FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

Similar documents
Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

Integrating Community Development and Transportation Strategies. November 13, 2014

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Crystal City Citizen Review Council Meeting. July 10, 2013

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA

Planned Improvements from Sector & Area Plans that have been added to the MTP

N. Frederick Street to N. Manchester Street

Appendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP

TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR

PenPlace SPRC #6. September 27, DRAFT

Crystal City-Potomac Yard Transitway Extension

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

VIRGINIA RAILWAY EXPRESS

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of March 16, 2019

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

2045 Long Range Transportation Plan. Summary of Draft

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of October 20, 2018

ARLINGTON COUNTY, VIRGINIA

DOT Performance Measurement and Reporting System All Performance Measures

Business owner or commercial property owner in Arlington, 8. Visitor in Arlington, 17

TECHNICAL MEMORANDUM. Introduction

Washington DC Section of ITE Project Briefing

What if YOU could help plan Northern Virginia s transportation future?

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Public Information and Participation Comments

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

DOT Performance Measurement and Reporting System

Introductions John Carten noted that Linda Massaro has resigned from the TAC.

Update of the Master Transportation Plan s (MTP) Bicycle Element

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

ARLINGTON COUNTY, VIRGINIA

Arlington County Commuter Services. Making An Impact. May 2009

I-395 Express Lanes Northern Extension Project Public Hearings

Project Description Form 6V

Ridership in Virginia by System FY2017

/ ARLINGTON COUNTY, VIRGINIA

Solana Beach Comprehensive Active Transportation Strategy (CATS)

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

Transportation-Demand Management Community Presentation

Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project

CHAPTER 3: Service and System Evaluation

Arlington County, Virginia Proposed CIP Program Summary

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

Project Description Form 8EE

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

TECHNICAL MEMORANDUM. Introduction. Neighborhood Traffic Analysis. Vehicular Travel Times. Mitch Bonanno. Vornado/Charles E. Smith.

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Public Opinion about Transportation Issues in Northern Virginia


VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

SUMMARY OF TRANSPORTATION INVESTMENTS

HOW OUR REGIONAL TAX DOLLARS ARE BEING SPENT THE HONORABLE MARTY NOHE CHAIRMAN, NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

CHAPTER 7 OF THE COMPREHENSIVE PLAN TRANSPORTATION Mobility for all Modes

June 15, Ms. Norma Cozart Zoning Administrator ARLINGTON COUNTY 2100 Clarendon Boulevard Arlington, VA RE: Special GLUP Study Request

Metropolitan Council Transportation Committee

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

I-66 Corridor Improvements Route 15 to I-495. November 2014

Bus Rapid Transit Plans

Regional Transportation Needs Within Southeastern Wisconsin

Metropolitan Park 4/5

Project Description Form 8AA

Transportation Master Plan Advisory Task Force

Typical Rush Hour Commute. PennyforTransportation.com

Route 7 Corridor Study

FY2006 Budget Board Budget Committee request for information. Board Request: Detailed information on bus route 5A DC-Dulless Airport

Highway 217 Corridor Study. Phase I Overview Report

Appendix F: Detailed Modeling Results

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Columbia Pike Implementation Team (CPIT) Meeting

TRANSPORTATION & MOBILITY

Chapter 5 Future Transportation

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Capital Beltway HOT Lanes - Frequently Asked Questions

Table of Contents. 2.0 Land Use and Transportation Inputs Land Use Factors Transportation Factors

Capital Beltway HOT Lanes Project

City of Fairfax, Virginia City Council Work Session

Arlington s Master Transportation Plan

McLEAN CITIZENS ASSOCIATION

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

MTP BICYCLE ELEMENT UPDATE. November 2017

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Bicycle and Pedestrian Access in Transit Oriented Developments. Bruce Wright Chairman, Fairfax Advocates for Better Bicycling April, 2009

Virginia Hospital Center Expansion

County of Fairfax, Virginia. Department of Transportation

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012

Arlington County, Virginia Adopted CIP Program Summary

Arlington Public Schools Thomas Jefferson Site Evaluation Preliminary Findings. Thomas Jefferson Working Group Meeting #2 October 1, 2014

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Public Opinion about Transportation Issues in Northern Virginia A Report Prepared for the:

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

I-35W Solutions Alliance Project Update July 13, 2017

Durham Region Long Term Transit Strategy

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Transcription:

FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017

Forecasted Growth Arlington continues to grow with a shift towards multi-family residential infill Population Employment 340,000 340,000 320,000 320,000 300,000 280,000 289,500 300,000 280,000 279,500 260,000 260,000 240,000 240,000 220,000 200,000 222,800 220,000 200,000 222,300 2017 2045 Source: Arlington County Planning Division, Round 8.4 2

Transit-Oriented Development Success in concentrating growth around three transit corridors 37 million sq. ft. of office space 36 million sq. ft. in Metrorail station areas with over 6 million sq. ft. of supporting retail and services. Rosslyn-Ballston and Route 1 corridors support the County s commercial tax base. 114,000 housing units Over 47,080 in Metrorail station areas and 17,600 units along Columbia Pike corridor. 56% of all housing in established transit corridors. Source: Arlington County Planning Division, March 2016 3

Providing Travel Options County is investing to enhance the quality of all travel options 1,094 lane-miles of streets and 19 miles of HOV lanes Over 5,500 on-street metered parking spaces 12 miles of Metrorail and 11 stations VRE commuter rail Extensive regional (23 Metrobus routes) and local bus service (16 ART routes) Carshare program with nearly 90 cars, plus point-to-point carsharing in conjunction with DC (500 vehicles) Growing Bikeshare program with 88 stations and 20 more funded 50 miles of multi-use trails and 36 miles of on-street bike lanes and sharrows Extensive and growing network of sidewalks 4

Achieving a Sustainable Community Investments in transportation infrastructure and services help the community meet its sustainability goals R-B CORRIDOR TODAY R-B CORRIDOR 1970 5

Traffic Volumes Declining Smart growth has allowed Arlington to add population while decreasing traffic volumes Traffic on main arterials is down over 15-20 year period. Street Segment Street Type 1996 2011/2012 % Change 1996-2012 2014/2015 % Change 2012-2015 Lee Hwy - Rosslyn EW 6-lane arterial 37,770 31,951-15.40% 25,400-20.50% Wash. Blvd. - VA Square EW 4-lane arterial 20,469 17,500-14.50% 16,885-3.50% Clarendon Blvd. EW 2-lane 1-way arterial 13,980 13,292-5.00% 12,000-9.70% Wilson Blvd. - Clarendon EW 2-lane 1-way arterial 16,368 12,603-23.00% 11,000-12.70% Arlington Blvd. EW 6-lane arterial 55,865 65,259 16.80% 66,445 1.80% Glebe Road - Ballston NS 6-lane arterial 35,230 31,000-12.00% 28,000-9.70% Glebe Road - South of Col. Pike NS 4-lane arterial 29,000 27,000-6.00% 24,000-11.10% George Mason Drive* NS 4-lane arterial 20,002 20,518 2.30% 20,405-0.60% Route 1 north of Glebe Rd. NS 6-lane arterial 52,000 44,000-15.40% 48,500 10.20% *2016 volumes were included due to unavailability of 2015 counts 6

Vehicle Miles Declining 7

Safety is Improving 8

Demand Management is Effective 9

Residents Bike and Walk More 10

Transit Ridership Increasing Arlington s focus on developing high-quality transit is moving more people without more traffic. Transit ridership grew significantly over 19-year period but Metro and VRE ridership have declined in recent years. FY1996 Actual FY2015 Actual % Growth Metrorail Arlington Stations 45,335,000 56,191,208 23.9% Metrobus Arlington Routes 12,049,000 14,247,548 18.5% VRE Crystal City 567,000 829,137 46.2% Arlington Transit (ART) 105,000 2,821,980 2,587% Total Annual Ridership 58,056,000 78,122,856 27.7% 40% of Virginia s total annual transit ridership is from Arlington-related trips. 11

Annual Ridership Local Bus Ridership Growing ART ridership continues to increase, counter to the significant declines in transit ridership region-wide 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,990,402 2,261,100 2,833,000 2,823,346 2,537,000 2,644,000 3,111,575 3,405,000 1,500,000 1,000,000 674,806 1,428,827 1,225,427 926,574 1,060,441 500,000 0 FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 Fiscal Year FY17 12

Master Transportation Plan (MTP) County Board-adopted policy guides our transportation CIP investments. MTP General Policies: A. Integrate transportation with land use B. Support the design and operation of Complete Streets C. Manage travel demand and transportation systems 13

Accessibility Expanding Options 14

Recent Accomplishments 15

Recent Accomplishments Capital Bikeshare expansion Columbia Pike Street Improvements and Utility Undergrounding - South Wakefield to Four Mile Run New Commuter Store at Rosslyn Metro Station Freedmans Village Bridge 16

Recent Accomplishments Crystal City Potomac Yard Transitway Wilson Boulevard restriping (between Frederick and Manchester Streets) Bus stop improvements 17

Recent Accomplishments Building out the County s ITS Fiber Network Benefits: Provides increased capacity and reliability by replacing obsolete copper communications Will connect more than 290 traffic signals to central system, and will serve public safety sites such as fire stations Final phase of County s Transportation System Management Communications Upgrades 18

Overview of Transportation CIP Continues Arlington's commitment to developing, maintaining and managing a transportation system that expands travel choice and provides equal access for all users During next 10 years, Arlington plans to invest over $1 billion in transportation improvements to enhance the quality of life and economic well-being of residents, workers and visitors Complete street projects to enhance multimodal accessibility in our neighborhoods Metrorail station projects to improve accessibility, safety for riders A new Premium Transit Network for Columbia Pike, Pentagon City, Crystal City, Potomac Yard Maintenance and reconstruction of County bridges and roads Improvements to street lights and signals Enhancements to the pedestrian and bicycle network and parking 19

Transportation Program Summary Other Maintenance Capital 0.5% Program Administration 3.5% Paving 11.9% Complete Streets 44.2% Prog ram $M Complete S treets 568 Trans it 512 Paving 152 Other Maintenanc e C apital 7 Program A dminis tration 44 T otal 1,284 Transit 39.9% 20

Transportation Funding Summary TCF 27% TIF 5% Federal 6% State 14% Source $M* Federal 72 State 182 NVTA Regional 290 PAYG/Other 160 GO Bond 169 TCF 344 TIF 65 Total 1,284 GO Bond 13% NVTA Regional 23% * Figures for the various sources include new funds as well as previously approved funds PAYG/Other 12% 21

External/Dedicated Funding Sources Funding Source Federal Formula State Transit Formula State House Bill 2 State Revenue Sharing Northern Virginia Transportation Authority (NVTA) Regional Toll Revenues I-66, I-395* Transportation Capital Fund (TCF) Commercial and Industrial (C&I) Tax TCF NVTA Local Tax Increment Financing (TIF) Restrictions on Use of Funding (per state code or other binding documentation) Multiple programs, small annual allocations, focused on improvements related to safety, air quality, and multimodal transportation (0-20% match) Transit service expansion and capital improvements (match varies) Roadway improvements, transit capacity expansion, TDM (no match) Roadway improvements (50% match) Roadway and transit improvements included in the NVTA Regional Plan that provide greatest congestion reduction relative to cost (no match) Multimodal improvements on parallel corridors that increase person throughput and benefit the toll-paying users of the toll road (no match) New or enhanced road / transit improvements that add capacity, service, or access and capital or operating costs related to the new projects, and benefit the business community Additional roadway construction, capital improvements that reduce congestion, or public transportation purposes Capital and public infrastructure improvements in the TIF area: Crystal City, Pentagon City, Potomac Yard * This source is anticipated and does not yet exist 22

Investment Areas Implementing the MTP and Supporting Land Use Plans Transit Complete Streets Route 1 Columbia Pike Maintenance Capital Rosslyn-Ballston County-wide 23

Investments Route 1 Corridor CCPY Transitway Extension to Pentagon City Projects: Complete streets: 18 th St. S. S. Fern St. to S. Eads St. S. Hayes St. Pentagon City Multimodal Army Navy Dr. to 15 th St. N. 27 th St. S. US1 to Crystal Drive Crystal Drive US 1 to 27 th Street Clark/Bell Streets 12 th to 18 th Streets Clark/Bell Streets Vicinity of 15 th Street 18 th Street US 1 to Crystal Drive S. Eads Street 15 th to 23rd Streets 12 th Street S. S. Eads to S. Clark Streets Airport Viaduct Removal Viaduct Trail Access to National Airport 12 th St. S. S. Fern St. to S Eads St. 23 rd St. S. US1 to Crystal Drive Source: Crystal City Sheraton Transit: CCPY Transitway Extension to Pentagon City Crystal City Metro Station East Entrance Benefits: Improve pedestrian, bicycle, vehicle and transit access and safety. Improve Metrorail station access and safety. 24

Investments Columbia Pike Projects: Complete Streets: Columbia Pike: o S. Frederick St. to Jefferson St o Oakland St. to S Wakefield St. o S. Garfield St. to Quinn St. o Orme St. to Joyce St. o Courthouse Road to S. Quinn St. Bike Boulevards Bicycle facility improvements 12 th St. S. Glebe Rd. to Monroe St. 11 th St. S. Glebe Rd. to Monroe St. Transit: Transit Stations Columbia Pike Complete Street cross-section Columbia Pike Multimodal Street Improvements Benefits: Improve pedestrian, bicycle, vehicle and transit access and safety

Investments Rosslyn - Ballston Projects: Complete Streets: Rosslyn-Ballston Corridor Accessibility Rosslyn Esplanade N. Lynn St. & Custis Trail 13 th St. N. Phase III Hudson St. to Ivy St. Hudson St. & Wilson Blvd. Washington Blvd. Wilson Blvd. to Kirkwood Rd. 10 th St. N. at Fairfax Dr. Clarendon Circle Pedestrian Improvements Wilson Blvd. N. Lincoln Street to 10 th Street N. Proposed Court House Station Second Elevator Transit: Court House Metro Station Second Elevator Ballston Metro Station Multimodal Improvements Ballston-MU Metro Station West Entrance Proposed Ballston - MU Station West Entrance Benefits: Improve pedestrian, bicycle, vehicle and transit access and safety Improve Metrorail station access and safety 26

Investments County-wide Projects/Programs: Transit: ART Facilities and Fleet Expansion Bus Stop/Shelter and Accessibility Improvements Capital Bikeshare Complete Streets: Transportation Systems & Traffic Signals Investments to Support Multimodal Operations Arterial Streets/Intersections Outside Major Business Corridors Walk Arlington/Bike Arlington/Safe Routes to School Neighborhood Complete Streets Other: Capital Bikeshare System Expansion Commuter Stores ART Light Duty Maintenance Facility Benefits: Improve pedestrian, bicycle, vehicle and transit access and safety. 27

CIP Update Process The County 10 year CIP is updated every 2 years The update process starts with staff technical work in the Fall of 2017 The County Manager presents a proposed CIP to the County Board in late Spring 2018, followed by commission/community briefings County Board hearings and CIP adoption scheduled for Summer 2018 The Transportation CIP is informed by County Board adopted plans and policies (ex: sector plans) It is also shaped by the available funding sources and associated requirements 28