GROUND ANCHOR LOAD TESTING REPORT FOR WHITE POINT SLOPE STABILIZATION, PASEO DEL MAR, SAN PEDRO DISTRICT, LOS ANGELES, CALIFORNIA

Similar documents
WEDGE-ALL Wedge Anchors

Submittal / Substitution Request

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

Innovative Solutions

CASE STUDY OXLEY HIGHWAY SLIP STABILISATION

FITNESS, SAFETY & MEDICAL SUPPLIES

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

Project Incorporation of Sea Level Rise City of Newport Beach Approach for Balboa Islands, City of Newport Beach, California

Homework 2 PROBLEM No. 1

Special Provision No. 903S01 November OPSS 903, December 1983, Construction Specification for Piling is deleted and replaced with the following:

Outlet Structures T-12

Roughneck TM Mesh Slings

VACUUM TESTING PRECAST CONCRETE MANHOLES

Item 404 Driving Piling

Residential Fence Tubing

TorqBolt Wedge Anchors Torque Controlled Expansion Anchor

Introduction Introduction

1 SafeClaw Anchorage Connectors

Kennedy Bridge - Summary of Pier 6 Movement Records

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

l DESCRIPTION l FEATURES l LIMITATIONS l TYPICAL APPLICATIONS l MATERIAL SPECIFICATIONS TECHNICAL MANUAL SECTION 2.3 PAGE 1 / 6

TOWN of CHEEKTOWAGA Permit Application for Swimming Pools, Hot Tubs, or Personal Spas

TECHNICAL MEMORANDUM 002 EMORANNO. 001

USE OF IN-PLACE INCLINOMETERS (IPI) DURING LATERAL LOAD TESTING

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

I would like to express the sincerest appreciation to our customers who have been supporting Samwoo.

Safence. Wire Rope Safety Barrier. Product Manual

CHEMICAL. Straight cut rod is provided in the materials listed below and includes nuts / washers.

Mechanical Anchoring Systems HDA Undercut Anchor Product description. HDA-P Undercut Anchor Pre-Set Type

3. Types of foundation

Vertical and Horizontal Bladder Tanks

Football Equipment. 5 9/16" Gooseneck Goalposts

3/4 SafeClaw Anchorage Connectors

WELL COMPLETION & PROTECTION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

S110 Steel Level Panel Installation Instructions

TOWER INSPECTION REPORT

MIRABAY PILOT PROJECT REPORT

FLEXIBLE AND RELIABLE ANCHORING

SPIDER Avalanche. Avalanche barriers with SPIDER spiral rope net

SPIDER Avalanche. Avalanche barriers with SPIDER spiral rope net S4/230

SECTION SHOWER AND BATH ENCLOSURES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

Instrumentation and Monitoring of Mahawewa Landslide off Walapane in Central Hills of Sri Lanka

CAISSONS SECTION Section CAISSONS. Part 1-GENERAL

Wire Rope Ordering Information

ARMOR RODS Series 10000

User Instructions 1789 Parapet Wall Anchor

Contents Threadbar anchors

SOIL ANCHORS ETSAB/UPC J.Llorens - ETSAB/UPC PASSIVE ANCHORS - ANTECEDENTS

List of Figures. List of Tables

Slope Stabilization at Mt. Alberta View SE, Calgary, Alberta

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Hatch cover securing and tightness

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:

VSL MINING & TUNNELING SYSTEMS VSL. mining and tunneling

AUTOMATED MONITORING EQUIPMENT FOR ACIP AND DD PILES

Made in the USA. For Fall Protection Only. SafeLok Part Description

Well PGE-6 Decommissioning Evaluation PG&E Topock Compressor Station

ALCOA FASTENING SYSTEMS INDUSTRIAL FASTENER DIVISION TEST REPORT IDT # 175. Performance of 5/8 Huck 360 Fasteners,

TUBE SIGN POST PRODUCTS

Proof load is the load applied in performance of a proof test. Proof test is a nondestructive tension test performed by the sling manufacturer or an

SPECIFICATION FOR CAISSON CONSTRUCTION

A hose layline contains important information for specifying the replacement assembly: manufacturer, hose trade name, working pressure and hose ID.

Displacement-based calculation method on soil-pile interaction of PHC pipe-piles

USER S INSTRUCTION MANUAL FOR THE INSTALLATION, OPERATION & MAINTENANCE OF THE GUARDIAN TEMPORARY HORIZONTAL LIFELINE SYSTEM

Liquefied gas cargo tanks and process pressure vessels

TECHNICAL BENEFITS OF CJS / RAISE HSP. Technical Advantages

TEST FOR STABILOMETER VALUE OF BITUMINOUS MIXTURES

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection

Appendix E BACKGROUND TO STRAIN GAUGE AND EXTENSOMETER CALIBRATIONS. R. Frederking and D. Sudom

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning

Division of Environmental Quality Wellhead Protection Section

New MacLean-Dixie 4-1/2 Strength Squared Pipe Piles/Anchors (Patent Pending) for Compression and Tension Applications

Highbond anchor FHB II-A S

DR.ING. CARLO AVANZINI PROFESSIONAL ENGINEER GRIP TEST REPORT NOVA SIRIA, ROLETTO, Premise

Minimum Standards for Driveway Construction Village of Bear Creek

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

MICHIGAN DEPARTMENT OF TRANSPORTATION 6" X 8" (NOMINAL POST) 3-1/2" DIA. 2 HOLES TAPERED HARD WOOD WEDGES (HARDWOOD WEDGE

Standard Specification for Stranded Carbon Steel Wire Ropes for General Purposes 1

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

Self-drilling hollow anchor bolts and accessories

Analysis of Pressure Safety Relief Valve using Finite Element Analysis

Spider Rock Protection System for Rock Slope Stabilization

Standard Specification for Stranded Carbon Steel Wire Ropes for General Purposes 1

The cost-efficient fixing for flexible use in non-cracked concrete VERSIONS. zinc-plated steel stainless steel hot-dip galvanised steel

ANNUAL METEOROLOGICAL MONITORING TOWER INSPECTIONS - MAINTAINING SAFETY AND EXPOSURE TO WIND

FACE CONSULTANTS LIMITED. Accelerated Abrasion Resistance Surveys. BS :2002 And BS : A2: 2011

Trial Anchors through Existing Gabions

BIMBAR INFLATABLE PACKERS AND ACCESSORIES

SECTION FACILITY FALL PROTECTION PART I - GENERAL

New MacLean-Dixie 3-1/2 Strength Squared Pipe Piles/Anchors (Patent Pending) for Compression and Tension Applications

Anchor Load Cells. Among the different types that are used as anchor load cells

TZ WEDGE ANCHOR FOR CRACKED AND UNCRACKED CONCRETE

Drop-In Internally Threaded Anchor (DIAB) Mechanical Anchors. Key features. Material: Carbon steel. Coating: Zinc plated

TEST PROTOCOL VERIFICATION OF THE BEHAVIOUR OF A MECHANICAL COMPRESSION COUPLING DURING SETTLEMENT

SECTION PRESSURE TESTING OF PIPING

Annex E Bridge Pier Protection Plan

Transcription:

ALASKA CALIFORNIA COLORADO FLORIDA MISSOURI OREGON WASHINGTON WISCONSIN June 27, 2014 Mr. Gene Edwards Geotechnical Engineering Group Department of Public Works, City of Los Angeles 1149 S. Broadway, Suite 120 Los Angeles, CA 90015 RE: GROUND ANCHOR LOAD TESTING REPORT FOR WHITE POINT SLOPE STABILIZATION, PASEO DEL MAR, SAN PEDRO DISTRICT, LOS ANGELES, CALIFORNIA Dear Mr. Edwards: This letter summarizes load testing for the ground anchors constructed for slope stabilization at the above-referenced site. This letter refers to our previous conclusions and recommendations described in the following correspondence with the City of Los Angeles Bureau of Engineering: Final Addendum Geotechnical Report No. 2, April 17, 2013 (Add-2 Report); Ground Anchors Plan prepared by Wagner Engineering & Survey, Inc., dated June 7, 2013 (Project Plans); Ground Anchor Performance Test Report, dated December 26, 2013; Field Activity Reports (FARs) 11 to 113 (Anchor FARs), November 2013 through. Our services have been performed in general accordance with our Add-2 Report and Project Plans. We prepared this letter report to summarize our findings for the ground anchor testing. The contractor, Hayward Baker, Inc. (HBI), installed the ground anchors. HBI installed 18 ground anchors, in two rows from November 12, 2013 to June 17, 2014. The anchors are identified by column with letters A through I and then row placement is denoted by numbers 1 (upper row) and 2 (lower row). The locations of the ground anchors are shown on the Site Plan, Figure 1. The design load on each anchor is 210 kips. Each anchor consists of 6 seven-wire strands designed in accordance with ASTM International (ASTM) A416 (Standard 664 WEST BROADWAY GLENDALE, CALIFORNIA 91204-1008 818-543-4560 FAX: 818-543-4565 TDD 1-800-833-6388 www.shannonwilson.com

Mr. Gene Edwards Department of Public Works June 27, 2014 Page 2 of 3 Specification for Steel Strand, Uncoated Seven-Wire, Stress-Relieved Strand for Prestressed Concrete). Each anchor incorporates the PTI Class I double corrosion protection (highest protection). The wedge plates are electro-zinc coated per ASTM B633. The bearing plates, trumpets, and steel end caps are hot dip galvanized per ASTM A153. The diameter of the grout hole is approximately 6 inches. The anchor inclination is approximately 45 degrees from horizontal. The total anchor lengths are approximately 165 and 160 feet, for the upper and lower row anchors, respectively. The bonded length is approximately 35 feet into the Altamira Shale bedrock. Details of the ground anchor construction are provided in the Anchor FARs. HBI conducted the ground anchor proof testing program between February 24 and 27, 2014 for the upper anchor row and between June 11 and 17, 2014 for the lower anchor row. Testing was performed in accordance with the plans and specifications. Two performance tests for the preproduction anchors were completed at Anchors C-1 and G-1 on December 19, 2013. Test loads were measured with the pressure gauge and a load cell. In addition, Dyna Force sensors were installed in Anchor C-1 and G-1 to monitor the test loads in the anchors. The anchor elongations were measured by dial gauges to the nearest 0.001 inch. The displacements of the reinforced concrete bearing pad were measured by a digital gauge to the nearest 0.001 inch. A summary of the 18 ground anchor load testing results are presented in Figures 2 through 19. The ground anchors held the required test loads without excessive deformation per the Plans and Specifications. The measured elastic elongations at the maximum test load exceeded 80 percent of the theoretical elastic elongations of the strand unbonded length (lower limit). The measured elastic elongations at maximum test load did not exceed 100 percent of the theoretical elastic elongations of strand unbonded length plus 50 percent of the theoretical elastic elongations of strand bonded length (upper limit). These limits are given in Section 3.04-E of the Plans and Specifications. The creep movements at the maximum test load were within acceptable tolerance of 0.04 inch in 10-minute holding duration per Section 3.04-E of the Plans and Specifications. A positive value of creep indicated elongation of anchor and the negative value indicated shortening of anchor. A second proof test was performed on Anchor D-1 since the maximum test load was not maintained for the load hold duration of 10 minutes due to equipment malfunction (jack pressure loss). The creep movements at the maximum test load for Anchor D-1 retesting were within acceptable tolerance of 0.04 inch in 10 minutes. Therefore, it is our opinion that the anchors were installed in accordance with the Project Plans and Specifications. L14/wp/nxn

Login: Louis Larios B-8 LEGEND B-12 Boring with Inclinometer and/or Piezometer I-2 Anchor and Anchor Bearing Pad Upper HDPE Dewatering Drain Lower HDPE Dewatering Drain B-7 B-10 County Storm Drain Approximate Limits of Crack (See FAR #8) A-1 B-1 Approximate Limits of Construction Bench B-11 C-1 D-1 EX-1 EX-3 F-1 Approximate Limits of Crack E-1 (See FAR #59) EX-4 G-1 I-1 H-1 F-2 B-12? APPR OX. LIM IT OF 2009 L ANDS LIDE A-2 EX-2 B-2? Filename: I:\PROJECTS\10079 White Point Observation - Hayward Baker\033 Anchors - Construction Services\Graphics\FIG 1 - SITE AND EXPLORATION PLAN.dwg Date: 06-27-2014 B-3 EX-1 Extensometer C-2 D-2 E-2 G-2 I-2 H-2 1. Map adapted from drawing titled Ground Anchors Plan, Sheet C-4.0, by Wagner Engineering & Surveying, Inc. Dated 05-01-2013. 2. Extensometer EX-1 was replaced by EX-3 in January 2014 due to interference with the drilling equipment. 3. FAR = Field Activity Report 0 20 40 SCALE: 1"=40' SITE PLAN 80 FIG. 1

PROOF TESTING ANCHOR A-1 FIG. 2

PROOF TESTING ANCHOR B-1 FIG. 3

PERFORMANCE TESTING ANCHOR C-1 FIG. 4

PROOF TESTING ANCHOR D-1 FIG. 5

PROOF TESTING ANCHOR E-1 FIG. 6

PROOF TESTING ANCHOR F-1 FIG. 7

PERFORMANCE TESTING ANCHOR G-1 FIG. 8

PROOF TESTING ANCHOR H-1 FIG. 9

PROOF TESTING ANCHOR I-1 FIG. 10

PROOF TESTING ANCHOR A-2 FIG. 11

PROOF TESTING ANCHOR B-2 FIG. 12

PROOF TESTING ANCHOR C-2 FIG. 13

PROOF TESTING ANCHOR D-2 FIG. 14

PROOF TESTING ANCHOR E-2 FIG. 15

PROOF TESTING ANCHOR F-2 FIG. 16

PROOF TESTING ANCHOR G-2 FIG. 17

PROOF TESTING ANCHOR H-2 FIG. 18

PROOF TESTING ANCHOR I-2 FIG. 19