Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Similar documents
Chapter 13 ORANGE COVE

Chapter 11 KINGSBURG RELATIONSHIP TO CITY PLANS AND POLICIES. City of Kingsburg Bicycle Transportation Plan (2017) City of Kingsburg General Plan

January 2018 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN

CONNECTING PEOPLE TO PLACES

TABLE OF CONTENTS. Executive Summary

City of Charlottesville Bicycle and Pedestrian Master Plan Update

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Bicycle Master Plan Goals, Strategies, and Policies

Perryville TOD and Greenway Plan

PEDESTRIAN ACTION PLAN

ACTIVE TRANSPORTATION

Non-Motorized Transportation 7-1

Chapter 9: Pedestrians and Bicyclists

A Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?

5.13 Soledad. Demographic Profile. Disadvantaged Communities. Safety Profile

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Rail Station Fact Sheet University of Dallas Station

Plant City Walk-Bike Plan

Vision Zero Task Force February 28, Collision Landscape Analysis

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

City of Novi Non-Motorized Master Plan 2011 Executive Summary

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Agency Advisory Group Meeting #3 and Walk Audit Anchorage Non-Motorized Plan

MASTER BICYCLE AND PEDESTRIAN PLAN

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Overview Introduc on Project Process Key Issue:

Moving Ahead. (Community Engagement) Chapter Three

San Mateo County Comprehensive Bicycle and Pedestrian Plan

Castro Valley Municipal Advisory Council March 19, 2018

Typical Rush Hour Commute. PennyforTransportation.com

Solana Beach Comprehensive Active Transportation Strategy (CATS)

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Rail Station Fact Sheet DFW Airport North Station* (*station under construction with anticipated start of service in late 2018)

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

Appendix C 3. Bicycle / Pedestrian Planning

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

Rochester Downtown Bicycle Study 2009

Living Streets Policy

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

5. Pedestrian System. Accomplishments Over the Past Five Years

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

2010 Pedestrian and Bicyclist Special Districts Study Update

Rail Station Fact Sheet CentrePort/DFW Airport Station

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

I-105 Corridor Sustainability Study (CSS)

EXECUTIVE SUMMARY. Vision

This page intentionally left blank.

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Santa Ana Creating Community Together


2014 Regional Bicycle and Pedestrian Study Evaluation Tools Leslie A. Meehan, AICP MPO Technical Coordinating Committee Meeting April 1, 2015

Chapter 2 RELATIONSHIP TO OTHER PLANS AND POLICIES

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Urbana Pedestrian Master Plan

Community Transportation Plan Acknowledgements

PRESS RELEASE San Joaquin Council of Governments

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

This page intentionally left blank.

Update on Regional Bicycle, Pedestrian, & Trail Planning. Presented to TCC November 21, 2014

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Rail Station Fact Sheet Downtown Carrollton Station

Creating Complete Streets to Accommodate All Users

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

FINAL PLAN APPENDIX D CITY OF BERKELEY BIKE PLAN D-1

SAN BENITO COUNTY Bikeway and Pedestrian Master Plan

A copy of the draft plan is available at:

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Community Bicycle Planning

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

TULARE COUNTY ASSOCIATION OF GOVERNMENTS

ORDINANCE NO

Walking & Bicycling Questionnaire for Candidates

City of Richmond Bicycle Master Plan

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

4. Mobility and Transportation Element. Page Bikes and Pedestrians

CHAPTER 1 INTRODUCTION

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Bicycle and Pedestrian Connectivity Study Phase 2

COMMUNITY PARTICIPATION CHAPTER 8

Chapter 6. Lawndale. Alta Planning + Design 147

Shared Use Facili es. Mul -Use Trails. Chapter 3 Design Elements BICYCLE/PEDESTRIAN MULTI USE TRAILS

Rail Station Fact Sheet Buckner Station

CHAPTER 3: Vision Statement and Goals

Transcription:

Chapter 14 PARLIER This chapter describes the current status and future plans for biking and walking in the City of Parlier. RELATIONSHIP TO CITY PLANS AND POLICIES The Parlier General Plan is the primary document specifying goals and policies for the City, including those relating to walking and bicycling. The Parlier General Plan and other local plans are described in this section. Several other regional, state, and federal plans and policies also contain goals and policies relating to bicycling and walking in Parlier. These plans are discussed in Chapter 2, Existing Conditions, and in Appendix C, Relationship to State and Federal Plans and Policies. City of Parlier General Plan (2010) The Parlier City Council adopted the Parlier General Plan Update in February 2010. This plan establishes guidance for future planning in the City extending to the year 2030. Circulation Element The Circulation Element provides guidance for the continued development and improvement of the circulation system in the City of Parlier. The use of non-motorized modes of transportation, such as walking and biking, are promoted to reduce the demands on the transportation system and to improve air quality. The Bicycle Facilities section discusses how the City supports the installation of a shared use roadway system and will encourage newly developing areas to provide bicycle facilities. The section also explains that while the City does not currently have a comprehensive bicycle plan in place, the interest in a plan will grow as the City s population increases. Therefore, the development of a comprehensive bicycle plan should be considered as part of the long range plan for the City. This Element proposes that development of bike lanes and/or bike paths should be explored around schools and parks, and a potential bicycle and pedestrian path could be implemented along the City s abandoned rail line. One objective in the Objectives, Policies, and Standards section is related to bicycling: Promote the use of bicycles as a viable means of transportation. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014) The City of Parlier, in collaboration with the Latino Coalition for a Healthy California and the Central California Obesity Prevention Program, was selected as a focus community for a Community Pedestrian Safety Training (CPST). The CPST program is a joint project of the University of California at Berkeley s Safe Transportation Research Center (SafeTREC) and California Walks (Cal Walks) and is funded by a grant from the California Office of Traffic Safety through the National Highway Traffic Safety Administration. Both SafeTREC and Cal Walks were invited by the City of Parlier to facilitate a workshop and walkability assessment to assist with the City s grant application for the Fresno Council of Government s Regional Active Transportation Program. The City of Parlier s workshop and walkability assessment was held with an emphasis on addressing two major goals. The first goal was to inform the development of the City s Regional ATP grant application in alignment with community residents identified and prioritized needs. The second goal was to provide City staff, community organizations, and residents with a toolkit for promoting FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN 14-1

pedestrian safety and walkability and to inform future comprehensive active transportation planning and improvement efforts. A summary of all community resident recommendations was developed and specific recommendations were applied to the City s recent Regional Active Transportation Program Application. Municipal Code of Parlier, California The Municipal Code and Charter of Parlier is a compilation of the City of Parlier s ordinances, codified into regulations. In the code, regulations are grouped by subject matter into titles. With a few minor exceptions, most regulations concerning pedestrian and bicycle planning and riding can be found in Title 10, Vehicles and Traffic, Title 12, Streets and Other Public Places, and Title 16, Subdivisions. The section with direct applicability to the ATP is 16.09.010, Pedestrian walkways and bikeways: 16.09.010 - Pedestrian walkways and bikeways A. Pedestrian walkways or bikeways may be required where needed for: 1. Access to schools, playgrounds or parks, shopping centers, or other public areas; 2. Traffic safety; and 3. Access through unusually long blocks. Pedestrian facilities in Parlier 14-2 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN

EXISTING CONDITIONS Currently there are 8.5 miles of bicycle facilities and 53.9 miles of sidewalks within the City of Parlier. These networks are summarized in Table 14-1 and depicted in Figures 14-1 and 14-2. Parlier is generally well connected by sidewalks, though gaps exist as shown in Figure 14-2. Table 14-1: City of Parlier Existing Facilities Type Miles Sidewalks 53.9 Class I Bike Paths 1.0 Class II Bike Lanes 10.0 Class III Bike Routes 0.0 Class IV Separated Bikeway 0.0 Sources: Fresno Council of Governments, 2017, Fehr & Peers, 2017 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN 14-3

Figure 14-1: Parlier Existing Bicycle Facilities Ninth St Fifth St Third St J St K St H St E Progress Dr Greenwood Ave E Rose Ave School Waterway Existing Bicycle Facilities Canal Class I Bikeway (Bike Path) Class II Bikeway (Bike Lane) Park/Open Space Class III Bikeway (Bike Route) Source: Fresno Council of Governments, 2017, Fehr & Peers, 2017 14-4 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN

Figure 14-2: Parlier Existing Pedestrian Facilities Ninth St Fifth St Third St J St K St H St E Progress Dr Greenwood Ave E Rose Ave School Existing Bicycle/Pedestrian Trail Existing Pedestrian Facilities Sidewalk Present on Both Sides Waterway Sidewalk Present on One Side Canal Park/Open Space Source: Fresno Council of Governments, 2017, Fehr & Peers, 2017 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN 14-5

The City of Parlier is located roughly equidistantly between Sanger, Selma, and Reedley. A trail and open space occupy much of the old railroad alignment through the center of the City. The following factor also is notable to the safety and comfort of bicycling and walking in Parlier: Much of new city development is occurring along Manning Avenue, a busy arterial with few crosswalks that is often difficult for pedestrians to cross. No existing bike parking was confirmed in the City of Parlier, though some bike parking may exist. Shaded Class I multi-use path trail in Parlier 14-6 Bus stop with canopy and bench in Parlier FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN

Key Destinations Figure 14-3 shows key destinations for bicyclists and pedestrians in the City of Parlier. Highlights include Parlier High School, Parlier Junior High School, and Cesar Chavez, Benevidez, and John C. Martinez Elementary Schools Fresno County Library and Parlier Community Center Restaurants and businesses downtown, especially along J Street Figure 14-5 shows the General Plan Zoning Map for the City, which identifies residential, commercial, and industrial areas. Figure 14-3: Parlier Key Destinations Ninth St (( ( K St H St ( Greenwood Ave Higher Education Employment Center Library Medical Center School Waterway ( Transit Stop Canal Government Retail Park/Open Space Source: Fresno Council of Governments, 2017, Fehr & Peers, 2017 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN 14-7

Figure 14-4: Parlier General Plan Zoning Map Source: City of Parlier, 2017 14-8 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN

S Ross Ave Disadvantaged Communities All of Parlier meets one or more of the criteria for disadvantaged communities, as shown in Figures 14-5 to 14-8. These indicators are explained in Chapter 3, Existing Conditions. Figure 14-5: Parlier Household Median Income Figure 14-6: Parlier CalEnviroScreen 3.0 Score Low Income Census Tracts Canal Waterway Park/Open Space Sources: U.S Census American Community Survey, 2016, Fehr & Peers, 2017 Cal EnviroScreen 3.0 Waterway In Worst Performing 25% Canal Source: California Office of Environmental Health Hazard Assessment, 2017, Fehr & Peers, 2017 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN 14-9

S Ross Ave Figure 14-7: Parlier Free or Reduced Price Meal Eligibility Existing Trips Based on data collected through the U.S. Census American Community Survey, approximately 0% of Parlier workers commute to work by bicycling and 2.5% commute to work by walking. These shares are lower than the statewide averages, as shown in Table 14-2. However, these statistics only include workers who walk or ride every day, not those who do so occasionally. Reliable data on non-commute trips, including trips to school, trips for shopping, and recreational trips is not readily available and not included in these estimates. Thus, the total number of biking and walking trips in Parlier is higher than shown here. Table 14-2: Parlier Trips to Work by Bicycling and Walking Jurisdic on Bicycle Walk Es mate Share Es mate Share Parlier 0 0.0% 126 2.5% Percent of Students Eligible for Free or Reduced Price Meals Waterway 0% to 75% More than 75% Park/Open Space Source: California Department of Education, 201, Fehr & Peers, 2017 Figure 14-8: Parlier Zero Automobile Households California 188,736 1.2% 458,5623 2.9% Note: Workers aged 16 years and older, excludes percentage of employees that work from home. Sources: U.S. Census 2011-2015 American Community Survey, 2016; Fehr & Peers, 2017 Percent of Zero-Car Households in Census Tract 0% to 5% 5% to 10% 10% to 15% Waterway 15% to 20% Canal More than 20% Sources: U.S. Census 2011-2015 American Community Survey, 2016, Fehr & Peers, 2017 14-10 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN

Collisions The graphics shown below summarize injury collisions in Parlier involving bicyclists and pedestrians by severity and year. Figure 14-9 shows locations of injury collisions involving bicyclists and Figure 14-10 shows locations of injury collisions involving pedestrians. Sources: Traffic Injury Mapping System, 2017, Fehr & Peers, 2017 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN 14-11

Figure 14-9: Parlier Collisions Involving Bicyclists, 2009-2013 Ninth St X X X Fifth St X X X Third St K St J St X H St E Progress Dr Greenwood Ave E Rose Ave X Bicyclist Collision (Injury) Waterway Canal Park/Open Space X Source: Traffic Injury Mapping System, 2017, Fehr & Peers, 2017 14-12 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN

Figure 14-10: Parlier Collisions Involving Pedestrians, 2009-2013 Ninth St Three collisions in this location, one fatality X X X X X X E Progress Dr Fifth St X Two collisions in this location X K St Third St J St H St Greenwood Ave X E Rose Ave X Pedestrian Collision (Fatality) X Pedestrian Collision (Injury) Waterway Canal Park/Open Space Source: Traffic Injury Mapping System, 2017, Fehr & Peers, 2017 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN 14-13

Past Expenditures Information on recent expenditures on bicycle and pedestrian facilities in Parlier is provided in Table 14-3. Table 14-3: Parlier Active Transportation Expenditures, 2011-2017 Project Manning Avenue Safe Routes to Schools Connec vity Project Cost $853,000 Citywide School Signing and Striping $182,000 Sources: City of Parlier, 2017 Maintenance Policies The City of Parlier has implemented a pavement management program used to track maintenance in the City. Five E s Parlier s recent efforts supporting the five E s are presented in Table 14-4. Table 14-4: Parlier Five E s of Active Transportation E Educa on Engineering Evalua on J Discussion The City met with resdents to discuss safety and ac ve transporta on for schools. The City implemented the projects presented in Table 14-3 and also installed LED stop signs in recent years. The City of Parlier conducted a walkability assessment in 2014 as discussed earlier in this chapter. The City also been analyzing extensions to exis ng bike paths and crea on of bike routes where bike lanes are not feasible. Sources: City of Parlier, 2017, Fehr & Peers, 2017 14-14 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN

PLANNED NETWORKS The planned bicycle and pedestrian networks for Parlier are summarized in Table 14-5 and shown in Figures14-11 to 14-12. The networks include shared-use paths, bike lanes and routes, sidewalks, and crosswalk improvements. The proposed networks are designed to connect to Parlier s multi-use trails, to provide access to key destinations, and to serve as recreational assets. The sidewalk improvements also fill gaps in the sidewalk network and add crossing improvements to enhance safety near schools and across busy roads. Figure 14-13 presents planned bike parking for Parlier. These recommendations add bike parking at schools, parks, and near civic and retail areas. Based on the indicators of disadvantaged communities discussed earlier in this chapter, these facilities all support disadvantaged communities. Intersection of J Street and Fresno Street in Parlier. Table 14-5: Parlier Planned Bicycle and Pedestrian Facilities Facility Type Exis ng (Miles) Planned (Miles) Total (Miles) Sidewalk 53.9 1.4 55.3 Class I Bike Path 1.0 1.3 2.3 Class II Bike Lane 10.0 11.6 21.6 Class III Bike Route 0.0 3.6 3.6 Sources: Fresno Council of Governments, 2017, Fehr & Peers, 2017 Costs to implement these facilities are summarized in Table 14-6. Table 14-6: Parlier Planned Bicycle and Pedestrian Network Costs Facility Type Cost Per Mile High Priority Other Total Sidewalk $343,000 $466,000 $466,000 Class I Bike Path $750,000 $990,000 $990,000 Class II Bike Lane $175,000 $652,000 $1,386,000 $2,038,000 Class III Bike Route $8,000 $28,000 $28,000 Intersec on Improvements $225,000 $225,000 Source: Fehr & Peers, 2017 Total $652,000 $3,095,000 $3,747,000 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN 14-15

Figure 14-11: Parlier Planned Bicycle Facilities 14-16 E Rose Ave Existing Bicycle Facilities Greenwood Ave Class I Bikeway (Bike Path) Class II Bikeway (Bike Lane) FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN Planned Bicycle Facilities E Progress Dr Class I Bikeway (Bike Path) Class II Bikeway (Bike Lane) Class III Bikeway (Bike Route) Class III Bikeway (Bike Route) Ninth St Fifth St Class IV Bikeway (Separated Bikeway) Class II\IV K St J St Third St H St Source: Fresno Council of Governments, 2017, Fehr & Peers, 2017 Funded Project, Not Included in ATP Project Covered by Other Plans

Figure 14-12: Parlier Planned Pedestrian Facilities Ninth St Fifth St Third St J St K St H St E Progress Dr Greenwood Ave E Rose Ave Intersection Improvements\Pedestrian Crossing Construct Sidewalks Existing Pedestrian Facilities Sidewalk Present on Both Sides Source: Fresno Council of Governments, 2017, Fehr & Peers, 2017 School Funded Intersection Improvements\Pedestrian Crossing Project Covered by Other Plans Sidewalk Present on One Side Existing Bicycle/Pedestrian Trail Planned Bicycle/Pedestrian Trail Funded Project, Not Included in ATP FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN 14-17

Figure 14-13: Parlier Planned Bicycle Parking Ninth St K St J St E Progress Dr Greenwood Ave E Rose Ave Existing Bike Parking Waterway Planned Bike Parking Canal Park/Open Space Source: Fresno Council of Governments, 2017, Fehr & Peers, 2017 14-18 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN