PIERRE QUINON STADIUM

Similar documents
THE NEW TRACK AT HORNET STADIUM

ATHLETIC STADIUM ISAIA DI CESARE

SERIES A VOLLEYBALL LEAGUE

WORLD PADEL TOUR. Year Founded: 2013 Number of events: 16 (2015 edition) Number spectators per event: about 20,000. Turf (Spain)

Sports Synthetic Court

Team up with the leading European scoreboard manufacturer

THE 2012 LONDON GAMES

AUBURN UNIVERSITY RECREATION AND WELLNESS CENTER

Product range. Over 3,000. Elan. telescopic stands. dividing curtains. games. scoreboards. multipurpose outdoor playgrounds

E V E N T S & E N T E R T A I N M E N T T H E K I A O VA L


OXYGEN POWER By Jack Daniels, Jimmy Gilbert, 1979

gripper multipurpose surface

LET S get moving! campus walking routes. ulethbridge.ca/hr/wellness. University of Lethbridge 4401 University Dr. West Lethbridge, AB T1K 3M4

South Dakota High School Activities Association. The Basketball Season Will Soon Be Starting

GrAnD StAnDS EVENT SOLUTIONS TO COMFORTABLY WELCOME YOUR AUDIENCE

Scheduling the Brazilian Soccer Championship. Celso C. Ribeiro* Sebastián Urrutia

Endrup School. Improving the preschool learning environment with daylight and fresh air

INFORMATION PACKAGE. Ctra. Cales de Mallorca s/n. Km. 1,2, 07500, Manacor Mallorca (Spain)

The Economic Importance of Recreational River Use to the City of Calgary

European Athletics Health and Well-Being Conference January 2014, Marseille (FRA)

TRANSIT SIGNAL PRIORITY The Toronto Experience

DESIGN CHARETTE AND PUBLIC INFORMATION SESSION CITY OF HAMILTON - LANDINC - SPECTRUM

Exponent's Fundamentally Flawed Research


TRANSPORTATION TOMORROW SURVEY

ORGANISING TRAINING SESSIONS

Satisfaction with the quality of the sporting experience survey (SQSE 4) Results for Handball: Trends July 2012

National Sport Trust Fund Manitoba Chapter Approved Project List (As of Sept 2, 2015) SPORT PARTNER PROJECT NAME PROJECT #

Airfield Pavement Smoothness Airport Pavement Workshop. Michael Gerardi APR Consultants

INFORMATION PACKAGE GENERAL INFORMATION. Ten-Pro Global Junior Tour RAFA NADAL ACADEMY by MOVISTAR

Starring. Kentucky expo center - kentucky int l convention center

Gonzaga Off-Campus Theme House Application Applications due October 5th at 4:30pm

CALIFORNIA Golden Bears

Update Paris 2024 presents an optimised Olympic Games venue concept

SAMPLE RH = P 1. where. P 1 = the partial pressure of the water vapor at the dew point temperature of the mixture of dry air and water vapor

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Understanding the. Dr. Christopher Waller. Federal Reserve Bank of St. Louis

The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG)

Movement Analysis Observation, Evaluation and Prescription

Vienna International White Water Crocodile Club

PDMS Report 2012, NZG Consultation Process National Membership Statistics, Casual Golf Membership Research.

2014 INDOOR WORLD CHAMPIONSHIPS IN ATHLETICS

WMO LABORATORY INTERCOMPARISON OF RAIN INTENSITY GAUGES

Sports, Sports Education and Leisure in Riga

Russian Outbound Ski Tourism in 2018: An Overview

The Re-Creation of Recreation Your Community Ice Rink. "A Step By Step Plan"

GENERAL. 1. Description

Master Transportation Plan Bicycle Element Survey

Olivier Robinet B TWIN International Director

Ultra Lightweight Family

Ultra Lightweight Family

Equestrian Estate. Property Features. For Sale - $2,900, Woodbrook Way, Fountain, NC

Telephone : Fax :

ABOUT BATA INDUSTRIALS

Show jumping Owners Partnerships. with Amy Graham and Haras du Ry

Inspiration toolkit. Toulouse: key facts EUROCITIES members Cities in action: grasping Berlin - shaping Berlin... 4

DISCOVERFLIGHT.ORG MODELAIRCRAFT.ORG

discovered main bill energy

YMCA EPPING April 2018

Writing Exam Feedback Fall Training Inspiring Lifelong Passion for the Mountain Experience

Simon Patmore The Paralympian South Korea

Exploring Measures of Central Tendency (mean, median and mode) Exploring range as a measure of dispersion

Junior Colts Cheerleading Program

VAV SYSTEM INDOOR AIR QUALITY CONSIDERATIONS FOR OFFICE SPACES

Female Football in Kosova Sanije Krasniqi. Women s football: Played, Watched, Talked about!

For God, For Learning FOREVER SAMFORD. Building a strong future for Samford University

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

001/1516 Minutes of the Previous Meeting (Sports Committee - 19th March 2015) No points of action required attention

PNC R1, CBRP Soccer Concession Programming Partner

STUDENT. Sport Guide

SKATE AT THE ISU WORLD CUP SPEED SKATING FINAL, MARCH 16-26, 2018 MINSK, BELARUS FUNTASTIC SKATING TRAINING CAMP

2016 NATIONAL SPORTS LAW NEGOTIATION COMPETITION ROUND TWO. Bump, Set, Spike GENERAL FACTS FOR BOTH TEAMS

Bus Riders of Saskatoon Meeting with City of Saskatoon Utility Services Department October 23, :30pm 2:30pm th Street West, Saskatoon

Turim.Projects. Il salasso Turin, Italy Piero Camoletto apartment. Palasport Olimpico. Lingotto Factory Conversion

Palexpo. Geneva Motor Show 2016 ADVERTISING PRODUCTS. 3 rd to 13 th March March (Press Days) 3 13 March (Public Days)

Molten to Supply Official Match Ball

ESSENTIAL FUNCTIONS ANALYSIS of Decontamination/Radwaste Technician

Carolina Panthers: Changing Gas Station Strategies in Charlotte

OCEANIA AREA RECORD REGULATIONS

Hunting for the Sweet Spot by a Seesaw Model

improve your performance

DMU 065 Ogemaw County Deer Management Unit

Equity in Athletics 2017 Institution: Roosevelt University (148487) User ID: E Screening Questions

Fatigue Resistant Sockets for Dynamic Loads PFEIFER Cable Structures. Cable structures technology Info Nr PFEIFER SEIL- UND HEBETECHNIK GMBH

Junior C olts Cheerleading Program

liniled Handrail liniled Handrail Number of LEDs

64% UNSAFE and. Where can features be added to improve the street for bicyclists?

AN INVITATION TO BECOME A SPONSOR OF

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Enjoy the summer sports camps and GO WILDCATS!

Donald W. Reynolds Razorback Stadium North End Zone Addition and Stadium Updates JUNE 2016

The first Deliberative Poll in Poland

Using Farecard Data to Suggest Cycling Policies in Singapore. Ashwani Kumar Viet Anh Nguyen Kwong Meng Teo Amedeo Odoni

CORPORATE. DUPLAYS Employee Engagement Program 2014

INTRODUCTION 3 ORYA MISSION STATEMENT 3 PROGRAM INFORMATION 3 LEAGUE DESCRIPTIONS 3 RIPKEN BASEBALL INC. 3

BISA VOLLEYBALL. A scene of volleyball play in an Erwadi village.

Year Level Players Net Height Court Dimensions Game Year on m Divided Volleyball Court (3 mini courts) Badminton Court (inside lines)

Canadian Gymnaestrada

Friar s Walk / Newport South Wales

Transcription:

PIERRE QUINON STADIUM Start of construction: September 2011 Opening: September 2013 Installation of track surface: April 2013 Cost: 22 million euros Capacity: 532 (89 for some events) Project Management: Architect Jean Guervilly THE FIRST INDOOR SPORTS STADIUM IN NANTES IS IN THE GRAND WEST AREA OF FRANCE. THE FACILITY WAS BUILT WITH RESPECT FOR THE ENVIRONMENT AND TO SAVE ENERGY. INSIDE THE FACILITY IS A TRACK WITH A MONDO SURFACE. Sport Architecture (France) From a technical perspective, athletes are very happy and say that the track is very fast, Christophe Saudrais, Project Manager, DATI BATI - Pôle Projets d'equipements. THE FIRST INDOOR STADIUM IN THE GRAND WEST In the early 2000s, professional athletes residing in the city of Nantes and the Pays-de-la-Loire region needed a facility where they could train throughout the year out of adverse weather. So the city s administration and the region s government decided to build an indoor stadium, dedicated mainly to athletics, but also suitable for hosting sports such as badminton, handball, basketball, volleyball, etc. The athletics world in the Nantes area demanded such a structure for several decades, but the project could only be completed through the financial participation of several organizations, said Christophe Saudrais, Project Manager, DATI BATI - Pôle Projets d'equipements. The 22 million euro cost to build the facility was equally divided between the city of Nantes, the Pays-de-la-Loire region, the University of Nantes and the state. THE STRUCTURE Located on the Nantes University campus, the Pierre Quinon stadium allows athletes to practice sports at all levels year-round and in the best conditions possible. This is primarily a training facility open to everyone (schools, clubs, and associations), but it also hosts important events at the regional and interregional levels, and some of the most important university sports competitions, such as the French Championships, said Saudrais. The choice to build on campus was deliberate. What prompted the University of Nantes to participate actively in the project was the desire to have a multipurpose sports facility, said Olivier Laboux, Rector of the University of Nantes. The new stadium is useful for university sports in all forms, Pag. 1/

whether it s training and studying sports activities, or competing and training in the field. In addition, some rooms host exams twice a year. HOW IT IS CORRESPONDING TO THE CONSTRUCTION The construction of the Pierre Quinon stadium was entrusted to Jean Guervilly, an architect with extensive experience designing facilities for indoor sports enthusiasts. For the new stadium, Guervilly wanted to give athletes who practice sports indoor similar conditions to what they would have t r a i n i n g o r r u n n i n g o u t d o o r s. In countries where it rains and is cold, having an indoor athletics stadium is necessary. Although this is an acceptable solution, it is still not the same as actually training outdoors. So I wanted this facility to enable those training inside to be able to experience the outside as much as possible, explained Guervilly. To achieve this goal, Guervilly maximized the use of natural lighting. Windows extend across the ceiling from one side of the facility to the other, enabling an abundant amount of natural light to come in. The windows face north to avoid glare, which can make workouts more difficult, said Guervilly.*** THE TRACK During construction, close attention was paid to the quality of the track surface that was installed to ensure the athletes best performance during training and competition. For the oval and the athletics track, which occupied the largest area, a product with optimal shock absorption, [athlete's response, energy storage and return, and durability was required. Mondo s Sportflex Super X Performance 13.5mm was chosen for the indoor track. From a technical perspective, the athletes are quite satisfied and say that the track is very fast," said Saudrais. A DELICATE OPERATION ondo was involved in the supply and installation of athletics track pavement and related elements. Asphalt preparation is fundamental work for us, recalled Alessandro Ambrogio, Sales Manager of Mondo France. In this installation, setting up the track with inclined curves was a particularly delicate operation. Following asphalt construction, technicians who specialize in mathematics conducted a series of surveys, which were needed by those who prepared the infrastructure. The measurements were checked again before the floor was finally laid. Perfect coordination between the various workers involved in the construction was critical. The outside of the track has the same bend radius as the track, and there is a casing around the surface, so it was necessary to have excellent coordination between the technicians, suppliers, and installers of the track and the facility designers, explained Ambrogio. Building a facility is the result of collaboration among workers. Exactly like for an athlete, a good final result is a combination of work, trust, and relationship with others. "When there is a coming together like the one that was with the Nantes project, the result is a beautiful, high-quality facility," said Guervilly. THE IMPORTANCE OF AN INDOOR FACILITY The Pierre Quinon stadium is located in an area of France where sport, and especially athletics, is practiced assiduously. In our region, passion for athletics is strong: in recent years, membership of the Regional Athletics League has increased by 54%, bringing the number of members to 22,000, which makes us the second largest region of France, behind Ile-de-France," said Jean-Pierre Fournery, President of the Athletics League Pays-de-la-Loire region. Given that athletics training is from the beginning of October to the end of April, the importance of an indoor facility available for working out is evident. Already the presence of an indoor stadium in the region has brought some immediate benefits, including easier participation of athletes especially young people throughout the year, increase in athlete s performance level, and decrease in fatigue and costs associated with frequent transportation that athletes and their coaches previously had. Until now, we had to drive many hours to find a 200m indoor track, commented Cristophe Cavoleau, Vice President of the Club Athletics Herbauges Athlé 44. This stadium allows the club to save transportation costs. The track is beautiful, fast, and the stadium is suitable for organizing regional events. Having a structure of this level and being able to train during all seasons improves the development of Nantes club. Pag. 2/

Pag. 3/

Pag. 4/

Pag. 5/

Pag. 6/

Pag. /