Similar documents


*REVISED-AWARDED CALL ORDER /09/13


OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15


OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17

OKLAHOMA DEPARTMENT OF TRANSPORTATION





OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019

Bowhunter Observation Survey

Asphalt Concrete Plants With Expired or Nearly Expired Scale Certifications (Scales must be recertified every six months)

TO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2018

Bowhunter Observation Survey

Affordable Housing Needs.

OKLAHOMA SECONDARY SCHOOL ACTIVITIES ASSOCIATION P.O. Box 14590, Oklahoma City, Oklahoma

Legislative Update Williamsburg Residency

Southmoore Instrument Arts Program 2019 Spring Calendar

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

FY Regional Transportation Improvement Program

Kentucky Highway District 7

Estimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1

Check Out the Discounts for OU Employees at These Participating Fitness Centers!

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

Culpeper District. Albemarle County Monthly Report September, 2011

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Club County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa

HIR on Oklahoma Turnpikes

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Tabulation of Bids. Counties: Project(s):

Vertical Alignment. Concepts of design & guidelines Computing elevations along vertical curves Designing vertical curves

Culpeper District. Albemarle County Monthly Report October, 2011

TRANSPORTATION COMMISSION OF WYOMING

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

LINE ITEM REPORT 9/18/2009

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

COUNTY OF HUNTERDON DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Apparent Bids for Letting of January 20, 2017

The Richland County Transportation Penny Program. September 21, 2015

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

Summary of Local HSIP Solicitation State Fiscal Years (SFY) 2016, 2017, 2018 & 2019

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

INCOG Board of Directors

Pavement Rehabilitation & Buffered Bike Lane

General Notes. Project No /15/2018 Page 1 of 1

Annual Listing of Obligated MPO Projects

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Current Roadway Projects Wednesday, September 03, 2014

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

"Emul Asph (SS-1HP) Tack".

General Notes. Project No /15/2018 Page 1 of 1

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Tabulation of Bids. Counties:

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

TO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2014

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

TRAFFIC OPERATIONS DEPARTMENT

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Napa Hot Air Balloon Adventure

PRESENTATION OUTLINE

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

S/TIP LIST OF PROJECTS

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Taylor Road Resurfacing Project

Update January 4, 2016

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

SFY Transportation Improvement Program Highway and Bikeway Element Amendments

Short and Long Term Needs

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop

Plan Holders Listing October 19, 2018 Letting (1) CN McKinley County

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Meadow Woods Elementary School

DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights

Tabulation of Bids. Counties:

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

Welcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting.

INTERSECTION WITH RIGHT TURN TAPER

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Paul Vraney Bureau of Project Development 02/11/2016

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

Transcription:

AWARDED: CALL ORDER: 020 PROJECT NO.:CIRB-102C(126)RB J.P. NUMBER:2483204 BAMS NO: 130174 CALENDAR DAYS ALLOTTED: 200 COUNTY: ALFALFA HIGHWAY NO.: EW-25 LENGTH: 4.9740 MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : COUNTY ROAD (EW-25) : FROM 1.0 MILE WEST OF THE WOODS COUNTY LINE, EXTEND EAST. CONTRACT AMOUNT : $ 3,696,002.95 CONTRACTOR : THE CUMMINS CONSTRUCTION CO., INC. ENID OK AWARDED: CALL ORDER: 060 PROJECT NO.:HSIP-205C(019)TR J.P. NUMBER:3020904 BAMS NO: 130176 CALENDAR DAYS ALLOTTED: 30 COUNTY: BECKHAM HIGHWAY NO.: SH-30 LENGTH: 0.0000 MILES DESCRIPTION : SAFETY IMPROVEMENT (SCHOOL ZONE) LOCATION : SH-30: AT EW-111 IN THE TOWN OF SWEETWATER. CONTRACT AMOUNT : $ 14,965.00 CONTRACTOR : TRAFFIC SIGNALS, INC. AWARDED: CALL ORDER: 100 PROJECT NO.:SSP-107C(154)SS J.P. NUMBER:2623604 BAMS NO: 130179 CALENDAR DAYS ALLOTTED: 240 COUNTY: BRYAN HIGHWAY NO.: SH-48 LENGTH: 0.0000 MILES LOCATION : SH-48: OVER THE BLUE RIVER AND BLUE RIVER OVERFLOW, 1.6 MI NORTH OF SH-78. CONTRACT AMOUNT : $ 3,298,483.65 CONTRACTOR : PARADIGM CONSTRUCTION & ENGINEERING, INC TULSA OK

AWARDED: CALL ORDER: 120 PROJECT NO.:NHPPIY-0040-4(437) J.P. NUMBER:2648807 BAMS NO: 130014 CALENDAR DAYS ALLOTTED: 90 COUNTY: CADDO HIGHWAY NO.: I-40 LENGTH: 0.0000 MILES DESCRIPTION : BRIDGE REHABILITATION LOCATION : I-40: AT MILEPOST 103.5. CONTRACT AMOUNT : $ 344,140.80 CONTRACTOR : REDLANDS CONTRACTING, LLC AWARDED: CALL ORDER: 140 PROJECT NO.:STPG-214E(018)AG J.P. NUMBER:2930104 BAMS NO: 130180 CALENDAR DAYS ALLOTTED: 60 COUNTY: CLEVELAND HIGHWAY NO.: CITY STREETS LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNALS (VIDEO DETECTION UPGRADE) LOCATION : CITY STREETS: AT MULTIPLE LOCATIONS IN THE CITY OF NORMAN. CONTRACT AMOUNT : $ 482,900.00 CONTRACTOR : TRAFFIC SIGNALS, INC. AWARDED: CALL ORDER: 160 PROJECT NO.:STP-119D(184)CI J.P. NUMBER:2579604 BAMS NO: 130184 CALENDAR DAYS ALLOTTED: 110 COUNTY: CREEK HIGHWAY NO.: COUNTY ROAD (EW-91) LENGTH: 0.2160 MILES LOCATION : COUNTY ROAD (EW-91): OVER SANDY CREEK, 2.0 MILES EAST OF SH-48. CONTRACT AMOUNT : $ 677,638.10 CONTRACTOR : BELK BRIDGE, INC. BROKEN ARROW OK

AWARDED: CALL ORDER: 190 PROJECT NO.:SSP-219B(021)SS J.P. NUMBER:3022104 BAMS NO: 130202 CALENDAR DAYS ALLOTTED: 90 COUNTY: CREEK HIGHWAY NO.: SH-51 LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNALS LOCATION : SH-51: FROM 3.7 MILES WEST OF THE TULSA C/L IN MANNFORD. CONTRACT AMOUNT : $ 100,421.65 CONTRACTOR : MIDSTATE TRAFFIC CONTROL, INC. AWARDED: CALL ORDER: 195 PROJECT NO.:CIRB-137C(075)RB J.P. NUMBER:2282106 BAMS NO: 130229 CALENDAR DAYS ALLOTTED: 90 COUNTY: KINGFISHER HIGHWAY NO.: COUNTY ROAD(NS-274) LENGTH: 3.7430 MILES DESCRIPTION : GRADE, DRAIN, AND SURFACE LOCATION : COUNTY ROAD (NS-274): FROM 4.0 MILES SOUTH OF SH-33, EXTEND NORTH. CONTRACT AMOUNT : $ 1,733,285.34 CONTRACTOR : DUIT CONST. CO, INC./TTK CONST. CO., INC AWARDED: CALL ORDER: 200 PROJECT NO.:HSIPG-237F(007)TR J.P. NUMBER:3020204 BAMS NO: 130187 CALENDAR DAYS ALLOTTED: 30 COUNTY: GRANT HIGHWAY NO.: MULTIPLE LOCATIONS LENGTH: 0.0000 MILES DESCRIPTION : SAFETY IMPROVEMENT (RUMBLE STRIP) LOCATION : SH-3/SH-11/SH-33: AT MULTIPLE LOCATIONS IN DIVISION IV. CONTRACT AMOUNT : $ 67,885.70 CONTRACTOR : ACTION SAFETY SUPPLY CO.

AWARDED: CALL ORDER: 240 PROJECT NO.:STPY-241C(008)RW J.P. NUMBER:2422813 BAMS NO: 130189 CALENDAR DAYS ALLOTTED: 180 COUNTY: LINCOLN HIGHWAY NO.: US-62 LENGTH: 0.0000 MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE LOCATION : US-62: FROM 0.65 MILES WEST OF THE LINCOLN/OKLAHOMA COUNTY LINE, EXTEND EAST. CONTRACT AMOUNT : $ 45,117.00 CONTRACTOR : M & M WRECKING, INC. BLANCHARD OK AWARDED: CALL ORDER: 260 PROJECT NO.:STPG-242C(010)AG J.P. NUMBER:2942204 BAMS NO: 130190 CALENDAR DAYS ALLOTTED: 15 COUNTY: LOGAN HIGHWAY NO.: CITY STREETS LENGTH: 0.0000 MILES DESCRIPTION : STRIPING AND PAVEMENT MARKING LOCATION : CITY STREETS: AT MULTIPLE LOCATIONS IN LOGAN COUNTY. CONTRACT AMOUNT : $ 27,752.30 CONTRACTOR : ACTION SAFETY SUPPLY CO. AWARDED: CALL ORDER: 280 PROJECT NO.:SSP-243N(002)SS J.P. NUMBER:2858407 BAMS NO: 130191 CALENDAR DAYS ALLOTTED: 210 COUNTY: LOVE HIGHWAY NO.: I-35 LENGTH: 0.9960 MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : I-35: NORTH HALF OF INTERCHANGE AT WINSTAR BLVD (PHASE 2). CONTRACT AMOUNT : $ 7,484,000.00 CONTRACTOR : SILVER STAR CONSTRUCTION CO., INC. MOORE OK

AWARDED: CALL ORDER: 300 PROJECT NO.:SSP-247C(003)SS J.P. NUMBER:2327704 BAMS NO: 130192 CALENDAR DAYS ALLOTTED: 30 COUNTY: MAJOR HIGHWAY NO.: SH-8 LENGTH: 0.0000 MILES DESCRIPTION : BRIDGE PAINTING LOCATION : SH-8: OVER DEEP CREEK, 2.0 MILES NORTH OF THE BLAINE COUNTY LINE. CONTRACT AMOUNT : $ 97,840.00 CONTRACTOR : P & H STUCCO & CONSTRUCTION, INC. TARPON SPRINGS FL AWARDED: CALL ORDER: 320 PROJECT NO.:STPY-252C(010) J.P. NUMBER:2330610 BAMS NO: 130193 CALENDAR DAYS ALLOTTED: 30 COUNTY: CANADIAN HIGHWAY NO.: MULTIPLE LOCATIONS LENGTH: 0.0000 MILES DESCRIPTION : BRIDGE WATER PROOF SEAL LOCATION : I-35/I-40/US-77/US-81/US-177: AT MULTIPLE LOCATIONS IN DIVISION IV. CONTRACT AMOUNT : $ 156,520.58 CONTRACTOR : JLT CONTRACTING, LLC CUSHING OK AWARDED: CALL ORDER: 340 PROJECT NO.:STPG-155F(363)AG J.P. NUMBER:2011404 BAMS NO: 130194 CALENDAR DAYS ALLOTTED: 45 COUNTY: OKLAHOMA HIGHWAY NO.: CITY STREETS LENGTH: 0.0000 MILES DESCRIPTION : STRIPING AND PAVEMENT MARKING LOCATION : CITY STREETS: AT MULTIPLE LOCATIONS IN DEL CITY. CONTRACT AMOUNT : $ 71,558.66 CONTRACTOR : ACTION SAFETY SUPPLY CO.

AWARDED: CALL ORDER: 360 PROJECT NO.:STP-155C(604)AG J.P. NUMBER:2404104 BAMS NO: 130048 CALENDAR DAYS ALLOTTED: 250 COUNTY: OKLAHOMA HIGHWAY NO.: CITY STREET LENGTH: 0.7650 MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : CITY STREET (KELLY AVE): FROM COVELL RD, EXTEND NORTH TO COFFEE CREEK RD IN EDMOND. CONTRACT AMOUNT : $ 5,934,304.44 CONTRACTOR : DUIT CONST. CO, INC./TTK CONST. CO., INC AWARDED: CALL ORDER: 380 PROJECT NO.:STP-157D(090)CI J.P. NUMBER:2392904 BAMS NO: 130195 CALENDAR DAYS ALLOTTED: 120 COUNTY: OSAGE HIGHWAY NO.: COUNTY ROAD LENGTH: 0.2450 MILES LOCATION : COUNTY ROAD (EW-45) : OVER QUAPAW CREEK, 0.5 MILE SOUTH OF SH-20. CONTRACT AMOUNT : $ 1,142,319.75 CONTRACTOR : PARADIGM CONSTRUCTION & ENGINEERING, INC TULSA OK AWARDED: CALL ORDER: 390 PROJECT NO.:STP-165D(123)CI J.P. NUMBER:2868704 BAMS NO: 130167 CALENDAR DAYS ALLOTTED: 90 COUNTY: ROGER MILLS HIGHWAY NO.: COUNTY ROAD (EW-92) LENGTH: 0.2080 MILES LOCATION : COUNTY ROAD (EW-92): OVER CAMP HOLLOW CREEK 3.5 MILES EAST AND 2.0 MILES NORTH OF THE NORTH SH-30/SH-47 JCT. CONTRACT AMOUNT : $ 421,163.00 CONTRACTOR : SEWELL BROS., INC.

AWARDED: CALL ORDER: 400 PROJECT NO.:CIRB-175D(099)RB J.P. NUMBER:2549104 BAMS NO: 130198 CALENDAR DAYS ALLOTTED: 210 COUNTY: WASHITA HIGHWAY NO.: COUNTY ROAD LENGTH: 2.8740 MILES DESCRIPTION : GRADE, DRAIN, AND SURFACE LOCATION : COUNTY ROAD (NS-225): FROM SH-152, EXTEND NORTH IN CORDELL. CONTRACT AMOUNT : $ 2,793,189.89 CONTRACTOR : CORNELL CONST. CO., INC. CLINTON OK AWARDED: CALL ORDER: 420 PROJECT NO.:STPY-176B(096)SS J.P. NUMBER:2327804 BAMS NO: 130199 CALENDAR DAYS ALLOTTED: 340 COUNTY: WOODS HIGHWAY NO.: US-281 LENGTH: 1.0440 MILES LOCATION : US-281: OVER THE CIMMARON RIVER, 0.8 MILES NORTH OF THE MAJOR COUNTY LINE. CONTRACT AMOUNT : $ 7,411,605.25 CONTRACTOR : SEWELL BROS., INC.

LETTING DATE = 05/16/13 REJECTED: CALL ORDER: 180 PROJECT NO.:STP-219B(016)SG J.P. NUMBER:3011704 BAMS NO: 130132 CALENDAR DAYS ALLOTTED: 60 COUNTY: CREEK HIGHWAY NO.: SH-51 LENGTH: 0.0000 MILES DESCRIPTION : LIGHTING LOCATION : SH-51: FROM 2.0 MILES EAST OF SH-48 IN MANNFORD, EXT EAST. CONTRACT AMOUNT : CONTRACTOR :

LETTING DATE = 05/16/13 THE TOTAL AMOUNT OF AWARDED CONTRACTS: $ 36,001,094.06 ================ THE TOTAL AMOUNT OF REJECTED CONTRACTS: $ 433,402.10 ================ THE TOTAL AMOUNT OF DEFERRED CONTRACTS: $ 0.00 ================