DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights

Similar documents
ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road. Closed due to bridge down. Road is open to local traffic only.

Alligator Harvest Unit Maps

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

2012 PRIORITY TRANSPORTATION PROJECTS

Technical Advisory Committee (TAC)

Panther ID Age Sex Cause of Death County Location. intraspecific aggression

LIST OF PRIORITY PROJECTS

LIST OF PRIORITY PROJECTS 2020/ /35

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

UNFUNDED PRIORITY PROJECTS

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report

PRESENTATION OUTLINE

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

Financial Project ID No(s).: and ETDM No(s).: and 14181

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Okeechobee Waterway Speed Restrictions

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

INTERSECTION CONTROL NOVEMBER 2018

2008 Florida Alligator Hunting Survey Report

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA

Mobility Plan Status Report 2012 Average Annual Daily Traffic

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

Each of the Primary PSAPs are under the management of the respective Chief of Police or Sheriff.

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

FDOT Treasure Coast Traffic Report

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Chapter 5. Financial Analysis

DEPARTMENT OF REVENUE Property Tax Oversight 2008 Taxable Value of Real Property by Category Part 1

DEPARTMENT OF REVENUE Property Tax Oversight 2009 Taxable Value of Real Property by Category - Part 1

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2023

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Traffic Safety Study Report City Wide Intersection Study City of Coconut Creek Broward County, Florida

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

Florida Department of Transportation

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

FDOT Treasure Coast Traffic Report

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

ITEM NUMBER: PROJECT DESCRIPTION:SR 8 (I-10) FROM W OF SR 10 (US 90) TO OCHLOCKONEE RIVER BR. *SIS*

CITY OF SOUTH DAYTONA

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

Florida Department of Transportation MIKE DEW SECRETARY

COMMITTED TOTAL 9,518,714 5,167, ,800 15,185,405 BALANCE (2,486,243) 6,751, ,256 5,082,514

Public Involvement Kickoff Meeting. April 29, 2015

Palm Beach MPO Complete Streets Working Group

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FDOT Treasure Coast Traffic Impact Report

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2024

2. TRANSPORTATION ELEMENT.

Single Point of Contacts for the Release of Children s Foster Care Records

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

Palm Beach MPO Complete Streets Policy

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

::~-~ w ANNUAL LIST OF PALM BEACH MPO PRIORITY PROJECTS FY Adopted July 20, '"',, - ==~"'c;;f'";~":?:'!""

Culpeper District. Albemarle County Monthly Report October, 2011

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

FM #: ETDM #: 11241

General Interest Highway Statistics Source Book

0 / FEMA-4337-DR-FL Geospatial Information Unit (GIU)

HERBERT HOOVER DIKE REHABILITATION PROJECT

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016

2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017

FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

VIII. Project Prioritization & Implementation

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FEMA-4337-DR-FL Geospatial Information Unit (GIU)

339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway

FEMA-4337-DR-FL Geospatial Information Unit (GIU)

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

7.0 Preferred Alternative with Service Road Concept

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

Jean Byers Award for Excellence in Cancer Registration

Registry of Certified Court Interpreters Haitian Creole Language

Design Traffic Technical Memorandum

Chapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0

Transcription:

DeSoto County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights DeSoto Map ID 1 Project Description SR 70 over Joshua Creek - Bridge #040027 Bridge - Repair / Rehabilitation 21/22 Project Status PD&E / ENV PE ROW CST 2 CR 761 Bridge - Scour Countermeasures Bridge - Repair / Rehabilitation 18/19 3 4 5 American Legion Drive over Peace River - Bridge - Repair / Rehabilitation 18/19 19/20 Bridge #049001 Reynolds Street Bridge over Hawthorne Bridge Replacement 18/19 Creek Turner Avenue at AT Roan St / Gibson St Intersection Improvement 18/19 Improvements 6 US 17 NE Livingston Avenue Intersection Improvement 21/22 7 SR 31 Extension from SR 70 to US 17 New Road Construction 22/23 8 9 Kings Highway (CR 769) from Charlotte C/L to Peace River St SW Hull Avenue from SW Senate St to US 17 PE for Future Capacity Improvement 21/22 20/21 10 SR 70 from Peace River to Hickory St 21/22 11 12 13 SE Durrance Street from Airport Rd to SR 31 19/20 SW Senate Street from US 17 to Grape Av 19/20 Hillsborough Avenue from Fletcher St to Adel St 19/20 Snapshot Date 10/06/2017 Phase Codes: PD&E - Project Development and Enviroment ENV - Environmental PE - Preliminary Engineering ROW - Right of Way CST - Construction

HRTPO - DeSoto County FDOT Draft Tentative Work Program (FY 2019/20) ZOLFO SPRINGS 66 17 HARDEE COUNTY DESOTO COUNTY 17 70 72 72 ARCADIA ( 6 ( 3 ( 5 ( 7 ( 10 ( 13 ( 11 ( 4 35 ( 1 70 HIGHLANDS COUNTY ( 9 35 31 17 ( 2 ( 12 ( 8 I Miles 0 2.25 4.5 9 Legend HRTPO Counties City Limits Regionally Significant Roadways Draft TWP Projects Capacity Intersection Bridge ( # Project (Map ID) Heartland Regional TPO 555 E Church Street, Bartow, FL 33830 863-534-7130 heartlandregionaltpo.org Data Source: FDOT District 1 Snapshot 10-6-2017 Document Path: D:\Projects\Heartland_TPO\Tentative_Work_Plan\DTWP_Oct2017\DTWP19-20_DeSoto_103117.mxd

Glades County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights Glades Map ID Project Status PD&E / ENV PE ROW CST 1 SR 78 from US 27 to Bananna Grove Rd 19/20 20/21 2 CR 721 from Bullhead Grade Rd to Highlands C/L 19/20 3 4 Project CR 721 from S Tucker Ridge Road to Bullhead Grade Rd SR 78 from Bananna Grove Rd to Herbert Hoover Bridge Description 20/21 19/20 20/21 5 US 27 from 5th Street to N of SR 78 18/19 18/19 6 US 27 at SR 78 Reconstruct 20/21 7 CR 74 from 2.5 miles E of Firetower to SR 29 Widen and 18-19 Snapshot Date 10/06/2017 Phase Codes: PD&E - Project Development and Enviroment ENV - Environmental PE - Preliminary Engineering ROW - Right of Way CST - Construction

HRTPO - Glades County FDOT Draft Tentative Work Program (FY 2019/20) Lake Istokpoga 98 700 700 98 LAKE PLACID 70 27 25 70 70 98 OKEECHOBEE ( 2 78 ( 3 HIGHLANDS COUNTY GLADES COUNTY 78 ( 7 ( 4 Lake Ok 27 ( 1 29 78 25 ( 5 78 ( 6 MOORE HAVEN 29 80 80 80 25 27 80 LA BELLE CLEWISTON 80 27 29 I Miles 0 2.5 5 10 HENDRY COUNTY Legend HRTPO Counties City Limits Draft TWP Projects Intersection ( # Project (Map ID) Heartland Regional TPO 555 E Church Street, Bartow, FL 33830 863-534-7130 heartlandregionaltpo.org Regionally Significant Roadways Data Source: FDOT District 1 Snapshot 10-6-2017 Document Path: D:\Projects\Heartland_TPO\Tentative_Work_Plan\DTWP_Oct2017\DTWP19-20_Glades_103117.mxd

Hardee Map ID 1 CR 664 - Bridge #060034 over Little Payne Creek Hardee County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights Project Description Project Status PD&E / ENV PE ROW CST Bridge replacement 18-20 19/20 21/22 2 Heard Bridge Road - Bridge #060017 Bridge PD&E / EMO Study 22/23 3 Parnell Road - Bridge #064034 Bridge PD&E / EMO Study 22/23 4 SR 64 at Griffin Road Intersection PD&E / EMO Study 22/23 5 Polk Road from SR 62 to Florida Ave 20/21 6 SR 64 from Main Street to Brandtwood Dr 21/22 7 South Hammock Road from SR 66 to Highlands C/L 20/21 8 SR 636 from US 17 to SR 64 21/22 9 CR 663 from SR 64 to SR 62 19/20 10 Bertha Fulse Street from Myrick Ave to MLK Drive Widen and 18/19 11 Jones Street from Byran Ave to Starke Ave Widen and 18/19 12 Townsend Street from Florida Ave to Heard Bridge Rd Widen and 18/19 13 Fair Avenue from Grove St to Main St Widen and 18/19 14 Church Street from Jones St to Grape St Widen and 18/19 Snapshot Date 10/06/2017 Phase Codes: PD&E - Project Development and Enviroment ENV - Environmental PE - Preliminary Engineering ROW - Right of Way CST - Construction

HRTPO - Hardee County FDOT Draft Tentative Work Program (FY 2019/20) 17 35 98 27 98 62 37 ( 1 62 ( 10 ( ( 11 13 ( 14 BOWLING GREEN 35 17 64 ( 5 ( 2 64 ( 9 WAUCHULA ( 12 ( 8 636 ( 4 64 64 ( 6 ZOLFO SPRINGS 66 ( 3 ( 7 17 35 66 HARDEE COUNTY DESOTO COUNTY 70 17 35 70 ARCADIA I 72 Miles 0 2.5 5 10 31 70 70 Legend HRTPO Counties City Limits Regionally Significant Roadways Draft TWP Projects Intersection Bridge ( # Project (Map ID) Heartland Regional TPO 555 E Church Street, Bartow, FL 33830 863-534-7130 heartlandregionaltpo.org Data Source: FDOT District 1 Snapshot 10-6-2017 Document Path: D:\Projects\Heartland_TPO\Tentative_Work_Plan\DTWP_Oct2017\DTWP19-20_Hardee_103117.mxd

Hendry County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights Hendry Map ID Project Description Project Status PD&E / ENV PE ROW CST 1 SR 29 from F Rd to Cowboy Way Add lanes and Reconstruct 19-21 18-20 2 SR 29 from Keri Rd to F Rd Add lanes and Reconstruct 22/23 22/23 3 SR 29 from Cowboy Way to Whidden Rd Add lanes and Reconstruct 20/21;22/23 21-23 4 Helms Road Extension from SR 29 to SR 80 Add lanes and Reconstruct 18/19 5 LaBelle Draw Bridge #070033 over Caloosahatchee River Bridge Rehab and repair Contract Incentives - 18/19 6 SR 80 from Lee C/L to Grandma's Grove RV Resort 20/21 21/22 7 SR 80 from N of Bee Creek to N of Fort Thompson Ave 18/19 18/19 8 Cowboy Way from SR 80 to Bridge Street 19/20 9 CR 835 from 9.1 Miles S of US 27 to 7.7 Miles S of US 27 20/21 10 CR 835 from Obern Rd to KT Grove Rd Widen and 21/22 11 Fort Denaud Road from SR 80 to Fort Denaud Bridge Way Widen and 18/19 12 CR 78 from Kirby Thompson Rd to Fort Denaud Bridge Way Widen and 18/19 Snapshot Date 10/06/2017 Phase Codes: PD&E - Project Development and Enviroment ENV - Environmental PE - Preliminary Engineering ROW - Right of Way CST - Construction

HRTPO - Hendry County FDOT Draft Tentative Work Program (FY 2019/20) 27 78 Lake Okeechobee 25 29 27 78 MOORE HAVEN 78 80 ( ( ( 5 7 3 80 25 80 ( 12 ( 27 8 ( 11 ( 4 LA BELLE 80 ( ( 6 1 CLEWISTON 25 29 ( 9 ( 2 HENDRY COUNTY 82 82 82 ( 10 29 I Miles 0 2.5 5 10 Legend HRTPO Counties City Limits Regionally Significant Roadways Draft TWP Projects Capacity ( # Project (Map ID) Heartland Regional TPO 555 E Church Street, Bartow, FL 33830 863-534-7130 heartlandregionaltpo.org Bridge Data Source: FDOT District 1 Snapshot 10-6-2017 Document Path: D:\Projects\Heartland_TPO\Tentative_Work_Plan\DTWP_Oct2017\DTWP19-20_Hendry_103117.mxd

Highlands County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights Project Status Highlands Project Description PD&E / Map ID ENV PE ROW CST 1 US 98 from US 27 to Airport Rd Add Lanes and Reconstruct 18/19 21-23 2 US 27 at east Phoenix St Add Turn lanes 18/19 3 SR 17 at Arbuckle Creek Rd Add Turn lanes 18/19 4 US 27 at Sun 'N Lake Blvd Add Turn lanes 22/23 5 SR 17 at CR 17A Add Turn lanes 19/20 6 SR 66 at Payne Rd Add Turn lanes 18/19 7 US 98 at Arbuckle Creek Rd Add Turn lanes 19/20 21/22 8 SR 66 at Orange Blossom Blvd Add Turn lanes 18/19 9 SR 17 at Manatee Dr Add Turn lanes 18/19 19/20 10 US 27 at Lake Mirror Intersection Improvement 19/20 21/22 11 US 27 at SR 66 Intersection Improvement 22/23 12 US 27 at SR 70 Intersection Improvement 21/22 13 US 27 at Northwood Intersection Improvement 19/20 21/22 14 US 27 at SR 64 Intersection Improvement Contract Incentives - 19/20 15 SR 25 from Cloverleaf Rd to SR 66 19/20 20/21 16 US 27 from Glades C/L to S of Horn Rd 20/21 17 US 27 from SR 66 to Highlands Ave 19/20 20/21 18 Kenilworth Boulevard from Haywood Taylor Blvd to Mini Ranch Rd 18/19 19 W Stryker Road from N Olivia Dr to US 27 18/19 20 CR 64 from S Angelo Lake Rd to E Butler Rd 21/22 21 Heron Street from Hammock Rd to Howey Rd Widen and 18/19 Adaptive Signal System on US 27 from N/A Highlands Ave to Sebring Pkwy Adaptive Signal System 19/20 18/19 20/21 Snapshot Date 10/06/2017 Phase Codes: PD&E - Project Development and Enviroment ENV - Environmental PE - Preliminary Engineering ROW - Right of Way CST - Construction

HRTPO - Highlands County FDOT Draft Tentative Work Program (FY 2019/20) 27 98 25 64 ( 19 ( 14 AVON PARK 64 17 ( 5 ( 20 98 ( 4 ( 13 27 ( 3 ( 9 SEBRING OKEECHOBEE COUNTY 700 17 17 ( 21 66 66 ( 6 ( 8 ( 17 ( 11 ( 18 ( 1 ( 7 98 700 ( 15 700 98 ( 2 LAKE PLACID ( 10 27 25 70 70 ( 12 70 OK HIGHLANDS COUNTY ( 16 GLADES COUNTY I Miles 0 2.25 4.5 9 27 25 78 78 Legend HRTPO Counties City Limits Regionally Significant Roadways Draft TWP Projects Capacity Intersection ( # Project (Map ID) Heartland Regional TPO 555 E Church Street, Bartow, FL 33830 863-534-7130 heartlandregionaltpo.org Data Source: FDOT District 1 Snapshot 10-6-2017 Document Path: D:\Projects\Heartland_TPO\Tentative_Work_Plan\DTWP_Oct2017\DTWP19-20_Highlands_103117.mxd

Okeechobee County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights Okeechobee Map ID Project Status PD&E /ENV PE ROW CST 1 US 441 from 4th St to 9th St 19-21 20/21 2 US 98 / US 441 at SE 18th Terrace Intersection (Roundabout) 18/19 20/21 SR 710 from L-63 Canal to to Sherman Wood 3 Add lanes and Reconstruct 22/23 Ranches 4 Lofton Road from Kissimmee River to US 98 and Widen 21/22 5 SR 710 from Sherman Wood Ranches to Martin C/L Add lanes and Reconstruct 21/22 6 SR 710 from US 441 to L-63 Canal New Road Construction 18-21 7 US 98 N of NW 80TH Ave to US 98 21/22 8 US 441from S of NE 304th Street to Osceola C/L 18/19 9 SR 710 from W of SE 48th Street to W of SE 67th Way 18/19 10 SW 5th Ave from Park Street to S of Central Elementary Widen and 18/19 11 US 441 at NE 102ND St Add turn lanes 18/19 18/19 Snapshot Date 10/06/2017 Project Description Phase Codes: PD&E - Project Development and Environment ENV - Environmental PE - Preliminary Engineering ROW - Right of Way CST - Construction

HRTPO - Okeechobee County FDOT Draft Tentative Work Program (FY 2019/20) 441 60 (8 OKEECHOBEE COUNTY 91 91 441 15 700 98 Lake Istokpoga (4 11 ( 700 70 98 70 (7 (1 (6 98 OKEECHOBEE 70 ( 98 441 78 (3 10 ( 2 (9 15 5 ( 710 441 GLADES COUNTY 710 15 98 441 78 700 Lake Okeechobee I 0 2.5 5 76 Miles 10 Legend HRTPO Counties Draft TWP Projects City Limits Capacity Regionally Significant Roadways Intersection (# Project (Map ID) Heartland Regional TPO 555 E Church Street, Bartow, FL 33830 863-534-7130 heartlandregionaltpo.org Data Source: FDOT District 1 Snapshot 10-6-2017 Document Path: D:\Projects\Heartland_TPO\Tentative_Work_Plan\DTWP_Oct2017\DTWP19-20_Okeechobee_103117.mxd