1. The well has been shut in on a kick and the kill operation has not started.

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper


DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

Deepwater Horizon Incident Internal Investigation

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

IWCF Equipment Sample Questions (Surface Stack)

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40)

NORSOK STANDARD D-002 Edition 2 (2013)

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10)

August 21, Deepwater MPD / PMCD

RIG CAPABILITIES For Multi Well/Pad Development

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

BLACK HILLS PLATEAU PRODUCTION COMPANY

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

BP SIT Testing Franks Facility Lafayette

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Hard or Soft Shut-in : Which is the Best Approach?

RPSEA UDW Forum June 22 & 23, Secure Energy for America

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Chapter 4 Key Findings. 4 Key Findings

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

SUBSEA KILL SHEET EXERCISE No. 5

Extended leak off testing

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

Subsea Safety Systems

Why Do Not Disturb Is a Safety Message for Well Integrity

Worked Questions and Answers

ENGINEERING + SERVICES INSPECTION, MAINTENANCE + RECERTIFICATION (IMR)

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

B.R.O. Basketball Return Optimizer. Electrical & Computer Engineering

SIDT 2017 XXII SEMINARIO SCIENTIFICO DELLA SOCIETÀ ITALIANA DOCENTI DI TRASPORTI

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Practice Exam IADC WellSharp Driller and Supervisor

APPLYING VARIABLE SPEED PRESSURE LIMITING CONTROL DRIVER FIRE PUMPS. SEC Project No

Perforation Techniques in brown fields for Production optimization.

Wellhead Compressor Installation on Liquid Loaded Gas Wells in Sicily: A summary of results and best practices

HYDRAULIC CYLINDER TEST

BaraShield -664 LCM Standard Field Application Procedure

The Past. The Present. The Future. Objective of turf manager High quality appearance of turf Complementing the surrounding environment.

TECHNICAL DATA. Q = C v P S

The Cyclone Tire Deflation & Inflation Tool

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

The Developing Design of the Blowout Preventer in Deep Water

Engineered solutions for complex pressure situations

IPTC Introduction

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content

SUBJECT: Board Approval: 4/29/04

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

Post Job Summary Cement Intermediate Casing

MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells.

Wellhead Compression A proven deliquification method for marginal gas wells

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

Blocking time reduction for level crossings using the genetic algorithm

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT

The Path to LUBRICATION EXCELLENCE

Lesson 3: Which fish should I eat?

Chapter 5: Methods and Philosophy of Statistical Process Control

Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

S-CO 2 Brayton Recompression Loop Design and Control

5k Slickline Lightweight Pressure Control Equipment 4 ID

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

12 SAND MEDIA FILTERS

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Eliminating Fatal Risks. Dale Bradford Drilling Superintendent

THE COMPACT LINE. Mobile power packs in convincing BAUER quality l/min 225 / 330 bar TOUGH RELIABLE WELL ESTABLISHED

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

Sullair Air Systems. *Assessment of the market for compressed air efficiency services. Technical report, U.S. Department of Energy, June 2001

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

Drilling Equipment Services

OIL & GAS DRILLING PROGRAM

Drilling Efficiency Utilizing Coriolis Flow Technology

DB Bridge Plug. Features. Benefits. Applications

21700 Nordhoff St. Chatsworth, CA Phone

INTEROFFICE MEMORANDUM MODIFICATIONS TO DEW POINT CONTROL PROCESS

DRILLING HOSE SOLUTIONS

APPENDIX A1 - Drilling and completion work programme

Risk Management Qualitatively on Railway Signal System

The Diagnosis of Well Control Complications during Managed Pressure Drilling

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

COMPRESSED AIR DISTRIBUTION SYSTEMS

Beaver Creek Madison Reservoir Management and Conformance

Study Proposal for the Batu Berhenti Light Buoy

MAKES A DIFFERENCE SANDVIK PARTS EVOLUTION

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

COMPRESSED AIR TEXTILES ENERGY EFFICIENCY

Energy Drilling Prospects

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

SRL Series. Oil-less Scroll Air Compressors. Pharmaceutical. Research & Development. Food & Beverage. Chemical. Electronic

Transcription:

BOP Testing Best Practices Ocean Endeavor and Ocean Baroness Andrew Hunter and Derek Ridgway Updated 12/21/08 NYSE: DVN www.devonenergy.com page 1

Background & Scope Excessive BOP testing times on Ocean Baroness Consistent performance on Ocean Endeavor What are we doing differently? Review, compare & analyze data Make recommendations & implement Identify Best Practices NYSE: DVN www.devonenergy.com page 2

Endeavor Average Hours per Stack Test ~ Entire Jack 3 Well ENDEAVOR - Hours per Stack Test Hours 2.0 1.8 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Test Number Protected choke manifold; tests are performed off-line when possible Consistent performance (0.9 hrs/test) NYSE: DVN www.devonenergy.com page 3

Baroness Average Hours per Stack Test ~ Bass well to date Hours 2.0 1.8 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 Baroness - Hours per Stack Test 11/20/08 1.27 hrs/test 12/12/08 1.97 hrs/test 6,000 6,000 6,000 10,000 psi 10,000 psi HP test 1 2 3 4 5 6 7 Test Number High Pressure = 10,000 psi on Tests #6 and #7 Excessive time on Test #6 and #7 Why?? NYSE: DVN www.devonenergy.com page 4

Preliminary Conclusions Causes of Excessive BOP Test Time on Baroness 1. Unprotected choke manifold; all tests over 10,000 psi must be on-line 2. Inefficient pump operation (see following slides for examples) NYSE: DVN www.devonenergy.com page 5

Efficient Pump Operation on Endeavor ~ Test #13 to 9,000 psi on 10/28/08 Endeavor operator bumps pressure 5 times in ±25 minas soon as a rapid decline is noticed More efficient method of compressing synthetic base mud Good test in 35 min NYSE: DVN www.devonenergy.com page 6

Inefficient Pump Operation on Baroness ~ Test #6 to 10,000 psi on 12/13/08 (1.97 hrs/test) Operator bumps pressure 5 times in ±65 min(half the frequency of Endeavor) Baroness operator waiting too long to bump up pressure Good test in 125 min (over twice as long as Endeavor) Same pattern seen when comparing most high-pressure tests NYSE: DVN www.devonenergy.com page 7

Inefficient Pump Operation on Baroness ~ Test #8 to 10,000 psi on 12/14/08 (1.97 hrs / test) As per SLB operator on Endeavor, the 5 min high pressure test could have ended at either noted interval Baroness operator unnecessarily spent ± 55 min NYSE: DVN www.devonenergy.com page 8

Inefficient Pump Operation on Baroness ~ Re-test #9 to 10,000 psi on 12/14/08 As per SLB operator on Endeavor, the 5 min high pressure test could have ended at the noted interval Baroness operator unnecessarily spent ± 40 min NYSE: DVN www.devonenergy.com page 9

On-line Test Optimization Comparison of Baroness tests #6 & #7 Hours 2.0 1.8 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 Baroness - Hours per Stack Test 1 2 3 4 5 6 7 Test Number 11/20/08 1.27 hrs/test 12/12/08 1.97 hrs/test Both tests to 10,000 psi using 14.9 ppg SBM At first glance test #6 looks much better than test #7 However, test #7 total time was ~10 hours less than test #6 This was done by combining component testing which reduced the total number of on-line tests performed from 19 to 11. NYSE: DVN www.devonenergy.com page 10

Team Recommendations 1. Review each rig s test charts with Baroness Halliburton pump operator & company men 2. Identify unacceptable decline more quickly and bump pressure (±100 psi) more frequently (not an exact science) 3. HES to review test charts with MMS to better understand what makes a good test Note: MMS inspectors are invited to SLB quarterly safety meetings to review test requirements 4. Use water in surface lines and cement unit to minimize compression time 5. Optimize on-line testing. Maximize number of tests performed off-line Combine on-line tests to test multiple components at once Post-job evaluation: Evaluate number of tests performed and time per test to find optimal testing procedure 6. Investigate modifications that would allow for off-line high pressure testing on Baroness 7. Review performance of next BOP test on Baroness (due 12/28/08) 8. Identify Best Practices NYSE: DVN www.devonenergy.com page 11