Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Similar documents
An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (September 2015)

An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (March 27, 2003)

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

MNDOT PAVEMENT DESIGN MANUAL

Low Traffic Volume LR 159 Low Traffic Preservation

Five Years Later. Illinois Asphalt Pavement Association Annual Meeting March 9, William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

Tack Coat Effect on Field Performance. February 3rd, 2015 NCAUPG/ICT Joint Meeting

HIR on Oklahoma Turnpikes

Driving Indiana s Economic Growth

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

REAL WORLD PAVEMENT PRESERVATION SOLUTIONS

Kentucky Transportation Center

Lake Waterford Community Association Meeting. November 15, 2016

Keeping good roads good

FLORIDA DEPARTMENT OF TRANSPORTATION

ASPHALT PAVING LEVEL 1

Burns Cooley Dennis, Inc. Geotechnical and Materials Engineering Consultants Performance of Permeable Friction Courses NCHRP 9-41

2018 ROAD MAINTENANCE PROGRAM

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Road Condition Statistics: Notes and definitions

Executive Summary. Introduction

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

MnROAD Mainline IRI Data and Lane Ride Quality MnROAD Lessons Learned December 2006

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s

Pavement Quality Indicators

Pavement Management Program

High Performance Racetracks

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Pavement Markings (1 of 3)

NCHRP Project 9-40 Update Optimization of Tack coat for HMA Placement

NEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES

City of Davis Pavement Management Program

Pavement Evaluation of the Nairobi Eastern By-Pass Road

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

I-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Update on Performance of Thin Asphalt Overlays

land transport road assets

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Toward Zero Deaths Maintaining a Safer Roadway Workshop

Appendix B Existing ADOT Data Parameters

Kentucky s Surface Transportation System

Managing Density For Asphalt Pavement

land transport road assets

2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND

ADA Self Evaluation and Transition Plan for Public Rights-of-Way

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division

Pavement Management Report. City Council Meeting of May 21, 2013

Where Did the Road Go? The Straight and Narrow about Curves

Evaluation of Construction-Zone Pavement Marking Materials

Rennick Yard Roller-Compacted Concrete Pavement

C ITY OF B EDFORD H EIGHTS

APPENDIX I-A Kings County Regional Transportation Plan. Appendix A Page A-1 STATE ROUTES

CSAH 101 Preliminary Design

Smoothing Out the Bumpy Road Ahead

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

September Reporting on Work Plan 95-R-15 Final Report. Prepared by: Reviewed by:

Chapter 3 DESIGN SPECIFICATIONS

AEMA-ARRA-ISSA-PPRA Fall Meeting Recycling, Ayrton Senna Highway Brasil, & USA

Chapter 9 Maintenance

Optimising Gravel Road Maintenance Strategies. Presenter: Gerrie van Zyl

Crash Analysis of I-64 Closure in St. Louis County

Binder Modified with a Combination of PPA and SBS: The NCAT Test Track Experience PPA Workshop April 7, 2009

Paving for Progress Municipal Streets Seminar

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar

City of Moorhead Committee of the Whole Meeting

The Use and Performance of Geogrids in Kentucky

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Available online at ScienceDirect. Transportation Research Procedia 14 (2016 )

2017 Temporary traffic control guidelines for pedestrians. v.2

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

Value-Based Pavement Prioritization Tool. 11th National Conference on Transportation Asset Management Tim Skeel July 11, 2016

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

South Carolina Department of Transportation. Engineering Directive

PAVEMENT FUNCTIONAL SURFACE CHARACTERISTICS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

Design of Turn Lane Guidelines

50 Year Roads: Don't Accept Anything Less

Illinois Center for Transportation

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange

New Mexico Transportation Funding Challenges

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

TexSys: Guide for Selecting HMA for Texas Flexible Pavements

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

The City of Port Moody 2013 Paved Road Network Condition Assessment

Free Floating Screed. Screed Weight Forward Motion. Head of Material. Material Stability. Angle of Attack

SCI/IAT/IHT Seminar Cases for and against hot mix road surfacings

Use of Performance Metrics on The Pennsylvania Turnpike. Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc.

Transcription:

2007-18 Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research

Technical Report Documentation Page 1. Report No. 2. 3. Recipients Accession No. MN/RC 2007-18 4. Title and Subtitle 5. Report Date Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment On US-169 Princeton, MN May 2007 6. 7. Author(s) 8. Performing Organization Report No. Malaki Musa Ruranika & Jerry Geib 9. Performing Organization Name and Address 10. Project/Task/Work Unit No. Office of Materials 1400 Gervais Avenue 11. Contract (C) or Grant (G) No. Maplewood, MN 55109 12. Sponsoring Organization Name and Address 13. Type of Report and Period Covered Minnesota Department of Transportation 395 John Ireland Boulevard Mail Stop 330 St. Paul, Minnesota 55155 15. Supplementary Notes http://www.lrrb.org/pdf/200718.pdf 16. Abstract (Limit: 200 words) Final Report 14. Sponsoring Agency Code The purpose of this report is to evaluate the performance of 1999 and 2000 ultra-thin bounded wearing course (UTBWC) surface treatment on US-169 in Princeton, Minnesota. The UTBWC consisted of gap graded course aggregate hot mix asphalt over a heavy asphalt emulsion layer and it was placed at an average thickness of 3 8. For comparison purposes, a control section was established to assess the performance of the overlay. This section continues to be maintained using standard sealing and patching techniques. The surface roughness and condition of these sections have been monitored on yearly basis. The overall performance of the UTBWC sections has been very good, while the control section is currently in need of major rehabilitation. The UTBWC appears to provide an economical choice for pavements in need of minor rehabilitation. In addition, UTBWC may prove beneficial as a preventive maintenance option. It should be considered for all sections with minor cracking and roughness distresses that do not stem from subgrade problems. Nationwide research has shown that UTBWC reduces deterioration caused by weathering, oxidation, traffic and provides good skid resistance, reduced rolling noise, reduction of hydroplaning, and back spray from roadway. UTBWC does not increase the structural capacity of the pavement, however, the use of UTBWC on new pavements as a wearing course could be considered. 17. Document Analysis/Descriptors 18. Availability Statement Novachip, UTBWC, Pavement, Preventive Maintenance, Performance, Ultra-thin, Hot mix asphalt, Ride Quality Index, RQI No restrictions. Document available from: National Technical Information Services, Springfield, Virginia 22161 19. Security Class (this report) 20. Security Class (this page) 21. No. of Pages 22. Price Unclassified Unclassified 23

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, MN Final Report Prepared by: Malaki Musa Ruranika & Jerry Geib Minnesota Department of Transportation Office of Materials May 2007 Published by: Minnesota Department of Transportation Research Services Section 395 John Ireland Boulevard, MS 330 St. Paul, Minnesota 55155-1899 This report represents the results of research conducted by the authors and does not necessarily represent the views or policies of the Minnesota Department of Transportation and/or the Center for Transportation Studies. This report does not contain a standard or specified technique. The authors and the Minnesota Department of Transportation and/or Center for Transportation Studies do not endorse products or manufacturers. Trade or manufacturers names appear herein solely because they are considered essential to this report

Acknowledgements The authors gratefully acknowledge the help of several individuals, including: Dan Wegman with SemMaterials for providing cost data. Randy Reznicek and Pat Wallin Johnson with Mn/DOT District 3 for their support in obtaining data and more information. Tom Nordstrom and Tom Wood with Mn/DOT for their information and assistance with Mn/DOT Pavement Management system. The authors would also like to express their appreciation to Peter Davich with Mn/DOT for his ideas and vital contribution.

Table of Contents Chapter 1: Introduction...1 Chapter 2: Project Description...2 Chapter 3: Performance of UTBWC on US-169...4 Chapter 4: Conclusion and Recommendation...11 References...12 Appendix A: Index Performance Graphs

List of Tables Table 1 Rate of RQI Change for UTBWC Sections...4 List of Figures Figure 1 Texture of UTBWC on US-169....1 Figure 2 Project Location...2 Figure 3 Pathway Services, Inc Video Inspection Vehicle (VIV)...3 Figure 4 Ride Quality Index Performance for UTBWC and Cracks Sealed Sections...5 Figure 5 UTBWC Overlay Section...6 Figure 6 Cracks Sealed Section...6 Figure 7 Longitudinal Edge Crack...7 Figure 8 Transverse Cracks Reflecting Through the UTBWC Overlay...7 Figure 9 Transverse Cracks Reflecting Through the UTBWC Overlay...8 Figure 10 UTBWC Pavement Located on the Left and Control Section on the Right...8 Figure 11 Rehabilitation Strategy versus Performance...10

Executive Summary Ultra-thin bonded wearing course (UTBWC) pavement treatment was introduced to Minnesota in 1999. This technique, in which hot mix asphalt (HMA) is laid over a heavy asphalt emulsion layer or membrane, can be used as a preventive maintenance option or surface rehabilitation technique. One of the first highways to be overlaid with UTBWC was US-169 near Princeton. This was done in two phases, September 1999 and August 2000, and made use of the Novachip brand. For comparison purposes, a control section was established to assess the performance of the overlay. This section was sealed and pothole patched and has been maintained using standard techniques. Pavement condition data were collected yearly using the Pathway Services Inc. video inspection vehicle (VIV). The average ride quality index (RQI) of the UTBWC overlay section was 3.3 in 2002 and 3.2 in 2006, which indicates an RQI change of 4.5 percent. The RQI on the control section was 2.5 in 2002 and 1.9 in 2006, which is a 24 percent change. There have been no maintenance costs on the UTBWC overlay section since its construction. Some transverse cracks have reflected through; however, they are still tight. Mn/DOT s Pavement Management System predicts that the UTBWC overlay section will perform well for at least 5 more years, while the control section is currently in need of major rehabilitation. On the basis of these observations, ultra-thin bonded wearing courses appear to provide an economical choice for pavements in need of minor rehabilitation. In addition, they may provide benefits as a preventive maintenance option. It is recommended that they be considered for all sections with minor cracking and roughness distresses that do not stem from subgrade problems.

Chapter 1 Introduction Ultra-thin bonded wearing course (referred as Novachip ) is a surface treatment process developed in France in 1980s. UTBWC involves the placement of a thin 3 8 to ¾ gap graded course aggregate hot mix asphalt over a membrane called Novabond. Novabond is a polymer modified asphalt emulsion designed to seal the existing roadway and bond with UTBWC asphalt materials. Some of the advantages of the UTBWC treatment as reported by Koch Materials Company are: Can be placed without milling. Minimum lane closure time. Placed in one pass. Reduce rolling noise (especially in urban use). Finished lift is 3 8 to ¾ thick. Fewer curb and minimal clearance adjustments. Coarse aggregate matrix- no loose chips. Uses a special asphalt membrane (Novabond ) for superior bonding. Wear resistant for longer life. Thinner lift means lower costs (1) and no shoulder overlay The performance limitations for UTBWC are that the treatment should be used on structurally sound pavements, only cracks greater than ¼ should be sealed. It should not be used on rutted pavements exceeding ½ or above overband crack filling or new seal patch due to the likelihood of bleed through (2,3). Figure 1: Texture of UTBWC on US-169. Photo Taken at RP 182 NB on February 14 th, 2007. UTBWC was placed in August 2000. 1

Chapter 2 Project Description The Minnesota Department of Transportation (District 3) constructed two projects on highway US-169 Northbound using Ultra-thin bonded wearing course (UTBWC) near the city of Princeton. The first project involved paving lanes between reference post 183 and 185.3 in September 1999. The second project extended this section from RP 180.845 to RP 183 in August 2000. The section from RP 185.3 to 187 was unmodified and has been used as a control section. US-169 was constructed in 1977 as a bituminous aggregate over base pavement (BAB). In 1993 a thin bituminous overlay was added to the original structure. The existing road had transverse cracks, which affected the roughness. This portion of US-169 carries an Average Annual Daily Traffic (AADT) of approximately 15,900 vehicles, of which 4 percent are trucks. Figure 2: Project Location in Princeton, Minnesota (US-169 Northbound) Surface Preparation and UTBWC Placement It was necessary to seal the cracks in the pavement with crumb rubber before the UTBWC was placed. 3 8 gap graded aggregates (granite), PG70-28 binder, and Novabond were used. Mn/DOT supplied labor and equipment except for the paver, which was supplied by Koch Pavement Solution. The material was laid using a special paver, which spread both the asphalt emulsion and hot mix asphalt in a single pass. Compaction was done to seal the asphalt into the Novabond membrane. 2

Data Collection Mn/DOT currently collects pavement condition data annually using the Pathway Services, Inc Video Inspection Vehicle (VIV) shown in Figure 3. Prior to 2000, Mn/DOT collected data every 2 years. Figure 3: Pathway Services, Inc Video Inspection Vehicle (VIV) (4). Pavement condition data from 1977 to 2006 were obtained from Mn/DOT s Pavement Management System. Visual inspection was done on February 14 th, 2007. 3

Chapter 3 Performance of UTBWC on US-169 Pavement Roughness To access the effectiveness of the Ultra-thin bonded wearing course, the ride quality index from the UTBWC treated section was compared with the RQI from the crack sealed (control) section. Table 1 contains RQI data from 2002 to 2006 as well as the predicted year at which rehabilitation will become necessary. A RQI value of 2.5 is often regarded as the point at which rehabilitation is necessary (5). The average change of RQI on the UTBWC section from 2002 to 2006 is 4.5 percent while the change on the control section over the same time period is 24 percent. This indicates that the control section deteriorated more than 5 times faster than the UTBWC section. Appendix A contains the graphs of RQI plotted against time from the Mn/DOT Pavement Management System, which predict how long the pavement will still be sound. Figure 4 shows the RQI from the UTBWC and crack sealed sections from 1990 to 2006. It can be seen that the ride quality index increased after the UTBWC placement in 1999 and 2000. There was a smaller increase in the RQI for the crack sealed (control) section as well. The average ride quality index for the UTBWC overlay section is 3.2, which is in good condition as categorized by Mn/DOT (4). However, the RQI for the crack sealed section is 1.9, which indicates that the pavement is in poor condition and needs major rehabilitation or reconstruction. Figures 5 and 6 contain pictures of the UTBWC overlay and crack sealed sections. The small change in the RQI trend in 2005 was mostly likely due to introduction of new video inspection vehicles. Table 1: Rate of RQI Change for UTBWC Sections UTBWC Location Reference Point RQI 2002 RQI 2006 RQI Change % Year Predicted for RQI =2.5 180.845 182 Paved Aug 2000 3.5 3.4 2.9 2021 US-169 NB 182 183 Paved Aug 2000 3.6 3.4 5.6 2017 183 184 Paved Aug 1999 3.0 2.9 3.3 2013 184-185.3 Paved Aug 1999 3.2 3.0 6.3 2012 185.3 187 (Control Section) 2.5 1.9 24.0 2002 4

US-169 Ultra-Thin Bonded Wearing Course Performance 4.5 4 Ride Quality Index (RQI) 3.5 3 2.5 2 Thin Overlay 1993 UTBWC Overlay 1999, 2000 1.5 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 Year UTBWC Overlay Crack Sealing and Pothole Patching RP 180.845-182 Paved Aug 2000 RP 182-183 Paved Aug 2000 RP 183-184 Paved Sept 1999 RP 184-185.3 Paved Sept 1999 RP 185.3-187 Control Section RQI Category 4.1-5.0 Very Good 3.1-4.0 Good 2.1-3.0 Fair 1.1-2.0 Poor 0.0-1.0 Very Poor Figure 4: Ride Quality Index Performance for UTBWC and Cracks Sealed Sections. 5

Figure 5: UTBWC Overlay Section (Paved in August 2000). Photo taken at RP 181.00 NB on February 14 th, 2007 Figure 6: Cracks Sealed Section. Photo taken at RP 185.4 NB on February 14 th, 2007. Distress Performance Figures 7, 8, and 9 show longitudinal edge crack and transverse cracks reflecting through the UTBWC overlay after 7 years. It can bee seen that the transverse cracks reflecting through the UTBWC overlay are still tight. The longitudinal cracks between the mainline and shoulder are wider in the area where the UTBWC overlay was not extended past the existing longitudinal 6

edge crack (Figure 7). Figure 10 shows the interface between the UTBWC overlay on the left and crack sealed section on the right. Figure 7: Longitudinal Edge Crack - after 7 years. Photo Taken at RP 184 NB on February 14 th, 2007. Figure 8: Transverse Cracks Reflecting Through the UTBWC Overlay. Photo Taken at RP 183.5 NB on February 14 th, 2007. 7

Figure 9: Transverse Cracks Reflecting Through the UTBWC Overlay. Photo Taken at RP 183 NB on February 14 th, 2007. Figure 10: UTBWC Pavement Located on the Left and Control Section on the Right- February 14 th, 2007. 8

UTBWC Cost Comparison The estimated in-place cost of the UTBWC for the US-169 project in 1999-2000 was $2.90 per square yard. The latest costs for UTBWC in Minnesota (2007) is estimated at $4.00 per square yard by SemMaterials SM, which includes material and placement costs. The actual price will depend on the quantity of UTBWC to be placed. No costs relating to the maintenance or rehabilitation of the UTBWC overlay sections have yet been incurred. None of the UTBWC overlay sections were near the terminal RQI value of 2.5 at the time of rating in 2006. The control section had a ride quality index of 2.5 in 2002 and 1.9 in 2006. Therefore, the control section is due for major rehabilitation. The estimated cost for the control section rehabilitation ranges from $12 to $15 per square yard, which includes a 3 mill and overlay. Figure 11 shows different performance curves for likely rehabilitation strategies. This indicates that UTBWC can be used as a cost effective alternative and should have long-term benefits. 9

5 Pavement condition before UTBWC $2.90/ sq yd for UTBWC in 1999 Estimated $4/ sq yd UTBWC in 2007 4 Performance (Ride Quality Index) 3 2 Control section RQI = 2.5 in 2002 Estimated $12-15/ sq yd for major rehabilitation in 2007 2006 RQI = 1.9 for 1.6 mi control section 1 0 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 2015 Year Figure 11: Rehabilitation Strategy versus Performance 10

Chapter 4 Conclusion and Recommendations The field performance of the UTBWC after 7 years is excellent: no weathering or edge deterioration is evident on any of the sections. Furthermore, the UTBWC appears to be adhering to the existing surface well: no raveling is evident This project is also performing well in regards to ride quality and transverse cracking. The average ride quality index on the UTBWC overlay section is 3.2 and the Mn/DOT Pavement Management System predicts the UTBWC overlay section will not reach an RQI of 2.5 for more than 5 years. The transverse cracks reflecting through the UTBWC overlay are still tight. Ultra-thin bonded wearing courses (UTBWC) appear to be durable: no maintenance costs have been incurred since 1999/2000. However, crack sealing should be considered in the future to extend the life of the overlay. The US-169 control section deteriorated very quickly despite annual maintenance. The ride quality index was 1.9 at the time of rating in 2006, which is well below the rehabilitation trigger value of 2.5. Major rehabilitation should be done on this section. Nationwide research has shown that UTBWC reduces deterioration caused by weathering, oxidation, traffic and provides good skid resistance, reduced rolling noise, reduction of hydroplaning, and back spray from roadway (2,6). UTBWC does not increase the structural capacity of the pavement, however, the use of UTBWC on new pavements as a wearing course could be considered. In order to reduce the effect of longitudinal cracks between the mainline and shoulder, the UTBWC overlay should extend past the existing longitudinal edge cracks. Evaluation of the US-169 UTBWC project should be continued on a yearly basis in order to have a better understanding of UTBWC performance and its life cycle costs. 11

References 1. Novachip - Moving Performance, (Wichita: Koch materials Company, 1998). 2. Technical Note: The Use of Novachip as Surface Treatment, (Olympia, Washington; Washington State Department of Transportation, June 2003). 3. Pavement Preventative Maintenance Program - Guidelines, (Saint Paul, Minnesota; Department of Transportation, January, 2001). 4. An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices, (Saint Paul, Minnesota; Minnesota Department of Transportation, March 2003.) 5. Mn/DOT Distress Identification Manual, (Saint Paul, Minnesota; Minnesota Department of Transportation, February 2003). 6. Performance of Novachip in New Mexico, (Santa Fe, New Mexico; New Mexico State Highway & Transportation Department, 2003). 12

Appendix A Index Performance Graphs

5 4 Ride Quality Index 3 2 1 Project: 1977 BAB Construction Project: 1993 Thin Overlay 0 1976 1980 1984 1988 1992 1996 2000 2004 2008 2012 2016 2007/03/05 Year Section:US 169 0 0 I 0 180+0.845-182+0.000 Index Performance Plot for UTBWC (US-169 NB RP 180.845 182.00) 5 4 Ride Quality Index 3 2 1 Project: 1977 BAB Construction Project: 1993 Thin Overlay 0 1976 1980 1984 1988 1992 1996 2000 2004 2008 2012 2016 2007/03/19 Year Section:US 169 0 0 I 0 182+0.000-183+0.000 Index Performance Plot for UTBWC (US-169 NB RP 182.00 183.00) A-1

5 4 Ride Quality Index 3 2 1 Project: 1977 BAB Construction Project: 1993 Thin Overlay 0 1976 1980 1984 1988 1992 1996 2000 2004 2008 2012 2016 2007/03/05 Year Section:US 169 0 0 I 0 183+0.000-184+0.000 Index Performance Plot for UTBWC (US-169 NB RP 183.00 184.00) 5 4 Ride Quality Index 3 2 1 Project: 1977 BAB Construction Project: 1993 Thin Overlay 0 1976 1980 1984 1988 1992 1996 2000 2004 2008 2012 2016 2007/03/05 Year Section:US 169 0 0 I 0 184+0.000-185+0.000 Index Performance Plot for UTBWC (US-169 NB RP 184.00 185.30) A-2

5 4 Ride Quality Index 3 2 1 Project: 1977 BAB Construction Project: 1993 Thin Overlay 0 1976 1980 1984 1988 1992 1996 2000 2004 2008 2012 2016 2007/03/05 Year Section:US 169 0 0 I 0 186+0.000-187+0.000 Index Performance Plot for Cracks Sealed Section (US-169 NB RP 185.30 187.00) A-3