PERMANENT PAVEMENT MARKING PLAN

Similar documents
PERMANENT PAVEMENT MARKING PLAN

PERMANENT PAVEMENT MARKING PLAN

PERMANENT PAVEMENT MARKING PLAN

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 1 STANDARD PRACTICES

TRAFFIC LINE MANUAL Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION

TRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

Pavement Markings (1 of 3)

General Notes. Project No /15/2018 Page 1 of 1

ADA Operations Contact Info

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

SECTION 12 ROAD MARKINGS AND DELINEATION

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

General Notes. Project No /15/2018 Page 1 of 1

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

ADA Training Standard Plans

ADA on Construction. Guidance for Section C Plan Preparers

PUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES

Accommodating Pedestrians in the Work Zone

FOR LOOP RAMPS-TAPERED DECELERATION LANE

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1. 2 Classification 2


Fundamentals of Traffic Control Devices

"Emul Asph (SS-1HP) Tack".

Sign Designs and Markings Manual (TEM 295-2) Page 8-3

Chapter V TRAFFIC CONTROLS. Tewodros N.

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

APPENDIX G SIGNAGE AND STRIPING SUPPLEMENT

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

CW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)

Traffic Control Devices

FREEWAY AND SERVICE ROAD CONNECTIONS

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

SECTION 12 ROAD MARKINGS AND DELINEATION

The first lift, mainline, shall be placed using a spray paver.

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

Minnesota Manual on Uniform Traffic Control Devices

INTERSECTIONS AT GRADE INTERSECTIONS

2017 Changes to the 2011 MMUTCD January 2017

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Driveway Design Criteria

MINNEAPOLIS PARK & RECREATION BOARD DRAFT TRAIL DESIGN STANDARDS FOR: SIGNS AND PAVEMENT MARKINGS

Sign Design Manual (TEM 295-2)

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation

Page 1 of KA

INDEX. Geometric Design Guide for Canadian Roads INDEX

Revisions to Larimer County Urban Area Street Standards (2016 Update)

Geometric Design Tables

Field Design, Construction and inspection of ADA compliant Curb ramps. Mike Anderson City of Lee s Summit Construction Manager (816)

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

(This page left intentionally blank)

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

2003 Edition Page 2C-1

November 2012: The following Traffic and Safety Notes were revised:

Identify the letter of the choice that best completes the statement or answers the question.

LADOTD Roundabout Assistance Contract

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

Tract or Parcel Project Name PCN Checked By Date

Traffic Signs and Markings. Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation

2009 Manual on Uniform Traffic Control Devices

General References Definitions. (1) Design Guidance. (2) Supporting Information

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS

Vermont Permit Test Flash Cards

Restoration Requirements

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE

Appendix Work Zone Traffic Control

PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices

Edge Wedge 150 lb/ft 3

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

0 CITY OF SANTA ANA 0

Oregon Supplement to the Manual on Uniform Traffic Control Devices. Adopted July 2005 by OAR

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Appendix A-6. Signing and Marking Guidelines. Number Name Pages. 2B.06 Signing at T Intersections 1. 2B.12 Pedestrians in Crosswalk 1

Off-road Trails. Guidance

TURN ARROW. LANE-REDUCTION ARROW (RIGHT) (For Left Lane, Use Mirror Image) LANE-REDUCTION ARROW MARKING DETAIL

2C-3 Placement of Warning Signs

FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS

PENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)

SECTION 3 STREET DESIGN

Access requests to County streets and roadways are processed through one of the following methods:

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

TRAFFIC CONTROL DEVICES

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

ROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE

Transcription:

PERMANENT PAVEMENT MARKING PLAN NOTES & GUIDELINES PERMANENT PAVEMENT MARKING PLAN INDEX GENERAL INMATION: EPOXY: 0 PERM PAVEMENT MARKING TITLE AND TABULATION 0-0 DETAILS PMSamplePlan.typicals PLOTTED/REVISED:0/8/206 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn THE ENGINEER'S INVOLVEMENT IN THE APPLICATION OF THE MATERIAL SHALL BE LIMITED TO FIELD CONSULTATION AND INSPECTION. THE CONTRACTOR WILL PLACE NECESSARY "SPOTTING" AT APPROPRIATE POINTS TO PROVIDE HORIZONTAL CONTROL STRIPING AND TO DETERMINE NECESSARY STARTING AND CUTOFF POINTS. LONGITUDINAL JOINTS, PAVEMENT EDGES AND EXISTING MARKINGS MAY SERVE AS HORIZONTAL CONTROL WHEN SO DIRECTED. EDGE LINES AND LANE LINES ARE TO BE BROKEN AT INTERSECTIONS WITH PUBLIC ROADS AND AT PRIVATE ENTRANCES IF THEY ARE CONTROLLED BY A AGENCY PLACED YIELD SIGN, STOP SIGN OR TRAFFIC SIGNAL. THE BREAK POINT IS TO BE AT THE START OF THE RADIUS THE INTERSECTION OR AT MARKED STOP LINES OR CROSSWALKS. A TOLERANCE OF /4 INCH UNDER OR /4 INCH OVER THE SPECIFIED WIDTH WILL BE ALLOWED STRIPING PROVIDED THE VARIATION IS GRADUAL AND DOES NOT DETRACT FROM THE GENERAL APPEARANCE. BROKEN LINE SEGMENTS MAY VARY UP TO 3 INCHES FROM THE SPECIFIED LENGTHS PROVIDED THE OVER AND UNDER VARIATIONS ARE REASONABLY COMPENSATORY. ALIGNMENT DEVIATIONS FROM THE CONTROL GUIDE SHALL NOT EXCEED INCH. MATERIAL SHALL NOT BE APPLIED OVER LONGITUDINAL JOINTS. ESTABLISHMENT OF APPLICATION TOLERANCES SHALL NOT RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITY TO COMPLY AS CLOSELY AS PRACTICABLE WITH THE PLANNED DIMENSIONS. JUST PRIOR TO THE PLACEMENT OF PAVEMENT MARKINGS THE ROAD SURFACE SHALL BE CLEANED AND FREE OF CONTAMINATION AS RECOMMENDED BY THE MATERIAL MANUFACTURER AND ACCEPTABLE TO THE ENGINEER. PORTLAND CEMENT CONCRETE SURFACES SHALL BE SANDBLAST CLEANED TO REMOVE ANY SURFACE TREATMENTS AND/OR LAITANCE. APPLY ALL PAVEMENT MARKINGS AS RECOMMENDED BY THE MATERIAL MANUFACTURER. PERMANENT PAVEMENT MARKINGS SHALL NOT BE PLACED OVER TEMPORARY TAPE MARKINGS. THE FILLING OF TANKS, POURING OF MATERIALS OR CLEANING OF EQUIPMENT SHALL NOT BE PERMED ON UNPROTECTED PAVEMENT SURFACES UNLESS ADEQUATE PROVISIONS ARE MADE TO PREVENT SPILLAGE OF MATERIAL. REFER TO SPECIAL PROVISIONS OR SPEC BOOK GROUND IN/RECESSED PAVEMENT MARKING APPLICATION REQUIREMENTS. CONTRAST MARKINGS: STANDARD LINEAR PAVEMENT MARKINGS, CROSSWALK MARKINGS AND PAVEMENT MESSAGES WITH.5 INCH NON REFLECTIVE BLACK BORDERS. PAINT: GLASS BEADS SHALL BE APPLIED AT A RATE OF AT LEAST 8 LBS/GAL. IMMEDIATELY AFTER APPLICATION OF THE PAINT LINE. PAVEMENT MARKINGS SHALL BE APPLIED IN SEASONABLE WEATHER WHEN AIR AND PAVEMENT SURFACE TEMPERATURES IS 50 F OR HIGHER AND SHALL NOT BE APPLIED WHEN THE WIND OR OTHER CONDITIONS CAUSE A FILM OF DUST TO BE DEPOSITED ON THE PAVEMENT SURFACE AFTER THE ROAD SURFACE SHALL BE CLEANED AT THE DIRECTION OF THE ENGINEER JUST PRIOR TO APPLICATION. PAVEMENT CLEANING SHALL CONSIST OF AT LEAST BRUSHING WITH A ROTARY BROOM (NON-METALLIC) OR AS RECOMMENDED BY THE MATERIAL MANUFACTURER AND ACCEPTABLE TO THE ENGINEER. NEW PORTLAND CEMENT CONCRETE SURFACES SHALL BE SANDBLAST CLEANED TO REMOVE ANY SURFACE TREATMENTS AND/OR LAITANCE. THE EPOXY MARKING APPLICATION SHALL IMMEDIATELY FOLLOW THE PAVEMENT CLEANING. GLASS BEADS SHALL BE APPLIED IMMEDIATELY AFTER APPLICATION OF THE EPOXY RESIN LINE. APPLY EPOXY MARKINGS WITH A MINIMUM THICKNESS OF 20 MILS, GLASS BEADS SHALL BE APPLIED AT A RATE OF AT LEAST 25 LB/GAL. THE "NO-TRACKING" CONDITION SHALL BE DETERMINED ON AN APPLICATION OF SPECIFIED THICKNESS TO THE PAVEMENT AND COVERED WITH GLASS BEADS AT THE RATE OF AT LEAST 25 LB/GAL. PAVEMENT MARKINGS SHALL BE APPLIED IN SEASONABLE WEATHER WHEN AIR AND PAVEMENT SURFACE TEMPERATURES ARE 40 F OR HIGHER AND SHALL NOT BE APPLIED WHEN THE WIND OR OTHER CONDITIONS CAUSE A FILM OF DUST TO BE DEPOSITED ON THE PAVEMENT SURFACE AFTER CLEANING AND BEE THE MARKING MATERIAL CAN BE APPLIED. PREMED MARKINGS: MANUFACTURER CERTIFICATIONS ARE REQUIRED INSTALLERS, AND WRITTEN CERTIFICATION SHALL BE PRESENTED AT ANYTIME UPON REQUEST OF ENGINEER OR OTHER STATE PERSONAL. DO NOT USE LINE MATERIAL TO PIECE TOGETHER INDIVIDUAL LETTERS, SYMBOLS, OR CROSSWALKS BLOCKS. UTILIZE PRECUT KITS PROVIDED BY THE MANUFACTURER. TWO STRIPS OF 8" LINE MATERIAL MAY BE USED TO M CROSSWALK BLOCKS OF 36" WIDTH. DO NOT USE NARROWER LINE MATERIAL TO PIECE TOGETHER WIDER LINES. IF THERE IS A CRACK OR JOINT IN ROAD SURFACE. ( TAPE LAY OVER CRACK OR JOINT THEN CUT TAPE " ON EACH SIDE OF CRACK OR JOINT). ( THERMO MAKE A DEEP SCORE IN THE MATERIAL ONCE IT HAS SET UP BUT NOT ENTIRELY COOLED DOWN). PREM TAPE INLAY APPLICATION: MAT TEMPERATURE SHALL BE CHECKED USING A THERMOMETER TO MAKE SURE THE INLAY IS BEING DONE IN THE PROPER TEMPERATURE RANGE. THE TEMPERATURE SHOULD MEASURE BETWEEN 50 F (ASPHALT FIRM ENOUGH TO WALK ON) AND 20 F. APPLICATION BELOW 20 F MAY NOT GET A PROPER INLAY. INLAYS ARE NOT RECOMMENDED AFTER SEPTEMBER 5th AS THE ASPHALT COOLS TOO FAST AT THIS TIME OF THE YEAR. NO PRIMERS ARE USED INLAY APPLICATION. DO NOT PLACE LANE LINES ON AN ASPHALT SEAM. ROLLING OF ALL THE MARKINGS SHOULD BE LENGTHWISE IN THE DIRECTION THEY WERE LAID. CROSSWALKS AND STOP BARS, INITIAL TAMPING WITH THE TAMPING CART IS RECOMMENDED USING 00 LBS. OF WEIGHT. USE COMPACTION ROLLER TO EMBED (INLAY) MARKINGS INTO PAVEMENT SURFACE. USE MINIMUM SPEED AND WATER ON ROLLER. DO NOT USE VIBRATOR. IF MARKING BUCKLES OR DISTORTS SEVERELY IN FRONT OF ROLLER, MAT TEMPERATURE OR ROLLER SPEED MAY BE TOO HIGH. CLEANING AND BEE THE MARKING MATERIAL CAN BE APPLIED. BITUMINOUS PAVEMENT SURFACES WHERE PAVEMENT MARKINGS CANNOT BE INLAID IN THE HOT MAT SHALL HAVE A RECESS GROUND IN THE PLACEMENT OF DURABLE REFLECTORIZED PAVEMENT MARKINGS. SEE CONTRUCTION SPECIFICATIONS. REMOVE ALL UNNECESSARY MATERIAL NOTES FROM TITLE SHEET. THIS SPACE MAY BE USED PERMANENT PAVEMENT MARKING TABULATIONS SHEET. 0-0 TYPICALS SYMBOLS & MATERIALS LEGEND CROSSWALK BLOCK PAVEMENT MESSAGE (LEFT ARROW) STRIPING KEY CIRCLE-EPOXY SQUARE-PREF TAPE OCTAGON-PREF THERMO TRIANGLE-PAINT ST DIGIT 2ND DIGIT 3RD DIGIT WIDTH PATTERN COLOR 4", 8", ETC. S - SOLID W - WHITE B - BROKEN Y - YELLOW T - DOTTED B - BLACK D - DOUBLE K - DOUBLE BROKEN H - DOUBLE DOTTED G=GROUND IN W=WET REFLECTIVE C=CONTRAST E=ENHANCED SKID RESISTANCE 4SW PREF THERMO EXAMPLE: = GROUND IN, CONTRAST, WET REFLECTIVE GCW I HEREBY CERTIFY THAT SHEETS 000 THROUGH 000 OF THIS PLAN WERE PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PRINT NAME: ENGR NAME HERE LICENSE # DATE: 0/8/206 SIGNATURE: DESIGNER TECH NAME HERE TITLE: PERMANENT PAVEMENT MARKING TITLE SHEET STATE PROJ. NO. 0000-000 (TH 000) SHEET NO. 000 OF 000 SHEETS

PAVEMENT MARKING TABULATION PMSamplePlan.typicals2 PLOTTED/REVISED:0/8/206 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn PAVEMENT MESSAGE PREF THERMO ESR LINE PAINT LINE EPOXY CROSSWALK EPOXY CROSSWALK PREF TAPE GR IN CROSSWALK PREF THERMO (WR) CROSSWALK PREF THERMO ESR GR IN CONT PAVEMENT MARKING REMOVAL PAVEMENT MARKING REMOVAL ITEM UNIT QUANTITY PAVEMENT MESSAGE PAINT PAVEMENT MESSAGE PAINT GR IN PAVEMENT MESSAGE EPOXY PAVEMENT MESSAGE EPOXY CONT PAVEMENT MESSAGE PREF TAPE PAVEMENT MESSAGE PREF TAPE GR IN (WR) PAVEMENT MESSAGE PREF THERMO 8" BROKEN LINE PAINT GR IN LINE PREF TAPE LINE PREF TAPE (GR-IN) LINE PREF TAPE (CONT) LINE PAINT (WR) LINE PAINT GR IN (WR) LINE EPOXY GR IN LINE EPOXY (WR) SOLID LINE EPOXY CONT SOLID LINE EPOXY GR IN CONT LINE PREF TAPE (WR) LINE PREF TAPE (WR) CONT LINE PREF THERMO GR IN LINE PREF THERMO GR IN CONT PAVEMENT MARKING SPECIAL PAVEMENT MARKING SPECIAL MOBILE RETROREFLECTOMETER MEASUREMENTS PERMANENT PAVEMENT MARKING TABULATIONS LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000)

TWO LANE, TWO WAY 5' TWO LANE, TWO WAY WITHOUT MARKINGS LESS THAN 400 ADT SIMULATING A SOLID LINE AND A BROKEN LINE (50 FOOT CYCLE) WITH TRPM'S 0' 0' 0' SIMULATING SOLID LINE PMSamplePlan.typicals3 PLOTTED/REVISED:0/8/206 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn EXISTING ZONE PASSING NO NO PASSING ZONE EXISTING MULTI-LANE, UNDIVIDED MULTI-LANE, DIVIDED 45' NO PASSING ZONE END STAKE 5' 45' 5' DO NOT PASS MARKER POST NO CARE WITH PASS PASSING ZONE EXISTING MileMaximum MileMaximum 7 7 MileMaximum MileMaximum EXISTING PASS WITH CARE DO NOT PASS ZONE PASSING NO MARKER POST SIMULATING BROKEN LINE (50 FOOT CYCLE) GENERAL NOTES: 0' 40' USING TRPM'S AS INTERIM PAVEMENT MARKING WHEN TRPM'S ARE USED TO SIMULATE A LINE THE FOLLOWING GUIDELINE APPLIES: SKIP STRIPE - USES 3 TRPM's PER 0' SKIP STRIPE ON 5' CENTERS WITH A 40' GAP SOLID LINE - USES TRPM'S ON 0' CENTERS ON TANGENTS, FLATTER GRADES AND CURVES UNDER 6 DEGREES. CURVES OVER 6 DEGREES AND STEEP GRADES, THIS SPACING SHALL BE REDUCED TO 5' CENTERS. SEE SPECIAL PROVISIONS INTERIM PAVEMENT MARKING GUIDELINES THESE INTERIM PAVEMENT MARKING GUIDELINES APPLY TO ALL TEMPORARY TRAFFIC CONTROL ZONES OF AT LEAST 300' IN LENGTH ON TANGENT AND ON CURVES OF 6 DEGREES OR GREATER.. 2. ALL PROJECTS GREATER THAN.25 MILES IN LENGTH, INTERIM SKIP STRIPE PAVEMENT MARKINGS SHALL USE THE SAME CYCLE LENGTH AS FINAL PAVEMENT MARKINGS () AND SHALL BE A MINIMUM OF 5' LENGTH. DOTTED LINE CYCLE SHALL BE 3' LINE 2' GAP UNLESS STATED OTHERWISE IN THE PLAN. ON PROJECTS GREATER THAN 300' IN LENGTH, BUT LESS THAN.25 MILES IN LENGTH, THE INTERIM MARKING SHALL MATCH THE CYCLE LENGTH AT EITHER END OF THE PROJECT. THE INTERIM STRIPE SHALL BE 5' IN LENGTH. DOTTED LINE CYCLE SHALL BE 3' LINE 2' GAP UNLESS STATED OTHERWISE IN THE PLAN. USING SIGNING AS INTERIM PAVEMENT MARKING EDGE OF DRIVING LANE ALL INTERIM MARKINGS SHALL BE PLACED PRIOR TO REMOVING LANE CLOSURE OR OPENING THE ROADWAY TO TRAFFIC. INTERIM PAVEMENT MARKINGS SHALL CONSIST OF CENTER LINE (INCLUDING NO-PASSING ZONES), PAINTED ISLAND (MINUS CROSSHATCHING), AND ALL LANE LINES (INCLUDING TURN LANE LINES). AND SHALL BE THE SAME WIDTH AS THE CORRESPONDING PERMANENT PAVEMENT MARKINGS. FINAL MARKINGS AND ALL OTHER PAVEMENT MARKINGS INCLUDING EDGELINES, CHANNELIZING LINES LANE, LANE REDUCTION TRANSITIONS, GORE MARKINGS AND OTHER LONGITUDIUAL MARKINGS AND THE VARIOUS NON-LONGITUDINAL MARKINGS (STOP LINES, RAIL ROAD CROSSING, CROSSWALKS, WORDS, SYMBOLS. ETC) SHOULD BE PLACED WITHIN 4 CALENDAR DAYS. WHEN FINAL MARKINGS ARE TO BE EPOXY AND PAINT IS USED INTERIM SOLID LINES, A 0 MIL THICK LAYER APPLICATION OF A WATER-BASED TRAFFIC MARKING PAINT SHALL BE USED. WITH A 0 MIL LAYER OF PAINT APPLIED, BEADS SHOULD BE APPLIED AT A RATE OF 6 LBS/GAL. REMOVAL OF THE 0 MIL LAYER OF PAINT IS NOT REQUIRED PRIOR TO PLACING THE EPOXY. ON LOW VOLUME ROADS WITH AN ADT (AVERAGE DAILY TRAFFIC) OF LESS THAN 400 VEHICLES, THE SIGNS MAY BE USED IN LIEU OF PAVEMENT MARKINGS UP TO 4 CALENDAR DAYS (SEE SECTION 5A. OF THE MMUTCD) OR AS DIRECTED BY THE PROJECT ENGINEER. 45'. 2. IF NO INTERIM MARKINGS ARE USED A "NO CENTER STRIPE" SIGN (W8-2) SHALL BE USED EACH DIRECTION OF TRAVEL. THIS SIGN SHALL BE REPEATED AT MAJOR INTERSECTIONS OR ONE MILE INTERVALS, WHICHEVER IS GREATER. IF NOT ALREADY IN PLACE, A "DO NOT PASS" SIGN (R4-) SHALL BE PLACED ON THE RIGHT SIDE OF THE ROAD AT THE BEGINNING OF THE ZONE OPPOSITE OF THE "NO PASSING ZONE" SIGN (W4-3) INTERIM PAVEMENT MARKINGS PUBLISHED BY OTST: 4 OCT 206 CHECKED BY: XXX LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000) SHEET NO. 000 OF 000 SHEETS

DOTTED AND CHANNELIZING LINE APPLICATIONS EXIT RAMP WITH TAPERED DECELERATION LANE DOTTED AND CHANNELIZING LINE APPLICATIONS EXIT RAMP WITH PARALLEL DECELERATION LANE PMSamplePlan.typicals4 PLOTTED/REVISED:0/8/206 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn 4" DOTTED WHITE LANE LINE IS OPTIONAL IN THE DECELERATION LANE TAPER. 2 (OPTIONAL) SEE "CROSSHATCHING" TYPICAL DESIGN AND PLACEMENT OF CROSSHATCHING. 4" DOTTED WHITE LANE LINE IS OPTIONAL IN THE DECELERATION LANE TAPER. 4" DOTTED (VARIABLE LENGTH) 2 (OPTIONAL) SEE "CROSSHATCHING" TYPICAL DESIGN AND PLACEMENT OF CROSSHATCHING. PUBLISHED BY OTST: 20 NOV 205 MODIFIED: PUBLISHED BY OTST: 20 NOV 205 MODIFIED: LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000)

MARKINGS PEDESTRIAN CROSSWALKS STOP LINE AT UNSIGNALIZED MID BLOCK CROSSWALKS PMSamplePlan.typicals5 PLOTTED/REVISED:0/8/206 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn SEE "MARKINGS PEDESTRIAN CROSSWALKS" TYPICAL PLACEMENT AND DIMENSIONS OF CROSSWALKS. ALTERNATE ALTERNATE (L) (W) (S) (W) (S) WIDTH OF WIDTH OF WIDTH OF NOTE: WIDTH OF WIDTH OF INSIDE LANE PAINTED AREA SPACE PAINTED AREA SPACE SIGN LOCATION. 9' 2.0' 2.5' 0' 2.5' 2.5' 2.0' ' 2.5' 3.0' 2.0' 2' 3.0' 3.0' 2.5' 3' 3.0' 3.5' (SEE NOTE 2).5' MINIMUM.5' MINIMUM (SEE NOTE 2) L S W L H H (SEE NOTE 7) (SEE NOTE 7) NOTES:. PAINTED AREAS TO BE CENTERED ON CENTERLINE AND LANE LINES. 2. A MINIMUM OF.5 FT. CLEAR DISTANCE SHALL BE LEFT ADJACENT TO THE CURB FACE. IF LAST PAINTED AREA FALLS INTO THIS DISTANCE IT MUST BE OMITTED. 3. ON TWO LANE TWO WAY STREETS, USE SPACING SHOWN AN FT. INSIDE LANE. 4. DIVIDED ROADWAYS, ADJUSTMENTS IN SPACING OF THE BLOCKS SHOULD BE MADE IN THE MEDIAN SO THAT THE BLOCKS ARE MAINTAINED IN THEIR PROPER LOCATION ACROSS THE TRAVELED PORTION OF THE ROADWAY. 5. AT SKEWED CROSSWALKS, THE BLOCKS ARE TO REMAIN PARALLEL TO THE LANE LINES AS SHOWN. 6. THE BLOCKS SHALL BE PLACED SO THAT THEY ARE NOT LOCATED IN THE WHEEL PATH OF THE VEHICLES. 2 7. THE BLOCKS SHALL BE A MINIMUM OF 6' LONG AND AT LEAST AS LONG AS THE TRUNCATED DOMES, FANNED TRUNCATED DOMES THE BLOCKS SHALL BE AT LEAST AS LONG AS THE APPROACHING SIDEWALK OR SHARED USE PATH. 8. THE ALTERNATE (W) AND (S) MAY BE USED WHEN BLOCKS LONGER THAN 6' (H) ARE USED. 3.0' 3.5' 3.5' 20' TO HERE TWO-WAY ROADWAY ONE-WAY ROADWAY 2 20' TO 20' TO HERE HERE HERE 2 PUBLISHED BY OTST: 20 NOV 205 MODIFIED: PUBLISHED BY OTST: 20 NOV 205 MODIFIED: LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000)

AREA = 5 SQ' AREA = 5 SQ' AREA = 5 SQ' AREA = 5 SQ' AREA = 5 SQ' STOP LINE AND "STOP AHEAD" APPLICATION OF AUXILIARY LANE-DROP MORE THAN MILE BETWEEN INTERSECTIONS PMSamplePlan.typicals6 PLOTTED/REVISED:0/8/206 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn NOTE: SIGN LOCATION. 2 STOP AHEAD 40' STOP 8' LETTERS 00' DESIGNER"S NOTES:. DO NOT PLACE A STOP AHEAD PAVEMENT MESSAGE IF THE INTERSECTION HAS ADEQUATE LIGHTING. 2. 3. PLACE ONE SET OF STOP AHEAD PAVEMENT MESSAGES. IF A STOP AHEAD SIGN NEEDS TO BE PLACED MORE THAN 000 FT FROM THE STOP SIGN, CONTACT THE DISTRICT TRAFFIC ENGINEER TO DETERMINE IF, WHERE, A SECOND SET OF "STOP AHEAD" PAVEMENT MESSAGES SHOULD BE PLACED. THE STOP LINE SHOULD ORDINARILY BE PLACED 4 FT IN ADVANCE OF AND PERPENDICULAR TO THE NEAREST CROSSWALK LINE. IN THE ABSENCE OF A MARKED CROSSWALK, THE STOP LINE SHOULD BE PLACED AT THE DESIRED STOPPING POINT, AND IN NO CASE NO MORE THAN 30 FT OR LESS THEN 4 FT FROM THE NEAREST EDGE OF THE INTERSECTING CURB LINE OR THE NEAR EDGE OF THE THRU LANE. 4. IF A STOP LINE IS USED IN CONJUNCTION WITH A STOP SIGN, IT SHOULD SEE "TURN LANE WITH ARROW MESSAGE, ORDINARILY BE PLACED IN LINE WITH THE STOP SIGN. HOWEVER, IF THE SIGN OR WITH DOTTED LINE EXTENSION" TYPICALS CANNOT BE LOCATED EXACTLY WHERE VEHICLES ARE EXPECTED TO STOP. THE PLACEMENT AND NUMBER OF ARROWS OR STOP LINE SHOULD BE PLACED AT THE STOPPING POINT. OPTIONAL LANE LINE EXTENSIONS. 5. USE TABLE 7.4 IN THE (TEM) TO DETERMINE THE MINIMUM LENGTH (MNMUTCD SECTION 3B.20) OF A NO PASSING ZONE IN ADVANCE OF A STOP CONDITION. 6. PAY STOP LINE AS 2 LINE. TURN ARROWS REQUIRED, "" PAVEMENT MESSAGE RECOMMENDED. MNMUTCD 3B.20 PLACE "" PAVEMENT MESSAGE EQUAL DISTANCE BETWEEN TURN ARROWS * * * * * * * * * * * (PAVEMENT MESSAGE) VARIABLE LENGTH VARIABLE LENGTH MORE THAN MILE PUBLISHED BY OTST: 20 NOV 205 MODIFIED: PUBLISHED BY OTST: 4 OCT 206 MODIFIED: LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000)

PMSamplePlan.typicals7 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn AREA = 5 SQ' REM SQ = 48 ' SQ' AREA = 5 = 30 ' PERIMETER AREA = 5 SQ' REM = SQ 48 ' = 5 SQ' AREA AREA 5 SQ' = = 30 ' PERIMETER AREA = 5 SQ' 48 ' REM = SQ PLOTTED/REVISED:0/8/206 TWO-WAY LEFT-TURN LANE A * 00' MINIMUM MINIMUM SINGLE-DIRECTION LEFT-TURN ARROWS SHALL NOT BE USED IN LANES BORDERED ON BOTH SIDES BY TWO-WAY LEFT TURN LANE MARKINGS. * INSERT SPACING SPACING, BASED ON BASED FIELD ON CONDITIONS FIELD CONDITIONS. SEE "TURN LANE MESSAGE WITH ARROW PLACEMENT" MESSAGE, OR TYPICAL WITH DOTTED NUMBER LINE AND EXTENSION" PLACEMENT TYPICALS OF ARROWS. PLACEMENT AND NUMBER OF ARROWS OR OPTIONAL LANE LINE EXTENSIONS. (MNMUTCD SECTION 3B.20) USE 6" EDGE LINES ON 2-LANE 2-WAY RURAL TYPE ROADWAYS WITH OUT RUMBLES. 2 CONTACT TRAFFIC ENGINEER NO PASSING ZONE SURVEY. LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000) MAJOR CROSS STREET MINOR CROSS STREET TWO-LANE, TWO-WAY 8'-6' A LANE WIDTH 2' LANE 2' LANE 2" +/- " 2" +/- " OR BROKEN SECTION B-B 4" SPACING 4" 4" SECTION A-A TWO WAY LEFT TURN LANE PUBLISHED BY OTST: 4 OCT 206 MODIFIED: PUBLISHED BY OTST: 4 OCT 206 MODIFIED: CYCLE 40' 0' B 2 C L B - LEFT EDGE 2" RIGHT OF C L IN DIRECTION OF STRIPER TRAVEL C L

FOUR-LANE DIVIDED LANE BYPASS LANE PMSamplePlan.typicals8 PLOTTED/REVISED:0/8/206 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn THRU LANE SHLD. 2" +/- " SHLD. C L C L THRU THRU LANE LANE VARIABLE WIDTH MEDIAN SHLD. SHLD. 2" +/- " 2" +/- " 2" +/- " 2" +/- " SECTION A-A FOUR LANES CYCLE 40' A 0' MEDIAN A THRU LANE 2" +/- " 2" +/- " SHLD. * * * SHLD. OF RADIUS BEGIN LINE AT END BEGIN LINE AT END OF RADIUS NO PASSING ZONE STRIPING IS OPTIONAL AT THE DISCRETION OF THE DISTRICT TRAFFIC ENGINEER RURAL INTERSECTIONS. NO PASSING ZONES AT INTERSECTIONS SHALL BE STRIPED 500 FT ON BOTH SIDES OF THE INTERSECTION IF IT IS LOCATED WITHIN THE CITY LIMITS. NO PASSING ZONES AT INTERSECTIONS SHALL BE STRIPED IF LOCATED WITHIN ANY NO PASSING ZONE. SEE "TURN LANE MESSAGE PLACEMENT" TYPICAL PLACEMENT AND NUMBER OF ARROWS OR OPTIONAL LANE LINE EXTENSIONS. (MNMUTCD SECTION 3B.20) MAY USE 6" EDGE LINES ON 2-LANE 2-WAY RURAL TYPE ROADWAYS WITH OUT RUMBLES. PUBLISHED BY OTST: 20 NOV 205 MODIFIED: PUBLISHED BY OTST: 20 NOV 205 MODIFIED: LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000)

TURN LANE ARROW MESSAGE UNDIVIDED ROADWAY TRANSITION NOTE: PMSamplePlan.typicals9 PLOTTED/REVISED:0/8/206 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn LEFT TURN LANE RIGHT TURN LANE TURN LANE THRU LANE THRU LANE TURN LANE OR SOLID OR SOLID LINE 2" +/- " 2" +/- " 2" +/- " 2" +/- " 2" +/- " /2 "L" "L" 200' OR LESS 20' USE 6" EDGE LINES ON 2-LANE 2-WAY RURAL TYPE ROADWAYS WITH OUT RUMBLES. CONTINUE 4" OR 6" EDGE LINE THROUGH THE TURN LANE EDGE LINE. REFER TO (MNMUTCD SECTION 3B.20) TURN LANE ARROW OR LINE EXTENSION OPTIONS. 30' - 80' OVER 200' 30' - 80' 20' 2" +/- " 500' MINIMUM SOLID YELLOW LINE * * * * SIGN LOCATION. 500' MINIMUM SOLID YELLOW LINE 2' IF THE DISTANCE BETWEEN THE BEGINNING OF THE * PLACE TRANSITION ARROWS LANE REDUCTION TRANSITION SOLID IS LESS THAN THE DISTANCES ADJACENT TO LANE ARROWS ARE OPTIONAL IN TABLE 7.5 FROM THE END OF A PRECEDING REDUCTION SIGNS. REFER TO SPEEDS LESS THAN 45 MPH. SOLID IN THE SAME LANE, THE SOLID SIGNING TYPICALS SIGN MAY USE 6" EDGE LINES ON NOTE: LINE SHALL BE EXTENDED BETWEEN THEM. DETAILS AND PLACEMENT. 2-LANE 2-WAY RURAL TYPE END PAVEMENT MARKINGS AT ROADWAYS WITH OUT BEGINNING OF RADIUS RUMBLES. PUBLISHED BY OTST: 20 NOV 205 MODIFIED: PUBLISHED BY OTST: 20 NOV 205 MODIFIED: LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000)

PMSamplePlan.typicals0 PLOTTED/REVISED:0/8/206 PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn FREEWAY AND EXPRESSWAY AUXILIARY LANE BETWEEN RAMPS WITH ESCAPE LANE APPLICATION ESCAPE LANE TO END 2' LANE 2' LANE 2' LANE MEDIAN, DRIVERS LEFT 2" +/- " 2" +/- " 2" +/- " 3 OF TAPER FREEWAY AND EXPRESSWAY AUXILIARY LANE /2 TO MILE IN LENGTH BETWEEN RAMPS WITHOUT ESCAPE LANE APPLICATION 2 200' - 000' EXTEND MIN. BEYOND THE 3 EXTEND 200' TO 000' FROM GORE AREA TO COMPENSATE SHARP CURVATURE. INTERSECTION OF GORE STRIPES, DEPENDING ON LENGTH OF LANE BEING DROPPED, AS DETERMINED BY EXTEND MIN. BEYOND THE 2 EXTEND 200' TO 300' AT DISTRICT TRAFFIC ENGINEER. GORE AREA TO COMPENSATE SHARP CURVATURE. DISCRETION OF DISTRICT TRAFFIC ENGINEER. ON CURVATURE OR OTHER SITUATIONS WHERE NEEDED ON PAVEMENTS OVER 24' WIDE (I.E. 27' ) EDGE LINES ON PAVEMENTS OVER 24' WIDE (I.E. 27' ) EDGE LINES BETTER DELINEATION. WILL BE PLACED SO LANES ARE A MAXIMUM OF 2' WIDE. WILL BE PLACED SO LANES ARE A MAXIMUM OF 2' WIDE. 2' LANE MEDIAN, DRIVERS LEFT 2' LANE 2' LANE 2" +/- " 2" +/- " 2" +/- " PUBLISHED BY OTST: 20 NOV 205 MODIFIED: PUBLISHED BY OTST: 20 NOV 205 MODIFIED: LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000)

PMSamplePlan.typicals PATH & FILENAME: IP_PWP:d89609\PMSamplePlan.dgn PLOTTED/REVISED:0/8/206 LIC. NO. DATE 0/8/206 STATE PROJ. NO. 0000-000 (TH 000)