PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

Product Information Report Lockout/Tagout Hazardous Energy Control

Lockout/Energy Control

THE UNIVERSITY OF NORTH CAROLINA

Lockout / Tag out Program

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

LO/TO LOCKOUT/TAGOUT PROGRAM

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

Gettysburg College. Energy Control Program

LOCKOUT/TAGOUT PLAN August 2015

Lockout/Tagout Safety Policy

Lockout/Tagout Training Overview. Safety Fest 2013

Lockout/Tagout Program

UCHC Lockout/Tagout Policy (4/09)

230-LOCKOUT/TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

Lock Out/Tag Out Control of Hazardous Energy

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Hazardous Energy Control Lockout/Tagout

LOCKOUT/TAGOUT PROGRAM

University of Arkansas Office of Environmental Health and Safety

Lockout Tagout Program

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

LOCKOUT-TAGOUT PROGRAM

Management Plan for Lockout Tagout (LOTO) ISD #535

Control of Hazardous Energy Lockout / Tagout Program

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

H. Control of Hazardous Energy: Lockout/Tag Out

Lockout Tagout Program

Control of Hazardous Energy. Environmental Health and Safety

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM

Health, Safety, Security and Environment

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

Hazardous Energy Control (Lockout-Tagout)

Lockout/Tagout Manual

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

Lockout / Tagout Program OSHA 29 CFR

LOCKOUT/TAGOUT PROGRAM

Elements of a Lockout/Tagout Program OSHA

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

RiskTopics. Lockout/Tagout October 2017

LOCKOUT TAGOUT. Quick Reference FAQs REQUIREMENTS OF THE STANDARD COMMONLY USED TERMS

Control of Hazardous Energy Program (Lockout/Tagout)

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

LOCKOUT / TAGOUT PROGRAM

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4.

Lockout/Tagout - Energy Control Program

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Facilities Management

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Lockout / Tagout Safety Program

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

Health and Fire Safety Review 2/15

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

LOCKOUT AND TAGOUT. PART 1: INTRODUCTION

LOCKOUT/TAGOUT PROGRAM

Lockout/Tagout - Control of Hazardous Energy Program

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

Lockout/Tagout Program

CONTROL OF HAZARDOUS ENERGY

University of Vermont Department of Physical Plant Burlington, Vermont

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

Lockout Tagout Policy

University of Illinois at Chicago. Control of Hazardous Energy Program (Lockout/Tagout)

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

Control of Hazardous Energy Program (LOTO)

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HAZARDOUS ENERGY CONTROL LOCKOUT PROGRAM

Lockout/Tagout Program

Lock Out - Tag Out Safety Program

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

2523-LDG-E. Leader s Guide

EM Section 12. Control of Hazardous Energy (Lockout/Tagout)

EM385 Construction Safety and Health Certification Course Section 12 Control of Hazardous Energy

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

This session covers the safety procedure known as lockout/tagout, which is required by Occupational Safety and Health Administration (OSHA) in its

MCW s Control of Hazardous Energy Program

Lockout / Tagout Program. The Control of Hazardous Energy. Environmental Health and Safety Office

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

Lockout/Tagout And Alternative Methods

University of Tennessee Safety Program

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

2008. AURORA PICTURES

University of Louisville. Physical Plant

Bruce Koenecke. Key Account Manager Middletown, PA

ITHACA COLLEGE LOCKOUT/TAGOUT PROGRAM

Lock-out Tag-out Program (Zero Energy State)

Lockout Tagout Program

Hazardous Energies Control and Lockout/Tagout Program

Hazardous Energy Control/Lockout

Transcription:

Energy Control Procedures Lockout/Tagout 29 CFR 1910.147 Paul Schlumper, PE, CSP Georgia Tech Research Institute What is covered? Servicing and maintenance Normal production operations where: Employees by-pass guard(s) Employees place any part of their body in a hazardous area 1

What is not covered? Construction, agriculture, and maritime Normal production operations (subpart O) Cord-and-plug under the control of employee (written procedure still required) Exposure to electrical conductors (subpart S and electrical safety-related work practices) Locked Out????????? Energy types Electrical Mechanical Hydraulic Pneumatic Chemical Thermal Other 2

Lockout vs. Tagout If capable of being locked out: Prefer lockout Tags allowed, if employer can demonstrate FULL EMPLOYEE PROTECTION Machine Modifications Full employee protection? Tags attached at the same location as locks Full compliance with all tagout provisions in 29 CFR 1910.147 Additional means when necessary (e.g. removal of a valve handle) Definitions Affected employee Authorized employee Capable of being locked out Energy isolating device Servicing and/or maintenance 3

Servicing and maintenance includes: Setting up Adjusting Inspecting Modifying Installing Lockout/tagout requirements Written program which includes specific written procedures Training of employees (not just maintenance!) Periodic review of procedures Written lockout/tagout procedure Clearly and specifically outline Scope Purpose Authorization Rules, techniques for control of energy 4

Lockout procedure (cont.) Clearly and specifically outline: Means to enforce compliance including: Intended use of procedure Specific procedural steps Specific testing requirements Documentation exceptions: Machine has no potential for stored energy Machine has a single energy source Isolation of that source will completely deenergize Machine is isolated and locked out during maintenance Documentation exceptions (cont.) A single lockout device will achieve locked-out condition Lockout device under exclusive control of employee Maintenance does not create hazard to others No previous accidents involving unexpected energization on this equipment 5

Energy control procedure Notification of employees Preparation for shutdown Machine or equipment shutdown Machine or equipment isolation Lockout/tagout device application Stored energy Verification of isolation Release from lockout/tagout Lockout procedure Step 1 NOTIFICATION OF EMPLOYEES Before controls are applied, and before they are removed Lockout procedure Step 2 PREPARATION FOR SHUTDOWN Knowledge of the type and magnitude of energy and methods to control energy 6

Lockout procedure Step 3 MACHINE OR EQUIPMENT SHUTDOWN Orderly shutdown to avoid increased hazard Lockout procedure Step 4 MACHINE OR EQUIPMENT ISOLATION All energy isolation devices located and operated to isolate machine Line breaking: Means the intentional opening of a pipe, line, or duct that is or has been carrying flammable, corrosive, or toxic material, an inert gas, or any fluid at a volume, pressure, or temperature capable of causing injury 7

Line blanking or blinding: Means the absolute closure of a pipe, line, or duct by fastening of a solid plate that completely covers the bore and that is capable of withstanding the maximum pressure of the pipe, line, or duct with no leakage beyond the plate. Double block and bleed: Means the closure of a line, duct, or pipe by closing and locking or tagging two in-line valves and by opening and locking or tagging a drain or vent valve in the line between the two closed valves. Lockout procedure Step 5 LOCKOUT OR TAGOUT DEVICE APPLICATION Affixed by authorized employee holding energy isolating device in the safe or off position 8

Lockout procedure Step 6 STORED ENERGY Relieve all stored energy and continue to verify if there is a chance of re-accumulation Stored energy examples Batteries and capacitors Pressure differential Hydraulic Pneumatic Vacuum Springs Gravity 9

Lockout procedure Step 7 VERIFICATION OF ISOLATION Prior to servicing or maintenance, authorized employee must verify machine has been deenergized Lockout procedure Step 8 RELEASE FROM LOCKOUT OR TAGOUT Inspect work area to ensure removal of nonessentials Employees safely positioned and notified Lockout/tagout removal (by employee who applied) Lock/tag removal if authorized employee is not available? Verify that authorized employee is not at facility Make reasonable efforts to inform him or her Ensure that he/she knows of removal upon reentering MUST INCLUDE THIS PROCEDURE IN WRITTEN PROGRAM 10

Hardware requirements Durable Standardized Substantial Identifiable Hardware must be: Provided by the employer Singularly identified Only devices used for control Not used for other purposes Hardware must be (cont.): Durable be able to withstand environment Standardized color, size, etc. Tags : print and format Substantial no accidental removal Tag attachment means: Withstand at least 50 pounds of force Not re-usable Self locking Attachable by hand 11

Hardware must be (cont.): Identifiable identify the employee who applied Tags must include legend such as DO NOT START 12

13

Periodic Inspection Performed at least annually Lockout include review with authorized employees Tagout include review with authorized and affected employees Certification record kept: Identify machine or equipment Date of inspection Employees performing and included in inspection Training and re-training Authorized employees Recognition of hazardous energy Type and magnitude of hazardous energy Methods of isolating energy How to verify isolation Affected Purpose and use of procedure Other Procedure and Prohibition from tampering Tagout provisions Re-training is required when: Change in job assignment Change in machine or process Change in lockout/tagout procedure Inadequacies revealed in periodic review 14

Training certification Certify that the training has been conducted and kept up to date: Employee names Date(s) of training Other requirements Contractors? Personnel or shift changes? Testing or positioning machines Clear the machine of tools and materials Remove employees from the area Remove lockout/tagout devices Energize and proceed with testing/positioning De-energize and re-apply energy control measures 15

Group lockout Personal lock or tag (usually) Lockbox or master tag system with principal authorized employee Shall utilize a procedure which affords a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device Minor Servicing Exemption Activities which are routine, repetitive, and integral to the use of the equipment for production are not covered by this standard if alternative measures provide effective protection. Activity must be conducted during normal production operations Activity must be routine (regular course of procedure in accordance with established practices), repetitive (regularly repeated as part of production), and integral (essential to the production process). SUMMARY Written program including written procedures for each machine Training of employees Periodic review of program ENFORCEMENT 16