Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

Similar documents
IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

Proposed Uniform Standards for Equipment Leaks

Requirements for the Ethylene MACT

EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC. Tennessee Operations Eastman Chemical Company

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Inspection Manual: Federal Equipment Leak Regulations for the Chemical Manufacturing Industry Volume I: Inspection Manual

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

U.S. EPA REGION 7 ORGANIC AIR EMISSIONS ASSISTANCE RCRA SUBPART CC GUIDANCE MODULE FOR CONTAINER LEVEL 3 CONTROLS

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

Tool Box Talk. Confined Space Entry New Construction Standard (2015)

Permitted MSS Emissions Tracking, Recordkeeping, and Reporting. Presented by ACES April 24, 2008

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

The purpose of this rule is to limit volatile organic compound (VOC) emissions from the storage of organic liquids.

O&M MANUAL HIGHLIGHTS

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

Frequently Asked Questions Directive 056 Facilities Technical

Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2)

Thank You for Attending Today s Webinar. Today s Featured Speaker

VOC Process Equipment Clearing, Cleaning, and Routine Maintenance. Individual Unit Function: Environmental Procedure No.: PA Page: 1 of 10

MSC Guidelines for the Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: March 30, 2012

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN

It s Just Calibration How Hard Can It Be?

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

PRESSURIZED EQUIPMENT AND SYSTEMS

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Low Coking Temperatures & Recent Site Experience

Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

U.S. EPA REGION 7 ORGANIC AIR EMISSIONS ASSISTANCE RCRA SUBPART CC GUIDANCE MODULE FOR TANK LEVEL 2 CONTROLS

High-Pressure Boiler Inspection Procedures: A Complete Checklist

Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert Gas Blanketing of Chemical Process Vessels

Title: Pressure Relieving and Venting Devices Function: Ecology & Safety No.: BC Page: 1 of 7 Reviewed: 6/30/12 Effective: 7/1/12 (Rev.

Flare Gas Composition Analysis and QA/QC Lessons Learned and Lessons Lost SPECTRUM ENVIRONMENTAL SOLUTIONS, LLC 1

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

WHITE PAPER. SmartPlant P&ID Engineering Integrity 10 Example Rules

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

STANDARD OPERATING PROCEDURES

Model General Permit Template. SERIES 13 Tanks. Template # SJV-TK

NORMAL OPERATING PROCEDURES Operating Parameter Information

GUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS

OPERATING PROCEDURES

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Operating Instructions

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code

SERIES 30. Spring Operated Tank Blanketing Valve PROTECTOSEAL.

9.0 Equipment Cleaning and Repair

Simplicity in VRU by using a Beam Gas Compressor

FE Petro vs. New Red Jacket Competitive Comparison

POWER FLUSH KIT INSTRUCTIONS

The Discussion of this exercise covers the following points:

SCENARIO 18 Leak on Intermodal Pressure Tank Container

Start-up, Shutdown and Malfunction Plans. Norman L. Morrow Fresh Air Consulting

Ohio EPA. Division of Air Pollution Control. Engineering Guide #78. (also known as DSIWM Guidance Document #1001 and #1002)

STANDARD OPERATING PROCEDURES

METHOD 25A - DETERMINATION OF TOTAL GASEOUS ORGANIC CONCENTRATION USING A FLAME IONIZATION ANALYZER

SECTION PRESSURE TESTING OF PIPING

Energy Control Procedures Lockout/Tagout 29 CFR

MSC Guidelines for Pressure Vessels

CCR Fugitive Dust Control Plan

HYDROSTATIC LEAK TEST PROCEDURE

PUBLIC COMPANY ORLEN LIETUVA OCCUPATIONAL HEALTH AND SAFETY PROCEDURE BDS-12 USE OF PORTABLE GAS ANALYZERS I. GENERAL

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1

CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

13. Evaporative Emission Control System

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

Early evap monitors. Photo courtesy Toyota Motor Sales, U.S.A., Inc.; diagram courtesy University of Toyota

Installation and commissioning instructions 255 series and 256 series

Gas Detection. Portable Gas Detection for Safety in Confined Spaces

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

6.6 Relief Devices. Introduction

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

PROCEDURE NUMBER: PRC-SAF-16 (Preparation of Piping and Equipment for Repair) Page 1 of 10 Rev. 1.4 Date: 10/17/2016 Rev. 2.

Health and Safety Executive. Key aspects of HS(G) 253. Andrew Hall HID CI 1G. HM Specialist Inspector (Mechanical)

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

ACCU-PULSE Installation and Operation Instructions

API Piping Plan 62: A Reliable Quench System

Relief Systems. 11/6/ Fall

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

Standard for Hazardous Waste Management, Compliance Checklist. Sean K. Grady, CHMM Vice President-Principal

Veriforce TG CCT 609OP. Training Guide

Tank Blanketing Pressure Regulators RHPS Series

Class 2 Gases Learning Tool

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

6301 TYPE CAST IRON SAFETY VALVES

ATEX VACUUM PUMPS AND GAUGES CHEMICALLY RESISTANT, OIL-FREE AND SAFE

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

SECTION 2 APPLICATION OF FUNDAMENTALS

Transcription:

Subparts AA and BB - The Other RCRA Air Rules Beginners aabb 1

Background Subpart AA - Process vents Subpart BB - Equipment leaks Subpart CC - Tanks, surface impoundments, containers. Also includes Subpart X units. Beginners aabb 2 Subpart AA standards apply to units where heat or the boiling point of a waste is used to create separation.

Applicability Issues for Subparts AA and BB - Who is Covered? Facilities subject to 40 CFR Part 270 Permitted Interim status Hazardous waste recycling units located at 90-day facilities, provided another unit at the facility has to obtain a RCRA permit (previously exempt) 90-day tanks and containers [40 CFR 264.1030(b)(1-3)] Beginners aabb 3 On December 6, 1994, EPA modified 270.4 to require facilities that have already been issued a final RCRA permit (and whose permit does not address the Subpart AA and BB requirements) to comply with Subpart AA and BB standards. [62 FR 64657]

Subpart AA Regulates Process Vents Any open-ended pipe or stack that is vented to the atmosphere either directly, through a vacuumproducing system, or a tank associated with the regulated equipment described next Beginners aabb 4 Vented means discharged through an opening, typically an open-ended pipe or stack, allowing the passage of a stream of liquids, gases, or fumes into the atmosphere. The passage of liquids, gases, or fumes is caused by mechanical means such as compressors or vacuum-producing systems or by process-related means such as evaporation produced by heating and not caused by tank loading or unloading (working losses) or by natural means such as diurnal temperature changes. [ 264.1031]

Applicability Issues for Subpart AA - What Types of Vents are Covered? Process vents associated with: Distillation Fractionation Thin-film evaporation Solvent extraction Or air or steam stripping operations That manage hazardous wastes with organic concentrations of at least 10 parts per million by weight (ppmw) Beginners aabb 5

Process Vent - Applicability Beginners aabb 6 Steam strippers are commonly used on relatively dilute aqueous type wastes. So the question might be why is this a type of device where you would find equipment affected by these rules? When the waste materials are stripped, the organic vapor phase passes overhead into an accumulator tank. When the organic material comes out of the accumulator tank and passes through the pumps and valves, the stripping systems at these points may be contacting waste materials with high enough organic content to be subject to these rules.

How do Subpart AA Regulations Work? Identify affected process vents Determine emissions rates Sum individual rates Compare to emission rate limits Reduce emissions below limits or 95 percent Beginners aabb 7

Standards - Process Vents Total organic emissions from all affected process vents <1.4 kg/h (3 lb/h) and 2.8 Mg/yr (3.1 tons/yr) or use of a control device to reduce the total organic emissions by 95 percent by weight Provisions exist for a closed-vent system and control device to meet the limits Beginners aabb 8

Subpart BB - The Equipment Standards Beginners aabb 9

Review of Regulatory Requirements Subpart BB What equipment is covered? Waste stream criteria Requirements for Pumps Compressors Pressure relief devices Sampling connecting systems Open-ended valves or lines Valves Flanges and other connectors Repair requirements Recordkeeping requirements Beginners aabb 10

Applicability Issues for Subparts AA and BB - Who is Covered? Facilities subject to 40 CFR Part 270 Permitted Interim status Hazardous waste recycling units located at 90-day facilities, provided another unit at the facility has to obtain a RCRA permit (previously exempt) 90-day tanks and containers [40 CFR 264.1030] Beginners aabb 11

Applicability Issues for Subpart BB - Some Exemptions Exist for: Equipment which contains or contacts hazardous waste < 300 hours per year [40 CFR 264.1064(g)(6), 265.1064(g)(6)] Equipment in vacuum service [40 CFR 264.1064(g)(5), 265.1064(g)(5)] Beginners aabb 12

Which Hazardous Waste Streams? Hazardous waste streams with organic concentrations of at least 10 percent by weight Gas or liquid at operating conditions Liquid stream may be either a light or heavy liquid Beginners aabb 13

Definitions - Hazardous Stream by Service Light liquid service Heavy liquid service Gas/vapor service Beginners aabb 14

Determination of a Light/Heavy Liquid Light liquid: Contains compound(s) with vapor pressure greater than 0.3 kpa at 20 o C Total concentration of pure components with vapor pressure greater than 0.3 kpa is 20 percent by weight, AND Is a liquid at operating conditions Heavy liquid NOT light liquid or gas/vapor Beginners aabb 15 The definition of light liquid and heavy liquid is provided in 40 CFR 264.1031.

Requirements for Pumps in Light Liquid Service Monitored monthly to detect leaks Checked weekly for indication of liquids dripping from pump seal Instrument reading of 10,000 ppm or greater indicates a leak Indications of liquids dripping from pump seal indicates a leak Beginners aabb 16

Requirements for Compressors Equipped with a seal system with a barrier fluid system, except: Equipped with a closed-vent system Designed as no detectable emissions (<500 ppm above background) Barrier fluid must not be a hazardous waste with organic concentration of 10 percent by weight or greater Sensor to detect failure of seal system, barrier fluid system, or both Daily/monthly check of sensor and leak repair requirements Beginners aabb 17

Requirements for Pressure Release Devices in Gas/Vapor Service Operated with no detectable emissions (<500 ppm above background) except during pressure releases Returned to no detectable emissions (to be monitored and confirmed within five days) after each pressure release Repair requirements when a leak is detected Beginners aabb 18

Requirements for Sampling Connecting Systems Must be equipped with a closed-purge, closed-loop, or closed-vent system System must do one of the following: Return purged fluid to process line Collect and recycle the purged fluid Capture and transport all of the purged fluid to a waste management unit or control device In-situ sampling systems are exempt Beginners aabb 19

Requirements for Sampling Connecting Systems (cont d) Gases displaced when filling the sample container are not required to be collected or captured [40 CFR 264.1055(a), 265.1055(a)] Beginners aabb 20

Requirements for Open-ended Valves or Lines Must be equipped with a cap, blind flange, plug or second valve, which seals open end at all times, except during required operations Second valve provision Double block and bleed provision Beginners aabb 21

Requirements for Valves in Gas/Vapor or Light Liquid Service Each shall be monitored monthly to detect leaks except: Designated as no detectable emissions and no external actuator Unsafe-to-monitor valve(s) Difficult-to-monitor valve(s) Instrument reading of 10,000 ppm or greater indicates a leak If no leak is detected for two successive months - quarterly monitoring Repair requirements Beginners aabb 22

Requirements for Valves in Gas/Vapor or Light Liquid Service (cont d) Alternative standards Percent allowed to leak Skip period detection and repair Beginners aabb 23

Requirements for Pumps and Valves in Heavy Liquid Service, Pressure Release Devices in Light or Heavy Liquid Service, and Flanges and Other Connectors Monitored within 5 days if leak found by visual, audible, olfactory or other determination Instrument reading of 10,000 ppm or greater indicates a leak Repair requirements Beginners aabb 24

Repair Requirements Leak must be repaired as soon as practicable, but no later than 15 calendar days after detected First attempt at a repair shall be made no later than 5 calendar days after detected Delays in repair [40 CFR 264.1059, 265.1059] Beginners aabb 25

Recordkeeping Requirements Equipment identification numbers Hazardous waste management unit identification numbers Approximate location of equipment Type of equipment Waste state and percent-by-weight total organics in waste stream at equipment Method of compliance with standard Beginners aabb 26

Recordkeeping Requirements (cont d) When a leak is detected: Equipment shall be identified with a weatherproof visible ID tag Record shall be entered into inspection log including: Instrument, operator, and equipment identification number Hazardous waste state Dates and method of compliance Beginners aabb 27

Reporting Requirements Semi-annual report for Valve, pump, or compressor leak not repaired as required Dates of HWMU shutdowns Control device exceedance(s) Beginners aabb 28

EPA Method 21 overview Identifies leaks, does not quantify emissions Instrument must respond to specific compounds Scale readable to 2.5% of leak concentration Sample gas flow rate between 0.1 and 3.0 l/min Types of portable organic analyzers: Flame ionization (FID) Catalytic combustion Photoionization (PID) Infra-red Beginners aabb 29 Method 21 is outlined in 40 CFR Part 60.

Summary - The RCRA Air Rules Subpart AA - Process vents Applies to specific treatment equipment Subpart BB - Equipment leaks aka, the leak detection and repair program Subpart CC - Tanks, surface impoundments, containers Close, capture and control Beginners aabb 30