Chapter 8 Darts and pleats

Similar documents
Chapter 8 Darts and pleats

CHAPTER 3: ADVANCED PIECE MENU FUNCTION by Su-Jeong Hwang Shin, Ph.D. Professor

Women s Shirt Measure your best fitting shirt

SYNCHRONISED SWIMMING

fit guide landsend.com/school

Synchronised Swimming. Figure Grade 1

NFHS Field Hockey. Legal Uniforms

The easy solution for hard-to-fit students

FIT GUIDE LANDSEND.COM/SCHOOL

FIT GUIDE SCHOOL UNIFORM

To be used with technical drawing specification sheet. Size Range in Inches NO. LOCATION S M L XL 2XL 3XL 4XL 5XL

The Saber and the Scabbard. Key Terms. cant guard pistol belt port saber scabbard. Execute the manual of arms with the saber and the scabbard

GREEN STAR DRILL. Adopt the Position of Attention

CHAPTER 3 - FOOT DRILL. 1. During the initial stages of training in foot drill, instruction is to be given in open order.

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.

Garment Styles Design Choices Modifications Measuring Guide

S&DMHA Player Development Program Book Four - Goaltending

RIFLE DRILL. 1. General. Before commencing instruction in rifle drill, it is important that the cadets receive instruction in the parts of the rifle.

STUDENT OUTLINE INSTRUCTING DRILL MOVEMENTS (BLOCK 1) DI-2001D DRILL INSTRUCTOR SCHOOL M0681E2 04/29/2015

Falcon Off-Season Dribble Hand-Out

Lesson Guide Yoke Dirndl Skirt Draping: Beginner

CHAPTER 3 SQUAD DRILL ON THE MARCH WITHOUT ARMS

The Discus. By Al Fereshetian. Nature of the Event

Air Force Junior ROTC 30- STEP DRILL SEQUENCE INSTRUCTORS BOOKLET

1. POST: Options FRAME: Options 1-3

MOON RIVER by VJ Men's Measurement Form

Full-Time Cup Competitions Version 5.0

Synchronised Swimming. Figure Grade 3

Wave Load Pattern Definition

Coaching the Hurdles

NFHS Basketball Rules Changes Major Editorial Changes Points of Emphasis Major Manual Changes

Warm Ups. Standing Stretches

New Exceptions to the new FIG Code of Points are noted in this document and take precedence over the FIG Code of Points.

Synchronised Swimming. Figure Grade 2

Coaching Principles. STEPS IN TEACHING A DRILL 1. Introduce 2. Demonstrate 3. Explain 4. Organize 5. Execute 6. Correct 7. Practice GENERAL PRINCIPLES

Structure (Down plane)

When centered riders turn inwards. Prepare to pass in suicide charge through the center of each space.

Synchronised Swimming

RECRUIT SUSTAINMENT PROGRAM SOLDIER TRAINING READINESS MODULES Drill and Ceremony Overview 1 September 2012

Performance Examination 4100 Sub JAC Handbook

FIBA Europe Coaching Website. Manual. Practice Section

The Classical Circle Dance from Pa Kua Chang. Introduction and Transition 1 Single Palm Change

THE ROBERT GRAHAM FIT GUIDE

IIHF GOALKEEPER EQUIPMENT MEASUREMENT STANDARDS

What is Drill? What is March?

Revision 7/2/02 MEASURING WRAVMA DRAWING DESIGNS WITH SCORING TEMPLATES

SHOT PUT - GLIDE TECHNIQUE

IIHF GOALTENDER EQUIPMENT MEASUREMENT STANDARDS

MOVEMENT FLOW SEQUENCING A REFORMER CADILLAC AND WUNDA CHAIR REFORMER

LESSON 14: THE SABER AND THE SCABBARD

2990 Lorne Scots Royal Canadian Army Cadet Corps Rifle Drill

CENTER PIVOT EVALUATION AND DESIGN

NAWGJ NATIONAL SYMPOSIUM Registration Form NEW FRONTIERS: STEERING OUR PATHS FORWARD

[MYLAPS INTEGRATION]

Basic Rowing Technique

2. Crease halfway, making a mark. 5. Use mark from previous step to make this valleyfold. 8. Mountain in half. 9. Crease and unfold.

garment flat with front and back creases and smooth. Measure along the inside seam of one leg from the bottom of the hem to the crotch.

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Name:... Wetsuits style... Phone no... Wetsuits thickness wetsuits material... Date ordered... Guide to measure

Samurai Armor Set: Step by Step

Martynas Kūra. Finland judging congress 2016

Coaching Principles. 1. Introduce 2. Demonstrate 3. Explain 4. Organize 5. Execute 6. Correct 7. Practice

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

1. Downward Facing Dog

Shot put learn by - doing Basic technique for the Shot Put By: Mark Harsha Portage High School Girls Head Coach

The Golf Swing. The Fundamentals

Fightin Texas Aggie Band Marching Fundamentals Handbook

UNDERGROUND SURVEY WITH MINEMODELLER

Synchronised Swimming. Skill Level 1

overview 60s inspired top

Lands End School Uniform. fit guide. landsend.com/school

FireHalt TM Flexible Cavity Fire Barrier Systems

Bent & Straight Arm Holds focus on proper shoulder positions 2. Knee Hook opposite side and same side hooks 4

The triple threat SHOOTING

Total out of 9 : Legs perpendicular to the floor Stomach, chest and face touching legs Hands palm up, behind legs (barracuda set- up)

LEVEL 1 SKILL DEVELOPMENT MANUAL

GA-AAU COMPANION TEXT TO USA GYMNASTICS WOMEN S JUNIOR OLYMPIC COMPULSORY EXERCISES (1st EDITION ) Levels 1-4

BIOMECHANICAL MOVEMENT

EXERCISE GUIDE STRENGTHEN YOUR CORE

JUNIOR TOUCH BASICS level 1 & 2

IJF JUDOGI RULES. Judogi control during IJF events is the responsibility of the IJF Education and Coaching Commission.

USA Track & Field Heptathlon Summit- November

3-4 Keeping the bottom edge of the hoop on the floor, spin the hoop on the vertical axis to change to the right hand.

SHIP FORM DEFINITION The Shape of a Ship

Weekly Practice Schedule

Basic Movement Patterns Locomotor Skills 1.3

Updated Community Games routines - Boys. Deduction booklet

Shot Technical Model

Lesson 3 Part 1 of 2. Demonstrating and Describing the Forehand Drive Components. Purpose: National Tennis Academy

SCOTTISH GYMNASTICS WOMEN S ARTISTIC COMPULSORY LEVEL 5. Published March 2014

chapter eight Techniques that help build trust

PROGRAMMING LINX LEARNING GAME

Gymnasts who compete at the competition should not have competed in any other type of gymnastics competition outside of school.

Goaltending Development

Butler Tactical Parachute Systems, LLC

Overview. SEMEMI211 SQA Unit Code HF4E 04 Carrying out modifications or rewiring electrical circuits

The New Thrower s Ten Seven Exercises to Save the Thrower s Shoulder

Level 3 Floor Exercise

Overview. Time Learning Activities Learning Outcomes. 10 Workshop Introduction

VENDOR PARTNERSHIP HANGER & FOLDING INSTRUCTION MANUAL

Transcription:

Chapter 8 Darts and pleats Content 8.1 Relocate dart... 2 8.2 Shorten dart... 4 8.3 Hoods on darts and pleats... 5 8.4 Construct new darts... 6 8.5 Spread for pleats, pivot open and close... 7 8.6 Exercises... 9 Darts and pleats are an important styling element for garment construction. For construction of darts and pleats Grafis offers the following functions: automatic and interactive relocation of darts, shortening darts, construction of hoods for darts, construction of new darts and spreading in preparation for pleats.. In this chapter you will learn about all construction options for pleats and darts. In the remaining chapters 9 and 10, working with curves and various transformation options follow. In the well-known manner, each section of this chapter contains exercises for the consolidation of the new function. In the complex exercises at the end of the chapter all previously learned functions will find their applications, also.

2 Chapter 8 Darts and pleats 8.1 Relocate dart The modify menu This menu offers functions for adjustment of parts, relocation and shortening of darts. The relocation of darts is the content of this section, shortening darts is content of the next section. modify p adjust vertical horizontal relocate dart Pivot direction for relocating darts When clicking relocate darts in the modify menu you will be asked which dart line is to be relocated towards the other. The succession of clicking the lines determines the pivot direction (see Pictures 8-1 and 8-2). Prerequisites for relocation of darts 1. For the relocation of darts Grafis requires a closed perimeter - also across corners. Starting and final point of the lines are allowed a maximum of 0.5mm gap. The individual lines of the perimeter do not have to be linked. 2. The dart must not be closed, i.e. with a dart hood. If such a dart is to be relocated the hood is to be removed with separate und cut or corners, first. 3. The dart lines must be of the same length and share a apex. Step-by-step guide shortn dart lg=20.0 measure Check whether the conditions for dart relocation are met Basic menu --> modify Click relocate dart Determine relocation direction by clicking both dart lines (succession!) Adjust % of the dart to be relocated Switch +dart line or -dart line Click automatic Determine insert position with the sub-menu point construction Relocate additional objects; before clicking the objects the switch +/ -copy is to be adjusted and the object type lines or points is to be activated. Possibly, single objects with single or all objects with all Continue with 5. or terminate with 2nd click point * *1st click point Picture 8-1 After having determined the pivot direction, the dart is hatched; the direction of the hatching indicates the pivot direction. The relocate dart menu opens, see next page. 1st click point * *2nd click point Picture 8-2 The dashed lines in pictures 8-1 and 8-2 show the shape of the bodice in case the full dart (100%) is relocated.

Chapter 8 Darts and pleats 3 The relocate dart menu % of the dart to be relocated In the first part of the menu you determine how many % of the dart is to be relocated in the next step. The line rest=0% shows the remainder of the dart which can still be relocated. modify reloc. dart 100% dart to be relocated (rest=0%) automatic +dart line additional: points lines -copy single all automatic Activating the function automatic starts the relocation. The dart line switch determines whether or not the dart lines are drawn at the new position: +dart line draws the dart lines at the new position -dart line does not draw the dart lines at the new position. additional After having relocated parts of the dart important construction points and lines are no longer positioned correctly in relation to the part. These points or lines must be relocated directly after relocating the dart. The type of object (points or lines) is to be selected and the copy switch is to be set: +copy object is copied -copy object is relocated only. Clicking single or all determines: single additional relocated objects can be individually by clicking all the last relocation step is completely. Relocate 100% of the dart Relocating 100% of the dart is explained using an example. Call the basic block Grafis Bodice 10 and relocate 100% of the dart into the armhole notch (Picture 8-3): call modify relocate dart The right dart line is to be pivoted to the left. Click the right dart line first and then the left. 100% enter in the first line so it shows: 100% dart to be relocated (rest=100%). +dart line automatic click p construct the sleeve notch as insert position As two lines are assigned to the sleeve notch Grafis asks for the base line required. You can click one of the lines offered and the dart is relocated automatically. Check whether further objects are to be relocated to be positioned correctly in your construction. In this example this is not necessary and the dart relocation can be terminated with. all the dart is replaced in its original position Repeat relocation of the dart to a position on the side seam 30 mm from the armhole (not shown). Please note that the construction points of the armhole have to be relocated as well with: points -copy click the points required Picture 8-3 N* construction record to 001 test run Repeat relocating the dart with the left dart line being pivoted towards the right. Click the left dart line first and then the right. As opposed to Picture 8-3 the centre front is now angled, the position of the armhole remains unchanged.

4 Chapter 8 Darts and pleats Relocate parts of a darts Relocating a portion of a dart is explained with an example. Call the basic block Grafis Bodice 10. Now, 25% of the bust dart is to be relocated to the sleeve notch and 50% into the hem (Picture 8-4). Exercise Relocate 50% of the dart in the back of basic block Grafis Bodice 10 into the sleeve and the remaining 50% of the dart into the hem (Picture 8-5). 25% remain 25% call modify relocate dart The right dart line is to be pivoted towards the left. Click the right dart line first and then the left. 25% enter in the first line so it shows: 25% dart to be relocated (rest=75%). +dart line automatic click p sleeve notch Please note that the construction points of the armhole have to be relocated as well: -copy points 50% Picture 8-4 relocate construction points of the armhole 50% enter in the first line so it shows: 50% dart to be relocated (rest=25%) +dart line automatic click l hem Check whether any other objects must be relocated so that they are in the correct position in your construction. Terminate with. 8.2 Shorten dart Step-by-step guide Basic menu --> modify Adjust the length lg=..., by which the dart is to be shortened Activate shorten dart Click both dart lines Calling the function shorten dart This function is contained in the modify menu. An existing dart can be shortened by a specified amount lg=... with this function. Entering a negative value lengthens the dart. After having entered the amount and activated shorten dart, Grafis asks for the two dart lines. The shortened dart appears on screen; the distance Picture 8-5 modify p adjust vertical horizontal relocate dart shortn dart lg=20.0 measure between the original and the new apex is exactly the amount entered.

Chapter 8 Darts and pleats 5 Exercises 1 st Exercise Relocate the dart in the basic block Grafis Bodice 10 into the armhole, the side seam and the hem. Shorten the side seam dart by 20mm, the dart in the armhole by 30mm and lengthen the dart in the hem by 20mm (lg=-20.) (Picture 8-6). fold direction for the dart 1st click point * * 2nd click point fold direction for the dart Picture 8-8 Picture 8-6 2 nd Exercise Shorten the dart in the back skirt of the style Straight skirt from Section 2.4 by 20mm and lengthen the dart in the front skirt by 20mm (Picture 8-7). 2nd click point * * 1st click point Picture 8-7 Picture 8-9 8.3 Hoods on darts and pleats The pleats menu The functions in this menu allow for generation of hoods for darts and pleats dart construction and preparation of pleat construction with spreading. Contents of this section is the dart hood generation with its options single and double. The construction of darts with dart s+dir and dart s+apex is content of section 8.4. With the last dart hood generation or dart construction, respectively can be undone. Activating spread with click l or spread with click p=>p calls the spread menu which is introduced in section 8.5. Picture 8-10

6 Chapter 8 Darts and pleats Step-by-step guide for hood generation on darts or pleats Basic menu --> pleats Activate single or double Click the dart lines (with single consider the direction in which the dart / pleat is folded) dart hood single double dart s+dir dw= 20.0 dl= 80.0 dart s+apex dw= 20.0 pleats spread with click l click p=>p single hood on darts or pleats measure After having activated single, Grafis asks for the first dart line / pleat fold. The inside is folded toward this line, i.e. it determines the folding direction of the pleat / dart. Then, the second dart line / pleat fold is to be clicked (Pictures 8-8 and 8-9). double hood on darts or pleats The function double allows for construction of a box pleat or inverted pleat. The hood generation is symmetrical, so that the succession in which the pleat folds are clicked is of no consequence. After having activated double both dart lines / pleat folds are to be clicked (Picture 8-10). Exercise Call the basic block Grafis Bodice 10 and generate a single dart hood with fold direction neck, a single dart hood with fold direction armhole and a double dart hood. End with each time. As a result your screen will show Pictures 8-8, 8-9 and 8-10. Repeat the dart hood generation with a different fold direction and a double hood. Relocate the dart into the sleeve notch and construct the three different hood types here, also. 8.4 Construct new darts The pleats menu pleats Hood generation for darts and pleats, construction of darts and preparation for pleat construction dart hood with spreading are the contents of single the pleats menu. double This section deals with the creation of new darts with dart s+dir (dart dart s+dir out of symmetry point and direction) dw= 20.0 and dart s+apex (dart out of symmetry point and apex). dl= 80.0 dart s+apex dw= 20.0 Step-by-step guide Basic menu --> pleats Adjust the respective parameters dw=... and dl=... Activate dart s+dir or dart s+apex Click the line into which the dart is to be inserted Construct the symmetry point only with dart s+apex: construct the apex spread with click l click p=>p measure dart s+dir - dart out of symmetry point and direction For this construction with symmetry point and direction the dart width dw by which the original line is to be shortened and the dart length dl is to be entered (Picture 8-11). symmetry point The values are to be entered into the menu lines below dart s+dir. Activating s+dir starts the construction. First, the line into which the dart is to be inserted must be clicked. Then, the symmetry point and the direction for the dart are to be determined. The direction of the dart could be set as an angle to the insert line, for example. dl Picture 8-11

Chapter 8 Darts and pleats 7 Exercise on dart s+dir In the style Straight skirt from Section 2.4 construct a dart in the back skirt from a symmetry point and a direction with a dart width of 20mm, dart length of 80mm with a right angle to the waist curve in the symmetry point (see Picture 8-11). dart s+apex - dart out of symmetry point and apex For this construction with symmetry point and apex (Picture 8-12) only the dart width dw by which the insert line will be shortened is to be entered. This value must be entered into the line below dart s+apex. symmetry point 8.5 Spread for pleats, pivot open and close The pleats menu The functions in the menu for generating hoods on darts and pleats and construction of new darts were introduced in the previous sections. The spread function for preparation of pleat construction is the contents of this section. dart hood single double dart s+dir dw= 20.0 dl= 80.0 dart s+apex dw= 20.0 pleats spread with click l click p=>p measure apex Picture 8-12 Clicking on dart s+apex starts the dart construction. After having clicked the line in which the dart is to be inserted the construction of symmetry point and apex ensues. Exercise on dart s+apex In the style Straight skirt from Section 2.4 construct an auxiliary line beginning 100mm below the waist on the centre front running horizontally. Drop a perpendicular from the centre (50%) of the front waist onto the auxiliary line. Construct a dart with a dart width of 10mm. The symmetry point and the apex are the beginning and end point of the perpendicular respectively (Picture 8-12). Step-by-step guide for spreading Construct the spread line or starting and final point of the spread line with the functions of the p+l+c+r menu Basic menu --> pleats Click the lines below spread with click l if a spread line is available and click p=>p if the spread line is to be defined by its starting and final point. Construct the spread line, then the sub-menu spread opens (see below) possibly, construct the spread line again after having clicked spread line Enter the distances s1=..., s2=... and adjust +/- dir shift Activate single p, single l or all (directly below spread:) and click the respective objects possibly, by activating single p, single l or all (directly below :) and clicking the respective objects Switch +spread l. or -spread l.. Terminate by clicking deposit

8 Chapter 8 Darts and pleats Spread with click l or click p=>p After having clicked click l or click p=>p in the pleats menu the spread menu opens. The spread line appears as a white line (blue - if a line of the construction underlies) and a red line as target line. All required Grafis objects will be spread according to spread line target line. Correction of the spread line is possible by clicking spread line. Distances between spread line and target line The position of the target line is to be adjusted. The following options are available: alter the spacing between the starting points of spread and target line s1, alter the spacing between the final points of spread and target line s2, alter the spread direction by clicking the switch dir shift pleats spread spread line spacing: s1=20.0 s2= 0.0 -dir shift spread: single p single l all : single p single l all deposit +spread l. Spreading objects As soon as the target line is in the required position spreading of the individual objects ensues. The option spread: all spreads the complete part from the spread line onwards. Then, individual lines or individual points can be spread, additionally by activating single l or single p and clicking the objects. If too many objects were spread with spread: all, individual points or lines can be with : single p or : single l. Reset spread steps Single lines or points can be by the spread amount with : single p or single l. With : all all spread objects are. deposit After having spread all required objects the switch spread l. is to be adjusted: +spread l. the spread line is drawn, -spread l. the spread line is not drawn. To terminate spreading click deposit. Exercises on spread 1st Exercise Construct three pleats in the basic block Grafis Bodice 20 (back) according to Picture 8-13. First, raster the shoulder and then, construct three lines from these points to the auxiliary line 6cm below waist, parallel to the centre back. Then, activate pleats and spread with click l and click the first spread line. When clicking the spread line the right principle is to be followed. The starting point of the spread line is spread by the value s1, the final point by s2! Enter the spread amount, here s1=0.0 and s2=40.0 and select the correct spread direction from centre back to the side seam by clicking on dir shift. Click on spread: all to spread. Set the switch to +spread l. and deposit with deposit. Before depositing, test also the following: : single l click lines, with spread: single l back : single p click points, with spread: single p back spread: all : all spread: single l click lines spread: single p Picture 8-13 click points and restore the shape shown. Click the next spread line. Grafis transfers the spread direction and spacing so you can continue with spread: all and deposit. Construct folds (dart hoods) for the pleats and hatch the pleats.

Chapter 8 Darts and pleats 9 2nd Exercise Design two pleats in the front of Grafis Bodice 20.First, link the shoulder and generate a point sequence of 5 points on the shoulder. Drop perpendiculars from the front two points onto the hem. Spread the perpendiculars with a spread amount of 40mm at the hem. The pleats are not opened at the shoulder. Link the hem lines. s1=0 s2=40.0 Picture 8-14 When clicking the spread line the right principle is to be followed. The starting point of the spread line is spread by the value s1, the final point by s2! 3rd Exercise Construct four pleats from the knee in Grafis Trouser 10. The spread amount at the knee is zero and 30mm at the hem. To the left of the crease line the pleats are to be spread towards the side seam, to the right of the crease line spread towards the inside leg. Link the hem lines. 8.6 Exercises 1st Exercise Design four pleats from the hip line in the front skirt of the style Straight skirt from Section 2.4. The spread amount at the hip is 0 and the pleats are spread by 40mm at the hem. 2nd Exercise Design four pleats from the hip line in the front skirt of the style Straight skirt from Section 2.4. The pleats are spread by 60mm at the hip and hem respectively. Create inverted pleats at hip and hem. 4th Exercise Construct an asymmetrical pleat in the back of construction Grafis Bodice 10, beginning at 50% of the neckline and running vertically down. Construct the spread line with either p+digi or with p+dir+lg, not with perp.p=>l as otherwise the spread line would change when interactively altering the hem curve. Spread with a pleat content of 40mm at the neck and 70mm at the hem. Construct a single dart hood at the neck and link the hem curve.

10 Chapter 8 Darts and pleats Construct a single dart hood for the bust dart in the side seam. 5th Exercise In the front of Grafis Skirt 20 construct a pleat at a distance of 50mm from the centre front. The pleat content is to be 50mm. First, construct a parallel of 50mm to the centre front and then spread the front skirt at the parallel. 6th Exercise Blouse with pin-tucks Open the style Blouse with pin-tucks from Section 5.5 and continue designing. Construct a point on the back armhole, 100mm from the end of the shoulder. From this point, drop a perpendicular onto the centre back. Construct a point sequence of 4 points on the perpendicular and construct two spread lines from these points. The spread lines are to be aligned parallel to the centre back. Extend the spread lines to the hem with separate. Open another part 002 in the part organisation and insert all lines and points of the front from part 001 into part 002. Hide part 001 and continue designing with part 002. In part 002 spread the pleats in the front with a pleat content of 25mm at the shoulder and the hem respectively. Construct single dart hoods at the shoulder and close the hem with link single. Construct a seam allowance of 10mm with chain and set the symbols and the text. Save the style again as Blouse with pin-tucks!