City of Port Aransas Shoreline Analysis and Improvements

Similar documents
Cline s Point Marina Ship Wave Analysis

CALCASIEU SALINITY STRUCTURES. HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers)

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

SHORE PROTECTION AND HABITAT CREATION AT SHAMROCK ISLAND, TEXAS ABSTRACT

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

APPENDIX D-2. Sea Level Rise Technical Memo

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

APPENDIX C. Fluvial and Tidal Hydraulics Report

PLANNING AND CONSTRUCTION OF SHORE PROTECTION AT SHAMROCK ISLAND, TEXAS: PROJECT UPDATE ABSTRACT

LOCAL COASTAL PROGRAM UPDATE

SUPPLEMENTAL DOCUMENT SEA LEVEL RISE SCENARIO SELECTION AND DESIGN TIDE CALCULATION

NAVIGATION STUDY FOR LAKE WORTH INLET, FLORIDA DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT APPENDIX A ENGINEERING

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018

North Shore of Long Island, Feasibility Study

Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida

2016 NC Coastal Local Governments Annual Meeting

SEA LEVEL RISE IMPACT ASSESSMENT AND MITIGATION ALTERNATIVES DEVELOPMENT FOR BALBOA ISLANDS, CITY OF NEWPORT BEACH, CALIFORNIA

Project Incorporation of Sea Level Rise City of Newport Beach Approach for Balboa Islands, City of Newport Beach, California

Coastal Engineering Technical Note

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background...

SURGE SUPPRESSION ACHIEVED BY DIFFERENT COASTAL SPINE (IKE DIKE) ALIGNMENTS. Bruce A. Ebersole, Thomas W. Richardson and Robert W.

LITTLE LAGOON & LITTLE LAGOON PASS: RESEARCH UPDATES & DIRECTIONS

Preliminary Wake Wash Impact Analysis Redwood City Ferry Terminal, Redwood City, CA

Coastal Sediment Transport Modeling Ocean Beach & San Francisco Bight, CA

Hydraulic Modeling Analysis

Comparisons of Physical and Numerical Model Wave Predictions with Prototype Data at Morro Bay Harbor Entrance, California

Follets Island Nearshore Beach Nourishment Project

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

Redondo Beach Boat Launch Ramp Facility

St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting. May 2, 2018

Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting. August 21, 2017

Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting. June 05, 2018

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida

TITLE: The Importance of Model Validation: Two Case Studies. AUTHOR:Julie Thomas. Scripps Institution of Oceanography, La Jolla, CA.

Passage Key Inlet, Florida; CMS Modeling and Borrow Site Impact Analysis

WOODFIBRE LNG VESSEL WAKE ASSESSMENT

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

Implications of proposed Whanganui Port and lower Whanganui River dredging

Absecon Island Shore Protection The planning behind the project

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

The development of the historical harbour of Paphos, Cyprus H.J. van Wijhe*, M. Meletiou^ Division, P.O. Box 152, 8300 AD Emmeloord, The Netherlands

New Orleans Municipal Yacht Harbor

APPENDIX A Hydrodynamic Model Qualicum Beach Waterfront Master Plan

Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal

Assateague Island National Seashore North End Restoration Project Timeline

Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting. July 12, 2018

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario

Pier 8 Wave Overtopping Analysis (65 Guise Street East) Our File:

Sussex County, DE Preliminary Study Overview

ABSTRACT. KEY WORDS: Navigation safety; numerical modeling; waves; current; sediment transport; channel infilling; morphology change.

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Impact of Dredging the Lower Narrow River on Circulation and Flushing

Taranaki Tsunami Inundation Analysis. Prepared for Taranaki Civil Defence Emergency Management Group. Final Version

Analysis of Packery Channel Public Access Boat Ramp Shoreline Failure

INTRODUCTION TO COASTAL ENGINEERING

A New Strategy for Harbor Planning and Design

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

Appendix E Cat Island Borrow Area Analysis

Impact of Hurricane Matthew on the Atlantic Coast of Florida

STUDY ON TSUNAMI PROPAGATION INTO RIVERS

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

Richard W. Gilbert, P.E.

Boothbay Harbor Rotary Club May 12, 2016

Chapter 15 SEASONAL CHANGES IN BEACHES OP THE NORTH ATLANTIC COAST OF THE UNITED STATES

LAB: WHERE S THE BEACH

Estuarine Shoreline Stabilization

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

Plan B Dam Breach Assessment

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

North Half Moon Bay Shoreline Improvement Project, Pillar Point Harbor, CA Coastal Engineering Appendix

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

City of Del Mar Local Coastal Plan (LCP) Amendment for Sea Level Rise and Coastal Flooding

HARBOR INFRASTRUCTURE INVENTORIES Port Sanilac Harbor, Michigan

Hydrodynamic Modeling of Tides and Hurricane Storm Surge for Pre- and Post-Dredging Conditions in the Lower St. Johns River, Florida

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque

Hydrologic Feasibility of Storm Surge Barriers

BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY

Passing Vessel Analysis in Design and Engineering. Eric D. Smith, P.E. Vice President, Moffatt & Nichol

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

DELAWARE S VULNERABLE COASTAL AREAS. DELAWARE INLAND BAYS and DELAWARE BAY RECONNAISSANCE STUDY

Water Resources Report RKLD Annual Meeting July 30, 2016

MEAN LOW TIDE (MLT) to MEAN LOWER LOW WATER (MLLW)

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

Nome Harbor Page 2 of 12

Fact Sheet Ordinance Regulating Erosion Threatened Structures

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST

DUKC Chart Overlay. Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014

Feasibility Study for Restoration of Titlow Lagoon Fish Passage. South Puget Sound Salmon Enhancement Group

Available online at ScienceDirect. Procedia Engineering 116 (2015 )

Request Number IR1-12: Flow Passage. Information Request

Modeling Sediment Transport Along the Upper Texas Coast

Field and Laboratory Investigation of High-Speed Ferry Wake Impacts in New York Harbor

CROSS-SHORE SEDIMENT PROCESSES

Theory and Application Introductory Oceanography Ray Rector: Instructor

OECS Regional Engineering Workshop September 29 October 3, 2014

Modeling Historic Columbia River Flood Impacts

Developing Back Bay. Pre-Handout. Scope and Background

TIDES. Theory and Application

Transcription:

City of Port Aransas Shoreline Analysis and Improvements FINAL Technical Report August 24, 2016 Submitted To: City of Port Aransas

Prepared for: City of Port Aransas This document is intended for planning purposes only in support of future design efforts. It should not be used in lieu of permitting, final design, or construction documents developed specifically for those purposes. This version has been released as the final report. Respectfully Submitted, Aaron Horine Senior Coastal Engineer Coast & Harbor Engineering, a division of Hatch Mott MacDonald 711 North Carancahua, Suite 909, Corpus Christi, Texas 78401 361-661-3061 Aaron.Horine@mottmac.com Contributing Authors: Scott Fenical, P.E., D.CE Arpit Agarwal, P.E. Kirsten McElhinney, E.I.T Rev. Date of Issue Reason for Issue Lead Author QC Review Submitted by 0 6/30/2016 Draft for Review Kirsten McElhinney Arpit Agarwal Aaron Horine 1 8/24/2016 Final Report Kirsten McElhinney Aaron Horine Aaron Horine W:\347783 - City of Port Aransas Shoreline (Charlie's Pasture Marina)\4 - Technical Docs\20160824-FINAL Technical Memo.pdf August 24, 2016 FINAL Technical Report Page ii

City of Port Aransas Shoreline Analysis and Improvements Technical Report EXECUTIVE SUMMARY The shoreline along the Corpus Christi Shipping Channel (CCSC) in Port Aransas has been experiencing negative impacts from passing ship traffic and potential threat to public safety. The passing tankers produce surge waves which destroyed the City of Port Aransas fishing pier in 2008. After reconstructing the fishing pier at a higher elevation, the structure was damaged again in 2010 by waves produced by another passing vessel. The resulting hydrodynamic effects also cause overtopping of the bulkhead which creates a safety hazard for visitors walking along the bulkhead, as well as impacts to the concrete path and parking lot. The purpose of the analysis was to understand the hydrodynamics of the site, evaluate potential locations for a new fishing pier, evaluate potential improvements to enhance public safety at the bulkhead, and evaluate potential conditions inside a proposed marina basin. Vessel induced hydrodynamics were evaluated and simulated using the Vessel Hydrodynamics Longwave Unsteady (VH-LU) model. The VH-LU model calculates water level and current velocity fluctuations generated by moving deep-draft vessels. Observed conditions from site photos and videos were collected in order characterize the vessel induced hydrodynamics seen in the project area. The model results were compared with observed site photos and videos and documentation of pier damage and shown to provide a reasonable representation of the spatial patterns and magnitude of hydrodynamics affecting the shoreline. Vessel hydrodynamic modeling was used to evaluate water level and current velocity conditions surrounding the existing fishing pier, the existing bulkhead, and the proposed marina and breakwaters. Results from the modeling were then used to evaluate potential new locations for the fishing pier, measures to prevent overtopping of the bulkhead, and performance of breakwater alternatives in minimizing ship wave impacts inside the proposed marina. Maximum predicted water levels along the bulkhead were used to determine the possible locations of the fishing pier, and recommended elevation to avoid damage. The existing bulkhead was analyzed to determine both its current condition and stability, which is subject to scour. The maximum predicted water level along the bulkhead was also used to evaluate alternatives intended to minimize. Finally, several different entrance jetty and interior configurations were tested in order minimize water level fluctuations in the proposed marina. FINAL Technical Report Page iii

Table of Contents 1 Introduction... 1 2 Data Collection... 3 3 Ship Hydrodynamic Modeling... 4 3.1 Grid Setup... 5 3.2 Input Parameters... 5 3.3 Comparison of Modeling Results with Anecdotal Information... 6 3.4 Development of Design Conditions... 8 4 Alternative Development and Analysis... 10 4.1 Fishing Pier... 10 4.2 Bulkhead... 12 4.3 Proposed Marina Basin... 14 5 Conceptual Level Cost Estimates... 16 5.1 Fishing Pier... 16 5.2 Bulkhead... 17 5.3 Marina Entrance... 17 6 Conclusion... 17 7 References... 18 List of Figures Figure 1. Project vicinity...2 Figure 2. Examples of ship wave damage to fishing pier in 2008 (left) and 2010 (right)....2 Figure 3. Project site....3 Figure 4. NMS hydrographic survey transects (green) and area of additional NMS topographic survey (purple)....4 Figure 5. VH-LU grid bathymetry for existing conditions....5 Figure 6. VH-LU water surface elevation results. Note: Red contours on land signifies when a dry node has turned wet due to resulting water surface elevations, i.e. when overtopping has occurred....7 Figure 7. Extracted water surface elevation time series. Location of extracted data shown inset at blue dot...7 Figure 8. Comparison of overtopping extents for outbound case between observed (left) and modeled (right). Note: Arrow shows the approximate location and view point of the observed conditions....8 FINAL Technical Report Page iv

Figure 9. Maximum water surface elevation for inbound route (top) and outbound route (bottom) with vessel speed 10 knots....9 Figure 10. Maximum water surface elevation for 10 knot vessel speed (top) and 12 knot vessel speed (bottom) moving outbound....10 Figure 11. Fishing pier design. Note: Conceptual designs are not shown to scale.... Error! Bookmark not defined. Figure 12. Conceptual fishing pier locations and design. Note: Conceptual designs are not shown to scale....11 Figure 13. Conceptual bulkhead alternatives. Note: not shown to scale....13 Figure 14. Example of transparent flood barriers....13 Figure 15. Maximum water elevation along existing bulkhead (top) and associated distance along bulkhead (bottom)...14 Figure 16. Permitted marina design....15 Figure 17. Conceptual jetty configurations...15 Figure 18. Maximum water surface elevation generated by passing ship effects for alternative entrance channel and jetty configurations...16 List of Tables Table 1. Tidal datum at Port Aransas Station references to NAVD88 datum in feet....4 Table 2. Conceptual level fishing pier construction costs....17 Table 3. Bulkhead modification construction costs....17 FINAL Technical Report Page v

City of Port Aransas Shoreline Analysis and Improvements Final Technical Report June 30, 2016 1 INTRODUCTION This report describes analysis conducted by Coast & Harbor Engineering, (CHE), a division of Hatch Mott MacDonald, for the City of Port Aransas (City). The shoreline along the Corpus Christi Shipping Channel (CCSC) in Port Aransas has been experiencing negative impacts from passing ship traffic, such as damage to the fishing pier and overtopping of the bulkhead and public access walkway. Figure 1 shows the location of the impacted shoreline near Port Aransas Nature Preserve (formerly known as Charlie s Pasture). The resulting ship wakes overtop the bulkhead which creates a safety hazard for visitors walking on the path along the top of the bulkhead. Tanker induced waves have also damaged the fishing pier. Approximately 25 feet of the pier was severely damaged in 2008 (Parker, 2008), as shown in Figure 2. When repairing the damaged pier, the deck elevation was raised in order to avoid future damage of the pier. Unfortunately, the new deck elevation was not sufficient to protect the pier as it was damaged again due to passing ship effects in 2010, also shown in Figure 2. CHE evaluated tanker induced hydrodynamics in order to characterize the impacts passing vessels have on the project site. Resulting hydrodynamics were analyzed at the location of the existing fishing pier and along the existing bulkhead. Using this analysis, alternative locations and modifications to these structures were evaluated to minimize impacts to the structures and public safety from passing ship effects. Additionally, a permitted marina concept was analyzed with alternative entrance protection and interior features with the goal of developing a marina conceptual layout with lesser impacts from passing ship effects. Figure 3 shows the project area including the existing fishing pier, existing bulkhead and proposed conceptual marina basin. Final Technical Report Page 1

Project Site Corpus Christi Bay Figure 1. Project vicinity. 2008 2010 Figure 2. Examples of ship wave damage to fishing pier in 2008 (left) and 2010 (right). FINAL Technical Report Page 2

Existing Fishing Pier Existing Bulkhead Proposed Marina Figure 3. Project site. 2 DATA COLLECTION Bathymetry data was compiled from various sources in order to create a numerical modeling grid for passing vessel hydrodynamic modeling. A single-beam hydrographic survey was performed for the project by Naismith Marine Services (NMS). The survey transects were focused along the project site, as shown in Figure 4. NMS also collected elevation data along the bulkhead and fishing pier, with the area of detail shown in Figure 4 within the purple outline. Additional data for the modeling grid was gathered from US Army Corps of Engineers (USACE) hydrographic surveys (USACE 2015) and USGS topographic survey data (USGS 2011). The hydrographic surveys were used to complete areas of missing in-water data while the topographic contours were used for upland elevations. FINAL Technical Report Page 3

Figure 4. NMS hydrographic survey transects (green) and area of additional NMS topographic survey (purple). The tidal datums used for this project were obtained from the Port Aransas Station published by Texas Coastal Ocean Observation Network (TCOON, 2014) and are shown in Table 1. Table 1. Tidal datum at Port Aransas Station references to NAVD88 datum in feet. DATUM ELEVATION [FT. NAVD88] Mean Higher High Water (MHHW) 1.00 Mean High Water (MHW) 0.96 Mean Sea Level (MSL) 0.62 Mean Low Water (MLW) 0.09 Mean Lower Low Water (MLLW) -0.04 3 SHIP HYDRODYNAMIC MODELING Deep-draft vessel-induced surge analyses were performed to provide an evaluation of water level fluctuations and surge-induced current velocities generated within the project site by passing vessels. The VH-LU model was used to simulate water level and velocity fluctuations generated by passing deep-draft tankers within the project area moving inbound and outbound in the ship channel. FINAL Technical Report Page 4

3.1 Grid Setup The bathymetry grid was developed using all relevant data available with priority given to the 2016 survey data collected by NMS. The grid used for the VH-LU model is approximately 2.3 miles by 0.8 miles with a uniform grid spacing of 3.3ft (1m). The bathymetry contours and grid boundary are shown in Figure 5. Figure 5. VH-LU grid bathymetry for existing conditions. 3.2 Input Parameters Two different sets of input parameters were used in order to evaluate the performance of the VH-LU model. One set of simulations utilized a conservative, typical scenario with the largest vessel that traverses the CCSC and the water level at Mean Higher High Water (MHHW). A second set of simulations utilized conditions during an actual historical event from 2008 that caused extensive damage to the fishing pier. CHE gathered all available information about the incident in order to replicate the historical hydrodynamic conditions. One design vessel was the Godavari Spirit, a crude oil tanker with length, beam, and draft of 900ft, 157ft and 45ft, respectively. This design vessel represents the typical largest tanker that travels the CCSC. The routes modeled for the passing vessel were along the channel centerline for both inbound (from Gulf of Mexico to Corpus Christi Bay) and outbound vessels. Passing speeds were 10 knots. Historical simulations utilized the ship that caused the damage in 2008, the SKS Tiete, a crude oil tanker with length, beam, and draft of 800ft, 138ft, and 45ft, respectively. The ship was traveling outbound when the damaging event occurred. A speed of 10 knots was selected as a conservative estimate (speed was unknown). The water level the ship passed the fishing pier according to the Port Aransas station (NOAA 2016) was approximately 0.7ft above MHHW. FINAL Technical Report Page 5

3.3 Comparison of Modeling Results with Anecdotal Information In order to qualitatively confirm the results of the VH-LU model, model results were compared with anecdotal information (photos, videos and observations). Videos and photos have shown the characteristics of the ship induced hydrodynamics, including wave patterns and overtopping locations. Anecdotal and photo/video observations were compared to the water surface elevation data from the VH-LU simulations. During the 2008 damage event, witnesses reported that the wave overtopped the bulkhead and traveled more than 150 feet across the pier parking lot (Parker, 2008). VH-LU water surface elevation results during this event (shown in Figure 6) show overtopping along the bulkhead and inundation of the entire parking lot. The furthest extent of over wash was up to 300 feet away from the bulkhead. The water surface elevations at the fishing pier were also compared to the known fishing pier deck elevation at the time of the accident. Figure 7 shows the VH-LU calculated maximum water surface elevation at the fishing pier which was approximately 1 foot above the deck elevation, indicating that damage would be likely to occur. Site videos showing bulkhead overtopping during outbound events were also compared with model results. A video taken from the fishing pier looking southwest (Urban, 2014) showed extensive overtopping along the bulkhead, as shown in Figure 8. Similarly, the VH-LU model results indicate very similar overtopping along the bulkhead (in Figure 8). For all scenarios tested, the VH-LU model qualitatively replicated the ship-induced hydrodynamic conditions observed at the site. Both the spatial patterns and magnitudes of the modeling results are in general agreement with the site observations. Based on these results, the VH-LU model is considered to be a reliable tool for evaluation of proposed project alternatives. FINAL Technical Report Page 6

~300 Figure 6. VH-LU water surface elevation results. Note: Red contours on land signifies when a dry node has turned wet due to resulting water surface elevations, i.e. when overtopping has occurred. T.O. Bulkhead & Fishing Pier Deck = +5 ft Figure 7. Extracted water surface elevation time series. Location of extracted data shown inset at blue dot. FINAL Technical Report Page 7

Figure 8. Comparison of overtopping extents for outbound case between observed (left) and modeled (right). Note: Arrow shows the approximate location and view point of the observed conditions. 3.4 Development of Design Conditions The ship hydrodynamic modeling results were used to develop design conditions for evaluating different alternatives and locations for the fishing pier, bulkhead and marina basin. Inbound and outbound passing ship routes were compared to determine which is more appropriate to use in evaluating alternatives. Figure 9 shows the difference in overtopping along the bulkhead and at the fishing pier between inbound (top) and outbound (bottom) passing vessels (with a vessel speed of 10 knots). The outbound route allows more development of the bore wave along the bulkhead due to a shallow shelf present just seaward of the bulkhead. Due to the more destructive nature of the outbound results, the outbound passing route was used for testing of alternatives. FINAL Technical Report Page 8

Inbound Outbound Figure 9. Maximum water surface elevation for inbound route (top) and outbound route (bottom) with vessel speed 10 knots. Simulations indicated that passing ship impacts are not necessarily worse at higher speeds due to stronger bore formation earlier along the ship channel, and higher dissipation of the bore prior to reaching the project features of interest. Therefore to determine the worst-case condition for evaluating alternatives, two possible maximum speeds at 10 and 12 knots were tested in the VH-LU model. Figure 10 shows that the 12 knot vessel (bottom) caused more overtopping at the western end of the bulkhead but resulted in almost no inundation at the fishing pier. In comparison, the 10 knot vessel (top of Figure 10) gives similar overtopping along the bulkhead, but also completely overtopped and inundated the fishing pier and associated parking lot. Therefore, 10 knot passing speed was chosen for evaluation of project alternatives. FINAL Technical Report Page 9

10 knots Figure 10. Maximum water surface elevation for 10 knot vessel speed (top) and 12 knot vessel speed (bottom) moving outbound. 12 knots Design water level is also required for testing alternatives. In order to test the structures during worst case conditions, the water level from the day of the 2008 pier damage event (+0.72 MHHW) was used for the alternatives analysis. 4 ALTERNATIVE DEVELOPMENT AND ANALYSIS Both the existing structures (the fishing pier and bulkhead) and proposed structures (permitted marina and entrance protection) were analyzed to develop project alternatives that would maximize public safety and provide the desired recreational benefits. The ship hydrodynamic model results were used to develop alternative concepts for improving conditions at the existing and proposed structures. The following sections detail the design conditions used and the resulting designs for the fishing pier, bulkhead, and marina. 4.1 Fishing Pier The alternative fishing pier designs were assumed to be similar overall. The three design features that vary between the alternatives are location along bulkhead, length of catwalk, FINAL Technical Report Page 10

and pile bent elevation. The variation of these designs are due to differences in maximum water elevation and bathymetry for the different locations along the bulkhead during design conditions. The locations were chosen based on the spatial extents of maximum water surface elevation for a vessel traveling outbound at 10 knots (shown in top of Figure 10). At these locations, the maximum water surface elevation at the bulkhead was extracted (shown in Figure 14) and analyzed in order to determine an appropriate pier elevation that would avoid contact with the pressure field waves. Finally, pier lengths were prescribed in order to provide depths similar to those at the seaward end of the existing fishing pier. Figure 11 shows the alternative fishing pier locations, elevations, and lengths. In general, the fishing pier deck elevation can be lowerin locations farther west due to lower water surface elevations during passing ship events, but the pier lengths increase due to the orientation of the bulkhead relative to the bottom contours (deeper water). Figure 11. Conceptual fishing pier locations and plan view design. Note: not shown to scale. FINAL Technical Report Page 11

4.2 Bulkhead Several bulkhead modifications were considered to reduce or prevent overtopping. One modification considered was addition of a concrete barrier to the top of the existing bulkhead (Alternative A in Figure 12). While suitable for eliminating overtopping, more analysis is required to determine whether the existing bulkhead could support the additional load. Another alternative analyzed was addition of a transparent barrier to the top of the bulkhead (Alternative B in Figure 12). Using a lighter material makes this a more feasible option than Alternative A as the load on the bulkhead would be significantly reduced. Also, using transparent materials would avoid obstructing channel views and provide a more aesthetically pleasing option than the concrete barrier (example structures are shown in Figure 13). Alternative C in Figure 12 consists of installing a new, taller bulkhead in front of the existing bulkhead. The final conceptual alternative is a rock revetment in front of the existing bulkhead (Alternative D in Figure 12). This rock revetment would help reduce the overtopping, and also provide scour protection along the toe of the bulkhead. The top elevation of Alternatives A, B, and C were computed in order to prevent overtopping by the peak water levels during the design passing ship event. Figure 16 shows the maximum water surface elevation along the bulkhead, and the existing bulkhead elevation. From the data shown in Figure 14, it was determined a top elevation of +8.5 ft NAVD88 would likely preclude significant overtopping. The top elevation of Alternative D was developed only to ensure the rock structure was emergent during the design condition, or above MHHW (which is approximately 1.72 NAVD88). Therefore, Alternative D is not intended to eliminate overtopping by acting as a barrier. Alternative D could reduce overtopping due to its roughness and porosity, which would help break up the traveling bore wave and allow water passage through the structure. FINAL Technical Report Page 12

A B C D Figure 12. Conceptual bulkhead alternatives. Note: not shown to scale. Figure 13. Example of transparent flood barriers. FINAL Technical Report Page 13

Proposed Top Elevation of Alternatives A, B, and C Existing Bulkhead Elevation Figure 14. Maximum water elevation along existing bulkhead (top) and associated distance along bulkhead (bottom) 4.3 Proposed Marina Basin In addition to analyzing potential improvements/replacements for the existing structures (pier and bulkhead), a proposed marina basin conceptual layout was also analyzed in order to evaluate the potential conditions inside during passing vessel events. Figure 15 shows the permitted marina design with angled jetties. Both the interior basin configuration and entrance jetty configuration were modified to evaluate their influence on conditions inside the harbor. The goal of the modifications was to minimize wave reflections and concentrations of stronger currents during passing ship events. Initial results determined that the marina basin interior should not include side slopes, where ship waves tend to shoal and break, and should avoid sharp edges to minimize strong currents and toe scour at interior bulkheads. Those interior basin modifications, while not intended to represent an optimized harbor, were further used when evaluating various entrance and jetty configurations. The primary intent of entrance modifications was to minimize the water level fluctuations within the marina. Figure 16 shows four of the different jetty configurations considered while Figure 17 shows the maximum water surface elevation for each of the alternatives. As shown in Figure 17, Alternatives 3 and 4 resulted in the lowest maximum water elevations within the marina due to the angle of the jetties. Alternatives 1 and 2 have larger long-period water FINAL Technical Report Page 14

level fluctuations inside the basin since the entrances are wider than Alternatives 3 and 4. Alternatives 2 and 3 have no overtopping of the existing bulkhead on the east side of the harbor, whereas Alternatives 1 and 4 have overtopping on both sides of the entrance. Figure 15. Permitted marina design. 1 2 3 4 Figure 16. Conceptual jetty configurations FINAL Technical Report Page 15

1 2 3 4 Figure 17. Maximum water surface elevation generated by passing ship effects for alternative entrance channel and jetty configurations. 5 CONCEPTUAL LEVEL COST ESTIMATES The following sections present conceptual level cost estimates for the conceptual alternatives including the fishing pier, bulkhead modifications, and marina entrance jetties. These costs are intended to be conceptual in nature, are approximate and are subject to change during preliminary and final engineering design. Costs are exclusive of permitting, data collection and engineering. These estimates assume typical equipment is used by contractors who commonly perform marine construction activities in the region. 5.1 Fishing Pier Two different type of fishing piers were considered in order to give a range of cost information for each alternative design and location. The cost for both concrete and timber fishing piers are presented in Table 2 for Locations 2 through 4. Location 1 (the location of the existing fishing pier) is known to be in a vulnerable location, therefore only costs for a FINAL Technical Report Page 16

concrete pier are provided. As shown in Table 2, concrete piers are more costly than timber piers; however, concrete is more durable and less likely to be damaged. Table 2. Conceptual level fishing pier construction costs. Concrete Structure Location Approximate Total Cost Timber Approximate Total Cost Location 1 $1,200,000 to $1,600,000 -- Location 2 $2,200,000 to $2,600,000 $250,000 to $300,000 Location 3 $2,200,000 to $2,600,000 $250,000 to $300,000 Location 4 $3,000,000 to $3,400,000 $300,000 to $350,000 5.2 Bulkhead Conceptual level costs to improve the existing bulkhead were estimated and shown in Table 3. While Option 1 is the lowest cost, additional analysis is necessary in order to determine if the existing wall can withstand the additional forces of the concrete barrier. It should also be noted that the new bulkhead option (Option 3) includes the possibility of either steel or concrete sheet pile to be used to construct the new bulkhead. Table 3. Bulkhead modification construction costs. Bulkhead Improvement Approximate Cost/LF Option 1: Concrete Addition to Existing Option 2: Glass Addition to Existing Option 3: New Bulkhead Option 4: Revetment $60 - $75/LF $450 - $510/LF $2,500 - $3,000/LF $500 - $650/LF 5.3 Marina Entrance A conceptual level cost estimate was also developed for the proposed marina entrance which includes the construction of sheet pile type jetties. The cost doesn t include dredging for the entrance channel or the interior basin excavation. The conceptual level cost estimate is in the range $2.0M to $4.0M, assuming a steel sheet pile jetty structure, the current bathymetry and is applicable for all alternatives presented. 6 CONCLUSION The shoreline along the CCSC in Port Aransas is experiencing detrimental conditions due to passing ship traffic. The existing structures (fishing pier and bulkhead) are vulnerable to damage and unsafe conditions and need to be addressed immediately to avoid future damage and safety hazards. The fishing pier, which has been destroyed in the past decade, needs to be relocated and elevated in order to avoid impacts from ship-induced waves. The bulkhead requires modification to eliminate the overtopping that is creating a safety hazard. The proposed marina needs adequate FINAL Technical Report Page 17

protection to prevent waves generated by outbound vessels in the HSC from causing damage and safety hazards in the basin. Results indicate that an angled jetty configuration with narrower entrance is most efficient at minimizing the resulting wave action from the passing vessels inside the basin. However, the issues with the existing structures (fishing pier and bulkhead) need to be addressed prior to the design and construction of the marina and entrance jetties to ensure public safety. 7 REFERENCES Gostkowski, T.(2013, July 28). [tom gostkowski]. Tyler Gostkowski Ship Wake Surf - Port Aransas, Texas. https://www.youtube.com/watch?v=kwkssafnera. NOAA (2016) National Ocean Service Tides and Currents. http://tidesandcurrents.noaa.gov/stationhome.html?id=8775237. Last accessed February 2016. Parker, D. (2008, January 24). City seeks restitution for pier damage. Port Aransas South Jetty. Retrieved from http://www.portasouthjetty.com/. TCOON (2014). Texas Coastal Ocean Observation Network. http://www.cbi.tamucc.edu/tcoon/. Last accessed October 2014. Urban, J. (2014, April 17). [Jim Urban]. Charlies pasture bulkhead. https://www.youtube.com/watch?v=o2h46vxq62g U.S. Army Corps of Engineers. (2015). Galveston District Hydrographic Surveys. http://www.swg.usace.army.mil/missions/navigation/hydrographicsurveys/galvestontexascity Houston.aspx. Last Accessed February 2016. US Geological Survey. (2011). Lidar dataset. http://tnris.org/data-catalog/elevation-lidar/usgs-2011-150cm/. Last Accessed February 2016. FINAL Technical Report Page 18