TO: FROM: Y.102/MIN

Similar documents
Shoreline Studies Program, Department of Physical Sciences, VIMS

Estuarine Shoreline Stabilization

VIMS CCRM Coastal Management Decision Tools. Decision Tree for Undefended Shorelines and Those with Failed Structures

For more information or permission to reprint slides, please contact Donna Milligan at 1

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL

Friends of the Detroit River Habitat Restoration Project Update

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

LaSalle Park Marina Wave Break

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

Welcome to Paddle for the Edge!

Part 9 Specific Land Uses - Foreshore & Waterway Development

HARBOR INFRASTRUCTURE INVENTORIES Lexington Harbor, Michigan

Welcome! Did You Know...? Aquatic Centre Dock Rebuild. Key Objectives

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today

Project Incorporation of Sea Level Rise City of Newport Beach Approach for Balboa Islands, City of Newport Beach, California

29 National Estuarine Research Reserves

JAP Additional Information Sheet

MEMORANDUM. Existing Operations. City of Clearwater. Michael Herrman. Date: January 26, Seminole Boat Launch Overview. M&N Job No.

RI Regulatory Setbacks & Buffers: Coastal Management Issues

CITY OF NEWPORT BEACH HARBOR COMMISSION STAFF REPORT

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016

Water Resources Report RKLD Annual Meeting July 30, 2016

Issues facing this region include the status of the Sluice Creek tide gates, various tidal wetlands, and locations of public access:

Information for File # SEW

NORTHERN CELL OPTIONS SHORTLIST RECOMMENDATIONS

Request Number IR1-12: Flow Passage. Information Request

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB

Washington State Parks comments to the Draft Clallam County Shoreline Master Program Update Consistency Review June 3, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning

Richard W. Gilbert, P.E.

AN EARTHWORK HILL, RINGED WITH SEATING AND SHAPED TO SLOPE DOWN TO THE RIVER, FORMS THE CENTERPIECE TO A NEW SOCIAL PIER. A WOOD SEATING TERRACE

RESTORING THE CONNECTION BETWEEN CREEK AND LAKE: FRESH WATER ESTUARINE CREATION IN MISSISSAUGA

X.B WETLANDS ROGUE RIVER ESTUARY

RESILIENCE THROUGH RESTORATION

10/20/2010 Version 3. Guidelines for Developing Non-motorized Boat Launches in Florida

National Oceanic and Atmospheric Administration (NOAA)/ Mulberry Phosphate Trustee Council September 12, 2013

Outlet Structures T-12

Restoring a Recreational Gem. Pete Jopke Water Resources Planner Dane County Land & Water Resources Department

NORTHAMPTON COUNTY WETLANDS BOARD Minutes May 15, 2013

HARBOR INFRASTRUCTURE INVENTORIES Cheboygan Harbor, Michigan

Comments The Plan for Port Whitby

Community Advisory Committee (CAC) Workshop #6

CITY OF NAPLES STAFF REPORT

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

Feasibility Study for Restoration of Titlow Lagoon Fish Passage. South Puget Sound Salmon Enhancement Group

Oregon Estuaries defined: (Goal 16)

Canoe/Kayak Launch Sites and Accessibility

HARBOR INFRASTRUCTURE INVENTORIES Oak Orchard Harbor, New York

Keller Williams Realty Marco Island

HARBOR INFRASTRUCTURE INVENTORIES West Harbor, OH

Redondo Beach Boat Launch Ramp Facility

Alaskan Way, Promenade, and Overlook Walk Final EIS

Raleigh Park Open House #2 Summary (5/23/17)

NORTHAMPTON COUNTY WETLANDS BOARD Minutes December 15, 2010

New Orleans Municipal Yacht Harbor

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

PREPARE TO LAUNCH! DESIRED LAUNCH CHARACTERISTICS Updated April User Accessibility. Site Location Appropriateness

Hunters Point Naval Shipyard Environmental Remediation Program Overview

Fish Community. Fish Habitat, Streams and Rivers

Design and Construction of Living

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

Habitat Development: Habitat Boulders Lawson Pier Foreshore Enhancement

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017

SARASOTA COUNTY GOVERNMENT Parks and Recreation

The Blue Heron Slough Conservation Bank

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

Closure Plan for CCR Surface Impoundments

HARBOR INFRASTRUCTURE INVENTORIES Caseville Harbor, Michigan

Summary of Water Access for Marinas and Public Boat Ramps

Hope Mills Lake Recreational Improvement Plan. Lake Advisory Committee

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

Figure 1. Schematic illustration of the major environments on Mustang Island.

Warm-up # 7 A day 5/17 - B day 5/18 UPDATE YOUR TABLE OF CONTENTS

Number Details Action

GLYNN COUNTY MANAGER S OFFICE 1725 Reynolds Street, Third Floor, Brunswick, GA Phone: (912) Fax: (912)

Tracy E. Skrabal. October 2, 2012

Coastal management has lagged behind the growth in population leading to problems with pollution

Design Considerations for Living Shorelines in Connecticut. Jennifer E.D. O Donnell Department of Marine Sciences University of Connecticut

Tonight is for you. Learn everything you can. Share all your ideas.

Habitat Fact Sheets. Rocky habitats are dominated by seaweeds and often mussels, which rely on the rocks for attachment.

1. Distribute the activity sheet, and allow 20 minutes for the first use.

PRACTICE STANDARDS AND NR 328. Choosing a Technique and Getting a Permit

CHAPTER 4 - SHORELINE PROTECTION STUDY AND PLAN

Living Shorelines Non-structural Erosion Control Practices Rhode Island Land & Water Summit, 2014

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Chapter I: Marine Resources

APPENDIX D-2. Sea Level Rise Technical Memo

C C C

LAUDERDALE LAKES. Lake District Revisioning

Building Coastal Resiliency at Plymouth Long Beach

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Sea-Level Rise and Coastal Habitats in Southeastern Louisiana An Application of the SLAMM Model

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach

APPENDIX C. Fluvial and Tidal Hydraulics Report

AIRPORT RD. EROSION HOMEOWNER FOCUS GROUP SUMMARY 1/1/ PM NATURE COAST BIOLOGICAL STATION

Launch Site Accessibility Evaluation & Design Recommendations

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Transcription:

TO: FROM: Hastings-on-Hudson Shoreline Committee Amanda Ludlow and Kathryn Sommo, Roux Associates, Inc. DATE: March 13, 2017 RE: Meeting with NYSDEC Region 3 Hastings-on-Hudson Conceptual Shoreline Plans Meeting Attendees: Kevin Farrar... NYSDEC Central Office Division of Environmental Remediation (via teleconference) Dan Miller... NYSDEC Region 3 Hudson River Estuary Program; Restoration Biologist/Ecologist Corbin Gosier... NYSDEC Region 3 Bureau of Habitat / Marine Resources, Fish and Wildlife Technician Jessica LaClair... NYSDEC Region 3 Division of Environmental Remediation, Environmental Engineer Heather Gierloff... NYSDEC Region 3 Bureau of Habitat / Marine Resources, Biologist Jacquelyn Nealon... NYSDOH Bureau of Environmental Exposure Investigation, Public Health Specialist Shannon Rooney... Hastings-on-Hudson Shoreline Committee Meg Walker... Hastings-on-Hudson Shoreline Committee, Village Trustee Daniel Lemons... Hastings-on-Hudson, Village Trustee Amanda Ludlow... Roux Associates, Inc., Principal Scientist Kathryn Sommo... Roux Associates, Inc., Senior Biologist Meeting Meg Walker introduced the objectives of the meeting which included: 1. providing the NYSDEC with an understanding of the public desires for waterfront access and natural shoreline features; 2. gaining feedback from the NYSDEC on the conceptual design elements being presented (that were based on the public input and Hastings-on-Hudson Shoreline Committee input); and 3. gaining an understanding from the NYSDEC and where the BP project stands in the remedial design and the mitigation requirements the NYSDEC will be seeking from BP. 2831.0001Y.102/MIN

March 13, 2017 Page 2 Heather Gierloff confirmed the limits of the sloped shoreline area as stated in the Consent Order includes the area from the mean low water line (-2 ) to the finished grade at +11 feet above local mean sea level as will be determined in the Approved Remedial Design, estimated to be approximately 80 to 100 feet from the mean low water line and approximately 60 to 70 feet along the Northern and Southern boat slips. Corbin Gosier indicated that over the next three months, the ARCO/BP sampling data is being reviewed by the NYSDEC. Once feedback is provided to ARCO/BP, they will have six months to submit a 50 percent Remedial Design. Water infiltration into the fill material may need to be considered in the Remedial Design, because water needs to get in and out; the ROD did not include measures to preclude groundwater except from areas where PCBs will remain. The NYSDEC will not allow an unnecessary filling of the Hudson River; rather they would encourage design elements to pull back from the River. Kevin Farrar No direct contact will be allowed with the historical fill material; a 2-foot cap, buffer or equivalent would be needed along the shoreline. Such a buffer at the shoreline should be permeable, but prevent fines from flowing into river. Amanda Ludlow presented the conceptual programming elements and potential shoreline treatment options within the sloped shoreline area. A summary of the Conceptual Design Elements Hastings-on-Hudson Shoreline presentation elements and response from the NYSDEC is provided below in the meeting notes. The presentation is provided as an attachment to the memo. Northwest Corner Design Elements Ferry Terminal Floating Docks Waterfront Access Steps Esplanade Amphitheater Great Lawn / Gathering Area Heather Gierloff The ferry terminal and floating docks would not be considered under the remediation design; these structures would require separate Tidal Wetland Permits from the NYSDEC (based on Article 25, Section 661 requirements within adjacent areas 300 from tidal wetland). The docking facility cannot exceed 40,000 square feet or a Docks and Mooring permit will be required. The permit application would need to demonstrate the need for these structures based upon examples of other ferry s and public opinion. These permits could be obtained later by the Village of Hastings and/or a developer. The floating dock running parallel to the bulkhead would not be a feasible design element for that area for small boats due to the wake created by boats along the Hudson River, but could be built in a protected area, such as south of the Northwest Corner fill area. ROUX ASSOCIATES, INC. 2831.0001Y.102/MIN

March 13, 2017 Page 3 The footprint of the waterfront access steps as shown would likely not be permitted; the footprint would need to be reduced to match only the bulkhead area that will be potentially included in the Remedial Design and the steps would also need to be set back so that filling within the Hudson River would not be required. Jacquelyn Nealon There will be recovery wells and a pump house potentially located around the perimeter of the Northwest Corner, where the hill and esplanade are shown. The Remedial Design will confirm the location of these remedial elements; however these areas may be restricted from public access and vehicle access into these areas may be required. North Cove Design Elements Daylight Stream and Freshwater Wetland/Pond Bridge over Stream Step Access to Salt Marsh Salt Marsh Created behind bulkhead remnants and piers (piers act as a wave break) Varying Topography with Walking Trails Woody Plantings Corbin Gosier Mitigation requirements for the filling that will be needed in the Northwest corner of the property are not yet known and will be determined upon NYSDEC review of the Remedial Design. The ratio could be as high as 4:1 or 5:1. Mitigation requirement will likely be intertidal marsh (from -2 to +2 ) as this type of habitat is lacking along the Hudson River. The BP Operation, Maintenance and Monitoring (OMM) requirements for the shoreline restoration and the remedial elements will also be evaluated as part of the alternatives analysis within the Remedial Design and the final OMM requirements will be included in the Site Management Plan upon implementation of the selected remedy. Dredging will be required along 2,000 linear feet of shoreline at a distance of 60 to 80 feet from the shoreline to a depth of approximately 6 feet in areas where depths are 15 feet. Excavation depths will be dependent upon water depth and concentrations of PCBs present (refer to ROD for Operable Unit Number 02 (OU-2)). The dredging and backfilling within the river will require a 401 Water Quality Certificate which means there will have to be some level of detail for shoreline creation by BP. The piers that are currently present (supporting sheet pile bulkhead) will likely all be removed during remediation (refer to ROD for OU-2). Some of the excavated material may be able to be reused for filling in uplands to create the proposed varying topography. Where backfill is required, wave breaks could be designed into new sediment fill. (See example of this between Stillwater and Schuylerville on upper Hudson River.) Heather Gierloff Step access to salt marsh will be generally incompatible with tidal wetland regulations unless installation of bulkhead is necessary as part of the remedial design. The area where the steps are shown is also an area where the NYSDEC was initially thinking could be used to create habitat to fulfill the mitigation requirements associated with the filling in the northwest corner of the Site. In general, due to the strong wave action caused by boat wakes along the ROUX ASSOCIATES, INC. 2831.0001Y.102/MIN

March 13, 2017 Page 4 Hudson River, salt marsh restoration that incorporates rip rap up to MHW is the most successful. Tidal wetland plantings in Haverstraw have to be repaired because they were not protected enough and do not have sufficiently shallow slopes. Any sills proposed to protect wetland plantings would need to be installed above the average mean high water line. However since this is a productive fish area the NYSDEC may not support filling the area with rock. Ice flows are generally not an issue along this stretch of the Hudson River. A deeper cap would be required to accommodate the proposed woody plantings, depending upon the Remedial Design, to ensure the plantings would not penetrate the remedial cap. Planting or woody species could be coordinated with remediation: areas with more excavation would provide room for roots. South Cove Design Elements Salt Marsh Created behind bulkhead remnants and piers (piers act as a wave break) Bulkhead and Riprap to support Boathouse Structure and Kayak Dock Restrooms Bridge to provide Pedestrian and Fishing Access Woody Plantings Refer to comments from North Cove Design Elements related to the salt marsh creation behind the bulkhead remnants and piers, and woody plantings. Heather Gierloff The proposed boathouse would require a Tidal Wetlands Permit, however, due to the anticipated wetland mitigation requirements that will likely rely on the south cove as an area for habitat creation and based upon the size and location of the proposed boathouse the reality is modifications to the proposed boathouse elements would be necessary in order to receive a permit. The wetland mitigation requirements will be determined upon NYSDEC review of the Remedial Design. The NYSDEC wants intertidal wetland habitat to replace the river bottom areas that will be filled as part of the Remedial Design and upland habitat creation will not be an acceptable wetland mitigation offset to compensate for the loss of river bottom habitat. A kayak launch would be ok but it would need to be smaller and be respectful to the mitigation that will likely be located in this area. All permanent structures will need to be set back 50 feet from the shoreline, including any proposed boat storage areas and restrooms. A separate permit for boat storage would be needed, but kayak launch could be part of remediation permit; it would not be included as part of the remediation. A floating dock would need to be less than 200 square feet to meet Tidal Wetland compatibility requirements and it would need to be located off the mudline during low tide. Kevin Farrar Perhaps the proposed stream daylighting and freshwater wetland/pond could be changed to an intertidal marsh that would help offset the mitigation requirements and may free up some of the shoreline/coves for public uses rather than strictly using the shoreline for habitat creation. There is also the potential that rather than backfilling some of the hot spot areas (especially those that are 9 deep), the excavation could be capped with claymax or a liner to create wetland habitat. These concepts would all have to be review and permitted through the ROUX ASSOCIATES, INC. 2831.0001Y.102/MIN

March 13, 2017 Page 5 tidal wetlands program. These concepts need to be refined to determine feasibility, but could be presented to BP for potential mitigation options required further evaluation by their engineers. Jessica LaClair Any proposed development will not be allowed to penetrate the cap. The ROD states pile-supported structures will not be permitted in any areas where PCB material is potentially present. The cap location and remediation elements will all be determined during the Remedial Design. Therefore, future redevelopment of upland areas will be driven by what remediation is left in the place and the cap design. Any site redevelopment plans would need to be discussed with the NYSDEC. A developer will need to follow the Site Management Plan and Excavation and Sediment Management Plan for the Site if they plan on penetrating the cap. Off Site Design Elements Stormwater Management Features Fishing Pier Mooring Field Beach Restrooms Shoreline Choked and Vegetated Riprap Refer to comments from Heather regarding setting back all permanent structures 50 feet from the shoreline. Shorelines that incorporate both riprap and plantings are the most successful along the Hudson River. Jacquelyn Nealon There have been trespassing issues with the entire site for years now. By creating public access you are also creating an attractive nuisance. Fish consumption is not allowed along the Hudson River. She would suggest posting a public advisory along the walkways and piers to discourage fish consumption and also to discourage the public from walking barefoot. There are public health concerns associated with direct contact with sediments impacted from sanitary sewer overflows, and in the lawn or park areas from goose droppings. The NYSDOH would not encourage the public to walk barefoot in these areas due to high bacterial concerns. Next Steps: 1. Meet with ARCO/BP managers to share our plans/ideas and request frequent communication and regular updates regarding the shoreline as they proceed with Remedial Design. 2. DEC Fish and Wildlife and Estuary Program will give them mitigation requirements at 50% design. ROUX ASSOCIATES, INC. 2831.0001Y.102/MIN

Conceptual Design Elements Hastings-on-Hudson Shoreline CLICK TO EDIT MASTER TITLE STYLE March 13, 2017

Proposed Approach Public access to waterfront Connectivity Responsive programming Flexible amenities Bioengineering solutions Habitat creation Remedial containment Long term performance & resiliency

Conceptual Elements Defined Shoreline Zone EL +11.0ft Mean High Water EL +2.0ft Mean Low Water EL -2.0ft

Site North Existing Riprap Shoreline

Site North Café and Restrooms Remedial Bulkhead Topographic Mound Amphitheater Great Lawn Esplanade Floating Dock Ferry Terminal Steps to Water

Site North Great Lawn and Esplanade

Site North Water Access and Ferry Terminal

North Cove North Cove EL. -3ft to +2ft Bulkhead Remnants

North Cove Stream Freshwater Wetland/Pond Upper Shoreline = Bioengineered Dense Woody Vegetated Bridge over stream Soft Walking Trail Varying Topography Step Access to Salt Marsh Lower Shoreline = Salt Marsh Protected by Bulkhead Remnants

North Cove Habitat Creation

Shoreline Stabilization Elements

Former Bulkhead and South Cove Bulkhead Remnants

Former Bulkhead and South Cove Varying Topography Upper Shoreline = Bioengineered Dense Woody Vegetated Restrooms Soft Walking Trail Lower Shoreline = Salt Marsh Protected by Bulkhead Remnants

Former Bulkhead and South Cove

South Cove South Cove EL. -4ft to +2ft Bulkhead Remnants

South Cove Restrooms Boathouse Kayak Dock/ Pool Upper Shoreline = Bioengineered Dense Woody Vegetated Riprap Bridge Lower Shoreline = Salt Marsh Protected by Bulkhead Remnants

South Cove Boathouse and Kayak Pool Long Dock Park, Beacon Dallas Community Boathouse

South Cove Habitat, Boardwalk, and Bridge

Off Site Existing Riprap Shoreline Dolphins

Off Site Restrooms Beach Mooring Field Stormwater Management Features Fishing Pier Shoreline = Choked and Vegetated Riprap Natural Mounded Playground

Off Site Stormwater and Flood Control

Off Site Additional Features

Conceptual Elements Shoreline: range of types (from soft to hard) steepness of slope width of slope and elevation variations pond or day lighted stream Marine uses and locations: ferry and excursion boats transient boaters kayak area with boathouse fishing pier floating dock Habitat: mitigation requirement salt marsh trees grasses and other emergents Structures: cafe restrooms boathouse Mounds and varied topography: Northwest Corner and elsewhere Shape of fill at Northwest Corner

Questions? aludlow@rouxinc.com (631) 232-2600