push buttons at Toucans, an increasing number of schemes are including detection loops or above ground detection on the approaches, positioned such that the lights change as the cyclist arrives there. Use of high level nearside displays on Toucans Where Puffin technology is used incorporating nearside displays at Toucans, the display can be masked by a group of cyclists / pedestrians. This can be addressed using the option of a second higher level signal. Diagonal Toucan crossings It is important that a Toucan crossing is located on the desire line of cyclists and so aligns with the traffic free route on either side of the road. Where the routes either side are not directly in line, the crossing may need to be at an angle if an awkward dog leg on a shared use footway is to be avoided. A good example is on Fen Causeway in Cambridge, where the cycle routes on either side of the crossing are on opposite sides of a bridge over a stream; so as to avoid cyclists having to use the footway over the bridge, the crossing is at an angle diagonally across the bridge. Cycle Activated Traffic Signs at Crossings This crossing helps cyclists travelling to East Midlands Airport to cross the busy A453 safely and, whilst not a signal controlled crossing, is a development likely to be of interest to signal engineers involved in designing cycle crossings. In order to overcome limited visibility on this derestricted road, Leicestershire County Council installed the first CATS (Cycle Activated Traffic Sign) crossing in the world. The crossing uses pressure pads to activate a sign with flashing amber lights and a SLOW DOWN 3 of 7

message for traffic approaching on the A453. If a cyclist rides over the pad (or waits to cross) at the same time as an approaching car is detected by the sign s radar, the sign is activated. The lights warn drivers so they slow down but the cyclist at the CATS crossing is unaware that a sign is being activated down the road and so proceeds with the same level of caution. The crossing went live in September 2006 and initial results during speed monitoring exercises show a 10% reduction in average approach vehicle speeds when the CATS are activated. This means most vehicles are travelling at just over 40 mph past the crossing. More details at: www.dft.gov.uk/cyclingengland/2007/08/innovative-cycle-crossingleicestershire/ Incorporating cyclists in UTC / SCOOT SCOOT has become an important tool for optimising the movement of traffic over the road network, although by doing so it may lead to additional delays for cyclists crossing at Toucans. However, whilst not often applied, there are ways in which SCOOT systems can be more cycle friendly, such as: Switching SCOOT off when traffic flows are low, rather than just using a fixed timetable; Consider double cycling Toucan crossings under SCOOT operation; Using the gap-out option allowing a signal site (e.g. a Toucan) to operate partly on SCOOT and partly on local isolated mode. 3.3 Cycle Provision at Signalled Junctions Cycle bypass (for left turners) at signals Where space and level of pedestrian use allow, it is often possible to provide a slip off in advance of a signalled junction, leading to a short section of cycle track that enables the cyclist to turn left regardless of the signals (or to continue straight ahead at the top of a T junction); care is needed in designing how cyclists rejoin the carriageway with a protected entry preferred. Early start for cyclists at signals In 1999 the Glasgow City Council opened the Colleges Cycle Route, a largely on road scheme which links the universities and further education colleges. A feature of this route is a separate cycle phase at the signals on Churchill Drive, giving cyclists a 6 sec start over other traffic so as to protect them from left turning vehicles. Exemption for cyclists from banned turns There are many examples of cyclists being exempted from banned turns at signals. Where there is a bus-only movement it should normally be feasible and desirable also to include cyclists. However, there will also be situations where a cycle-only exemption is appropriate as a movement banned for all motor traffic provides a valuable connection for cyclists. Advanced Stop Lines An Advanced Stop Line (ASL) with a cycle feeder lane enables cyclists to pass queuing motor traffic on the approach and take up the appropriate position for their intended manoeuvre before the signals change to green. They are established practice in most highway authorities so just a few comments are appropriate: They have little or no affect on capacity if the number of general traffic lanes remains unaltered Some local highways authorities now have a presumption to install ASLs at all signalled junctions A wide advisory cycle lane, accepting that some vehicles may encroach, may be better than a narrow mandatory lane. The benefit of an ASL can be much reduced if no lead in lane is provided. The design of an ASL must be site specific. 4 of 7

Consideration should be given to factors such as the location and number of lead in lanes and part-width ASLs, which may require authorisation. Location of loops to detect cycles On approaches to ASLs, it is important that detection loops are positioned so that they cover the approach cycle lanes as well as the general traffic lanes; often this is not the case, resulting in approaching cyclists not being detected. Similar considerations apply to above ground detection. Intergreens for cyclists Cyclists coming through a signal junction at the end of the green phase may be travelling rather slower than motor traffic; this may be affected by the gradient or the route they are taking through the junction. This need not alter the calculated intergreens but can be addressed by including an all red extension when a cyclist is detected who has not cleared the junction, which prolongs the intergreen accordingly. This will improve the safety of cyclists using the signals. Permanent green cycle signal on bus gate Increasingly traffic signals are being used at bus gates to provide queue relocation on the approach to a signalled junction. Several cities, including Cambridge, have incorporated a permanent green cycle aspect on the bus gate signal as there is no need to stop cyclists when other traffic has a green. Permanent green cycle signal to access ASL At Monkgate Bar, one of the gates in the historic city wall at York, the restricted width means that motor traffic has to wait at the red signal before it goes through the gate to the junction beyond. However, there is room for cyclists to pass through when traffic is entering from the other direction so cyclists are offered a permanent green signal permitting them to pass through the city gate and then wait in the ASL just beyond. Cycle provision at signalised roundabouts Large roundabouts are an obstacle for most cyclists. However, signalising them assists cyclists by introducing control of the main traffic movements. To accommodate cyclists using them, ASLs should normally be considered for each entry arm and if stacking space permits ASLs may also benefit cyclists on the circulatory carriageway. Less experienced cyclists are likely to prefer an off carriageway route around the roundabout, with signal control across the busier entries and exits. Temple Quay in Bristol provides both options. At large signalised roundabouts where there is a heavy cyclist demand for a right turn, it may be feasible to incorporate a short section of cycle track in the central island that is linked into the junction phasing to enable cyclists to make the right turn more directly. An example is for cyclists turning onto Lambeth Bridge in London. Separately signalled cycle phases at signals A specific signal phase for cyclists can be useful, for example: Where cyclists can undertake a manoeuvre not permitted for general traffic, and which cannot be shared with pedestrians, such as crossing between the carriageway and a cycle track on the other side of the junction. Where cyclists are separated from other traffic for safety reasons; cyclists continuing ahead on Hills Road in Cambridge have a phase that runs separately from that for traffic on the same approach turning left into Brooklands Ave. Uncontrolled cycle crossing at signalled junction At some signalled junctions operational considerations may make it very difficult to justify a separately controlled crossing for cyclists. In such cases it may be appropriate to consider an uncontrolled cycle crossing of an arm of the junction, with the cycle track approaches marked as give way. This also has the advantage that cyclists are not faced with a full red signal at a time when it is quite safe for them to cross. 5 of 7

Diagonal cycle crossing stage during all red Where there is a demand for cyclists to cross a four arm signalised junction diagonally, providing a direct diagonal crossing may be preferable to directing them across one arm at a time. If pedestrians cross on an all red stage, it may be feasible for that to incorporate a diagonal cycle crossing. Omagh and Birmingham both have signalled junctions which incorporate diagonal crossings for cyclists. Guiding cyclists through junctions Where a cycle phase is included at a signalled junction there may be benefits in highlighting this through the use of Elephants Feet markings (WBM 294), which need DfT authorisation. 4. What we might do This section identifies a range of further initiatives that could assist cyclists but which have not (to my knowledge) been trialled in the UK. Some of these could be introduced under current regulations and equipment, whilst others would entail substantial changes. Incorporating cyclists in UTC / SCOOT At present options are available that enable these systems to incorporate bus priority. Future developments could see them developed to be more cycle friendly and possibly incorporate priority for certain key cycle movements. Pelican crossing that defaults to pedestrian phase when no traffic demand In 1997 Hull introduced two pedestrian priority signals in the city centre. These signals operate by reversing the conventional priorities and giving pedestrians the default green whilst vehicles wait at the stop line before being detected. It is an unusual location with low traffic flow (90% buses) and very high pedestrian volumes. There could be situations where such provision could be provided at a shared cycle and pedestrian crossing. All red stage for motor traffic with all green stage for cyclists A number of cities in The Netherlands have junctions that include an all green stage for cyclists whilst motor traffic has an all red. Possibly a similar arrangement could be considered in the UK during an all red stage, subject to cyclists having to cede priority to pedestrians. Separate low level signals for cyclists on primary signal pole Many other European countries provide smaller signals at a lower level for cyclists. These are easier for cyclists to see and would open up options for separate sequencing for cyclists. Cyclists can turn left (right in mainland Europe) on red Some other European countries are trialling cyclists turning right on a red signal, but having to give way to pedestrians and other traffic. There is some interest in similar provision for cyclists in the UK. This can be seen as an extension of the flashing amber used in several European countries. Green light count down markers on approach to traffic signals A scheme trialled in Odense, in Denmark, provides a series of marker posts on the approaches to signalled junctions, incorporating green LEDs. These LEDs come on in sequence prior to the approach receiving a green signal, such that if an approaching cyclist keeps pace with the LEDs that are lit, then they will reach the signals as they turn green. Series of linked signals timed to give green wave for cyclists TfL and LB Camden are currently working on a trial scheme for Camden High Street that will link traffic signals and pedestrian crossings so that a green wave is provided if vehicles drive through at 20mph. Such a scheme is likely to benefit cyclists through reduced travel times as well as the wider safety benefits from lower speeds. If this proves successful there may be situations where it could be appropriate to design for a green wave at say 15mph, which would benefit more cyclists. In Copenhagen signals along several of the city s main arterial roads are set to provide a green wave for cyclists maintaining a speed of 20kph. 6 of 7

Permitting right turn in two stages, with intermediate waiting area in advance of ASL Standard practice in Denmark is to assist cyclists making a left turn (equivalent to a right turn in the UK) in two stages. Initially cyclists move forward part way across the junction and are able to wait ahead of the stop line and pedestrian crossing of the adjacent approach whilst that has a red signal; during the next stage, when that approach is green, these cyclists are able to complete their manoeuvre. Linking 2 stage Toucans Where a Toucan crossing is provided in two stages, technically it is likely to be feasible to link them such that a call on the first one triggers a demand on the second as well, timed to enable the cyclist to cross in a single manoeuvre. 5. Conclusions There is a wide variety of examples of good practice in the provision for cyclists at traffic signals. However, whilst some such as ASLs have gained broad acceptance, others are notable by their rarity. Cycling is moving up the political agenda, and national policy is moving towards a more proactive encouragement of cycling. This paper aims to raise signal engineers awareness of some of the high quality provision for cyclists in the UK, and to encourage them to increase the priority and consideration given to cycles at traffic signals. The needs of cyclists should be considered at least as much as for motor vehicles and pedestrians. Often these schemes are simple to provide if incorporated at an early stage, and engaging early in the process with your cycling officer and through them with local cycling stakeholders can assist greatly in identifying opportunities. However, there is no substitute for riding existing and potential cycle routes yourself to ensure you understand their deficiencies and opportunities. If you have not cycled for some years, you might benefit from a refresher cycle training course. For those already committed to making serious provision for cyclists, some ideas have been put forward on potential future developments. Examples of innovative schemes to assist cyclists at traffic signals are invited for the Scheme of the Month slot on the Cycling England website. Cycling England s Professional Support Service offers up to five days of technical support to (English) Local Authorities with a particular focus on schemes that contribute to Cycling England s priorities of leverage, impact and focus. For more details see: www.dft.gov.uk/cyclingengland/encouraging-cycling/professional-support/ Contact details: Tony Russell Transport Engineering Manager Sustrans 2 Cathedral Square College Green Bristol BS1 5DD tony.russell@sustrans.org.uk Sustrans is the UK's leading sustainable transport charity, working on practical projects so people can choose to travel in ways that benefit their health and the environment. The charity is behind the award winning National Cycle Network, Connect2, Safe Routes to Schools, Bike It, TravelSmart, Active Travel and Liveable Neighbourhoods, all projects that are changing our world one mile at a time. To find out more visit www.sustrans.org.uk 7 of 7