ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 100 & VB 120

Similar documents
ASSEMBLY AND OPERATING MANUAL LTW MAXI TRENCH BOX

ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 60

OPERATING MANUAL. SINGLE SLIDE RAIL RS Series 790

Single slide rail system Linear shoring

Aluminum Sheeting Guide (ASG)

Universal DKU piling frame element

Instructions for use. Edge-supported shoring units Krings.

Z5160 Load adapter Mounting instructions (1.2 EN)

Deep Linear shoring. E+S Trench shoring systems / Sliding rail systems. Deep Linear shoring

Tabulated Data Lite-Shield 20 System

MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A

Tripod Setup Guide (M-TPx)

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32

STEEL TRENCH SHIELDS TUFF-LITE MODELS

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Product Range Trench Shoring.

"STEEL FRAMED" ALUMINUM PANEL SHIELDS

STEEL TRENCH SHIELDS DW MODELS

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

ThyssenKrupp Bauservice

SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

Assembly, Installation and operating. instructions for. Söll-Xenon anchorage device

Flowtite GRP manholes Installation Manual

OPERATOR S MANUAL SPREADER. CSS, VNQ [For Combine Harvester AW82V] Original instructions

CPCS renewal test factsheet

Name of product: Gripper of FTV panels for horizontal façades Types: PHF (60, 80, 100, 120, 133, 150, 172,200, 240) INSTRUCTIONS FOR USE

Instant Garage 20' x 12' 3" x 8' 3"

USER MANUAL. Beach volleyball posts BEACH CHAMP ID:

LIFTING RIG Multi-Product Installation Rig

Instructions for assembly and use ZAP telescopic platform ladder Z600

S-60-TO : 1 ton tower system INSTRUCTION MANUAL

PUN M Manual Finger Punch Safety and Operation Manual

built build to TRENCHLINING DOWN A CAISSON

LOAD CHARTS RT890E METRIC DIN / ISO / 75%

TENSOREX C+ TENSOREX C+

Assembly Instructions. -Cantilever Boat Lifts

INSTALLATION. USE AND MAINTEINANCE INSTRUCTIONS FOR COLLAPSIBLE COLUMNS WITH HAND BALANCED SYSTEM

Instructions for use. Edge-supported shoring units E+S.

GAP Tool Box Talk: Quick Hitches

TYPICAL S/W TOWER STATIC STABILISER IMPORTANT NOTES

Name of product: Gripper for vertical façade FTV panels Types: PVF (60, 80, 100, 120, 133, 150, 172, 200 and 240 mm) INSTRUCTIONS FOR USE

30T A/Manual Hydraulic Shop Press

GATE INSTALLATION INSTRUCTIONS

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

Advantage Lockers & Bike

MODULAR ALUMINUM PANEL SHIELDS MAPS

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

PHOENIX, ARIZONA USA

Operator s Safety Manual Sumner Max Jax / Beam Jax

Drive Belt Instructions

Consult the architect or other responsible persons regarding the weight of the overhead structure that is to be supported.

Manual for the. Installation. Use and Maintenance. "Söll-GlideLoc" fall arrest system. Ho-Ver turn table

CPCS renewal test factsheet

NEXT GENERATION FLEX FENCE

OPERATOR'S & PARTS MANUAL

Operating instruction for the quick-change tap holders type:

DM-RD (English) Dealer s Manual. ROAD Rear Derailleur RD-9000 RD-6800 RD-5800 RD-4700

OPERATING INSTRUCTIONS FOR Essig Moles 45mm to 145mm

SASK-A-POLE OWNERS AND USERS MANUAL

Installation and Operation Instruction Manual

WIRE ROPE PULLING MACHINE

Instructions for Use. Plug connection for medical gas and vacuum acc. to DIN / 2004 DIN EN ISO

DIRECTIONS OF USE. Version for printout TITAN 3 TITAN 6. Rößler Waffen GmbH

Tru Trak Sulky Proline Mid Size Mower Attachment

4-BIKE HITCH RACK OWNER S MANUAL

Pressure maintenance valve SDV-P / SDV-P-E

44in Side Discharge Mower for Wheel Horse XL 440H Lawn Tractors Model No Serial No and Up

"DW" TRENCH SHIELDS "SP" TRENCH SHIELDS "TL" TRENCH SHIELDS "SW" TRENCH SHIELDS MANHOLE SHIELDS

MANUAL OF HANDLING, TRANSPORTATION AND STORAGE OF ELECTRICAL CABLE REELS

EZee Glider Manual. Tools needed for Assembly: Wrench (included) Philips Screwdriver (not included) Assembly Instructions

OPERATOR S MANUAL AND PARTS LISTING FOR THE. CTM Series Mounted Harrow

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

SPEED SHORE MANUFACTURER S TABULATED DATA MANGUARDS. October 31, 2005

Load Ring bolted > VWBG < in pink

RATCHET RELEASE SHACKLE

2.4M Viking Swing Basket Swing

Siting and Installation Manual

1.0 - OPENING AND CLOSING THE DOOR

INSTALLING A SWIMMING POOL/HOT TUB PROCESS AND INFORMATION GUIDE

Parts: Included in the parts box: Inner Rear Tire Tray. Inner Front Tire Tray. Trail Doc Clamp. Pivot Assembly. Trail Doc Post.

Agilent 1220 Infinity II LC Mobile Upgrade Kit

Quattrocycle BV. Quattrocycle. User Manual. Last update February Quattrocycle BV Bremkant EJ Middelbeers. User Manual Quattrocycle 1

Gebrauchsanleitung. Instructions for Use. Instructions d utilisation. Instrucciones de uso Istruzioni per l uso

HELMETS SAVE LIVES!!! ALWAYS WEAR A PROPERLY FITTED HELMET WHEN YOU RIDE YOUR SCOOTER. DO NOT RIDE AT NIGHT. AVOID RIDING IN WET CONDITIONS.

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

YOUR WISHES SET OUR STANDARDS. Retractable BOLLARD

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

It allows you to. is the Best Option. More information at

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998

RB 80 HYDRAULIC PROP RISK ASSESSMENT


Operation & Maintenance instructions for the Söll Vi-Go type fall protection system with guided type fall arrester

FEE SCHEDULE POOL PERMIT FEES. Refundable Security (Cash of L.C.) 1 Hot Tub, Spa, etc. $ nil 2 Above Ground Pool $ nil

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

INSTALLATION, OPERATING AND MAINTENANCE MANUAL Submersible Ballast Pump MANUFACTURED BY

Installation and Training Manual

Vibration isolation system 1VIS10W. User manual

Repair instructions. Pivot bushing replacement. XL-AS10001RM-en-DE Rev B

Transcription:

Manufacturer: LTW Tiefbauvertriebs GmbH Holter Weg 11 D 41836 Hückelhoven-Brachelen Phone: +49 (0) 24 62 / 2009 0 Fax: +49 (0) 24 62 / 2009 15 e-mail: info@ltw-verbau.de homepage: http:\ \ www.ltw-shoring.com LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 28.04.2014 page 1

General Instructions The trench Boxes type VB 100 & VB 120 can be used up to a depth of ~5,00m in the lowering and cut method with a maximum of 2 nos. top Boxes. The following regulations and rules have to be followed in their valid version: - Regulations of the BG-Fachausschuss Tiefbau (technical committee civil and underground engineering) - DIN 4124 Baugruben und Gräben (excavation pits and trenches) - DIN EN 13331 Teil 1 & 2 Grabenverbaugeräte (part 1 and 2 construction equipment) - Regeln für Sicherheit und Gesundheit bei der Arbeit (rules for safety and health during work) - Unfallverhütungsvorschriften / Arbeitsschutzvorschriften (regulations for the prevention of accidents and safety at work rules) Our shoring components have the GS-Sign Certified Safety. Please follow the instructions making use of our Boxes. Lifting & Transportation The shoring may only be attached at the corresponding eyes and openings and/or lifting accessories. Lifting chains must be chosen to suit the weight being handled. To prevent the accidental detachment of the load use only load hooks with safety catches. The allowed tensile forces have to be kept in any cases. Transportation has to be carried out next to soil and unneeded oscillations have to be avoided. It is prohibited to stand within the pivoting range of the excavator or crane and beneath suspended loads. When handling and removing the shoring, watch out for overhead contact lines (power cables). A load operator must stand to the front of the excavator and be in eye contact with the machine operator. Measures to reduce hazards The safety of persons on site must be enhanced with the aid of signs, cones, warning tapes and/or safety staff specially deployed on site for this purpose. Neighbouring traffic flow has to be made possible by means of safety staff if needed. Personnel must wear protective clothing (helmet/safety shoes/gloves). The risk of instability as a consequence of wind loads when setting up or using the shoring must be considered. The shoring must be lowered onto level and firm ground. Where the ground is sloping or uneven, the shoring should be set up, if possible, at right angles to the slope. Maintenance & Repair Before use, all shoring components must be checked for their correct function. Faulty or deformed parts must be replaced in any case. Minor repairs can be carried out by the user, after consultation with LTW. There is no warranty on incorrectly performed repairs and the use of non-original parts. According to intenseness of use, the components should be painted with anticorrosion paint every two years. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 28.04.2014 page 2

System view B T H Base Box Top Box Height b Shoring Width b C Inner Working Width t Pl Thickness h C Pipe Culvert Height L Length L C Pipe Culvert Length LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 28.04.2014 page 3

Technical Characteristics Base Boxes Pipe culvert Pipe culvert height Limit state design load weight Box weight length height thickness length L H t Pl L C h C e d G PL G E [ m ] [ m ] [ mm ] [ m ] [ m ] [ kn / m² ] [ kg ] [ kg ] 2,00 2,50 3,00 3,50 3,75 4,00 4,50 5,00 100 1,61 100 2,11 100 2,61 100 3,11 100 3,36 100 3,61 120 4,11 120 4,61 97,5 78,0 65,0 55,7 51,3 44,6 42,9 34,3 575 615 670 720 770 825 865 930 915 985 965 1035 1320 1420 1445 1560 1430 1520 1630 1730 1830 1940 2020 2150 2120 2250 2220 2360 2930 3130 3180 3410 Top Boxes Pipe culvert Pipe culvert height Limit state design load weight Box weight length height thickness length L H t Pl L C h C e d G PL G E [ m ] [ m ] [ mm ] [ m ] [ m ] [ kn / m² ] [ kg ] [ kg ] 2,00 2,50 3,00 3,50 3,75 4,00 4,50 5,00 100 1,61 97,5 100 2,11 78,0 100 2,61 65,0 100 3,11 55,7 100 3,36 51,3 100 3,61 44,6 120 4,11 42,9 120 4,61 34,3 350 400 410 470 470 540 535 610 565 645 595 680 810 925 890 1015 840 940 960 1080 1090 1220 1210 1360 1270 1430 1330 1500 1760 1995 1920 2170 LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 28.04.2014 page 4

Tensile Forces lifting eyes at the plate head R d = 229 kn bottom eyes R d = 47 kn Standard Strut Brace Extension Working Width b C Shoring Width b for VB 100 Shoring Width b for VB 120 Weight G [ m ] [ m ] [ m ] [ m ] [ kg ] without 0,99-1,29 1,20-1,50 1,24-71,0 0,30 1,29-1,59 1,50-1,80-1,84 15,5 0,50 1,49-1,79 1,70-2,00 1,74-2,04 20,0 0,80 1,79-2,09 2,00-2,30 2,04-2,34 26,7 1,00 1,99-2,29 2,20-2,50 2,24-2,54 31,1 1,50 2,49-2,79 2,70-3,00 2,74-3,04 42,3 2,00 2,99-3,29 3,20-3,50 3,24-3,54 53,4 2,50 3,49-3,79 3,70-4,00 3,74-4,04 64,5 A strut unit consists of two spring mushrooms, the strut and, if required, a brace extension. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 28.04.2014 page 5

Assembly Instruction Place the Base on the attachment points facing upwards. Place 4 spring spindle holders (mushrooms) in their allocated places and secure with bolts 40*226mm and locking clips. Release the nuts to expand the spring holder. Put the struts and extension pipes, respectively staggered, into the spring spindle holders (shoring width up to 2,0m at one plate - greater width at two plates) and secure with bolt 20*148mm and locking clips. Per strut unit brace extensions up to a maximum lengths of 3,0m can be used. After mounting all struts, one plate is connected to the corresponding lifting/transportation points at the top and the cutting edge. Lift the second plate above the first plate. Position carefully so that the spring spindle holder align with the struts assemblies. Carefully and slowly lower into place. Secure it with bolts 20*148mm and locking clips. 1 Spring Holder 2 Strut 3 Bolt 20*148 4 Bolt 40*226 5 Locking Clip Adjust the struts to the desired trench width (fine adjustment). Take care, to ensure that the two lower struts are adjusted 4-5cm wider than the top two. You must achieve an A Position. This will ensure correct alignment of the assembly as it is dug into the trench. The assembly of the top boxes is effected as described for the base box, whereas only one strut will be adopted centred each end. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 28.04.2014 page 6

Installation Instruction The shoring must be without gap and close to the ground. The limiting values for the max. loads have to be kept strictly. Single shoring boxes may only be used if the front and rear faces are properly secured. Place in position method The shoring box is placed into the totally pre-excavated trench. The place in position method is only allowed if the following conditions are given: - temporary steady soil - outside of the sphere of influence of buildings and structures - outside of the sphere of influence of circulation spaces and endangered lines - Settlements can be accepted The ground is considered as temporary firm, if no mayor collapses is noted in the period from the start of the excavation until the insertion of the shoring. If the trench depths is greater than the Base height, Base and Top modules must be assembled outside the trench and then inserted as a single unit into the trench. Base and Top Boxes are connected with the aid of Box Connectors and bolts and must be secured by locking pins. Connect the lifting hooks into all four lifting eyes on the top edges of the plates. Place the completely assembled Base and Top Box as a whole into the entirely preexcavated trench by means of lifting tools and appropriate lifting accessories. Observe the details regarding Box weights as per our technical data sheet.. The lengths of the excavated and unsecured section should not be more than the lengths of the Box. The gap between the trench walls and the inserted shoring unit must be backfilled and compacted. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 28.04.2014 page 7

The lowering and cut method ( dig and push ) If the soil is unsteady, the shoring box has to be pressed vertically into the ground, by alternately pushing and lowering. In order to protect the shoring plates we recommend using plate protectors.. Installation of Base Boxes Pre-Excavation max. 1,25m and not more than the lengths of one Box. In principle the pre-excavation complies with the type of soil and the safety regulations. Connect the lifting hooks into all four lifting eyes of the plates and place the adjusted base box in the pre-excavated trench, align and push it. Observe the details regarding Box weights as per our technical data sheet. Fill the gap between the trench walls and the inserted shoring unit and compact it. The shoring plates are to be pressed and not to be hammered. For safety reasons it is not allowed to push or press on the struts and brace extensions. No personnel should enter the trench until the shoring system is fully installed to depth required. Excavate about further 0,5m and alternately press in the plates. As smaller the steps are carried out as better for the shoring!. Do not press more than 0,5m on one side. The spindle assemblies have a maximum of +/-8 vertical movement available. Continue this process until the trench has reached the desired depth. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 28.04.2014 page 8

Installation of Top Boxes Depending of trench depth, Top Boxes are required. Connect the lifting hooks into all four lifting eyes on the top edges of the completely assembled Top Box. Align the Top Box over the Base Box and connect by means of Box Connectors, bolts 40*226mm and locking clips. The further installation is effected as above by alternately excavating and pressing in of the shoring plates. The top edge of the shoring must overlap the surrounding site by at least 5cm! Installation of the next shoring unit Once the foregoing shoring section has been installed to full depth, it can be started with the next shoring unit. Assemble and install the second assembly as the first. While the shoring is place utilise the safely protected work space to lay pipe or undertake other works. 4 Bolt 40*226 5 Locking Clip 7 Box Connector Re-Installation After completion of the Pipe laying the re-installation of the shoring can be effected. According to compacting possibilities bring in 0,5m filling material. Using 4 point lifting chain and lift the box by the filled height. As smaller the lifting steps as better for the shoring! Do not lift more than 0,5m to one side and not exceed the +/-8 limitation on horizontal movement of the spindle assemblies. Repeat the procedure as described until the shoring can be lifted out of the trench according to the safety regulations. Only use the corresponding lifting eyes for lifting! It is not allowed to lift at the struts or brace extensions! It is prohibited to stand within the pivoting range of the excavator or crane and beneath suspended loads. In order to avoid an overstraining of the shoring plates, do not lift one-sided. Attach the lifting accessories at least at 2 lifting eyes of the particular plate. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 28.04.2014 page 9