Contact Information. Progressive Optimization Service. We Provide: Street Bay #2. Grande Prairie, AB T8V - 4Z2

Similar documents
Acoustic Liquid Level Testing of Gas Wells

Jim McCoy. Tubing Anchor Effect on Pump Fillage. Lynn Rowlan Tony Podio Ken Skinner. Gas Well Deliquification Workshop.

Restoring Fluid Flow in Tubing Strings

Advanced Intermittent Gas Lift Utilizing a Pilot Valve

VortexFlow DX (Downhole) Tool Installation Instructions

Artificial Lift Basics Pre Reading

Acoustic Troubleshooting of Coal Bed Methane Wells

TROUBLESHOOT ROD PUMPED WELLS USING TUBING FLUID LEVEL SHOTS

Intermittent Gas Lift Utilizing a Pilot Valve

PRODUCTION AND OPERATIONAL ISSUES

Pump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS

Pressure Test Tubing for Leak

Downhole Gas Separator Selection

Acoustic Techniques to Monitor and Troubleshoot Gas-lift Wells

Intermittent Gas Lift and Gas Assist Plunger Lift

Optimizing Production Throughout the Well s Lifespan. Gas Lift

Troubleshooting Gas-lift Wells Using Dual Shot Acoustic Technique

FAQs about Directive 017

Downhole Gas Separation Performance

Two Short Topics 1) Using Compressors More Effectively 2) Improving Upon Poor-Boy Gas-Lift

Introduction. Part one: Identify the Hydraulic Trainer Components

PRO-ROD TM COILED ROD. Reduce Maintenance Increase Production Enhance Profit

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells

Beam Pumping to Dewater Horizontal Gas Wells

Dynamic Underbalance (DUB)

HOW TO MAKE MORE PRODUCTION WITH PLUNGER LIFT

GEOTHERMAL WELL COMPLETION TESTS

Worker Seriously Injured Servicing a Plunger Lift System

STIPumpCard. User Manual

TURBO GAS LIFT Innovative Hybrid Artificial Lift Method GÁS-LIFT COM TURBINA O MODO INOVANTE HÍBRIDO DE ELEVAÇÃO DE PETRÓLEO

Plunger Lift Optimize and Troubleshoot

Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 20 22, 2017

Using Gas Lift to Unload Horizontal Gas Wells

Dynamic IPR and Gas Flow Rate Determined for Conventional Plunger Lift Well

Downhole Gas Separator Selection

Intrinsically Safe Acoustic Instrument Used in Troubleshooting Gas Lift Wells

Practice Exam IADC WellSharp Driller and Supervisor

AUTOMATIC HOSE TEST UNIT, TYPE SPU

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability

Simplicity in VRU by using a Beam Gas Compressor

2010 Sucker Rod Pumping Workshop Optimizing Production and Reducing Costs by Solving Rod Pumping Problems With The Beam Gas Compressor

Information. And. Procedure. Manual

BACK PRESSURE / SUSTAINING

2007 Gas-Lift Workshop

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

Multi-Stage Plunger Lift: Case Histories

The key to connectivity

Electrical Submersible Pump Analysis and Design

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

The Time Has Come For Coiled Rod. Reprinted from Well Servicing magazine

BACK PRESSURE / SUSTAINING

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

High Pressure Continuous Gas Circulation: A solution for the

VOLUMETRIC METHODS and STRIPPING OPERATIONS

Is The Selection Of Artificial Lift

Engineered solutions for complex pressure situations

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

then the work done is, if the force and the displacement are in opposite directions, then the work done is.

Gas Well Deliquification Workshop. Sheraton Hotel, Denver, Colorado February 29 March 2, 2016

Wellhead Compression A proven deliquification method for marginal gas wells

FLOWING GRADIENTS IN LIQUID LOADED GAS WELLS

SPE Copyright 2012, Society of Petroleum Engineers

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Alan Brodie, PTC

EVT * -Pro Electronic Valve Tester

Understanding pressure and pressure

The Inflow Performance Relationship, or IPR, defines a well s flowing production potential:

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL

Bridging the Gap Using Gas Assisted Plunger Li5 (GAPL) Presented By: Todd Thrash Technical Data Provided By: Rusty Brown, P.E.

Don-Nan Pump & Supply. Don-Nan Pump & Supply 1

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

Appalachian Basin Gas Well. Marietta College, Marietta, Ohio June 7-8, Development. Robert McKee, P.E. Design Engineer Multi Products Company

The ERCB Directive 017 Overview

Representing EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS

Wellhead Compressor Installation on Liquid Loaded Gas Wells in Sicily: A summary of results and best practices

OPERATING PROCEDURES

RPSEA UDW Forum June 22 & 23, Secure Energy for America

Downhole Diverter Gas Separator

Completions & Workovers Module 1.9

Challenging Subsea Gas Lift Application, Offshore Norway.

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures

APPENDIX A1 - Drilling and completion work programme

Sucker Rod Lift Downhole Gas Separators Proposed Industry Testing

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES

COILED ROD. Optimize Your Rod Lift Systems With Pro-Rod

Tentec. Instruction Document. Mini Air Driven Pump Unit Model: HTT.627X Series. Part Identifier

Gas Locked Pumps are NOT Gas Locked!

Reducing Nonproductive Time

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD

HPHT Annular Casing Packer. Obex Annular Casing Packer

Drilling Efficiency Utilizing Coriolis Flow Technology

Well Testing Plan. New York Marginal Well Study. Introduction. I. Tests to be Conducted. II. Testing Procedures

Anomaly Marker Method for Gas-Lift Wells

5k Slickline Lightweight Pressure Control Equipment 4 ID

Transcription:

Progressive Optimization Services (P.O.S.) is an Oil and Gas Optimization Service company based out of Grande Prairie, Alberta with offices in Edson, Alberta and Ft St John British Columbia our operations staff service North West Alberta From Drayton Valley all the way to Rainbow Lake and all of North East BC delivering technically advanced, cost effective optimization solutions to the oil and gas industry. Our highly trained Field Technicians are competent with all our specialized equipment and maintain to the highest Safety Standards you can be assured that a job done by us is a job done right. Progressive Optimization Services is committed to forging long term business relations with a dedication to customer service, technically advanced equipment, and cost effective pricing.

We Provide: Slickline Services Plunger Lift Systems Dynamometer Analysis Inline Testing Optimization Trailers Acoustic Fluid Level Survey Annular Fluid Depression Test AWS Pressure Surveys Surface Casing Vent Testing Packer Isolation Testing Contact Information Progressive Optimization Service 8606-112 Street Bay #2 Grande Prairie, AB T8V - 4Z2 Alberta Sales 780.876.8764 Dennis@progressiveoptimization.com BC Sales 250.263.3969 Dhollman@progressiveoptimization.com Web www.progressiveoptimization.com

Slickline Services Our Slickline services reduce well intervention costs and increase production. Experienced, well trained personnel can reduce the frequency of trips into the well and restore full production with a minimum of nonproductive downtime. With the addition of our Slickline trucks we can now combine this with our Plunger lift service, placing the bumper spring with our equipment ensures there is no additional costs due to miss coordination of services with others. This also enables us to offer a guaranteed contract price to install a complete system allowing us to do our job more effectively while saving the customer money. POS has two complete Slickline units available along with pickers to service North West Alberta and North East BC. Each unit is Equip with.125 line Capable of sweet and sour work Full tooled for every job New and reliable equipment Safety Compliant Available 24 hours

Acoustic Fluid Level Survey Determination of the bottomhole pressure in a producing well is very important. A nonfoamy fluid level and casing pressure are used to determine the producing bottomhole producing pressure, and when used in conjunction with the static bottomhole pressure, an IPR curve can be developed which is the first step to optimizing production rates from any producing well. Inflow Performance Relationship (IPR) An IPR or deliverability curve is a plot of the calculated relationship between inflow and sandface drawdown. The IPR of a well graphically shows the producing efficiency and helps determine if there is incremental production available Annular Fluid Depression Test A foam depression test is designed to calculate accurate producing pressures in pumping wells by conducting a series of fluid level shots. The initial shot is conducted at the time that the casing valve is closed (note: the well is still pumping during the test, only the casing valve is closed). Subsequent fluid levels are taken following the closing of the casing valve, and the fluid level is tracked as it moves down the wellbore. Based on the change in interface pressure and the change in fluid level, the annular gradient can be determined. This gradient or combination of gradients is used to determine the producing pressure at MPP. An annular fluid depression test is generally conducted if a significant amount of fluid is indicated in the annulus after the first shot (Using an assumed annular liquid gradient could introduce great inaccuracies in producing pressure calculations).

Oil Services Dynamometer Analysis A dynamometer measures the amount of weight along the axis of the polished rod during any one pumping stroke at any moment of time. This can identify loading conditions on the surface and down hole equipment, production potentials and/or mechanical inefficiencies within the pumping unit. POS experienced staff can evaluate and make recommendations as to the proper potential weight positioning for effective balancing, sheave sizing for speed adjustment and possible stroke length adjustment. POS reports consist of the following: Surface Equipment Analysis Down hole Schematic Valve checks Visual Inspection Diagnostic Information

Inline Testing POS has a full line of mobile test trailers designed for inline gas measurement and G.L.R (gas liquid ratio) testing. Test trailers feature: The Mtrac controller that provides real-time measuring and sensing of equipment and processes can also be used to optimize wells. High Operating Pressures up to 1450 psi / 9997 kpa Gas throughput up to 70 E 3 per day Liquid capabilities of 8m 3 per day Satellite Communications Equipped. Equivalent Heli Portable unit available

Regulatory Testing AWS Pressure Surveys AWS pressure surveys determine the reservoir pressure from surface using pressure transducers and sound waves on oil and gas producing wells. Automated well-head equipment is attached to a well to measure the fluid level, casing head pressure and surface temperature at a predetermined schedule for a period of time necessary to accurately determine the reservoir characteristics. Analysis of acoustic pressure survey data can also detect the existence of near wellbore formation damage that prohibits the entry of fluids into the casing, reservoir boundaries, communication, production capabilities and much more. Surface Casing Vent Testing 90 days after a new well is drilled it is a requirement to perform a leak test. If it fails, measuring the gas flow and pressure buildup within the surface casing can determine if corrective repairs are required. Yearly reports are required to be submitted on existing wells with a previously documented vent flow. Packer Isolation Testing Most Regulatory Agencies have developed recommended test procedures to provide guidance for determining an accurate evaluation of the hydraulic isolation of the tubing/casing annulus. A P.O.S. technician will design a test procedure which is adequate to prove hydraulic isolation.

Optimization Trailers These trailers can be easily installed on existing plunger lift systems that require optimization. Using the MTrac controller on all of our trailers we can constantly makes changes until the well is optimized to its ultimate potential by continually monitoring tubing, casing and line pressures and by taking control of the motor valve between the wellhead and the flow line. All of our trailers are equipped with satellite communication systems allowing the customer to watch the progress of the optimization process. --.-.-_

Plunger Lift Systems POS offers full turnkey installation and servicing of most plunger lift systems; no need to hire various venders when one call does it all. POS can supply the Slickline, Install the complete system, supply all required components, Supervise job from start to finish, have our Optimization Technician ensure system is working to it s highest capabilities and provide Engineering support ensuring well meets candidate criteria. Some background; In the early stages of a well's life, liquid loading is usually not a problem. When rates are high, the liquids are simply carried out of the tubing with the high velocity gas. Eventually, the daily rate and velocity gradually decrease until the critical flow rate is reached. Below the critical flow rate, heavier liquids do not make it to the surface and start to fall back to the bottom exerting back pressure on the formation, loading up the well. Plunger lift systems are low cost, effective methods of unloading gas wells and high gas/liquid ratio oil wells without interrupting production. In operation, a plunger travels to the bottom of the well where the fluid is picked up by the plunger, acting as a swab, and is brought to the surfaced removing all liquids in the tubing. It also keeps the tubing free of paraffin, salt or scale build-up. Fluid removal prevents loading and keeps the well from dying. With continual removal of all produced liquids, there is less fluid weight on the formation, causing great productivity of the well. This system uses the well's own energy requiring no additional power expense. All types of controllers are available from basic to very sophisticated self optimizing.

Typical System

Plungers Lubricator Controller