Eliminating Medical Gas Shutdowns for 10 years

Similar documents
Installation Instructions for NP100 Series Nitrogen Control Panels

MEDICAL EQUIPMENT CATALOG

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Shut-Off Valves and Valve Boxes

I. Subject: Medical Gas Systems Utility Failure Interim Procedure III. Purpose:

LARGE DRY CHEMICAL, TWIN-AGENT, AFFF, HALON 1211, AND AQUASONIC (NITROGEN-OPERATED SYSTEMS) Pressure Regulator Test Manual

Pressure Regulators. Operating Instructions. Instrumentation

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

Inert Air (N2) Systems Manual

Medical Gas Solutions

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY PNEUMATIC RELEASE. 1. DESCRIPTION (Refer to Figures 1, 2 or 3.

MEGR-1912 Instruction Manual

UTMB RESPIRATORY CARE SERVICES GUIDELINES Respiratory Care Services Medical Gas Cylinder Storage, Use and Transport

4-W GAS ODORIZER WITH POSITIVE ACTION INDICATOR GAUGE (300 PSIG) 2014 INFORMATION MANUAL SUBMITTED BY:

MEGR-1627 Instruction Manual

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

MEDICAL AIR Effective date: 02/80 MAINTENANCE Revision date : 08/12

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY ELECTRIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

TECHNICAL DATA Q= C. Table 1 - Specifications

POWER FLUSH KIT INSTRUCTIONS

Table of Contents. Operating Instructions. Resource v.2 Conserving Regulator

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

Safety Policy Manual Policy No. 133

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

GE Oil & Gas. Mooney * Flowgrid * Slam Shut Regulator. Delivering accuracy, performance and protection

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

1 Exam Prep. Tabs and Highlights

September 2018 Pressure Test

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

TECHNICAL DATA. Q= Cv S

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

Piped Air SCBA Refilling System Standard

Thank You for Attending Today s Webinar. Today s Featured Speaker

Types 749B and R130 Changeover Manifolds

Oxygen Usage Best Practice Guide

Cable Pressurization Buffering

Medical Oxygen Concentrator Systems. Generate gases on site generate savings

TECHNICAL DATA. than the water inlet pressure to the concentrate

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

Nitrous Oxide / Oxygen FLOOR MOUNTED OUTLET STATION Installation and Instructions

INJECTION ODORIZING SYSTEMS : DOSAODOR TYPE

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

Tri-Tech Medical Inc.

First Stage Regulators

Pressure and/or Temperature Pilot Operated Steam Regulators Series 2000

Installation Operating Instructions for Duplex Manual Manifolds PX-TMD Series

TECHNICAL DATA. Q = C v P S

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

Float Operated Level Controllers

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009

1. HISTORY: This issue publishes a revision of this publication.

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

TECHNICAL DATA. Table 1 - Specifications

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA. Q = C v P S

I. Subject: Compressed gas cylinders, regulators, and portable liquid systems.

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Chlorine Supply Containers And Piping

TECHNICAL DATA OBSOLETE

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

Trifecta High-Pressure Systems

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002

DEPARTMENT OF THE ARMY MEDICAL DEPARTMENT ACTIVITY Fort Huachuca, AZ MEDDAC MEMORANDUM 06 March 2008 No

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime

TECHNICAL DATA. Page 1 of 12

ECS Protector Nitrogen Inerting Vent (PAV-WN)

NITROGEN INFLATION SYSTEM NG-4, NG-6, NG-12, NG-18

Emergency Mobile Unit Medicinal gases everywhere, always on time

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

Air Eliminators and Combination Air Eliminators Strainers

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

LPG DRIVER ATTENDED TRANSPORT LOADING

G96 Series BASOTROL Dual Operator Valve

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance

Trifecta Systems. Cryogenic Equipment for High Performance Gas Supply. Trifecta Product Catalog

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Welker Magnetic Indicator (With Gravity Mixer) Model CP2GM-HP

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

DK ton, Double-acting, Die-type Crimping Tool

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

Welding, Cutting, and Brazing

A guide to Part 10 of the

LNG Regulator Test Kit

Standard: NFPA 86 Process Ovens and Furnaces. NFPA 85 Boiler and Combustion Systems Hazards Code

AUTOVENT 4000 VENTILATOR

PERMA-CYL 230/450/1000/1500/2000. Installation Manual Manual # Revision B

INSTALLATION & OPERATION MANUAL FOR Stockpot Range

MicroBulk Solutions. Next Generation Solutions for Safe and Efficient Delivery for Gas and Liquid Applications

Technical Information

Transcription:

Eliminating Medical Gas Shutdowns for 10 years

Smart Tap is a tool used by hospitals. It has been used OVER 5000 TIMES to accomplish: Relocation of Bulk Gas Systems Relocation of zone valves Tie-ins of new additions and new buildings Tie-ins of new medical gas risers Capping off medical gas for renovations Additions and deletions within a zone without effecting patients in the adjoining rooms, especially in NICU &

SMART TAP Patented Procedure The Smart Tap procedure as well as most of the equipment are patented. The Shape Memory Alloy Couplings (SMA) are made of Nickel/Titanium by Smart Tap Inc. and have been included in NFPA Standards since 1985. SMA Coupling exceed a 1000 o F brazed joint. Their melting temperature is 2200 o F and have a burst pressure in excess of 7500 psi. at which point the copper fails All tools and pipe assemblies are cleaned for oxygen at are facility which is certified NASA Spec 10. This certification is far superior to cleaned for oxygen service. We have manufactured zone valves for most of the medical equipment providers All NFPA Standards for installation of new piping are followed by our certified technicians

A Normal Medical Gas Shut Down Requires: Months of planning Countless meetings and memos Coordination of hospital staff Ordering & coordinating medical gas deliveries, regulators & tank carts Delivering the medical gas to the patient rooms and setting up the back up. Shutdowns usually occur in the early mornings of a Saturday or Sunday This means overtime and hospital personnel doing jobs other then taking care of the patients

Using the SMART TAP instead of a shutdown Hospital has to receive our equipment and backup gas which is delivered to the facility We provide the staff & equipment to move and set up the back up gas Hospital has to provide two or more locations each with 2 patient outlets of the gas being worked on downstream of the Smart Tap to plug in backup Notify the facility personnel that work is being done on the medical gas system Hospital patients remain on the medical gas system with no change in their care The hospital staff remains doing their normal jobs Smart Tap is done during normal weekday hours of operation

Smart Tap Technology Saves Money by leaving the Respiratory, Nursing and Maintenance staff alone - doing what they are paid to do patient and facility care. Not worrying about gas cylinders, regulators or running out of supply Maintains patient care without change Saves time - all of the meetings and coordination Requires very little interface to get the job done

Smart Tap Personnel and Equipment Our personnel are highly trained in medical gas systems with a minimum of 18 years experience Our Quality Control Personnel are meticulous in the preparation of the equipment, valve assemblies and Shape Memory Couplings Our equipment is inspected and re -cleaned after each use Our staff coordinates all deliveries of equipment and backup medical gas From the Hospital s perspective, our procedure is a turn Key process

Back up Procedures - Oxygen We have designed and perfected a liquid oxygen back up that consists of an oxygen dewar that contains 150,000 ml of oxygen delivered through a vaporizer and dual line regulators One or more dewars are set up depending on size of back feed A duplication of the hospital s bulk system PLUS RESERVE

Medical Air and other types of Medical Gas back up One or more high pressure manifolds with dual line regulators are connected to the appropriate number of cylinders Each manifold has connected (in use and reserve cylinders) to provide an uninterrupted supply

Smart Tap Procedure The location of a new valve or valve assembly is established Back up (if needed) is placed downstream of this point Blocking valves (one or two) are placed on the line. The amount of blocks is determined by whether the downstream side to be taken out of service (one block) or needs to be maintained (two blocks) One block is closed if the downstream piping is being demoed then the downstream pipe is cut away and replaced with a medical gas valve If the downstream piping is remaining and has patients connected the backup gas is allowed to run and pressure is monitored, if need be the block can be opened and backup can be adjusted When it is determined that the back feed is functioning properly then the second blocking valve is closed and the piping is cut in- between the two blocks

Blocking Valve in Place opened One blocking valve means the downstream piping is being taken away

Blocking valve is closed closed At this point the downstream flow of gas is shutoff If back-up is in place it is tested to make sure it is capable of maintaining house pressure If not the blocking valve is opened and back-up is adjusted Once the medical gas system is functioning normally

The piping is cut free 1 2 A pneumatic end cap (1) with a linear block (2) is placed on the piping This end cap and linear block seals the end of the cut pipe This allows for the next step to take place

Blocking valve is opened (1) 1 2 The linear block (2) is then slid into the pipe past the blocking valve & engaged It is now possible to cut the blocking valve off the pipe

Blocking valve and pneumatic end cap are cut away & removed The piping is sealed by this linear block This linear block is capable of holding 500 psig The piping is now ready for the new medical gas valve or valves

Shape memory alloy coupling (1) and Valve (2) is installed over linear block The pipe cutter in this picture is acting as a stop for the proper placement of the coupling 2 The coupling has 4 radial teeth two in each half lengthwise 1 In about 40 seconds the coupling seals the joint with 60,000 ksi of stress making a live crimp

End cap (1) is put back in place 2 1 The end cap is placed over the end of the piping, linear block (2) and valve pipe extension End cap (1) is energized to seal valve pipe extension & linear block (2)

The valve is closed 1 The linear block (1) is then released and slid out past the valve 2 The valve is closed (2)

End cap and linear block removed The end cap and linear block are removed If the piping is going to be put back together the pipe would be blown out & another shape memory coupling would be installed Or the valve pipe extension could be capped for future use

Upstream piping would be done using the same procedure and future valve assembly would be installed This future valve assembly would be inserted on the downstream side of the second block You would now have a full port future valve

Future valve installations use 3 valves 2 3 1 There would be a valve (1) that controls both the new inline valve to the old system (2) and the new valve (3) to the future piping addition Allowing for more control of your piping systems

Assembly purge 3 A C 1 2 B A shape alloy memory coupling would be in place at location A & B there would be system gas pressure at both valves 1 & 2 which would be closed at this point of the procedure Valve 1 and valve 2 would be opened for a second to allow for system gas to purge at point C Location C would then be joined with a third shape memory alloy coupling Valve 3 would be opened and then valve 1 and 2 alternately would be opened to allow system gas to escape Valve 3 would then be closed and Valve 1 & 2 would be opened and the system would be placed back on line This procedure take approximately 40 to 80 minutes depending on size of pipe

The Smart Tap Procedure Has control of the gas from beginning to end A very small amount of system gas 4 lpm is allowed to flow when inserting the linear block this allows for no contamination to get into the piping The piping is then purged using the newly installed valve or valves and placed back into service

Some of our Clients

Contact Information Smart Tap, Inc P.O. Box 277 415 Main Street Oley, Pennsylvania 19547 Phone: 888-762-7855 Fax: 610-987-3810 Email info@smarttapinc.com Web: www. smarttapinc.com