RCM Applied to the CH-47 Chinook Heavy Lift Helicopter. For the Warfighter With the Warfighter

Similar documents
Understanding safety life cycles

Policy for Evaluation of Certification Maintenance Requirements

DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND,

Param Express. Param Sankalp December Newsletter winners. Key Activities Concluded. Watch Out For

DATA ITEM DESCRIPTION Title: Failure Modes, Effects, and Criticality Analysis Report

Param Express. Key Activities Concluded. Watch Out For

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Engr2110. Week 6 Product Safety/Liability

The Criticality of Cooling

(DD/MMM/YYYY): 10/01/2013 IP

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment

XVII Congreso de Confiabilidad

An atc-induced runway incursion

Life Extension of Mobile Offshore Units

Preparing for Combat in Vietnam By Phil Courts

The Best Use of Lockout/Tagout and Control Reliable Circuits

Selecting Maintenance Tactics Section 4

LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE)

The Path to LUBRICATION EXCELLENCE

New Thinking in Control Reliability

1309 Hazard Assessment Fundamentals

Moor, Tend Mooring And Unmoor Ship - Supervisor Level -

TECHNICAL REPORT A-061/2003 DATA SUMMARY

CHAPTER 28 DEPENDENT FAILURE ANALYSIS CONTENTS

Preventive Maintenance

Employ The Risk Management Process During Mission Planning

INNOVATIVE ENGINEERING SUPERIOR SERVICES. Robotic Online Storage Tank Floor Inspection Services

FLIGHT CREW TRAINING NOTICE

Course outlineimportant: As personnel i

Control of Hazardous Energy Lockout / Tagout Program

The RCM Analyst - Beyond RCM

Probability Risk Assessment Methodology Usage on Space Robotics for Free Flyer Capture

FLIGHT TEST RISK ASSESSMENT THREE FLAGS METHOD

Hazard Identification

Chapter 5: Methods and Philosophy of Statistical Process Control

Maintenance Forecast Summary

Experience on tailoring

Aeronautical studies and Safety Assessment

Distributed Control Systems

The Safety Case. Structure of Safety Cases Safety Argument Notation

The Safety Case. The safety case

How to Define Your Systems and Assets to Support Reliability. How to Define Your Failure Reporting Codes to Support Reliability

Reliability Engineering. Module 3. Proactive Techniques - Definitions

Helicopter Safety Recommendation Summary for Small Operators

See the diagrams at the end of this manual for judging position locations.

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

Safety Risk Assessment Worksheet Title of Risk Assessment Risk Assessment Performed By: Date: Department:

DeZURIK. KGC Cast Knife Gate Valve. Safety Manual

Managing for Liability Avoidance. (c) Lewis Bass

Advanced Test Equipment Rentals ATEC (2832) OMS 600

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed)

ARNG WARRIOR TRAINING CENTER PATHFINDER COURSE FORT BENNING, GEORGIA ATZB-RCG 1 October 2009

A Presentation to the International System Safety Society August 11, 2016 by Gary D. Braman Senior System Safety Engineer Sikorsky Aircraft

Test of. Boeing CH-47D Chinook. Produced by Virtavia

DEVELOPING YOUR PREVENTIVE MAINTENANCE PROGRAM

AN ANALYSIS ON HIGH PRESSURE DYNAMIC CALIBRATORS USED IN THE DEFENSE AREAS

RELIABILITY-CENTERED MAINTENANCE (RCM) EVALUATION IN THE INDUSTRY APPLICATION, CASE STUDY: FERTILIZER COMPANY, INDONESIA

Objectives Topics Resources & Notes GAIN ATTENTION Review homework answers for chapter 8 Slide 1 OBJECTIVE

Why do I need dual channel safety? Pete Archer - Product Specialist June 2018

V MW Offshore leadership

A i r c r a f t E l e c t r i c a l S y s t e m s ( 1 2 B )

Fail Operational Controls for an Independent Metering Valve

Analysis of Instrumentation Failure Data

Safety Standards Acknowledgement and Consent (SSAC) CAP 1395

STPA Systems Theoretic Process Analysis John Thomas and Nancy Leveson. All rights reserved.

Medium Support Helicopter Aircrew Training Facility (MSHATF)

SAFETY INFORMATION NOTICE

ALPINE OFFICIALS' MANUAL CHAPTER I INTRODUCTION AND OVERVIEW

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Using what we have. Sherman Eagles SoftwareCPR.

PC-21 A Damage Tolerant Aircraft. Paper presented at the ICAF 2009 Symposium by Lukas Schmid

FP15 Interface Valve. SIL Safety Manual. SIL SM.018 Rev 1. Compiled By : G. Elliott, Date: 30/10/2017. Innovative and Reliable Valve & Pump Solutions

Installation of Traffic Signals and Pedestrian Crossings

Mooney * Noise Controller Installation, Operation, and Maintenance Manual

Personal Flotation Device (PFD) JAPBI Industry Day

Best Practice RBI Technology Process by SVT-PP SIMTECH

Improvement of an Artificial Stall Warning System for Sailplanes

Development and Evolution of an Asset Management Organization

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #72

THE ST. LOUIS PREDICTIVE MAINTENANCE PROGRAM

MDEP Common Position No AP

Technical Rescuer Core NFPA 1006

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

Justification of Risk Reduction through In-Service Inspection / REDUCE

IST-203 Online DCS Migration Tool. Product presentation

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

CHAPTER 1 PRINCIPLES OF HELICOPTER FLIGHT FM 1-514

Fruity Chutes Hawk CO2 Release Valve

Failure Data Analysis for Aircraft Maintenance Planning

Squadron Operations. FAC: 1412 Description. Requirements Determination. Scope Determination. Aircrew Flight Equipment Shop. Table 1.

Safety-critical systems: Basic definitions

Top Negative Trends Discovered during FY-15 Maintenance Safety Assessments (Ascending order by Risk Assessment Code/Severity-Probability)

Safety Critical Systems

Deccan Charters Private Limited

Threat Awareness Train for the unexpected

Worksite Analysis Techniques & Tools. Bobbi K. Samples Owner/Principal Consultant The Safety Firm, LLC. Why Analyze The Workplace?

Hazard Operability Analysis

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS

HSI TF and ad hoc working group: Back and neck pain, vibration, and impact from military systems

Every things under control High-Integrity Pressure Protection System (HIPPS)

Transcription:

RCM Applied to the CH-47 Chinook Heavy Lift Helicopter For the Warfighter With the Warfighter

Presentation Agenda Application of Reliability Centered Maintenance (RCM) RCM Principles Applied to: Special Tools and Test Equipment (STTE) Unique Identification (UID) Condition Based Maintenance (CBM+) "Our Army at War -- Relevant and Ready". 2

"Our Army at War -- Relevant and Ready". 3

Application of Reliability Centered Maintenance

Application of RCM to the CH-47 To reverse the trend of increasing Operation and Support costs Chief focus of maintenance had been on the prevention of failures Common assumption that, in most cases, equipment wears out and inevitably becomes less reliable with age With RCM analysis, focus began to shift from preventing failures to managing the consequences of failures as they affect the aircraft as a whole. "Our Army at War -- Relevant and Ready". 5

RCM Working Group Systems Engineer Test Pilot Depot Rep Flight Engineer Equipment Manufacturer Mechanic Flight Engineer/ Crew Chief Facilitator In the absence of specific data on failure rates and characteristics, intervals are largely determined based on service experience. "Our Army at War -- Relevant and Ready". 6

Maintenance Transformation BEFORE RCM 200 Hour Phase maintenance AFTER RCM 400 Hour Cycle Service Plan 200 Hour Servicing/Inspection Number of Phase Maintenance tasks reduced by 73% Phase Maintenance requires 50% fewer man hours to complete with an increase in readiness. "Our Army at War -- Relevant and Ready". 7

Application of RCM to the CH-47 Eliminated unnecessary tasks Eliminated Duplication of Effort 200 Hour Phase Maintenance Program: Independent Activities 400 Hour Cycle Service: Supportive Activities Technical Justification Pitot Static System Check In response to single events Retorque droop stop bolts (due to bad lot of hydrogen embrittlement) Extended intervals Wheel bearing repacking (Extended from 200 to 400 hours) Move to On-Condition Maintenance Brake pad replacement Maintenance Pre-Flight Daily Corrosion Inspection Special Inspections "Our Army at War -- Relevant and Ready". 8

200 Flight Hour Phase Maintenance to 400 Flight Hour Cycle Service Plan # of Tasks Before RCM 200 Flight Hour Phase 428 # of Tasks After RCM 200 Flight Hour Servicing and Inspection 400 Flight Hour Cycle Service Plan 68 48 Total 116 "Our Army at War -- Relevant and Ready". 9

Default Strategies RCM applied to electronic system: T55-GA-714A Engine Full Authority Digital Electronic Control (FADEC) system Improved understanding Developed accurate and useable fault code matrix Capitalized on -714A technology to increase readiness and reduce mission aborts More than 18 new operating/emergency procedures added to Operator s manual Simulator software changes "Our Army at War -- Relevant and Ready". 10

Application of RCM to the CH-47 RCM results implemented in 2004. CH-47 achieved readiness goal of 75% FMC in August 2007 for the first time! "Our Army at War -- Relevant and Ready". 11

CHINOOK (CH47D) TOTAL ARMY 90 80 RCM results approved in August 2004 Since 2004, results were implemented aircraft by aircraft 70 60 50 40 30 20 10 0 FY02 FY03 FY04 FY05 FY06 FY07 FMC 58 54 51 56.5 54.9 70.1 NMCM 31 31 30 33 32 28 DA GOAL 75% FMC FY02 FY07 SOURCE OF DATA: RIDB "The Army Persuasive in Peace, Invincible in War" "Our Army at War -- Relevant and Ready". 12

RCM Principles Applied to Special Tools and Test Equipment (STTE)

STTE Analysis initiated to determine suitable Basis of Issue (BOI) to support Army Transformation BOI for STTE that was being was used estimated by Boeing ~1960s Assumption that units stayed together 1 of every applicable Tool was allotted per 25 Helicopters Needed to determine suitable BOI so the Field could operate under the new doctrine of Split Based Ops "Our Army at War -- Relevant and Ready". 14

Army Transformation Affect on STTE Combat Aviation Brigade (CAB) GSAB Attack Lift Aviation Support Brigade (ASB) AVIM General Support Aviation Brigade (GSAB) 12 CH-47s 10 UH-60s 8 MEDEVAC UH-60s AVUM Support Maintenance Company 12 Aircraft Company 4 4 4 Aviation Support Battalion (ASB) Personnel (maintenance, supply, etc.) AVIM Support Location 1 AVIM Support Location 2 2 Simultaneous Locations "Our Army at War -- Relevant and Ready". 15

STTE How do RCM Principles apply to STTE? Allows a clear understanding of the Operating Context Reviewed all tasks and analyzed STTE What tools were currently recommended versus what was needed Functions, Functional Failures, Failure Modes and Effects, and Consequences Determined new BOI to support Army Transformation "Our Army at War -- Relevant and Ready". 16

RCM Principles Applied to STTE The Big List Before 422 STTE line items CH-47 STTE After 224 STTE line items Purged obsolete STTE All -712 engine tools purged (~120) Many items that were identified as STTE but were common tools Dial Indicator Purged unnecessary STTE STVA (Self Tuning Vibration Absorber) Trailer Adapter "Our Army at War -- Relevant and Ready". 17

RCM Principles Applied to STTE Increased BOI in most cases Example: Actuator Safety Blocks and Rotor Head Lockout Pins from 1 set per 25 aircraft to 1 set per aircraft Field will be supplied with what they need Established Accountability In process of putting all STTE on the MTOE (Modified Table of Organization and Equipment) Means it must be inventoried and accounted for Most STTE before this process were not required to be inventoried. "Our Army at War -- Relevant and Ready". 18

RCM Principles Applied to STTE Acquisition of additional STTE began 1½ years ago First two units equipped in May and June 2007 Analysis results justified an increase in STTE funding As a results, the PM awarded $6M additional funding per year for the next 10 years Funds 2 Combat Aviation Brigades Guy in the Field has the tools he needs!! "Our Army at War -- Relevant and Ready". 19

Unique Identification

DoD UID Mandate: Parts Marking Approximately 1,000 components are required to be marked Conform to 1 or more of the 5 criteria Independent study performed on 300 components "Our Army at War -- Relevant and Ready". 21

"Our Army at War -- Relevant and Ready". 22

DoD UID Mandate: Parts Marking Realized that Parts Marking Decisions in such a critical environment require analysis Parts marking solutions identified using RCM Principles Systematic review of all failure modes, failure effects, and consequences of each marking opportunity Test Pilot Equipment Specialist Systems Engineer Depot Rep Equipment Manufacturer Facilitated Group Approach Ensures the right people who are sensitive to the hazards of the equipment in its operating environment are the decision makers Facilitator Incorporates safety and operating context into the core of the parts marking decision making. "Our Army at War -- Relevant and Ready". 23

DoD UID Mandate: Parts Marking Results: ~280 items approved for label marking 100 items under review for marking approval 167 Direct Part Marking Candidates Over 13,000 items marked in the DoD UID registry "Our Army at War -- Relevant and Ready". 24

CBM+

CH-47 CBM+ 49 specific CH-47 components selected for CBM+ analysis. Acknowledge that a FMEA is required to properly implement CBM+ strategy Components evaluated to identify Failure Modes that could be monitored. Forward Transmission: 13 Failure Modes such as Stationary ring gear wears due to normal use. FWD transmission 1st stage planetary carrier splines wear due to normal use. FWD transmission spiral bevel pinion gear wears due to normal use. Each Failure Mode prioritized for CBM+ Implementation based upon Failure consequences Frequency of failure Effort required for implementation (ex. cost of equipment, training, etc.) 161 Failure Modes were identified as candidates for Condition Based Maintenance "Our Army at War -- Relevant and Ready". 26

What RCM Achieved RCM makes you take a real hard look at what you re doing. RCM offers results to better support the Warfighter Reduced Downtime and improved Readiness Reduction of workload to the soldier Relieves unnecessary burdens Improved Health of Aircraft RCM has the ability to change the maintenance philosophy "Our Army at War -- Relevant and Ready". 27

Nancy Regan 256-428-8868 NancyRegan@TheForceInc.com "Our Army at War -- Relevant and Ready". 28